Modify Diesel Fill Stand Federal contract opportunity
Solicitation number
W912JD-18-R-2002
Issued by
Department of the Army Maine Army National Guard

About this file

Pre-Award RFI #1 Modify Diesel Fill Stand

View the file

Other files for this federal contract opportunity

Other files attached to Modify Diesel Fill Stand, newest first.
File Type Posted
11_Vehicle_Maintenance_Shops.pdf PDF
ME93.txt TXT text file
W912JD-18-R-2002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912JD-18-R-2002

17 September 2018

Point of Contract: SMSgt Jason Edwards Contracting Officer jason.m.edwards.mil@mail.mil Tel: (207) 404-7107

Project Title and No: Construct Diesel Fill Stand; FKNN172315

The purpose of this amendment is:

1. Address Requests for Information (RFI’s) received as a result of the pre-bid conference/site visit and contractor reviews of the plans and specifications. This is a running document and the final document will be incorporated by amendment prior to bid opening.

Please remember to acknowledge receipt of this Amendment on the original Request for Proposal (RFP) Form in the appropriate block.

All other terms and conditions remain unchanged by this amendment.

Q1. Can you find out if the connection to the Cam Lock is acceptable for loading of tank? We are looking for pricing on the Cla-valve fittings.

A1. Cam lock fitting will not suffice, we need to have a single point nozzle (Cla-Valve) installed.

Q2. The solicitation calls for overfill protection. That would be needed in the tank that is being filled to alarm when it reaches a certain volume. Does the vehicle have a means of overfill on it? If not, does the system on the truck show fuel level or volume the truck has? How will the tech filling the truck know how much fuel can be loaded prior to filling?

A2. The C-301 is currently equipped with a Scully overfill protection. In order to properly utilize this system a Scully control shall need to be installed with the new pump. A two man policy is also implemented while filling to visually monitor fuel flow and volume.

mailto:jason.m.edwards.mil@mail.mil

W912JD-18-R-2002
17 September 2018
All other terms and conditions remain unchanged by this amendment.