Site_Visit_MFR.pdf

PDF 99 KB Posted

Attached to
Carpet and Vinyl Flooring Replacment Federal contract opportunity
Solicitation number
W912JB-15-T-8015
Issued by
Department of the Army Michigan Army National Guard

About this file

Site Visit MFR

View the file

Other files for this federal contract opportunity

Other files attached to Carpet and Vinyl Flooring Replacment, newest first.
File Type Posted
Wage_Determination.pdf PDF
Amendment_0003.pdf PDF
Sign_IN_Sheet.pdf PDF
Bldg_6911_Floor_Plan.pdf PDF
Amendment_0001.pdf PDF
Bldg_6954_Drawing.pdf PDF
6911_Carpet_SOW.pdf PDF
6954.dwg DWG drawing
6954_Carpet_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICHIGAN AIR NATIONAL GUARD

HEADQUARTERS 110TH ATTACK WING (ACC) (ANG)

3545 MUSTANG AVENUE

BATTLE CREEK MI 49037-5509

17 Sep 2015

MEMORANDUM FOR CONTRACT FILE

PROJECT: W912JB-15-T-8015; Replace Carpet, Bldg 6911 & 6954

FROM: 110 MSG/MSC

SUBJECT: SITE VISIT MINUTES

1. A site visit meeting was held for subject project on 17 Sep 2015. The meeting was conducted on location at the 110th Attack Wing, Battle Creek, MI. The following personnel were present:

(See Attached)

2. Points of Discussion:

• Introductions were made, and the solicitation/statement of work were reviewed and the following subject matter was highlighted:

o The project drawings were verified. All existing carpet in each building is to be replaced.

o It was clarified that the replacement of the 4” vinyl cove was required (EXCEPTION: vinyl cove does not need to be replaced in Rm 274 of Bldg 6911).

o Venders would be allowed to spec out alternative products that meet or exceed the Shaw carpet specified in the statements of work.

o Venders were required to provide labor to move all free standing furniture from the room prior to carpet installation. Government personnel will be responsible for moving books, manuals, and personal effects prior to vender coming in.

o A correction was made to the statement of work for Bldg 6954 was made: Rm 149 (hallway) is to be added to the schedule, and Rm 168 should read 158.

o Concerning Bldg 6954, a bay in the vehicle storage area will be made available to the vender for furniture storage if they choose.

o Work will be performed during normal business hours: M-F, 0730 – 1630.

o All power will be disconnected by the Government prior to carpet removal/installation.

o All venders were reminded to register their company information at the SAM website (www.sam.gov).

o The Service Contract Act does apply to this acquisition. The appropriate wage determination will be incorporated by amendment to the solicitation.

o All questions are to be directed to the Contracting Officer, SMSgt Jonathan

Bodus. Email all questions to jonathan.d.bodus.mil@mail.mil, and answers will be given via amendment to the solicitation. All questions must be submitted NLT COB 21 Sep 2015.

o Proposals are due to the Contracting Officer NLT 23 Sep 2015, 1400EST.

mailto:jonathan.d.bodus.mil@mail.mil

• The contractors conducted a field inspection of the proposed sites. No questions were asked during the visit.

Jonathan Bodus, SMSgt, MI ANG Contracting Officer

2015-09-18T10:49:44-0400
BODUS.JONATHAN.DAVID.1145576683

File details come from the government source that posted it. Updated .