QASP_Troop_Laundry.docx
DOCX document 23 KB Posted
- Attached to
- Laundry Services Federal contract opportunity
- Solicitation number
- W912JB-17-Q-0022
About this file
QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined_Laundry.pdf | ||
| Wage_Determination_12_MAR.pdf | ||
| Laundry_Clauses.pdf | ||
| Laundry_PWS_FY18_updated.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
CAMP GRAYLING LAUNDRY SERVICES
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Camp Grayling Laundry Services. This plan sets forth the procedures and guidelines used to ensure the required performance standards or services levels are achieved by the contractor.
Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and to ensure that the government pays only for the level of services received.
Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by Directorate of Logistic NCOIC to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved.
ROLES AND RESPONSIBILITIES
The Contracting Officer The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer Representative (COR) and the contractor. The CO will designate a COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are (include those that apply)
· Random monitoring, which shall be performed by the COR designated inspector.
· 100% Inspection – Each month, the COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.
· Periodic Inspection –COR typically performs the periodic inspection on a monthly basis.
Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving [insert names of any critical services], the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at [insert name of government activity receiving services].
QUALITY ASSURANCE DOCUMENTATION
The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2 . The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.
The COR will retain a copy of all completed QA surveillance forms.
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
Determining Performance Government will use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
Reporting At the end of each month, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
Reviews and Resolution The COR may require the contractor’s project manager, or a designated alternate, to meet with the COR and other government IPT personnel as deemed necessary to discuss performance evaluation.
The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the KO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
| PWS Paragraph |
| Task |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
| 5.1 |
| Items are laundered IAW the PWS |
| The contractor shall provide laundry services as required 98% of the time each month. |
| 2% failure to provide laundered items properly |
| Random Inspection by COR; Customer Feedback gathered by COR |
| 5.2 |
| Items are sorted and folded IAW the PWS |
| The contractor shall provide laundry services as required 98% of the time each month. |
| 2% failure to provide laundered items properly |
| Random Inspection by COR; Customer Feedback gathered by COR |
| 5.2.5 |
| Items are returned wrapped in plastic. |
| The contractor shall provide laundry services as required 98% of the time each month. |
| 2% failure to provide laundered items properly |
| Random Inspection by COR; Customer Feedback gathered by COR |
| 5.3 |
| Damaged items are returned IAW the PWS |
| Items shall be returned IAW the PWS as required 98% of the time each month. |
| 2% failure to provide damaged items as required |
| Random Inspection by COR; Customer Feedback gathered by COR |
| 5.1 |
| Items are picked up at the date and time specified |
| Items are picked up weekly at the time/date specified 95% of the time |
| 5% failure to pick up laundry on time |
| 100% Inspection by the COR |
| 5.1 |
| Items are returned within 48 hours of drop off |
| Items are dropped off within 48 hrs 95% of the time |
| 5% failure to drop off laundry on time |
| 100% Inspection by the COR |
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD: Troop Issue Laundry Contract, Camp Grayling Michigan.
SURVEY PERIOD: June 2017 SURVEILLANCE METHOD (Check):
x Random Sampling x 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (Check):
| x | Monthly | Quarterly | As needed |
| PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: | ___10___ % |
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ___100___%
| Service Provider’s Performance (Check): | x | Meets Standards |
| Does Not Meet Standards |
Narrative of Performance During Survey Period: Laundry was picked up and returned on time with no issues with the product. The bags being used to return the laundry do meet the clear plastic standard, but are very thin and we would like a heavier bag. Some bags were returned to us with tears.
PREPARED BY: ___________________DATE: _______
File details come from the government source that posted it.