SF 30 - Summary of Changes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMD 0002.pdf | ||
| AMD 0002 Conformed.pdf | ||
| AMD 0001 conformed.pdf | ||
| SAS_AIWW_SS_Plans_09amd1.pdf | ||
| SPECIFICATIONS.pdf | ||
| SAS_AIWW_SS_Plans_09.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912HN-09-B-0021 Atlantic Intracoastal Waterw ay Selected Sites
See Page 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jul-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-09-B-0021
X 9B. DATED (SEE ITEM 11)
21-Jul-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jul-2009
CODE
U.S. ARMY ENGINEER DISTRICT SAVANNAH
ATTN: CT-P/AMY COLLINS
100 WEST OGLETHORPE AVENUE
SAVANNAH GA 31401-3046
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN-09-B-0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following items are applicable to this amendment:
A. CONTRACT CHANGES:
Block 3 of the SF 1442 Solicitation, Offer, and Award is revised from 17-Jul-2009 to 21-Jul-2009.
The date and time for receipt of bids remains 24 Aug 2009 at 2:00 PM EST.
SECTION 00010 - SOLICITATION CONTRACT FORM is changed as follows:
CLIN 7002
The CLIN extended description has changed from ARRA - Mobilization and Demobilization Complete to Deleted.
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The unit of issue Lump Sum has been deleted.
SECTION 00700 - CONTRACT CLAUSES is changed as follows:
The following have been added by full text:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not
W912HN-09-B-0021
relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
PLATE SHEET FILE NO. TITLE
NO. NO.
X-1 1 vjrx001.dgn INDEX OF DRAWINGS X-2 2 vjrx002.dgn LOCATION MAP, AIWW H-1 3 vjrh003.dgn FLORIDA PASSAGE EXAM SURVEY H-2 4 vjrh004.dgn ALTAMAHA SOUND EXAM SURVEY H-3 5 vjrh005.dgn BUTTERMILK SOUND EXAM SURVEY H-4 6 vjrh006.dgn BUTTERMILK SOUND EXAM SURVEY H-5 7 vjrh007.dgn BUTTERMILK SOUND EXAM SURVEY H-6 8 vjrh008.dgn FIELDS CUT EXAM SURVEY H-7 9 vjrh009.dgn DISPOSAL AREA 14B
(End of clause)
B. TECHNICAL SPECIFICATION CHANGES:
SECTION 01 11 00.00 37 – SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
Delete existing Page 2 in its entirety and replace with revised enclosed Page.
SECTION 35 20 23 – DREDGING
Delete existing Page 6 in its entirety and replace with revised enclosed Page.
NOTE:
Text that is added or revised by this amendment is replaced in its entirety and underlined and/or printed in bold and/or stamped appropriately.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
C. DRAWINGS
Delete Plate Numbers H-01 and H-07 in their entirety and replace with revised enclosed Plates:
(End of Summary of Changes)
Encls As stated
Maintenance Dredging, AIWW, Select Sites W912HN-09-B-0021 Georgia and South Carolina
SECTION 01 11 00.00 37
SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
33 CFR 64 Marking of Structures, Sunken Vessels and other Obstructions
33 CFR 66 Private Aids to Navigation
33 CFR 67 Aids to Navigation on Artificial Islands and Fixed Structures
33 CFR 67.01 General Requirements
33 CFR 67.40-1 Notification to District Commander
33 CFR 81 (2006) Implementing Rules
33 CFR 84 (2006) Positioning and Technical Details of Lights and Shapes
33 CFR 89 (2006) Inland Navigation Rules:
Implementing Rules
46 CFR 7 Boundary Lines
U.S. ARMY CORPS OF ENGINEERS (USACE)
ER 1110-1-5 Plant Pest Quarantined Areas and Foreign Soil Samples
1.2 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(ALTERNATE B) (JUN 2000 SAS)
The Contractor will be required to commence work under this contract within 5 calendar days after the date of receipt by him of Notice to Proceed, to prosecute said work diligently and to complete the entire work ready for usenot later than 150 calendar days after the date of receipt by him of Notice to Proceed provided, the total quantity of material to be paid for actually removed under the contract exceed the limit established in the clause entitled VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS, additional time will be allowed at the rate of 30 calendar days for each 350,000 cubic yards in excess of the established limit. The time stated for completion shall include final cleanup of the premises.
End of Clause
SECTION 01 11 00.00 37 Page 2 (Revised by Amendment No. 0001)
Maintenance Dredging, AIWW, Select Sites W912HN-09-B-0021 Georgia and South Carolina
1.6.2 No Subsurface Explorations
No subsurface explorations were conducted specifically for preparation of these specifications. Descriptions of subsurface materials to be removed in this contract are based on the nature of previous shoaling and the results of dredging along the AIWW in the vicinity of the project site.
1.6.2.1 Material and Record Inspection
Bidders should examine the areas included in this contract and determine for themselves the character of materials.
1.6.2.2 Records of Previous Dredging
Records of previous dredging are available in the office of the U.S. Army Engineer District, Savannah, 100 West Oglethorpe Avenue, Savannah, Georgia 31401-3640. Access may be obtained through Mr. Lyle Maciejewski at (912) 652-5480 or Mr. Roger LaFond at (912) 652-5326.
1.7 DREDGING CONTROLS
(JAN 1980 SAS)
In high silt areas, controlled dredging shall be used to avoid excess agitation of fine grained silt materials. The cutter speed shall be limited to a maximum RPM to limit the peripheral speed to 2 feet per second. The swing of the dredge shall be limited to a maximum of 0.5 foot per second in horizontal movement of the cutter head. The dredged bank shall be cut in layers not to exceed 1.5 times the diameter of the cutter.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 DISPOSAL AREA OPERATIONS
(MAY 1994 SAS)
3.1.1 Transport and Disposal of Dredged Material
The dredged material shall be transported to and deposited in disposal areas as shown on drawings described in the clause CONTRACT DRAWINGS AND SPECIFICATIONS (DFARS 52.236-7001) of Section 00700. The head section of the pipeline shall be placed at the location shown on the project drawings. Any deviation from the approximate head section location shown on the drawings must be approved by the Contracting Officer or his Authorized Representative prior to placement of the dredge pipe in the disposal area. The Contracting Officer's Representative reserves the right to direct placement of the Contractor's head section or add additional head sections in the disposal area. The Contractor shall coordinate the location of his pipe head section with the Contracting Officer or his Authorized Representative prior to placement of the pipe in disposal area.
The dredge pipeline shall be placed according to the routes designated on the drawings. During the placement or removal of the dredge pipeline on the designated disposal areas, all means necessary shall be used to lessen impacts to all marsh grass or vegetation. Any depressions or damage caused by the contractor to the marsh grass shall be repaired and/or replanted to the original condition by the contractor at no additional cost to the Government. Dredged material from each site or work area on the AIWW shall