Attachment_2_-_Bidding_Schedule_REVa.pdf

PDF 18 KB Posted

Attached to
FY19 CHARLESTON LOWER HARBOR MAINTENANCE DREDGING Federal contract opportunity
Solicitation number
W912HP-19-B-0001
Issued by
Department of the Army Corps of Engineers Engineering District Charleston

About this file

Bidding Schedule

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00 10 00 PAGE 1

SECTION 00 10 00

SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

ITEM NO. DESCRIPTION ESTIMATED

QUANTITY U/I UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND

DEMOBILIZATION – MAINTENANCE

DREDGING IN CHARLESTON LOWER

HARBOR

1 JA LUMP SUM $_________

0002 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOALS 2, 5, 6, 10

679,000 CY $_________ $_________

0003 COMPLIANCE WITH ENDANGERED

SPECIES ACT AND MARINE

MAMMALS PROTECTION ACT

(HOPPER ONLY)

1 JA LUMP SUM $_________

0004 NON-CAPTURE TRAWL SWEEPING

(24 HOURS/DAY) (HOPPER ONLY)

10 DAY $_________ $_________

TOTAL (COMBINATION OF BASE

BID ITEMS 0001-0004)

OPTIONS

0005 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 2A

260,000 CY $_________ $_________

0006 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 3

185,000 CY $_________ $_________

0007 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 3A

75,000 CY $_________ $_________

0008 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 4

46,000 CY $_________ $_________

0009 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 4A

105,000 CY $_________ $_________

0010 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 5A

8,500 CY $_________ $_________

0011 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

ANCHORAGE BASIN

420,000 CY $_________ $_________

SECTION 00 10 00 PAGE 2

TOTAL (COMBINATION OF

OPTIONAL BID ITEMS 0005-

0011)

TOTAL

TOTAL (COMBINATION OF ALL

BID ITEMS 0001-0011)

STATEMENT

Enter prices where space is provided for ALL items. Failure to follow this instruction may render the bid non-responsive and the bid will not be considered for award.

All bidders are advised materially unbalanced bids may be rejected as non-responsive. See FAR 52.214-19 Contract Award – Sealed Bidding – Construction.

Quantities indicated are ESTIMATED and are comprised of material within the required channel prism including the maximum pay slope material and the allowable overdepth as defined in the contract drawings.

File details come from the government source that posted it.