Summary_of_Changes.pdf
PDF 70 KB Posted
- Attached to
- FY16 Charleston Lower Harbor Maintenance Dredging Federal contract opportunity
- Solicitation number
- W912HP-16-B-0002
About this file
SUMMARY OF CHANGES
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 16c0008_Chs_Lwr_Hrbr_Drdg_Award_Notice_07.19.16.pdf | ||
| 16b0002_Bid_Opening_Sign_In_Sheet_6.28.16.pdf | ||
| 16B0002_Abstract_of_Offers_Bid_6_28_16_BIDS_TRANSPOSEDv2.pdf | ||
| W912HP-16-B-0002_Amendment_03_Clause_Upd__2016.06.23.pdf | ||
| W912HP-16-B-0002_Amendment_02_Ext_Due_Date__2016.06.15.pdf | ||
| Revised_Bid_Schedule_6.9.16.pdf | ||
| Amendment_Surveys.zip | ZIP file | |
| Amendment_Drawings.pdf | ||
| W912HP-16-B-0002_Amendment_01_6.9.16.pdf | ||
| SF1442_W912HP-16-B-0002_Chs_Lower_Harbor_Dredging_05.19.16.pdf | ||
| RTA_Drawings_signed.pdf | ||
| RTA_Specs.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY16 Charleston Lower Harbor Maintenance Dredging
Revision A
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. DRAWINGS
DELETE Drawings C-02 thru C-09 and REPLACE with revised Drawings C-02 thru C-09 (see attachment).
2. Section 00010, DESCRIPTION OF WORK
DELETE “1,905,000 cubic yards” and REPLACE with “1,662,000 cubic yards.”
3. Section 00010, BIDDING SCHEDULE
DELETE Bidding Schedule and REPLACE with revised Bidding Schedule (see attachment).
4. Section 35 20 23, DREDGING, Paragraph 1.4.3. Estimated Quantities
Shoal Number 1, Hog Island Reach
Allowable Overdepth Prim CY PL Meas. has increased from 95,000 to 100,000.
Total CY PL Meas. has increased from 185,000 to 190,000.
Shoal Number 2, Lower Town Creek Reach
Required Dredging Prism CY PL Meas. has decreased from 280,000 to 260,000.
Allowable Overdepth Prim CY PL Meas. has decreased from 120,000 to 105,000.
Total CY PL Meas. has decreased from 400,000 to 365,000.
Shoal Number 3, Tidewater Reach
Required Dredging Prism CY PL Meas. has decreased from 200,000 to 125,000.
Allowable Overdepth Prim CY PL Meas. has decreased from 105,000 to 95,000.
Total CY PL Meas. has decreased from 305,000 to 220,000.
Shoal Number 3A, Tidewater Reach
Required Dredging Prism CY PL Meas. has decreased from 55,000 to 50,000.
Allowable Overdepth Prim CY PL Meas. has decreased from 55,000 to 43,000.
Total CY PL Meas. has decreased from 110,000 to 93,000.
Shoal Number 4, Town Creek Reach
Allowable Overdepth Prim CY PL Meas. has increased from 40,000 to 45,000.
Total CY PL Meas. has increased from 75,000 to 80,000.
Shoal Number 5, Myers Bend
Required Dredging Prism CY PL Meas. has increased from 12,000 to 30,000.
Allowable Overdepth Prim CY PL Meas. has increased from 18,000 to 32,000.
Total CY PL Meas. has increased from 30,000 to 62,000.
Shoal Number 6, Drum Island Reach
Required Dredging Prism CY PL Meas. has decreased from 90,000 to 60,000.
Allowable Overdepth Prim CY PL Meas. has decreased from 45,000 to 37,000.
Total CY PL Meas. has decreased from 135,000 to 97,000.
Shoal Number 7, Lower Wando Reach
Required Dredging Prism CY PL Meas. has decreased from 40,000 to 35,000.
Allowable Overdepth Prim CY PL Meas. has increased from 40,000 to 43,000.
Total CY PL Meas. has decreased from 80,000 to 78,000.
Shoal Number 8, Wando Turning Basin
Required Dredging Prism CY PL Meas. has decreased from 100,000 to 65,000.
Allowable Overdepth Prim CY PL Meas. has decreased from 55,000 to 50,000.
Total CY PL Meas. has decreased from 155,000 to 115,000.
Shoal Number 9, Upper Wando Reach
Required Dredging Prism CY PL Meas. has decreased from 95,000 to 60,000.
Allowable Overdepth Prim CY PL Meas. has decreased from 60,000 to 52,000.
Total CY PL Meas. has decreased from 155,000 to 112,000.
Shoal Number 10, Daniel Island Reach
Required Dredging Prism CY PL Meas. has decreased from 125,000 to 110,000.
Allowable Overdepth Prim CY PL Meas. has decreased from 150,000 to 140,000.
Total CY PL Meas. has decreased from 275,000 to 250,000.
Total
Required Dredging Prism CY PL Meas. has decreased from 1,122,000 to 920,000.
Allowable Overdepth Prim CY PL Meas. has decreased from 783,000 to 742,000.
Total CY PL Meas. has decreased from 1,905,000 to 1,662,000.
File details come from the government source that posted it. Updated .