This document summarizes Amendment 0001 to solicitation W912ES22B0020 from the Department of the Army Corps of Engineers Engineering District St Paul. The amendment updates wage rates, adds instructions to bidders, and details a virtual bid opening process. Key requirements include placement of riprap into vanes to protect the shoreline at Fisher Island near Pool 5, Minnesota. Bidders must register in SAM, comply with Section 889, and submit any inquiries through ProjNet by a specified deadline. A bid guarantee and responsibility determination information may be required from the apparent low bidder. The wage determination is modified and bidders should review all provisions and previously submitted questions prior to bidding.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bidding Abstract_Fisher Island_22B0020.pdf | ||
| 22B0020 Amendment 0003.pdf | ||
| 22B0020 Amendment 0002.pdf | ||
| 22B0020 Fisher_Island Solicitation.pdf | ||
| 22B0020 Fisher_Island_Planset.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0001 is to, update the w age rates, add Instructions to Bidder section, and Virtual Bid Opening section.
1. CONTRACT ID CODE PAGE OF PAGES
1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES22B0020
X 9B. DATED (SEE ITEM 11)
27-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Aug-2022
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 FIFTH STREET EAST
SUITE 700
SAINT PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES22B0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
INSTRUCTIONS TO BIDDERS
1. SAM Registration. In order for contractors to conduct business with the Department of Defense, the contractor must provide registration information to the System for Award Management (SAM). Pursuant to FAR 4.1102, firms must be SAM registered at the time their bid is submitted. All bidders must register and complete online representations and certifications prior to the bid opening. Bidders that have not registered or completed their online representations and certifications may be rejected. Bidders are advised that the initial registration process in SAM may take several weeks. The Government will review completed representations and certifications in SAM following the bid opening. Submission of paper copies of completed representations and certifications is not required with bid submissions. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov
2. Section 889 compliance. Bidders shall complete the representation in SAM regarding FAR 52.204-
26 Covered Telecommunications Equipment or Services -Representation. For additional information see:
https://www.acquisition.gov/sites/default/files/page_file_uploads/Section-889-Explanation-1.pdf
3. Bidder Inquiries. Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit their questions using the ProjNet system at https://www.projnet.org
Clause 52.214-6 requires that all inquiries be submitted in writing. To submit a new inquiry or to view inquiries submitted by other prospective bidders, users must be registered and signed into the ProjNet system. Bidders may register online at https://www.projnet.org (click on “Register”). The following information will be needed to submit or view bidder inquiries:
Managing Agency: USACE The Solicitation Number is: W912ES22B0020 The Bidder Inquiry “Key” Number is: 9Z49RJ-5BDVPY
Bidders are requested to submit inquiries as early as possible prior to bid opening in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary. Those who submit an inquiry will receive a system-generated email acknowledgement. All answers to inquiries will be posted in ProjNet after they have been reviewed by the USACE technical team. Bidders are advised to review the solicitation in its entirety and to review all previously submitted questions and responses prior to submitting a new inquiry.
4. Bid Guarantee. This solicitation requires each bidder to submit an acceptable bid guarantee (current version of Standard Form 24) along with its bid (see provision 52.228-1). The Contracting Officer has the authority and responsibility to determine whether the bid bond and its accompanying documentation clearly show that the person(s) executing the bid bond on behalf of the surety have the authority to unequivocally bind the bonding company.
The bid bond must be accompanied by a signed and dated power-of-attorney. If a signed and dated power-of-attorney does not accompany the bid bond, the bid must be rejected as non-responsive. Please note that a http://www.sam.gov/ https://www.acquisition.gov/sites/default/files/page_file_uploads/Section-889-Explanation-1.pdf https://www.projnet.org/ non-responsive bid may not be corrected after bid opening to make it responsive – the bid must be rejected.
The power-of-attorney must be issued by the surety (the Treasury Department-approved bonding company, not the insurance agency writing the bond).
Original powers-of-attorney and photocopies or facsimiles of original, otherwise valid, powers-of attorney provide sufficient evidence of authority to bind the surety. Questions concerning the authenticity or enforceability of a power-of-attorney may be resolved by the Contracting Officer, often in consultation with the surety, after the bid opening.
This note does not provide offerors with an all-inclusive checklist for submitting an acceptable bid bond rather, it provides some information the validity of powers-of-attorney.
5. Responsibility Determination. In accordance with Federal Acquisition Regulation (FAR) Subpart 9.1, the apparent low bidder will be requested to provide the following information:
a. A detailed description of the work to be self-performed for each site location as applicable and resources available to demonstrate the firm is capable of complying with 52.219-14, Limitations on Subcontracting (Deviation 2021-O0008) (SEP 2021).
b. Financial Statements, including balance sheets that identify major categories of assets, liabilities, and owner’s equity; and profit and loss statements for the past three (3) years.
c. A Bank Certification of Financial Capability (line of credit).
The above information must be received by the Contracting Officer within two business days after the bid opening. This information will be treated as confidential commercial or financial information to the extent permitted by law under exemption 4 to the Freedom of Information Act, 5 U.S.C. § 552(b)(4). The financial statements should be not over 60 days old. If over 60 days old, a certification shall be attached stating that the financial condition of the firm is substantially the same or, if not the same, the changes that have taken place.
6. Unit Pricing/Extended pricing. All extensions of the unit prices shown will be subject to verification by the Government. In case of a discrepancy between the unit price and the extension, the unit price will govern.
a. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump sum and extended prices will be corrected.
b. For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends its bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
7. Quantities. All quantities are estimated except where unit is given as “EA” (each) or “JOB” (job).
8. Facsimile or Electronic bids. Facsimile or Electronic (email) bids and modifications thereto are not authorized and will not be accepted.
9. Unbalanced Bids. The government may reject as non-responsive any bid that is materially unbalanced between contract line-item numbers or sub-items on the bidding schedule. A bid is materially unbalanced when it is based on prices that are significantly less than cost for some work and significantly more than cost for other work. A materially unbalanced bid may be rejected if the Contracting Officer has a reasonable doubt as to whether the bid will result in the lowest overall cost to the government even though it may be the low evaluated bid. Additionally, a bid that is unbalanced so as to be tantamount to an advance payment will be rejected as non-responsive even if acceptance of the bid would result in the lowest overall cost to the government. Reference is made to paragraph (d) of clause 52.214-19, “Contract Award
– Sealed Bidding – Construction.”
10. Bidder Qualifications. Before a bid is considered for award, the bidder may be requested by the
Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work.
11. Availability and Use of Utility Services The Government will make available to the Contractor, from existing outlets and supplies to the extent that they are available, all reasonably required amounts of electricity without charge. The Contractor, at his own expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and shall remove the same prior to final acceptance of the construction.
12. All or None Qualifications. A vendor must provide a price on all items in this solicitation to be eligible for award. The Government will award on an “All or None” basis. Evaluation of bids/offers will be based upon only the total price included on the pricing schedule for all items. If options are included in the pricing schedule the evaluation will be conducted in accordance with the applicable option clause in the solicitation.
VIRTUAL BID OPENING
The St. Paul District is in the process of moving to another location, for that reason, the bid opening will be held virtually and bidders will not be able to attend the bid opening in person.
Here is the bid opening meeting invite information:
When it's time, join your Webex meeting here.
https://usace1.webex.com/meet/kevin.p.henricks
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
WAGE RATES
"General Decision Number: MN20220036 07/29/2022 https://usace1.webex.com/meet/kevin.p.henricks
Superseded General Decision Number: MN20210036
State: Minnesota
Construction Type: Heavy Heavy including Water and Sewer Lines
Counties: Dodge, Olmsted and Wabasha Counties in Minnesota.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/25/2022 2 05/27/2022 3 07/29/2022
BRMN0017-007 05/04/2021
WABASHA
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 40.95 24.83
CARP0930-002 05/01/2019
Rates Fringes
CARPENTER........................$ 38.96 21.98
ELEC0343-008 07/01/2021
Rates Fringes
ELECTRICIAN......................$ 43.20 23.59
ENGI0049-067 05/01/2022
Rates Fringes
OPERATOR: Power Equipment Group 2.....................$ 39.43 23.45 Group 3.....................$ 38.98 23.45 Group 4.....................$ 38.69 23.45 Group 5.....................$ 36.11 23.45 Group 6.....................$ 35.24 23.45
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 2: Crane with over 135' Boom, excluding jib; Hydraulic Backhoe with shovel-type controls, 3 cubic yards and over;
Grader/Blade finishing earthwork and bituminous.
GROUP 3: Hydraulic Backhoe with shovel-type controls up to 3 cubic yards; Loader 5 cu yd and over; Mechanic; Tandem Scraper; Truck Crane; Crawler Crane
GROUP 4: Bituminous Roller 8 tons & over; Crusher/Crushing Plant; Drill Rig; Elevating Grader; Loader over 1 cu yd;
Grader; Pump; Scraper up; to 32 cu yd; Farm Tractor with Backhoe attachment; Skid Steer Loader over 1 cu yd with Backhoe attachment; Bulldozer over 50 hp.
GROUP 5: Bituminous Roller under 8 tons; Bituminous Rubber Tire Roller; Loader up to 1 cu yd; Bulldozer 50 hp or less.
ROUP 6: Oiler; Self-Propelled Vibrating Packer 35 hp and over.
CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM;
CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM
UNDERGROUND WORK:
UNNELS, SHAFTS, ETC. - $ .25 PREMIUM
UNDER AIR PRESSURE - $ .50 PREMIUM
HAZARDOUS WASTE PROJECTS (PPE Required):
LEVEL A - $1.25 PREMIUM
LEVEL B - $ .90 PREMIUM
LEVEL C - $ .60 PREMIUM
* IRON0512-041 05/01/2022
Rates Fringes
IRONWORKER, STRUCTURAL AND
REINFORCING......................$ 41.00 33.11
LABO0405-003 05/01/2021
Rates Fringes
LABORERS
(1) Common or General.......$ 33.06 19.29
(2) Mason Tender Cement/Concrete.............$ 33.26 19.29
(6) Pipe Layer..............$ 36.56 19.29
PLAS0633-029 05/01/2019
DODGE
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 43.52 10.13
PLAS0633-052 05/01/2021
OLMSTED
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 46.52 11.23
TEAM0160-019 05/01/2022
Rates Fringes
TRUCK DRIVER (DUMP)
(1) Articulated Dump Truck..$ 31.55 21.45
(2) 3 Axles/4 Axles; 5 Axles receive $0.30 additional per hour.........$ 31.00 21.45
(3) Tandem Axles; & Single Axles.......................$ 30.90 21.45
* SUMN2009-077 09/28/2009
Rates Fringes
LABORER: Landscape..............$ 12.88 ** 4.61
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"