FY16_Murrells_Inlet_Specs.pdf

PDF 4 MB Posted

Attached to
FY16 Murrells Inlet, SC Maintenance Dredging Federal contract opportunity
Solicitation number
W912HP-16-B-0003
Issued by
Department of the Army Corps of Engineers Engineering District Charleston

About this file

16B0003 Specifications

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BIDS NO. W912HP-16-B-0003

US Army Corps

Of Engineers

Charleston District

FY16 Murrells Inlet

Maintenance Dredging

Georgetown County, South

Carolina

U. S. Army Corps of Engineers

Charleston District

69A Hagood Avenue

Charleston, South Carolina 29403-5107

Construction Solicitation and Specification

FY16 MURRELLS INLET W912HP-16-B-0003

MAINTENANCE DREDGING

PROJECT TABLE OF CONTENTS PAGE 1

PROJECT TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

01 10 00 GENERAL

01 33 00 SUBMITTAL PROCEDURES

01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 10 QUALITY CONTROL SYSTEM

01 45 04.00 10 CONTRACTOR QUALITY CONTROL

01 55 00 SURVEY REQUIREMENTS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

ATTACHMENTS (See section for list of contents)

SECTION 01 33 00 PAGE 1

SECTION 01 10 00

GENERAL

PART 1 GENERAL

1.1. SUMMARY

1.2. PAYMENT

1.3. SUBMITTALS

1.4. PRECONSTRUCTION CONFERENCE

1.4.1. Conference

1.4.2. Letter of Record

1.5. CONSTRUCTION PROGRESS CHARTS

1.4. Submittal of Construction Progress Chart

1.5. Preparation of Construction Progress Chart

1.6. Modifications to Construction Progress Chart

1.6. CERTIFICATES OF COMPLIANCE

1.7. PHYSICAL CONDITIONS AND DATA

1.7.1. General

1.7.2. Physical Conditions

1.7.3. Weather Conditions

1.7.4. Transportation Facilities

1.7.5. Channel Traffic

1.7.6. Obstruction of Channel

1.7.7. Condition of Site

1.7.8. Records

1.8. As-Built Drawings

1.9. Access Routes

1.10. Datum and Bench Marks

1.11. Storage Areas

1.12. Contractor Furnished Placement Areas

1.13. Construction Schedule Constraints

1.14. Public Access

1.15. Quality Control

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

SECTION 01 33 00 PAGE 2

PART 1 GENERAL

1.1. SUMMARY

This section requires the Contractor to implement practices and procedures for general contract requirements.

1.2. PAYMENT

Separate payment will not be made for general contract requirements, and all associated costs therewith shall be included in the applicable unit prices or lump sum prices contained in the Bidding Schedule.

1.3. SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

Construction Progress Charts (Reference Subsection CONSTRUCTION

PROGRESS CHARTS); G

1.4. PRECONSTRUCTION CONFERENCE

1.4.1. Conference

A Preconstruction Conference will be arranged by the Contracting Officer's

Representative after award of contract and before commencement of work. The

Contracting Officer's Representative will notify the Contractor of the time and date set for the meeting. At this conference, the Contractor shall be oriented with respect to Government procedures and line of authority, contractual, administrative, and construction matters. Additionally, a schedule of required submittals will be discussed. The Contractor shall bring to the preconstruction conference the required preconstruction submittals in completed form.

1.4.2. Letter of Record

A Letter of Record will be written documenting all items discussed at the conference and a copy will be furnished by the Contracting Officer's

Representative to all in attendance.

1.5. CONSTRUCTION PROGRESS CHARTS

In accordance with Contract Clause SCHEDULES FOR CONSTRUCTION CONTRACTS, the

Contractor shall be guided by the following requirements and procedures as pertaining to submission of an initial and subsequent periodic construction progress chart. These charts as accepted and updated shall provide the basis for determination of the amounts of progress payments.

(a) The Contractor shall within five days after the Notice to Proceed prepare and submit to the Contracting Officer for acceptance three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring

SECTION 01 33 00 PAGE 3

materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting

Officer may withhold approval of progress payments until the

Contractor submits the required schedule.

(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the

Contracting Officer. If, in the opinion of the Contracting

Officer, the Contractor falls behind the approved schedule, the

Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the

Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the

Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the

Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

1.4. Submittal of Construction Progress Chart

Progress Charts shall be established and maintained within the Quality

Control System (QCS) in accordance Section 01 45 02.00 10 QUALITY CONTROL

SYSTEM. Additionally, a blank ENG Form 2454 is furnished in the ATTACHMENTS for the Contractor’s optional use.

1.5. Preparation of Construction Progress Chart

The Contractor shall indicate on the progress chart the Contract Line Items contained in the contract, showing the amount of the item and its relative weighted percentage of the total contract. The Contractor may separate features of work under each item to show salient work elements such as procurement of materials, plant, and equipment, and supplemental work elements such as excavation, reinforcing steel, backfill, etc. These salient features shall total to the cost and weighted percentages shown for the major

Contract Line Items. When quantity variations impact the weighted percentage of a separate item by five percent or more, the Contractor shall revise the contract progress charts to accurately reflect the impact of such variations.

1.6. Modifications to Construction Progress Chart

Modifications to the contract which are minor in nature shall be listed and scheduled separately in order of their issuance and as reported on the associated request for progress payment. Completion of work on minor modifications shall be noted as work progresses. When major modifications

SECTION 01 33 00 PAGE 4

are issued in which one or more of the Contract Line Items are significantly changed monetarily or in time of completion, the progress schedule should be revised to incorporate such changes showing revised item completion dates and overall new completion date, as applicable.

1.6. CERTIFICATES OF COMPLIANCE

Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in three (3) copies unless otherwise specified. Each certificate shall be signed by an official authorized to certify in behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

1.7. PHYSICAL CONDITIONS AND DATA

1.7.1. General

In accordance with contract Clause FAR 52.236-4, data and information furnished or referred to below are for the Contractor's information. The

Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1.7.2. Physical Conditions

The physical conditions indicated on the drawings and in the specifications are the results of site investigations by the U.S. Army Corps of Engineers, Charleston District (USACE-SAC). It highly recommended that bidders conduct their own investigations and decide for themselves the character of the materials and difficulties of performing the work.

1.7.3. Weather Conditions

The areas in which work is to be done under these specifications are workable during the entire year; however, tropical storms may require that operations be suspended temporarily. The season for tropical storms is during the period

June - November; during such disturbances precaution should be taken to secure all plant and equipment.

1.7.4. Transportation Facilities

The work site is located in Georgetown County in the Murrells Inlet, Huntington Beach, and Garden City areas, as shown on the Location Map and

Vicinity Map. This area is served by U.S. highways and state and local roads.

The nearest port is the Port of Georgetown, which is served by CSX

Transportation’s railroad facilities. Docking and fueling facilities, provisions, and limited marine supplies are also available. Scheduled airline service is available at Myrtle Beach International Airport. There is no direct access to Murrells Inlet from the Atlantic Intracoastal Waterway. The

Contractor shall be responsible for knowledge of transportation conditions, such as availability of roads, load limits for bridges and roads, and any other conditions that will affect the transportation of equipment and materials to the work site. It is highly recommended that prospective bidders examine the area of work prior to submission of bids in order to determine

SECTION 01 33 00 PAGE 5

for themselves accessibility and suitability for transportation of equipment, materials, personnel, and supplies, and also to familiarize themselves as to the nature and general arrangement of the work area.

Tidal benchmark information may be obtained from U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Ocean Service at the NOS website, www.co-ops.nos.noaa.gov.

1.7.5. Channel Traffic

Traffic at Murrells Inlet consists primarily of charter fishing boats, commercial fishing boats, and privately owned pleasure craft.

1.7.6. Obstruction of Channel

The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the Rivers and Harbors Act approved 8 August 1917. The

Contractor will be required to conduct the work in such a manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make it difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work the Contractor shall promptly remove his plant, including ranges, buoys, piles and other markers placed by him under the contract in navigation waters or on the shore.

1.7.7. Condition of Site

It is highly recommended that prospective bidders examine the areas of work, prior to submission of bids, in order to determine for themselves the accessibility for transportation of personnel, supplies and equipment and also to familiarize themselves as to the nature and general arrangement of work areas. The Contractor shall obtain any and all right-of-entries across private lands which he may use.

1.7.8. Records

Maps indicating previously dredged depths and recent dredging records are available for review at the Corps of Engineers, Charleston District, Navigation Section, 69A Hagood Avenue, Charleston, South Carolina. Bidders can schedule appointments to view these records with Mr. Scott Glass, phone

(843) 329-8144. Copies of historical files other than those which Mr. Glass has assembled may be requested under the Freedom of Information Act, attention Office of Counsel. These records will be released to the Contractor within twenty working days after the receipt of a proper Freedom of

Information Act request.

1.8. As-Built Drawings

The Contractor shall maintain a separate set of full-size contract drawings, marked up in red, to indicate as-built conditions. Each as-built contract drawing shall include the Contract Number associated with the contract. These drawings shall be maintained current with the work at all times until completion of the work and shall be available for review by Government personnel at all times. All variations from the contract drawings, for whatever reason, including those occasioned by modification, shall be indicated. These variations shall be shown in the same general detail that is http://www.co-ops.nos.noaa.gov/

SECTION 01 33 00 PAGE 6

utilized in the contract drawings. Upon completion of the work, the marked-up drawings shall be furnished to the Contracting Officer prior to acceptance of the work. The Government reserves the right to withhold two percent of the total price of the items for which as-built contract drawings have not been submitted.

1.9. Access Routes

Any damage to pavement, structures, or other facilities resulting from the

Contractors construction activities under this contract shall be promptly repaired by the Contractor, as approved by the Contracting Officer. The cost of maintenance and repair of the access routes shall be considered as a subsidiary obligation of the Contractor. The axle load of any heavy equipment operating on paved streets and roads shall not exceed South Carolina State

Highway Department load limits.

1.10. Datum and Bench Marks

Monument records are available for inspection at the Charleston District office, Charleston, South Carolina.

1.11. Storage Areas

No storage areas are provided at the site. The Contractor's equipment storage and staging areas shall be at locations subject to the approval of the

Contracting Officer.

1.12. Contractor Furnished Placement Areas

Trash, debris, and other objectionable matter shall be disposed offsite in an approved landfill in accordance with Federal, state and local regulations.

1.13. Construction Schedule Constraints

The work to be performed is to be accomplished on public beaches either adjacent to residential properties or within a state park that will be occupied and in normal usage during the course of construction. Public access shall be maintained as specified below in Paragraph Public Access. It is the intent of these provisions to provide for maximum coordination between construction activities pursuant to this contract and concurrent use by residents and the public and on-going routine activities of the state park personnel. Interference with and inconvenience to residents and visitors or to the routine of surrounding areas shall be held to an absolute minimum.

1.14. Public Access

Except in the immediate area where beach fill is being placed, beaches shall remain open to the public at all times during project construction. The

Contractor shall provide and maintain barricades, fencing signs, and observers as necessary to keep the public a safe distance from the discharge area of the pipe and shall protect the public from hazards in the other areas of construction. These requirement may be accomplished as the Contractor elects but must be in compliance with the requirements specified in Section

02325 DREDGING; 29 CFR 1910, Occupational Safety and Health Standards; 29 CFR

1926, Safety and Health Regulations; and EM 385-1-1, U.S. Army Corps of

Engineers Safety and Health Requirements Manual. This responsibility shall be included in the Contractor's submitted Accident Prevention Plan and will be discussed at the preconstruction safety conference.

1.15. Quality Control

SECTION 01 33 00 PAGE 7

In addition to the requirements of Section 01451 CONTRACTOR QUALITY CONTROL, the Contractor shall comply with the requirements specified in this paragraph. The Contractor shall establish and maintain a quality control system for all work to ensure compliance with contract requirements and record all inspections and tests under this system, including but not limited to the following:

(a) Fill material is placed within the specified tolerances.

(b) Dredge effluent does not flow landward of the fill section or other limits established by the Contracting Officer.

(c) Damage to the existing berm and dune is held to the minimum possible.

(d) Adequate control is provided to prevent unnecessary loss of material by seaward flow of pipeline effluent.

(e) The pipeline is periodically inspected for leakage as specified.

(f) All joints of pipe for discharge line are tight and sound.

(g) Safety, including ensuring signs and barriers are in place to keep public away from discharge point and beach fill placement work.

-- End of Section --

SECTION 01 33 00 PAGE 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1. SUMMARY

1.2. DEFINITIONS

1.2.1. Submittal Descriptions

1.2.2. Approving Authority

1.2.3. Work

1.3. PAYMENT

1.4. SUBMITTALS

1.5. SUBMITTAL CLASSIFICATION

1.5.1. Government Approved

1.5.2. Information Only

1.6. PREPARATION

1.6.1. Transmittal Form

1.6.2. Quantity of Submittals

1.7. INFORMATION ONLY SUBMITTALS

1.8. VARIATIONS

1.8.1. Considering Variations

1.8.2. Proposing Variations

1.8.3. Warranting That Variations Are Compatible

1.8.4. Review Schedule Is Modified

1.9. SUBMITTAL REGISTER

1.9.1. Use of Submittal Register

1.9.2. Contractor Use of Submittal Register

1.9.3. Approving Authority Use of Submittal Register

1.9.4. Copies Delivered to the Government

1.10. SCHEDULING

1.11. GOVERNMENT APPROVING AUTHORITY

1.12. DISAPPROVED SUBMITTALS

1.13. APPROVED SUBMITTALS

1.14. APPROVED SAMPLES

1.15. WITHHOLDING OF PAYMENT

1.16. STAMPS

SECTION 01 33 00 PAGE 2

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractor's Quality Control (CQC) System Manager shall check and approve all items prior to submittal. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:

Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals

(including parts list); certifications; warranties; and other such required submittals.

Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Contractor shall pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

1.2. DEFINITIONS

1.2.1. Submittal Descriptions

Submittals requirements are specified in the technical sections. Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Submittals which are required prior to issuance of contract notice to proceed include schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical

SECTION 01 33 00 PAGE 3

appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the contract requires extended product warranties.

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.

Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged.

Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.

SD-05 Design Data

Design calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

SD-08 Manufacturer's Instructions

SECTION 01 33 00 PAGE 4

Preprinted material describing installation of a product, system or material, including special notices and (MSDS) concerning impedances, hazards and safety precautions.

SD-09 Manufacturer's Field Reports

Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.

SD-10 Operation and Maintenance Data

Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.

This data is intended to be incorporated in an operations and maintenance manual or control system.

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings.

1.2.2. Approving Authority

Office or designated person authorized to approve submittal.

1.2.3. Work

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-

01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.3. PAYMENT

Separate payment will not be made for submittal requirements, and all associated costs therewith shall be included in the applicable unit prices or lump sum prices contained in the Bidding Schedule.

1.4. SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, SECTION 01 33 00 PAGE 5 a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

Submittal Register (Reference Subsection SUBMITTAL

REGISTER)

1.5. SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.5.1. Government Approved

Governmental approval (G) is required for extensions of design, critical materials, deviations, and other items as designated by the Contracting

Officer. Government approval is required for any deviations from the

Solicitation or Accepted Proposal and other items as designated by the

Contracting Officer. Within the terms of the Contract Clause 52.236-21

SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are considered “shop drawings.”

1.5.2. Information Only

Submittals not requiring Government approval will be for information only.

They are not considered “shop drawings” within the terms of the Contract

Clause referred to above.

1.6. PREPARATION

1.6.1. Transmittal Form

A transmittal form (ENG Form 4025-R) shall be used for submitting both

Government approved and information only submittals in accordance with the instructions on the second page of the form. This form is included in the QCS module that the contractor is required to use for this contract. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.

1.6.2. Quantity of Submittals

Unless otherwise noted in contract documents or directed by the Contracting

Officer Representative for an individual submittal, for both Information Only and Government Approved submittals, submit all documents by email in PDF version complete with the transmittal form, CQCs approval stamp, signature, and date to the address directed by the Contracting Officer. If files are too large for email, then submittals can be submitted on CDs.

1.7. INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals. The

Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;

SECTION 01 33 00 PAGE 6

and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.8. VARIATIONS

Variations from contract requirements require both Designer of Record (DOR) and Government approval pursuant to contract Clause FAR 52.236-21

SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION and will be considered where advantageous to Government.

1.8.1. Considering Variations

Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value

Engineering Change Proposal (VECP).

Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the

Government.

1.8.2. Proposing Variations

When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.

Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal. The

Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

1.8.3. Warranting That Variations Are Compatible

When delivering a variation for approval, Contractor, including its

Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

1.8.4. Review Schedule Is Modified

In addition to normal submittal review period, a period of ten (10) working days will be allowed for consideration by the Government of submittals with variations.

1.9. SUBMITTAL REGISTER

Prepare and maintain submittal register, as the work progresses. Do not change data which as delivered by Government; retain data as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment.

This list may not be all inclusive and additional submittals may be required.

SECTION 01 33 00 PAGE 7

Maintain a submittal register for the project in accordance with Section 01

45 00.10 10 QUALITY CONTROL SYSTEM. The Government will provide the initial submittal register with the following fields completed, to the extent that will be required by the Government during subsequent usage.

Section: Lists specification section in which submittal is required.

Spec Paragraph Number: Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.

Description of Submittal: Lists a brief description of each submittal by section.

Type of Submittal: Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.

Classification: Indicate approving authority for each submittal.

The Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.

1.9.1. Use of Submittal Register

Submit submittal register with QC plan and project schedule. Verify that all submittals required for project are listed and add missing submittals.

Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:

Activity No: Activity number from the project schedule.

Contractor Submit Needed By: Scheduled date for approving authority to receive submittals.

Contractor Approval Needed By: Date Contractor needs approval of submittal.

Contractor Material Needed By: Date that Contractor needs material delivered to Contractor control.

1.9.2. Contractor Use of Submittal Register

Update the following fields in the fields in program utilized by Contractor with each submittal throughout contract.

Transmittal No: Contractor assigned list of consecutive numbers.

Contractor Action - Code : Lists code of action used to record

Contractor's review when forwarding submittals to QC.

Corps Received Date: List date of submittal transmission.

1.9.3. Approving Authority Use of Submittal Register

Update the following fields in the fields in program utilized by Contractor.

Transmittal No: Contractor assigned list of consecutive numbers.

Corps Received Date: List date of submittal receipt.

SECTION 01 33 00 PAGE 8

Government Action - Code : Lists code of action used to record

Contractor's review when forwarding submittals to QC.

Corps Returned Date: List date returned to Contractor.

1.9.4. Copies Delivered to the Government

Deliver one (1) copy of submittal register updated by Contractor to

Government with each invoice request.

1.10. SCHEDULING

Schedule and submit concurrent submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. Adequate time (a minimum of thirty (30) calendar days exclusive of mailing time) shall be allowed on the register for review and approval. No delay damages or time extensions will be allowed for time lost in late submittals.

(a) Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.

(b) Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation.

Approval by the Contracting Officer does not relieve the

Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked

"N/A."

(c) Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.

(d) Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal

Register."

1.11. GOVERNMENT APPROVING AUTHORITY

When approving authority is the Contracting Officer, the Government will:

(a) Note date on which submittal was received.

(b) Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. Two (2) copies of the approved submittal will be retained by the Contracting Officer and one (1) copy of the submittal will be returned to the Contractor.

1.12. DISAPPROVED SUBMITTALS

SECTION 01 33 00 PAGE 9

Contractor shall make corrections required by the Contracting Officer. If the

Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes," is to be given to the

Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.

If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.13. APPROVED SUBMITTALS

The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.

After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.14. APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the

Contractor at its expense, if so requested.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. Contractor to replace such materials or equipment to meet contract requirements.

Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.

1.15. WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required

Government approvals have not been obtained. No payment will be made for any

SECTION 01 33 00 PAGE 10

materials incorporated into the work for any information only submittals found to contain errors or deviations from the Solicitation or Accepted

Proposal.

1.16. STAMPS

Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements shall be similar to the following:

CONTRACTOR

(Firm Name)

_____ Approved

_____ Approved with corrections as noted on submittal data and/or attached sheets(s).

SIGNATURE: __________________________________________________________

TITLE: ______________________________________________________________

DATE: _______________________________________________________________

SECTION 01 35 29 PAGE 1

SECTION 01 35 29

SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

1.2. REFERENCES

1.3. DEFINITIONS

1.4. PAYMENT

1.5. SUBMITTALS

1.6. REGULATORY REQUIREMENTS

1.6.1. Revisions to Safety Manual, EM 385-1-1

1.7. ACCIDENT PREVENTION PLAN

1.7.1. Emergency Response Procedure

1.7.2. Certificate of Compliance for the Contractor Program and the

Dredge(s)

1.8. SAFETY PROGRAM CONFERENCE

1.9. ACTIVITY HAZARD ANALYSIS

1.10. SAFETY MEETINGS

1.11. SAFETY PROGRAM STAFF REQUIREMENTS

1.11.1. Site Safety and Health Officers (SSHO) Staffing for Dredging

Contracts

1.11.2. SSHO Requirements for Dredging

1.11.3. Designated Representative (DR) Requirements for Dredging

1.11.4. Safety Personnel Training Requirements for Dredging

1.11.5. SSHO Responsibilities

1.12. SAFETY PROGRAM FOR FLOATING PLANT

1.12.1. Certification of Floating Plant

1.12.1.1. Seagoing Barge Act--Special Standard of Responsibility

1.12.2. National Association of Marine Surveyors or the Society of

Accredited Marine Surveyors

1.12.3. Personal Flotation Device

1.12.4. Safety Drills

1.12.5. Smoke Alarms

1.12.6. CO Monitors

1.12.7. Fire Extinguisher - Mobile Construction Equipment

1.12.8. Electrical Installations

1.12.9. Safe Clearance Procedures

1.12.10. Work in Confined Spaces

1.12.11. Hazard Communication Program and Material Safety Data Sheets

1.12.12. Severe Weather Plan

1.13. SAFETY INSPECTION

1.13.1. Contractor Safety Inspection

1.14. EMERGENCY RESPONSE PROCEDURES

1.14.1. Emergency Response Procedures

1.14.2. Communications

1.14.3. Telephone Numbers, Call Signs and Instructions

1.14.4. Machinery and Mechanized Equipment Checklist

SECTION 01 35 29 PAGE 2

1.14.5. Welding Equipment

1.14.6. Anchor Points

1.14.7. Accident Notification

1.14.8. Exceptions

1.15. NOTICE TO MARINERS

PART 3 EXECUTIONS (Not Applicable)

SECTION 01 35 29 PAGE 3

This section requires Contractors to implement practices and procedures for working safely and in compliance with OSHA and USACE regulation.

1.2. REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.34 Protection of the Public on or Adjacent to

Construction Sites

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 302 Fire Protection Standard for Pleasure and

Commercial Motor Craft

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1910.146 Permit-required Confined Spaces

29 CFR 1926 Safety and Health Regulations for Construction

29 CFR 1926.16 Rules of Construction

1.3. DEFINITIONS

(a) High Visibility Accident. Any mishap which may generate publicity or high visibility.

(b) Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.

(c) Recordable Injuries or Illnesses. Any work-related injury or illness that results in:

(1) Death, regardless of the time between the injury and death, or the length of the illness;

(2) Days away from work (any time lost after day of injury/illness onset);

(3) Restricted work;

(4) Transfer to another job;

(5) Medical treatment beyond first aid;

(6) Loss of consciousness; or

(7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not

SECTION 01 35 29 PAGE 4

result in (1) through (6) above.

(d) "USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.

1.4. PAYMENT

Separate payment will not be made for providing and maintaining an effective

Safety Program, and all associated costs therewith shall be included in the applicable unit prices or lump sum prices contained in the Bidding Schedule.

1.5. SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

Accident Prevention Plan (Reference Subsection ACCIDENT

PREVENTION PLAN); G

Emergency Response Procedures (Reference Paragraph “Emergency

Response Procedure”)

Activity Hazard Analysis (Reference Subsection ACTIVITY HAZARD

ANALYSIS)

SD-06 Test Reports

Safety Meeting Reports (Reference Subsection SAFETY MEETINGS)

SD-07 Certificates

Certificate of Compliance (Reference Paragraph “Certificate of

Compliance for the Contractor Program and the Dredge(s)”)

Coast Guard Certification (Reference Paragraph “Certification of

Floating Plant”)

1.6. REGULATORY REQUIREMENTS

In addition to the detailed requirements included in the provisions of this contract and the Contract Clause 52.236-13 ACCIDENT PREVENTION, comply with the most recent edition of USACE EM 385-1-1, and the applicable federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.

(a) The Contractor shall provide and maintain work environments and procedures which will—

(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;

(2) Avoid interruptions of Government operations and delays in

SECTION 01 35 29 PAGE 5

project completion dates; and

(3) Control costs in the performance of this contract.

(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—

(1) Provide appropriate safety barricades, signs, and signal lights;

(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and

(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.

(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers

Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.

(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting

Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

(e) The Contractor shall insert this clause, including this paragraph

(e), with appropriate changes in the designation of the parties, in subcontracts.

1.6.1. Revisions to Safety Manual, EM 385-1-1

EM 385-1-1 and its changes are available at http://publications.usace.army.

mil/publications/eng-manuals/. The Contractor shall be responsible for complying with the current edition and all changes posted on the web through the date that is 10 calendar days prior to the date offers are due. If the solicitation is amended to extend the time set for receipt of offers, the 10 calendar days rule stated above shall be applied against the amended date.

(For example, if offers are due on 10 April, all changes posted on or before

31 March shall apply to the contract. If the time for receipt of offers is extended from 10 April to 20 April, all changes posted on or before 10 April shall apply to the contract.)

1.7. ACCIDENT PREVENTION PLAN

After award and no later than the pre-construction conference, the Contractor

SECTION 01 35 29 PAGE 6

shall submit, in writing, his proposal for Accident Prevention, using the format “Minimum Basic Outline For Accident Prevention Program” found in

Appendix A of the Safety and Health Requirements Manual EM 385-1-1. No work under this contract shall be performed without an accepted Accident

Prevention Plan by the Government.

1.7.1. Emergency Response Procedure

The Contractor's written Emergency Response Procedures including employee current First Aid and CPR Certification shall be submitted attached to the

Accident Prevention Plan. Work will not proceed until the plan has been reviewed and accepted by the Government and Contractor's emergency procedures are tested to insure rapid response in the field. At least two employees on each shift and each separate work area shall be certified to administer First

Aid and CPR.

1.7.2. Certificate of Compliance for the Contractor Program and the

Dredge(s)

The Contractor shall comply with the provisions of EM 385-1-1. If the

Contractor is a currently accepted participant in the Dredging Contractors of

America (DCA)/United States Army Corps of Engineers (USACE) Dredging Safety

Management Program (DSMP), as determined by the DCA/USACE Joint Committee, and holds a current valid Certificate of Compliance for both the Contractor

Program and the Dredge(s) to be used to perform the work required under this contract, the Contractor may, in lieu of the submission of an Accident

Prevention Plan (APP),

(a) Make available for review, upon request, the Contractor’s current

Safety Management System (SMS) documentation,

(b) Submit to the Contracting Officer the current valid Company

Certificate of Compliance for its SMS,

(c) Submit the current dredge(s) Certificate of Compliance based on third party audit, and

(d) Submit for…