B.08.03_Amendment_0003_W912HP19B0001.pdf
PDF 531 KB Posted
- Attached to
- FY19 CHARLESTON LOWER HARBOR MAINTENANCE DREDGING Federal contract opportunity
- Solicitation number
- W912HP-19-B-0001
About this file
SF30
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04.01_Abstract_of_Offers_W912HP19B0001.pdf | ||
| B.08.03_W912HP19B0001_Amendment_0004_-_Extend_Bid_Opening_Date.pdf | ||
| Attachment_2_-_Bidding_Schedule_REVa.pdf | ||
| Attachment_1_-_Contract_Surveys.zip | ZIP file | |
| Attachment_4_-_A.03.14_Davis_Bacon_Wage_Determination_SC3_and_SC4.pdf | ||
| Attachment_3_-_35_20_23_Estimated_Quantities_REVa.pdf | ||
| Attachment_1_-_Contract_Surveys.zip | ZIP file | |
| B.08.03_W912HP19B0001_Amendment_0002_(Extend_Bid_Opening).pdf | ||
| B.08.03_W912HP19B0001_Amendment_0001_(Bid_Schedule).pdf | ||
| Solicitation_W912HP19B0001_CHS_LH.pdf | ||
| RTA_Specifications.pdf | ||
| RTA_Drawings.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HP19B0001
X 9B. DATED (SEE ITEM 11)
19-Oct-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jan-2019
CODE
U.S. ARMY CORPS OF ENGINEERS, CHARLESTON
DISTRICT, CONTRACTING DIVISION
69-A HAGOOD AVENUE
CHARLESTON SC 29403
W912HP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HP19B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES
1. ADD “Contract Surveys.zip” file.
2. SF 1442 SOLICITATION, OFFER, AND AWARD, Block 10, Paragraph “Description of Work”
DELETE “1,697,500 cubic yards” and REPLACE with “1,778,500 cubic yards.”
3. CONTRACT SPECIFICATIONS, SECTION 00 10 00 SOLICITATION, CONTRACT LINE
ITEM NUMBER (CLIN) SCHEDULE
DELETE Bidding Schedule and REPLACE with “Bidding Schedule_REVa” (attached).
4. SECTION 35 20 23 DREDGING, Paragraph “Estimated Quantities”
DELETE Paragraph “Estimated Quantities” and REPLACE with “Estimated Quantities_REVa” (attached).
5. SECTION 35 20 23 DREDGING, Subsection ORDER OF WORK
DELETE first paragraph of Subsection ORDER OF WORK and REPLACE with the following paragraph:
“Shoal 10 – Daniel Island Reach will be the last order of work under this contract. Dredging of preceding shoals shall be listed in a plan for performing the work to be submitted by the Contractor.
The plan shall include a schedule, equipment list and description, and description of how the work is to be accomplished. The work plan shall be submitted for Contracting Officer’s acceptance a minimum or 14 days before any construction is to be performed.”
6. UPDATE WAGE DETERMINATIONS General Decision Number: SC190003 01/04/2019 SC3 for Hopper Dredge Construction Projects and SC190004 01/04/2019 for Heavy Dredging (attached).
(End of Summary of Changes)