Drawing - 9612W-HP0005_REVa.pdf

PDF 816 KB Posted

Attached to
Post 45 Lower Harbor Dredging Contract 4 Federal contract opportunity
Solicitation number
W912HP20B0003
Issued by
Department of the Army Corps of Engineers Engineering District Charleston

About this file

This document contains a pre-solicitation notice and related drawings for a dredging contract opportunity. The U.S. Army Corps of Engineers Charleston District will issue a formal solicitation on or around May 18, 2020 for maintenance and new work dredging of approximately 6.076 million cubic yards of unclassified material from the Charleston Lower Harbor Channel and Cooper River in Charleston and Berkeley Counties, South Carolina. Dredged material will be placed in the Clouter Creek Placement Area, Daniel Island Placement Area, and Ocean Dredged Materials Disposal Area. The contract value is estimated between $25-100 million. Survey data is provided for early review, with additional information to be posted with the solicitation. Hopper dredges may not be used for the work due to environmental considerations. Offerors are responsible for monitoring for changes to the notice and formal solicitation announcement.

View the file

Other files for this federal contract opportunity

Other files attached to Post 45 Lower Harbor Dredging Contract 4, newest first.
File Type Posted
C.04.01 - Abstract Complete (signed) - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
C.04.01 - Bid Opening Login Sheet - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
B.08.03 - Solicitation Amendment 0008 (released) - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
Amendment 0008 - Utilities - SCEG.zip ZIP file
Specifications Section 35 20 23_Dredging_REVb.pdf PDF
B.08.03 - Conformed Solicitation Amendment 0008 (released) - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
Amendment 0008 - Utilities - CPW.zip ZIP file
FY20 LiDAR - DI Wando Cell.zip ZIP file
B.08.03 - Solicitation Amendment 0007 (released) - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
Drawing - 9612W-HP0006_REVa.pdf PDF
B.08.03 - Conformed Solicitation Amendment 0007 (released) - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
SAC-2017-01482 HLT ocean disposal modification.040919.pdf PDF
Specifications Section 35 20 23_Dredging_REVa.pdf PDF
DHEC - 2017-01482 HLT Dredging - ODMDS Permit mod - Signed.pdf PDF
A.03.09 - Specifications Revised Amendment 0007 - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
Post 45 Contract 4 - Solicitation OPTIONS.zip ZIP file
Clouter Creek Middle Cell_Daniel Island Wando Cell.zip ZIP file
B.08.02 - Solicitation Released - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
Post 45 Contract 4 - Solicitation 2020.zip ZIP file
A.03.09 - Plans - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
A.03.09 - Specifications - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
B.01.03 - Geotech Supporting Investigations - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
B.01.03 - Contract 4 Drawings Draft - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
B.01.03 - Geotechnical Data - W912HP20B0003 - Post 45 Dredging Contract 4.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I S

L A

N D

D A

N I

E L

M Y E R S

B E N D

D A

N I

E L

I

S L

A N

D

R E

A C

H

LO

WE

R

WAN

DO

R

EA

CH

W E

T

C

L L

D A

N

IE

L

IS

L A

N D

W A

N D

O

T

U R

N I

N G

B

A S I

N

NUMBER

REFERENCE

SHEET

D a te

R e v

D ra w n b y

C k d b y

D e s ig n fi le n o

R e v ie w e d b y

S u b m it te d b y

D ra w in g o d e

D w g s c a le

P lo t d a te

F ile n a m e

M A

R K

D E S

C R

IP

T

IO

N A P P

R V

D A T E

D E S

C R

IP

T

IO

N M

A R

K A P P

R V

D A T E of Engineers US Army Corps

Charleston District

D e s ig n e d b y

CONTRACT

+0

+0

+0

1530+00

1535+00

1540+00

1545+00

1550+00

1555+00

1560+00

1565+00

1570+00

1575+00

1580+00

1585+00

1590+00

PI 15

27+57

PI 1547+88

P I

P I

PI 1533+20

2 2

4 2

300 0 300 600

SCALE IN FEET

295 ACRES

WANDO CELL

CENTERLINE STA. 115+00

DREDGE PIPE RAMP

CENTERLINE STA. 1+80

DREDGE PIPE RAMP

E 2328000

START STATION

PERIMETER DIKE

START STATION

CROSS DIKE

2333405.21, 364835.47XY=

2335712.22, 362685.81XY=

C-05

C H

A R

L E S T

O

IS

T R

IC

T

C H

A R

L E S T

O N S

C

1"

0'

S A

G

SHEET OF

U .S

A R

M Y

E

N G

IN

E

IS

T R

IC

T

A U G

O

G L A S S P .E

J J K

J J K

P O

S T

L O

W

H

R B

H U

L

A T

H E

R M

R M

IN

A L

M A

IN

T E

N A

N

W

K

E D

G

IN

G

A R

E 2329000 E 2330000 E 2331000 E 2332000 E 2333000 E 2334000 E 2335000 E 2336000 E 2337000 E 2338000

E 2329000 E 2330000 E 2331000 E 2332000 E 2333000 E 2334000 E 2335000 E 2336000 E 2337000 E 2338000

MATCHLINE

ACCEPTANCE SECTION 7

D A

N I

E L

I

S L

A

A C

H

L O

W

N

A C

H

STA. 29+85

CENTERLINE

4 X 8 SPILLWAY

STA. 43+29

CENTERLINE

4 X 8 SPILLWAY

STA. 58+88

CENTERLINE

4 x 8 SPILLWAY

STA. 86+47

CENTERLINE

4 X 4 SPILLWAY

STA. 9+87

CENTERLINE

4 X 4 SPILLWAY

N

IE

L

IS

L A

P

A

C E

M E

E

N

M

R

B E

R K

E L E

Y

C

O U

N T

Y S

O U

R O

L

IN

A

ACCEPTANCE SECTION 6

SHEET C-02, C-03, C-04 & C-07

IF

B

W

H P B

M J C

G

(N.T.S.)

DISCHARGE PIPE

DIRT RAMP

TOP OF DIKE

TOP OF DIKE

PIPE CROSSING DETAILS

TO PROVIDE VEHICLE ACCESS AROUND TOP OF DIKE

AND ON ALL ROADS AT ALL TIMES

NOTE: DREDGE PIPELINE TO BE BURIED

DISCHARGE PIPE

IN TRENCH

OR RAMPED OVER IN ACCORDANCE WITH THIS DETAIL

+5

+5

20+00

25+00

60+00

65+00

70+00

75+00

80+00

+0

+0

+0

CONTRACTORS/SUBCONTRACTORS.

UNDER A SEPARATE CONTRACT. CONTRACTOR SHALL COORDINATE IN THE FIELD WITH ALL OTHER

11. THERE MAY BE CONCURRENT CONSTRUCTION ACTIVITES IN DANIEL ISLAND - MIDDLE CELL PLACEMENT AREA, CONDITIONS.

10. INTERIOR TOPOGRAPHY IS EXISTING PRIOR TO DIKING EFFORT, AND IS NOT REPRESENTATIVE OF POST-DIKING

FEET. ESTIMATED COMPLETION DATE AND READY TO RECEIVE DREDGED MATERIAL: AUGUST 2020

9. PLACEMENT AREA IS UNDER CONSTRUCTION TO RAISE THE PERIMETER CONTAINMENT DIKE AND CROSS DIKE TO 32

(NSRS2007).

8. ALL HORIZONTAL COORDINATES ARE BASED ON THE SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM, NAD83

CONDITIONS ONLY. DATE OF CONDITION LiDAR SURVEY: APRIL 2020

7. ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET. THIS DRAWING IS TO BE USED FOR GENERAL SITE

CROSSINGS AND FOR ANY REQUIRED REPAIRS TO TOP OF DIKE.

6. THE CONTRACTING OFFICER'S REPRESENTATIVE SHALL DESIGNATE BORROW SOURCE FOR FILL MATERIAL FOR PIPE

DIKE OR ROADS.

CROSSINGS OVER DREDGE PIPE IN ACCORDANCE WITH THE PIPE CROSSING DETAILS WHEREVER PIPE CROSSES THE

THIS CONTRACT. ONLY RUBBER-TIRED VEHICLES SHALL BE USED FOR THIS PURPOSE. PROVIDE VEHICLE

5. TRACKED EQUIPMENT SHALL NOT BE USED ON THE TOP OF DIKE FOR TRANSPORTATION OF PERSONNEL DURING

NOTICE TO PROCEED AND DEMOBILIZATION, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.

DRUMS, MISC. STEEL, ETC. LEFT ON THE PLACEMENT AREA AND ADJACENT MARSHES BETWEEN THE TIME OF

4. THE CONTRACTOR SHALL REMOVE FROM THE PLACEMENT AREA THEIR DREDGE PIPE, PONTOONS, DUMP SHEDS, FUEL

PREVENT LEAKAGE.

TO PROPER LENGTH TO FIT SPILLWAYS (APPROX. 4') TO PREVENT BINDING IN SPILLWAY CHANNELS AND TO

3. ALL STOPLOGS SHALL BE 3" X 6" TONGUE AND GROOVE LUMBER (SEE SPEC.). CONTRACTOR SHALL CUT STOPLOGS

SLOPES OF DIKE.

RUTTING, DAMAGE OR RESTORATIVE OPERATIONS. RESTORATION SHALL INCLUDE GRASSING OF TOP AND SIDE

ANY RESULTANT LOSS OF FREEBOARD ATTRIBUTABLE TO HIS OPERATIONS REGARDLESS OF WHETHER DUE TO

DIKES, RAMPS, ROADS, ETC. IN ACCORDANCE WITH THE ABOVE REQUIREMENTS, HE SHALL BE RESPONSIBLE FOR

IS REQUIRED TO GRADE OR BLADE THE TOPS OF THE CROWNED OR SLOPED TO DRAIN. IF THE CONTRACTOR

PUMPING INTO THIS DISPOSAL AREA. TOPS OF DIKES, RAMPS, AND ROADS SHALL REMAIN GRADED SMOOTH AND

DURATION OF DREDGING AND SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION AT COMPLETION OF

2. ALL DIKES, RAMPS, ROADS, ETC. SHALL BE MAINTAINED IN ORIGINAL OR BETTER CONDITION THROUGHOUT THE

DEFICIENCIES FOUND.

PRIOR TO THE START OF DREDING. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER OF

1. ALL DIKES AND SPILLWAYS SHOWN ON DRAWING ARE EXISTING AND SHALL BE INSPECTED BY THE CONTRACTOR

NOTES:

a S

A

U

G a

W -H

P

_R

E Va .D

G N a a

U

P D

A T

T

N

L L

C

O N

T O

U R S

POINT

ACCESS

LEGEND

DIKE CENTERLINE

POINT

ACCESS

PIPELINE

File details come from the government source that posted it. Updated .