Revised_Bid_Schedule_6.9.16.pdf
PDF 192 KB Posted
- Attached to
- FY16 Charleston Lower Harbor Maintenance Dredging Federal contract opportunity
- Solicitation number
- W912HP-16-B-0002
About this file
Revised Bid Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 16c0008_Chs_Lwr_Hrbr_Drdg_Award_Notice_07.19.16.pdf | ||
| 16b0002_Bid_Opening_Sign_In_Sheet_6.28.16.pdf | ||
| 16B0002_Abstract_of_Offers_Bid_6_28_16_BIDS_TRANSPOSEDv2.pdf | ||
| W912HP-16-B-0002_Amendment_03_Clause_Upd__2016.06.23.pdf | ||
| W912HP-16-B-0002_Amendment_02_Ext_Due_Date__2016.06.15.pdf | ||
| Amendment_Surveys.zip | ZIP file | |
| Amendment_Drawings.pdf | ||
| W912HP-16-B-0002_Amendment_01_6.9.16.pdf | ||
| Summary_of_Changes.pdf | ||
| SF1442_W912HP-16-B-0002_Chs_Lower_Harbor_Dredging_05.19.16.pdf | ||
| RTA_Drawings_signed.pdf | ||
| RTA_Specs.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY16 CHARLESTON LOWER HARBOR W912HP-16-B-0002
MAINTENANCE DREDGING
SECTION 00010
BIDDING SCHEDULE
ITEM ESTIMATED
NO. DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT
BASE
0001 MOBILIZATION AND 1 JA LUMP SUM $__________
DEMOBILIZATION FOR
MAINENANCE DREDGING IN
CHARLESTON LOWER HARBOR
0002 DREDGING OF UNCLASSIFIED 190,000 CY $__________ $__________
MATERIAL IN HOG ISLAND
REACH SHOAL 1
0003 DREDGING OF UNCLASSIFIED 62,000 CY $__________ $__________
MATERIAL IN MYERS BEND
SHOAL 5
0004 DREDGING OF UNCLASSIFIED 97,000 CY $__________ $__________
MATERIAL IN DRUM ISLAND
REACH SHOAL 6
0005 DREDGING OF UNCLASSIFIED 78,000 CY $__________ $__________
MATERIAL IN LOWER WANDO
RIVER SHOAL 7
0006 DREDGING OF UNCLASSIFIED 115,000 CY $__________ $__________
MATERIAL IN WANDO RIVER
TURNING BASIN SHOAL 8
0007 DREDGING OF UNCLASSIFIED 112,000 CY $__________ $__________
MATERIAL IN UPPER WANDO
RIVER SHOAL 9
0008 DREDGING OF UNCLASSIFIED 250,000 CY $__________ $__________
MATERIAL IN DANIEL ISLAND
REACH SHOAL 10
0009 COMPLIANCE WITH ENDANGERED 1 JA $__________ $__________
SPECIES ACT AND MARINE MAMMALS
PROTECTION ACT (HOPPER ONLY)
0010 NON-CAPTURE TRAWL SWEEPING 10 DAY $__________ $__________
(12 HOUR DAYS) (HOPPER ONLY)
OPTIONS
0011 OPTION, DREDGING OF 365,000 CY $__________ $__________
UNCLASSIFIED MATERIAL IN
LOWER TOWN CREEK REACH
SHOAL 2
FY16 CHARLESTON LOWER HARBOR W912HP-16-B-0002
MAINTENANCE DREDGING
0012 OPTION, DREDGING OF 220,000 CY $__________ $__________
TIDEWATER REACH
SHOAL 3
0013 OPTION, DREDGING OF 93,000 CY $__________ $__________
TIDEWATER REACH
SHOAL 3A
0014 OPTION, DREDGING OF 80,000 CY $__________ $__________
TOWN CREEK REACH
SHOAL 4
TOTAL (COMBINATION OF BASE ITEMS 0001-0010) $_______________
TOTAL (COMBINATION OF OPTIONAL ITEMS 0011-0014) $_______________
TOTAL (COMBINATION OF ITEMS 0001-0014) $_______________
STATEMENT
Enter prices where space is provided for ALL items. Failure to follow this instruction may render the bid non-responsive and the bid will not be considered for award.
All bidders are advised materially unbalanced bids may be rejected as nonresponsive. See FAR 52.214-19 Contract Award – Sealed Bidding –
Construction.
Quantities indicated are ESTIMATED and are comprised of material within the required channel prism including the maximum optional pay slope material and two foot (2’) allowable overdepth.
File details come from the government source that posted it. Updated .