22B0020 Amendment 0003.pdf
PDF 453 KB Posted
- Attached to
- Fisher Island Shoreline Stabilization Federal contract opportunity
- Solicitation number
- W912ES22B0020
About this file
This amendment modifies an invitation for bid for a shoreline stabilization project. The purpose is to update instructions to bidders, specifications, and extend the bid opening date. Key changes include clarifying language around turbidity prevention and permitting requirements. The mailing address for bid submissions was updated. Bidders must register in the System for Award Management and complete representations and certifications. The apparent low bidder must provide documentation of work self-performance capabilities, financial statements from the past three years, and a line of credit certification within two business days of bid opening. Bids are due by September 1, 2022. The project involves placing riprap vanes to protect the shoreline of Fisher Island near Pool 5 in Minnesota.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bidding Abstract_Fisher Island_22B0020.pdf | ||
| 22B0020 Amendment 0002.pdf | ||
| 22B0020 Amendment 0001.pdf | ||
| 22B0020 Fisher_Island Solicitation.pdf | ||
| 22B0020 Fisher_Island_Planset.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0003 is to update Instructions to Bidders w hich includes new mailing address, update specif ications section
1.14.3 and extend the bid opening.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES22B0020
X 9B. DATED (SEE ITEM 11)
27-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2022
CODE
CONTRACTING DIVISION
USACE - ST PAUL
332 MINNESOTA STREET
SUITE E1500
SAINT PAUL MN 55101
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES22B0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES
AMENDMENT NO. 3
Summary of Changes
1. Specifications Section 1.14.3 Turbidity is changed:
FROM:
Minimize soil disturbance near areas where riprap vanes will be constructed to reduce potential increases in turbidity. Construct the project to follow any conditions associated with permits issued by MnDNR, including restrictions related to fishery protection exclusion dates (1 March to 1 June) and no tree removal from June 1 to July
31. Depending on Contractor’s schedule and means and methods, Contractor may be required to use a floating barrier to prevent sediment migration downstream.
TO:
Turbidity Minimize soil disturbance near areas where riprap vanes will be constructed to reduce potential increases in turbidity. Construct the project to follow any conditions associated with permits issued by MnDNR, including restrictions related to fishery protection exclusion dates (1 March to 1 June) and no tree removal from June 1 to July
31. The Contractor shall follow all permits while conducting the work to prevent sediment migration downstream.
The following have been modified:
INSTRUCTIONS TO BIDDERS
1. SAM Registration. In order for contractors to conduct business with the Department of Defense, the contractor must provide registration information to the System for Award Management (SAM). Pursuant to
FAR 4.1102, firms must be SAM registered at the time their bid is submitted. All bidders must register and complete online representations and certifications prior to the bid opening. Bidders that have not registered or completed their online representations and certifications may be rejected. Bidders are advised that the initial registration process in SAM may take several weeks. The Government will review completed representations and certifications in SAM following the bid opening. Submission of paper copies of completed representations and certifications is not required with bid submissions. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov
2. Section 889 compliance. Bidders shall complete the representation in SAM regarding FAR 52.204-
26 Covered Telecommunications Equipment or Services -Representation. For additional information see:
https://www.acquisition.gov/sites/default/files/page_file_uploads/Section-889-Explanation-1.pdf
3. Bidder Inquiries. Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit their questions using the ProjNet system at https://www.projnet.org
Clause 52.214-6 requires that all inquiries be submitted in writing. To submit a new inquiry or to view inquiries submitted by other prospective bidders, users must be registered and signed into the ProjNet http://www.sam.gov/ https://www.acquisition.gov/sites/default/files/page_file_uploads/Section-889-Explanation-1.pdf https://www.projnet.org/ system. Bidders may register online at https://www.projnet.org (click on “Register”). The following information will be needed to submit or view bidder inquiries:
Managing Agency: USACE
The Solicitation Number is: W912ES22B0020
The Bidder Inquiry “Key” Number is: 9Z49RJ-5BDVPY
Bidders are requested to submit inquiries as early as possible prior to bid opening in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary. Those who submit an inquiry will receive a system-generated email acknowledgement. All answers to inquiries will be posted in ProjNet after they have been reviewed by the USACE technical team. Bidders are advised to review the solicitation in its entirety and to review all previously submitted questions and responses prior to submitting a new inquiry.
4. Bid Guarantee. This solicitation requires each bidder to submit an acceptable bid guarantee (current version of Standard Form 24) along with its bid (see provision 52.228-1). The Contracting Officer has the authority and responsibility to determine whether the bid bond and its accompanying documentation clearly show that the person(s) executing the bid bond on behalf of the surety have the authority to unequivocally bind the bonding company.
The bid bond must be accompanied by a signed and dated power-of-attorney. If a signed and dated power-of-attorney does not accompany the bid bond, the bid must be rejected as non-responsive. Please note that a non-responsive bid may not be corrected after bid opening to make it responsive – the bid must be rejected.
The power-of-attorney must be issued by the surety (the Treasury Department-approved bonding company, not the insurance agency writing the bond).
Original powers-of-attorney and photocopies or facsimiles of original, otherwise valid, powers-of attorney provide sufficient evidence of authority to bind the surety. Questions concerning the authenticity or enforceability of a power-of-attorney may be resolved by the Contracting Officer, often in consultation with the surety, after the bid opening.
This note does not provide offerors with an all-inclusive checklist for submitting an acceptable bid bond rather, it provides some information the validity of powers-of-attorney.
5. Responsibility Determination. In accordance with Federal Acquisition Regulation (FAR) Subpart
9.1, the apparent low bidder will be requested to provide the following information:
a. A detailed description of the work to be self-performed for each site location as applicable and resources available to demonstrate the firm is capable of complying with 52.219-14, Limitations on Subcontracting (Deviation 2021-O0008) (SEP 2021).
b. Financial Statements, including balance sheets that identify major categories of assets, liabilities, and owner’s equity; and profit and loss statements for the past three (3) years.
c. A Bank Certification of Financial Capability (line of credit).
The above information must be received by the Contracting Officer within two business days after the bid opening. This information will be treated as confidential commercial or financial information to the extent permitted by law under exemption 4 to the Freedom of Information Act, 5 U.S.C. § 552(b)(4). The financial statements should be not over 60 days old. If over 60 days old, a certification shall be attached stating that the financial condition of the firm is substantially the same or, if not the same, the changes that have taken place.
6. Unit Pricing/Extended pricing. All extensions of the unit prices shown will be subject to verification by the Government. In case of a discrepancy between the unit price and the extension, the unit price will govern.
a. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump sum and extended prices will be corrected.
b. For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends its bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
7. Quantities. All quantities are estimated except where unit is given as “EA” (each) or “JOB” (job).
8. Mailed Bids. Bids may be mailed to ensure receipt by USACE before the sealed bid due date and time at the following mail address:
Contracting Division
ATTN: Roberta Just / Kevin Henricks / Ken Eshom
332 Minnesota Street
Suite E1500
Saint Paul, MN 55101
9. Facsimile or Electronic bids. Facsimile or Electronic (email) bids and modifications thereto are not authorized and will not be accepted.
10. Unbalanced Bids. The government may reject as non-responsive any bid that is materially unbalanced between contract line-item numbers or sub-items on the bidding schedule. A bid is materially unbalanced when it is based on prices that are significantly less than cost for some work and significantly more than cost for other work. A materially unbalanced bid may be rejected if the Contracting Officer has a reasonable doubt as to whether the bid will result in the lowest overall cost to the government even though it may be the low evaluated bid. Additionally, a bid that is unbalanced so as to be tantamount to an advance payment will be rejected as non-responsive even if acceptance of the bid would result in the lowest overall cost to the government. Reference is made to paragraph (d) of clause 52.214-19, “Contract Award
– Sealed Bidding – Construction.”
11. Bidder Qualifications. Before a bid is considered for award, the bidder may be requested by the
Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work.
12. Availability and Use of Utility Services
The Government will make available to the Contractor, from existing outlets and supplies to the extent that they are available, all reasonably required amounts of electricity without charge. The Contractor, at his own expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and shall remove the same prior to final acceptance of the construction.
13. All or None Qualifications. A vendor must provide a price on all items in this solicitation to be eligible for award. The Government will award on an “All or None” basis. Evaluation of bids/offers will be based upon only the total price included on the pricing schedule for all items. If options are included in the pricing schedule the evaluation will be conducted in accordance with the applicable option clause in the solicitation.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 26-Aug-2022 03:00 PM to 01-Sep-2022 02:00 PM.
The Issued By organization has changed from
CONTRACTING DIVISION
USACE - ST PAUL
180 FIFTH STREET EAST
SUITE 700
SAINT PAUL MN 55101-1678
to
CONTRACTING DIVISION
USACE - ST PAUL
332 MINNESOTA STREET
SUITE E1500
SAINT PAUL MN 55101
(End of Summary of Changes)