B.08 W912HN20R40010001.pdf
PDF 1 MB Posted
- Attached to
- North Carolina MATOC for General and Design/Build Construction Federal contract opportunity
- Solicitation number
- W912HN20R4001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08 W912HN20R400010002.pdf | ||
| Bidder Inquiries 7 October 2020.pdf | ||
| 20R4001.PDF | ||
| W912HN20R4001 Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
North Carolina MATOC for General and Design/Build Construction. The purpose of this amendment is to revise the Solicitation as outlined below . All other terms and condiitons remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 43
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN20R4001
X 9B. DATED (SEE ITEM 11)
02-Sep-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Sep-2020
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
A. CONTRACT CHANGES: Section 00 21 00 has been revised and the due date has been extended. All changes are in red.
B. TECHNICAL SPECIFICATION CHANGES: There are no Technical Specification changes with this amendment
C. CONTRACT DRAWINGS – There are no Contract Drawings changes with this amendment.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 08-Oct-2020 02:00 PM to 14-Oct-2020 01:00 PM.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
PROPOSAL SUBMISSION REQUIREMENTS AND
INSTRUCTIONS
1. DESCRIPTION OF WORK.
1.1 This Request for Proposal (RFP) solicits for a Multiple Award Task Order Contract (MATOC) under which task orders for General Construction are expected to be issued for projects within the three-state region of North Carolina, South Carolina, and Georgia. Work contemplated on this MATOC may be conducted for Army, Air Force, Navy, Marine Corps, National Guard and Reserve Components, and other Department of Defense (DoD) and Federal Agencies located on DoD installations and those in support of other Federal and Department of Defense operations. Work may be performed at other Federal Facilities outside the above-stated geographical boundary on an excepted basis as determined by the Contracting Officer. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either for
Design-Build or Design-Bid-Build General Construction. A project requiring use of civil funds is not authorized under this contract. (See solicitation section 01 11 00 for the complete scope of the anticipated contract to be awarded under this RFP.)
1.2 The purpose of the Source Selection Plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Two Phase Design Build process (See Federal Acquisition Regulation 36.303). In as much as the proposal shall describe the capability of the Offeror to perform any resulting contract, and the task orders issued there under, the proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract and task orders issued thereafter.
1.3 For the purposes of this solicitation, the Government will utilize the Two-Phase Design-Build Selection Process. In Phase One of the Two- Phase Design-Build selection procedure, interested Offerors will submit specified performance capability proposals for review and consideration by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described herein.
1.4 The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select no more than eight (8) of the most highly qualified Offerors to participate in Phase Two. Only those Offerors who receive a written notification from the Savannah District Contracting Officer that their firm has been selected to participate in Phase Two of this solicitation are invited to submit a Phase Two proposal.
1.5 In Phase Two of this process, the Government will evaluate both technical capability and price.
2. GENERAL INSTRUCTIONS
2.1 The requirement will be advertised for full and open competition;
any legally organized firm may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture.
2.2 Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor. Only exceptions to this is that information about the designer of record will be evaluated in Factor 2 and information about members on a joint venture will be evaluated in Factor 1.
2.3 Offerors shall submit their proposal electronically to the address shown in accordance with paragraph 3.3 Electronic Matter Submissions below.
2.4 In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically.
3. PROPOSAL FORMAT
3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents.
3.3 Electronic Matter Submissions. The Offeror’s Price and Technical proposals shall be submitted electronically, as described below. The Offeror’s proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited. The Offeror’s proposal is due no later than the time and date specified in Block 13 of Standard Form 1442.
Written material shall be on single sided 8 ½ X 11 size pages in no less than a 10 pitch or 10 font, unless specified in the RFP. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.
The only authorized transmission method for proposals in response to this solicitation is electronically via DODSAFE online submission. NO
OTHER TRANSMISSION METHOD (EMAIL, FACSIMILE, US
POSTAL MAIL, HAND CARRIED, ETC) WILL BE ACCEPTED
except for the Offeror’s Surety Letter validating the Offeror’s single and aggregate bonding Capability under TAB D- Financial Information & Bonding Capability, in Phase One and Phase Two and the Bid Bond Required in Phase Two.
The Offeror’s proposal must be received by the Government by the date/time specified in the solicitation. Offerors shall submit their proposal using the following link:
h ttps://safe.apps.mil/
Please send proposal using the link above to Contract Specialist Kisha Cook at nikisha.w.cook@usace.army.mil AND to Contracting Officer Bruce Helms at B ruce.A.Helms@usace.army.mil
INSTRUCTIONS FOR SUBMITTING ELECTRONIC
PROPOSALS: Due to the current COVID-19 pandemic, all proposals shall be submitted electronically through the DODSAFE website. You are limited to five
(5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the DODSAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
For this solicitation, recipients will be the Contracting Officer and Contract Specialist of the proposals. The Contract Specialist for this project is Ms. Kisha Cook whose email address is NNikisha.W.Cook@usace.army.mil. The Contracting Officer for this project is Mr. Bruce Helms, whose email address is B ruce.A.Helms@usace.army.mil.
Proposal Due Date and Time
Request For Proposal No: W912HN20R4001 Due Date of Proposal: Block 13 of Standard Form 1442 Time by which Proposals are Due: Block 13 of Standard Form
Title of Project: North Carolina MATOC for General and Design/Build Construction
Title the file(s) in the following format:
W912HN20R4001_COMPANY NAME_VOLUME I
W912HN20R4001_COMPANY NAME_VOLUME II
W912HN20R4001_COMPANY NAME_VOLUME III
W912HN20R4001_COMPANY NAME_VOLUME IV
REQUEST FOR UPLOAD CODE FOR SAFE WEBSITE: Offerors must email Contract Specialist Kisha Cook at nikisha.w.cook@usace.army.mil and to Contracting Officer Bruce Helms at bruce.a.helms@usace.army.mil no later than five (5) working days prior to the proposal due date to receive a request code which will allow for file uploads via the DODSAFE website.
Offerors that fail to email for request of a code five (5) working days before proposal submission date may not be able to receive a request code in time to upload their submission. Upload Codes are only valid for 14 days and only available for a one (1) time use. Offerors are responsible for ensuring they request enough codes to submit a complete proposal by the due date and time and to notify the Contract Specialist via email prior to the proposal due date/time of how many files constitute a complete proposal submission for each phase so the contracting office is notified of a complete submittal by an offeror.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be in the email notice to each of the recipients you choose to have access your file(s).
NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII) in the File Description.) Submission shall be in Adobe PDF format.
INSTRUCTION TO FOLLOW ON THE DODSAFE WEBSITE:
a. Once at the SAFE website, select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the DODSAFE site as a guest.
b. After selecting the “Click Here” link you will be prompted to add your personal information, file information, receipt (Government representative) information and emails email settings.
c. When completing your file information for transmittal via the SAFE website, you will be required to enter email addresses for all recipients.
For this solicitation, the recipients are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation Kisha Cook at nikisha.w.cook@usace.army.mil, and the Contracting Officer is Bruce Helms at bruce.a.helms@usace.army.mil. The contractor must enter the Email address for both the Contracting Specialist and Officer.
After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.
NOTE: Do NOT send the SAFE site packages to group email accounts.
Even if you successfully upload your proposal to the DODSAFE site, notification will not be sent to the government recipients until you verify your email address. A contractor can confirm proper submission by the “Drop-Off Completed” screen which generates based on proper file submission.
NOTE: It has been reported that documents may upload more quickly in the DODSAFE website when using the Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.
RECEIPT OF SUBMISSIONS: For the purposes of establishing whether a proposal submission is considered timely, the government considers the date and time the submission is completely uploaded in the DODSAFE website. For proposals larger than the 2GB capacity of the DODSAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded in to the DODSAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.
The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals.
Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
3.4 QUALITY CONTROL SYSTEM (QCS): Any contract award
resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 01 for additional information.
3.5 TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in Projnet (https://www.projnet.org) at least 10 calendar days prior to the date established in the RFO for receipt of bids. If an Offeror believes that the requirements in this Invitation for RFP contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale.
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via email, followed by an answer after it has been processed by our technical team.
All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the beta.SAM.gov website in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.
INVITATION FOR PROPOSAL NO: W912HN20R4001
TITLE OF PROJECT: North Carolina MATOC for General and
Bidder Inquiry Key: 7GC4A3-IMCCYJ
Specific Instructions for Initial ProjNet Bid Inquiry Access:
1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.
2. Identify the Agency as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone.
Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
Steps 1 through 3: same as above.
4. Email. Enter the email address you used to register previously in ProjNet.
5. Click Continue. A page will then open asking for the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system
3.6 Tabs. Proposal shall be organized and tabbed as follows:
Phase One Formatting - VOLUME I
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB B – Proposal Data Sheet – See Attachment 1 provided at the end of this section. Offerors should ensure telephone number, fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate DUNS number has been created for a joint venture it must also be submitted. A DUNS number shall also be provided for the Designer of Record identified in Factor 2. The Offeror should also submit its Tax ID number on the proposal data sheet.
TAB C – Joint Venture Agreement, if applicable. See General Instructions paragraph 2.1, 2.2.
TAB D – Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. The Offeror is not required to submit a bid bond in Phase One but is required to submit a letter, stamped with an official seal and notarized, from the contractor’s surety validating the Offeror’s single and aggregate bonding capability and a power of attorney if applicable. An electronic submission of the letter and power of attorney, if applicable, are to be submitted in Tab D. Any letter found to be insufficient may affect an Offeror’s responsibility determination. FAR clause 52.228-1, “Bid Guarantee” will be included in the contract. At the discretion of the Contracting Officer, a Bid Bond will be required for each task order.
Also the Surety Letter and power of attorney, if applicable, must be sent in original form to the address below via United States Postal Service (USPS), Federal Express (FedEX) or United Parcel Service (UPS). Other Forms of delivery are not authorized. FACSIMILE TRANSMISSIONS IS
NOT AUTHORIZED.
All Surety Letters must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Request For Proposal No: W912HN20R4001 Title of Project: North Carolina MATOC for General and
Surety Letter must be addressed:
U.S. Army Corps of Engineers, Savannah District
ATTN: CECT-SAS-E
100 West Oglethorpe Avenue Savannah, Georgia 31401-3640
TAB E – Representations and Certifications – Offerors are to submit a statement certifying that their Representations and Certifications are compliant with FAR 52.204-7, 52.204-8 and DFARS 252.204-7007 ALT A. Offeror’s Representation and Certifications are incorporated by reference into the proposal per FAR 52.204-19. In addition, if an offeror’s Representation and Certifications are amended from the electronic record at https://www.sam.gov, the offeror must submit a completed DFAR 252.204-7007 ALT A in full text identifying the changes to the electronic Representations and Certifications that are applicable to this solicitation only within Tab E.
PHASE ONE - VOLUME II
TAB C –Joint Venture Agreement (Duplicate of Volume I) TAB F – FACTOR 1 Past Performance TAB G - FACTOR 2 Design Experience.
4. PHASE ONE – TAB F – FACTOR 1 – PAST PERFORMANCE
4.1 SUBMISSION REQUIREMENTS.
4.1.1 The Offeror shall demonstrate a record of construction
performance and experience on recent and relevant projects. Offerors must submit a completed Past Performance Questionnaire Summary Sheet, Attachment 2. Offerors may use the Past Performance Questionnaire (PPQ), Attachment 3 at the end of this section to submit to the client (Point of Contact) for each relevant project submitted. Offeror must ensure correct phone numbers and email addresses are provided for the client. Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients to ensure timely submittal of completed questionnaires. If the offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1 – 5 of the PPQ and submit it with the proposal. Please note that, at a minimum, this first page of the PPQ and an additional page if used, must contain sufficient information for the government to determine the relevancy of the project.
Offerors may attach one additional single-sided page (per PPQ) to further describe how the project is similar to the RFP requirements.
Offerors may also submit a CPARS evaluation for each relevant project in lieu of a PPQ. Ensure that the PPQs or CPARS evaluations submitted for this Factor clearly describe the relevant characteristics of the project to include the client’s information (Name(s), Phone Number(s), Email Address), and for the respective project(s). The Government may call and confirm information provided by the Offeror on the PPQs with the points of contact to the extent necessary to verify the information in the PPQ or to obtain additional information. The Government reserves the right to interview other individuals if the point of contact is not available. By exception, the client may request submission of questionnaires directly to the Government’s point of contact (Contract Specialist), Kisha Cook.
Request may be made via email to nikisha.w.cook@usace.army.mil.
This request must be coordinated by the client in advance no later than five (5) business days before the proposal due date. PPQ’s submitted directly to the Contract Specialist shall be mailed via trackable means (certified US Mail, FedEx, or UPS). If the PPQ fails to arrive before the closing date and time, or if the information on the PPQ is insufficient to determine the Offeror’s name and appropriate solicitation number, it will not be considered.
Offerors are cautioned that the information submitted pertaining to a project shall be limited to the PPQ form or CPARS evaluation and an additional page and shall contain enough information to determine the similarity and relevancy of a project. Likewise, Project Information submitted in a format other than or in lieu of the PPQ format or CCASS/CPARS evaluation will not be considered. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other solicitations.
In addition to the PPQ, the Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet (Attachment 2) to provide a summary of the PPQs included and/or submitted to clients. The summary sheet shall include information for all columns.
Offerors may submit information about state and local government and private contracts that are similar to the Government’s requirements described in 4.1.2.
If the Offeror is a joint venture, the projects do not have to have been performed by the joint venture submitting the offer. The project could have been performed by either company in the joint venture. For purposes of this Request for Proposal, if the Offeror is submitting as a Joint Venture, no more than five (5) total project examples may be submitted for the entire JV.
Offerors are advised to submit projects wherein the Offeror, or proposed joint venture members, played a significant role and to clearly define those roles.
If any Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer.
4.1.2 Offeror shall submit a minimum of three (3) projects, but no more than five (5) total, recent relevant projects that have a minimum value of no less than $20 million each. The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum value. All projects must be successfully completed or fully designed and at least 50% construction progress completed within six (6) years preceding the date of this solicitation.
Projects that meet these criteria will be evaluated further to determine the level of relevancy. The SSEB may increase an offeror’s confidence rating if it submits more design build projects that meet the stated criteria than design bid build projects.
Projects with similar size, scope, and complexity of the following may be considered relevant projects:
Design-build or design-bid-build construction of Medical Facilities, Headquarters and Operational Facilities, Sensitive Compartmented Information Facilities (SCIFs), Administrative & Office Buildings, Educational Facilities, Military Training Facilities, Weapons Training Facilities, Animal Training & Storage Facilities, Religious Facilities, Recreational & Storage Facilities, Dining Facilities, Vehicle Maintenance Facilities, Aircraft Storage Facilities, Air Traffic Control Towers/Facilities, Barracks Buildings, Ranges, and Access Control Points.
4.1.3 Offerors shall submit no more than five (5) PPQs (Attachment 3) or CPARS evaluations in accordance with 4.1.1 and 4.1.2. Where a project was awarded as a task order or delivery order under an IDIQ type contract, submit information specific to the task or delivery order considered relevant to the requirements of this RFP, rather than the umbrella contract. If an Offeror submits more than five (5) total project examples, only the first five (5) will be evaluated.
4.1.4 Please note that projects submitted by design firms will not be evaluated in this factor. Design firms shall submit projects in accordance with the requirements in Factor 2.
4.1.5 Other Sources. In addition to the above, the Government may review any other sources other than those provided by the Offeror for evaluating past performance and experience. These other sources may include but are not limited to, past performance and experience information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers identified in the proposal on the Proposal Data Sheet, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. If a CPARS evaluation exists for a submitted project, it will be considered.
4.1.6 While the Government may elect to consider data from other sources, the offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.
4.1.7 The experience and/or past performance of individuals
will NOT be considered under this factor.
4.2 EVALUATION CRITERIA.
4.2.1 Past Performance Evaluation: The past performance and experience evaluation results in an assessment of the Government’s confidence in the ability of the Offeror to meet the solicitation requirements. The past performance evaluation considers each Offeror’s demonstrated record of performance and experience on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires. One performance confidence assessment rating is assigned for each Offeror after evaluating the Offeror’s recent past performance and experience, focusing on performance and experience that is relevant to the contract requirements.
4.2.2 Projects must meet the minimum criteria in paragraph 4.1.2 in order to be considered recent and relevant and will be evaluated against the requirements of the RFP. Projects will be evaluated for relevancy based on the description of the project. Information about projects that are not relevant will not be considered.
Table 4. Past Performance Relevancy Ratings Method:
Rating Definition
Very Relevant
Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
4.2.3 Confidence Assessment:
4.2.3.1 Offerors may increase the SSEB’s level of confidence if they are able to demonstrate successful performance in a wide variety of work as described in paragraph 4.1.2. Conversely, the SSEB may have a decreased level of confidence in Offerors whose experience is limited amongst the project types described in paragraph
4.1.2. Offerors may increase the SSEB’s level of confidence if they submit more than three Design-Build projects. Offerors may increase the Source Selection Evaluation Board’s (SSEB) level of confidence by demonstrating previous experience where the Offeror and the design firm(s) in Factor 2 worked together.
4.2.3.2 The Government will evaluate the Offeror's past performance and experience using the sources available to it including, but not limited to, the example projects identified by the Offeror and submitted on the PPQs and any additional information received from references and CPARS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the Offeror has not previously had an opportunity to respond if such information is determined to impact the rating to be assessed.
4.2.3.3 The Government will consider the recency of the performance, the relevancy including the context of the data, and the quality of the performance and general trends in performance and source of the information to reach a confidence assessment rating using Past Performance Confidence Ratings.
4.2.3.4 If no recent/relevant performance record is available or the Offeror’s performance record and experience is so sparse that no meaningful confidence assessment rating can be reasonably assigned this factor will be assigned a rating of “Unknown Confidence” (Neutral).
4.2.4 Past Performance
Confidence Ratings:
Table 5 Confidence Ratings
Rating Definition Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral No recent/relevant performance record is available or the offeror’s
5. PHASE ONE – TAB G – FACTOR 2 - DESIGN EXPERIENCE
5.1 SUBMISSION REQUIREMENTS:
5.1.1 Offeror shall submit a narrative not to exceed a total of five (5) single pages describing its Design Experience or the experience of the intended Designer of Record (DOR) on a minimum of three (3), but no more than five (5) projects that have a minimum construction value of no less than $20 million each and that demonstrate experience with the design of any of the following types of facilities:
Design-build or design-bid-build construction of Medical Facilities, Headquarters and Operational Facilities, Sensitive Compartmented Information Facilities (SCIFs), Administrative & Office Buildings, Educational Facilities, Military Training Facilities, Weapons Training Facilities, Animal Training & Storage Facilities, Religious Facilities, Recreational & Storage Facilities, Dining Facilities, Vehicle Maintenance Facilities, Aircraft Storage Facilities, Air Traffic Control Towers/Facilities, Barracks Buildings, Ranges, and Access Control Points.
5.1.2 Three One of the five projects SHOULD MUST be Design-Build construction.
5.1.3 Projects must be fully designed within six (6) years preceding the date of this solicitation. In the narrative, clearly state the project construction cost, if the effort was for design-build or design-bid-build project, the role of the DOR, and date of design completion.
5.1.4 In addition to the five (5) page narrative, Offerors may submit an additional two
(2) single pages describing the relationship between the Offeror and the Designer of Record for the performance of contract as a result of this solicitation (business agreement, formal arrangement, etc.).
5.2 EVALUATION CRITERIA:
5.2.1 The evaluation considers the demonstrated record of the Offeror’s DOR experience on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires.
5.2.2 Offerors may receive additional consideration for this Factor if it is able to demonstrate the successful design experience of the DOR in a wide variety of work as described in paragraph 5.1.1 or may receive additional consideration if more than one Design-Build projects is submitted. Conversely, offerors may receive less consideration if the experience is limited amongst the project types described in paragraph
5.1.1. Offerors may also receive additional consideration based on evidence of business agreement/level of commitment between the DOR and the Offeror.
5.2.3 Design Experience Ratings
Table 6 Design Experience Combined Technical/Risk Ratings.
Adjectival Rating
Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
6. RELATIVE IMPORTANCE OF FACTORS NON-COST FACTORS.
FACTOR 1: PAST PERFORMANCE. This factor is more important than Factor 2. FACTOR 2: DESIGN EXPERIENCE. This factor is less important than Factor 1.
7. PHASE ONE – PROPOSAL EVALUATION.
7.1 The Source Selection Evaluation Board (SSEB) will be established to conduct the evaluation of proposals received in response to this solicitation. An initial review will take place to ensure that all required forms and certifications are complete.
7.2 The evaluation will be based on the content of the proposal, proposal corrections and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
7.3 Each member of the SSEB will independently consider all
information provided in the proposal. Once these individual analyses are completed, the SSEB will assign a consensus rating for each evaluation factor.
7.4 The final ratings on individual factors will be provided to the Source Selection Authority. The Source Selection Authority, independently exercising prudent business judgment, will determine which Offerors, if any, will proceed to Phase Two.
PHASE TWO – Only offerors selected for Phase Two will submit a proposal – Instructions for Phase Two.
PROPOSAL TABBING REQUIREMENTS. Phase Two proposals shall be organized and tabbed as follows:
VOLUME III – CONTRACT REQUIREMENTS AND PRICE PROPOSAL
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture.
TAB B – Proposal Pricing Schedule, Section 00 10 00 - Base Contract Bid Schedule & Schedule B, Seed/Sample Task Order Pricing.
TAB C – Bid Bond and Surety Info – Solicitation Requirement: The Offeror is required to submit a bid bond validating the Offeror’s bonding capability for the Seed/Sample Task Order. Submit originals;
photocopied or scanned copies are not acceptable. This is to be submitted in original form and sent to the Contract Specialist with an electronic copy included in Tab C. In addition, the Surety shall provide a letter, stamped and notarized, and power of attorney, if applicable,to validate the Offeror’s aggregate bonding capability taking into account the Seed/Sample Task Order and any ongoing projects at this current point in time. An electronic submission of the letter and power of attorney, if applicable, are to be submitted in Tab C. FAR clause 52.228-1, “Bid Guarantee” will be included in the contract. At the discretion of the Contracting Officer, a Bid Bond will be required for each task order.
Also the Bid Bond, the Surety Letter, and power of attorney, if applicable, must be sent in original form to the address below via United States Postal Service (USPS), Federal Express (FedEX) or United Parcel Service (UPS). Other Forms of delivery are not authorized. FACSIMILE
TRANSMISSIONS IS NOT AUTHORIZED.
All Surety Letters must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Request For Proposal No: W912HN20R4001 Title of Project: North Carolina MATOC for General and Design/Build Construction
Surety Letter must be addressed:
U.S. Army Corps of Engineers, Savannah District
ATTN: CECT-SAS-E
100 West Oglethorpe Avenue Savannah, Georgia 31401-3640
TAB D – Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY. Subcontracting Plan shall be prepared in accordance with FAR 52.219-9, and SBA’s Electronic Subcontracting Reporting System
(eSRS) located at http://esrs.gov .
Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at this website. Offerors are to ensure subcontractors agree to submit to ESRS. Savannah District’s assigned subcontracting goals are as reflected in the Clause, Subcontracting Plan for Small Business.
TAB E – For Responsibility Determination Documentation, offerors will be required to submit the following:
Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.)
Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.
If offerors choose to submit Tab E separate from the rest of the proposal submission due to information protection corporate policy, then the Offerors are responsible for ensuring they request enough codes to submit a complete proposal by the due date and time and to notify the Contract Specialist via email prior to the proposal due date/time of how many files constitute a complete proposal submission for each phase so the contracting office is notified of a complete submittal by an offeror.
VOLUME IV – TECHNICAL REQUIREMENTS
TAB EF – FACTOR 3 – Design Technical – Quality of Building Systems TAB F G- FACTOR 4 - Small Business Participation Plan.
8 PHASE TWO – TAB E F – FACTOR 3 – DESIGN TECHNICAL
– QUALITY OF BUILDING SYSTEMS
8.1 SUBMISSION REQUIREMENTS:
a. Presentation Drawings. There are no specific drawings requirements for this TECHNICAL SECTION. However, the Offeror has the option of providing concept level drawing information for specific materials and/or systems which the Offeror feels are necessary to describe the proposed systems or materials for the Seed/Sample task order. If submitted, concept level presentations drawings will not be counted against the eight (8) single-sized typewritten narrative limitation as noted in Paragraph 8.1.b, below.
b. Technical Approach Narratives. Provide technical approach narrative, both qualitative and quantitative, defining the elements of the proposal. It is acceptable to include all the elements below into a single combined narrative for the entire facility. It is the responsibility of the Offeror to ensure that all aspects identified in the evaluation criteria below are addressed. Whether individual narratives or a single combined narrative is provided, the maximum total length for narratives under this TECHNICAL SECTION shall not exceed eight (8) single typewritten pages.
c. Architectural Finishes: Describe how the materials selected provide for a suitable environment for the expected population of the facility.
Discuss how these selections provide value to the Government and how they address the minimum requirements. Narrative should focus on durability and maintenance of the finishes proposed.
d. Mechanical Systems: Describe how the mechanical systems selected provide for a highly efficient environmental control system including information about provisions for indoor air quality maintenance. Discuss how these selections provide value to the Government and how they address the minimum requirements. Narrative should focus on maintenance considerations, limiting energy consumption, and suitability of the proposed systems for the expected usage.
e. Plumbing Systems: Describe how the plumbing systems selected provide for a highly efficient domestic hot water system and an efficient piping system. Discuss how these selections provide value to the Government and how they address the minimum requirements. Narrative should focus on maintenance considerations, energy consumption, and suitability of the proposed systems for the expected usage.
f. Electrical Systems: Describe how the electrical power and lighting systems, telephone, data, and cable television systems selected provide for a highly efficient electrical system. Discuss how these selections provide value to the Government and how they address the minimum requirements. Narrative should focus on maintenance considerations, energy consumption, and suitability of the proposed systems for the expected usage.
g. Site Utilities and Site Systems: Describe how the site utility systems selected provide for an efficient piping system. Discuss how these selections provide value to the Government and how they address the minimum requirements. Narrative should focus on maintenance considerations and suitability of the proposed systems for the expected usage. Include information regarding coordination with privatized utility providers where applicable.
h. Interoperability: Describe how systems integrated into the new facilities which require connection and interface with existing installation wide systems will be accommodated in the proposed project. Narrative should address the following systems as minimum: Fire Alarm, Telephone, Cable Television, UMCS, and privatized utility companies where applicable.
i. Energy Conservation: Describe the strategy to achieve required energy savings as specified in the RFP.
j. ATFP Considerations: Describe how the proposed materials, systems, and designs address the mandatory building ATFP requirements included in the Statement of Work.
k. Proposed Material Identifications: In order to evaluate and rate the quality of the materials being proposed, including any material or equipment warranties exceeding the one year warranty in the contract clause “Warranty of Construction”, the Offeror shall include in the proposal material identification for major materials in each of the areas shown below:
1) Architectural Finishes
2) Interior Walls
3) Floors
4) C e i l i n g s
5) Exterior Walls
10) Window systems/types (not individual windows)
11) Roofing Systems
12) Mechanical Systems
13) Central Heating/Cooling Equipment
14) Pumps
15) Air Handling Equipment
16) HVAC System Control Equipment
17) Energy Conservation Features
18) Plumbing Systems
19) Domestic Hot Water Generator
20) Electrical Systems
21) Main Switchgear and Panels
22) Data, Telephone, Cable TV, Intercom, CCTV, or Other Special Systems as Identified in the SOW
l. The Government will evaluate and consider materials and equipment proposed by brand name and model number as a quality standard. Unless substitution of a manufacturer, brand name or model is otherwise specifically prohibited in the contract, if the successful Offeror desires to substitute manufacturers, brand names or models after award, the substituted product must meet the contract requirements and be approved by the designer of record and the Government as equal in function, performance, quality and salient features to that initially proposed.
m. Acceptance of the proposal is not a guarantee that the proposed products meet the contractual requirements.
8.2 EVALUATION CRITERIA
8.2.1 FACTOR 3 – DESIGN TECHNICAL APPROACH – QUALITY
OF BUILDING SYSTEMS:
a. It is the Army's objective that the Seed/Sample project will have a 50-year useful life. The design and construction should provide an appropriate level of quality to ensure the continued use of the facility over that time period with the application of reasonable preventive maintenance and repairs that would be industry-acceptable to a major civilian sector project OWNER. The facility design should consider that the Army may repurpose the use of the facility over the 50-year life.
Within that overriding theme the Government will evaluate the Offeror selected systems and components proposed in terms of warranties provided, maintenance considerations (frequency, estimated cost, access, equipment locations), operability (ease of use, placement of control features, simplicity), durability (withstand troop usage, ease of cleaning), sustainability, and energy consumption (HVAC, lighting, power, etc.).
The minimum acceptable level of quality for finishes and materials for these buildings are those materials suitable for the expected population and usage. Residential or similar grade finishes and materials are not acceptable.
b. The Government encourages the Offeror to place emphasis on those design features which optimize and emphasize functional/operational requirements; interior/exterior finishes and systems; and life cycle/ energy efficiency. The following items will be considered in the evaluation of the building systems and materials of the Seed/Sample task order:
1) Architectural Finishes. Proposals include finishes which provide usable spaces for the intended purposes. Proposals will receive additional consideration for materials offered that include extended warranties, longer life expectancies, sustainability, durability (stand up to troop usage), have low maintenance requirements, and enhance the overall life cycle cost efficiency of the facility.
2) Architectural Components and Systems. Proposals include components and systems that provide the basic function necessary.
Proposals will receive additional consideration for components and systems offered that include extended warranties, longer life expectancies, sustainability, durability (stand up to troop usage), have low maintenance requirements, and enhance the overall life cycle cost efficiency of the facility.
3) Mechanical Components and Systems. Proposals include components and systems that provide the basic environmental control function necessary. Proposals will receive additional consideration for components and systems offered that include extended warranties, longer life expectancies, reduce energy consumption, sustainability maintainability (cyclical maintenance, access, equipment placement), and enhance the overall life cycle cost efficiency of the facility.
4) Plumbing Components and Systems. Proposals include components and systems that provide the basic function necessary. Proposals will receive additional consideration for components and systems offered that include extended warranties, longer life expectancies, sustainability, durability (stand up to troop usage), have low maintenance requirements,
5) Electrical Components and Systems. Proposals include components and systems that provide the basic function necessary. Proposals will receive additional consideration for components and systems offered that include extended warranties, longer life expectancies, sustainability, durability (stand up to troop usage), have low maintenance requirements,
6) Site Utilities Components and Site Systems. Proposals include components and systems that provide the basic function necessary.
Proposals will receive additional consideration for components and systems offered that include extended warranties, longer life expectancies, and sustainability, have low maintenance…