W912ES-16-B-0004_FullSize.pdf

PDF 20 MB Posted

Attached to
Sand Hill River Structure 4 Federal contract opportunity
Solicitation number
W912ES-16-B-0004
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

W912ES16B0004 Full Size Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Sand Hill River Structure 4, newest first.
File Type Posted
BID_ABSTRACT_W912ES-16-B-0004_SIGNED.pdf PDF
Amendment_4_W912ES16B0004.pdf PDF
Amendment_3_Bid_Schedule.pdf PDF
Amendment_3_W912ES16B0004.pdf PDF
Amendment_2_W912ES16B0004.pdf PDF
Sand_Hill_public_waters_permit.pdf PDF
Amendment_1_W912ES16B0004.pdf PDF
Sand_Hill_Site_Visit_Sign_in_sheet.pdf PDF
W912ES-16-B-0004__IFB_and_SPECs.pdf PDF
W912ES-16-B-0004_HalfSize.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T .S

U L L

Y

/0

/3

G C

W

/6 /2

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S T P

A U

L D

IS

T R

IC

T

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S H

R F P

G -0 d g n

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

A N

S I

D

C A

A

C A

A

G-002

2015/06/30

GCW

GCW

L/D 10

L/D 9

L/D 1

L/D 2 L/D 3

L/D 5

L/D 7

L/D 4

L/D 5A L/D 6

L/D 8

MINOT

ROCHESTER

MANKATO

BRAINERD

BEMIDJI

DULUTH

C A N A D A

ST. PAULS.A.F. L/D'S

STATE BOUNDARIES

RIVERS & LAKES

DISTRICT BOUNDARIES

NATIONAL BOUNDARIES

PROJECT

LOCATION

MINNEAPOLIS

L/D LOCK AND DAM

IOWA

SOUTH DAKOTA

NORTH DAKOTA

MINNESOTA

WISCONSIN

S O

U R I S

R.

DEVIL'S

LAKE R

E D

R I V E R

O F

T H E

N O R T H

LAKE OF

THE WOODS

UPPER

RED LAKE

LOWER

RED LAKE

LAKE

ITASCA

CASS

LAKE

LAKE

WINNIBIGOSHISH

GRAND RAPIDS

LEECH

LAKE

MILLE

LACS

LAKEM

I S S I S

SIPPI

R.

S T.

C R

O

IX

R.

LAKE

PEPIN

M I N

N

ES

OTA

RIVER

BIGSTONE

LAKE

LAKE

TRAVERSE

ST.CLOUD

WIS

CONSIN R.

MICHIGAN

LAKE SUPERIOR

LEGEND

LOCATION MAP

LAKE

ASHTABULA

SHEYENNE

R.

DARLING

LAKE

FORKS

GRAND

EAU CLAIRE

MADISON

PORTAGE

C

HI

PP

E

W A

R.

CITY

VALLEY

N

N.T.S.

PROJECT

#4

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

O

ID

N

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

8 1

A

BELTRAMI

NTS

.9

L O

C A

T

IO

N M

A P

V

IC

IN

IT

Y M

A P

LOCATION

VICINITY MAP

A T

L A

N T

IC

A

V E

430 ST SW 450 ST SW

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

Sheet

U L L

Y

/0

/1

/2

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S T P

A U

L D

IS

T R

IC

T

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S H

R F P

G -0 d g n

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

A N

S I

D

C A

A

C A

G-003

/0

/0

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

8 1

A

DESCRIPTION FILE NAME

DESCRIPTION

INDEX OF DRAWINGS - CONSTRUCTION

INDEX OF DRAWINGS - REFERENCE

EXIST

MAX

MIN

SST

TYP

EXISTING

FAR FACE

GALVANIZED

INSIDE FACE

MAXIMUM

MINIMUM

MISCELLANEOUS

OUTSIDE FACE

ON CENTER

STAINLESS STEEL

TOP AND BOTTOM

TYPICAL

UNLESS NOTED OTHERWISE

UNDERGROUND

APPROXIMATE

ALTERNATE WITH

ALUMINUM

BITUMINOUS

BOTTOM

CURB & GUTTER

CONSTRUCTION JOINT

CONCRETE

DIAMETER

EACH FACE

BOT

C/L

C&G

CMP CORRUGATED METAL PIPE

EXPANSION JOINT

ELEVATION

EACH WAY

DRAWINGDWG

HEIGHT

NUMBER

SAN SANITARY

SPECIFICATIONS

MIRR MIRRORED

APPROX

ALT W/

ALUM

BITUM

CENTER LINE

CLR CLEAR

CJ

CONC

DIA

EF

EJ

EL

EW

FF

GALV

HT

IF

OF

NO

OC

SPEC

T&B

UNO

UGND

FES FLARED END SECTION

WIDTH

WATER MAINWM

W

RIVERWARDR/W

LONG

LANDWARDL/W

LG

ABBREVIATIONS

* UNLESS OTHERWISE NOTED ON EACH SHEET

FILE NAME

GENERAL CROSS-REFERENCING SYMBOLS

EACH VIEW)

(CENTERED UNDER

VIEW SUBTITLE

SAME DRAWING

VIEW SHOWN ON

SECTION CUT W/

ANOTHER DRAWING

VIEW SHOWN ON

SECTION CUT W/

SAME DRAWING

VIEW SHOWN ON

DETAIL SYMBOL W/

ANOTHER DRAWING

VIEW SHOWN ON

DETAIL SYMBOL W/

FRONT SIDE

SECTION

ELEVATION

TOP

C-501

SCALE:

SUPPLEMENTAL INFORMATION

DETAIL/SECTION

D5

D5 DETAIL/SECTION

C-102

D5 C-302

D5

SECTION/DETAIL)

(CENTERED UNDER

DRAWING

TITLE ON SAME

SECTION/DETAIL

SECTION/DETAIL)

(CENTERED UNDER

DRAWING

TITLE ON ANOTHER

SECTION/DETAIL

GENERAL CROSS-REFERENCING SYMBOLS

EACH VIEW)

(CENTERED UNDER

VIEW SUBTITLE

SAME DRAWING

VIEW SHOWN ON

SECTION CUT W/

ANOTHER DRAWING

VIEW SHOWN ON

SECTION CUT W/

SAME DRAWING

VIEW SHOWN ON

DETAIL SYMBOL W/

ANOTHER DRAWING

VIEW SHOWN ON

DETAIL SYMBOL W/

FRONT SIDE

SECTION

ELEVATION

TOP

DETAIL/SECTION

D5 DETAIL/SECTION

D5 C-302

D5

SECTION/DETAIL)

(CENTERED UNDER

DRAWING

TITLE ON SAME

SECTION/DETAIL

SECTION/DETAIL)

(CENTERED UNDER

DRAWING

TITLE ON ANOTHER

SECTION/DETAIL

GENERAL LEGEND

FILL

CUT

AND NUMBER

BORING LOCATION

WATERMAIN

P.I. POINT

SANITARY SEWER

EXISTING

STORM SEWER

EXISTING

AND NUMBER

DWG OUTLINE

OVERHEAD P0WER

EXISTING

EXISTING GAS

97-41M

.9

ID

SHEET

ID

SHEET

DRAWING NUMBER

AS-BUILT

DRAWING NUMBER

AS-BUILT

M/R MAINTAINACE AND REPAIR

A A

A

ASHEET ID X-000

RIP RAP

GROUND DUCT

EXISTING UNDER-

AND NUMBER

CPT LOCATION

WORK LIMITS

97-41C

EXCLUSION AREA

TEMPORARY

POINT (3-DIMENSIONAL)

SURVEY CONTROL

L

E G

E N

D

D R

A W

IN

G I

N D

E X

G E

N E

R A

L N

O T

E S

SD102

SD101

C-601

C-501

C-403

C-402

C-401

C-302

C-301

C-102

C-101

B-201

G-101

G-003

G-002

G-001

SHRFP4_SD102---.DGN

SHRFP4_SD101---.DGN

SHRFP4_C-601---.DGN

SHRFP4_C-501---.DGN

SHRFP4_C-403---.DGN

SHRFP4_C-402---.DGN

SHRFP4_C-401---.DGN

SHRFP4_C-302---.DGN

SHRFP4_C-301---.DGN

SHRFP4_C-102---.DGN

SHRFP4_C-101---.DGN

SHRFP4_B-201---.DGN

SHRFP4_G-101---.DGN

SHRFP4_G-003---.DGN

SHRFP4_G-002---.DGN

SHRFP4_G-001---.DGN

MISC

NTS NOT TO SCALE

GENERAL NOTES:

THE CF TO OBTAIN GROUND COORDINATES.

PROPER LAYOUT OF THE PROJECT. DIVIDE GRID COORDINATES BY

COORDINATES SHOWN IN THE PLANS TO GROUND COORDINATES FOR

8. THE COMBINED FACTOR (CF) SHALL BE USED TO CONVERT THE GRID

NORTH ZONE.

7. COORDINATES BASED ON MINNESOTA STATE PLANE GRID SYSTEM,

AVOID DAMAGE TO THESE UTILITIES.

THE TYPE AND LOCATION OF UTILITIES AS MAY BE NECESSARY TO

CONTRACTOR IS RESPONSIBLE FOR MAKING THE DETERMINATION AS TO

OF UTILITIES MAY NOT BE ACCURATE OR ALL INCLUSIVE. THE

6. THE INFORMATION ON THESE DRAWINGS CONCERNING TYPE AND LOCATION

5. ORIGINAL DATA FROM 2011/2012/2015 HYDROGRAPHIC SURVEYS.

4. ORIGINAL DATA FROM 2011 LIDAR.

3. ELEVATION REFER TO NAVD88 (GEOID12A).

2. ORIGINAL DATA COMPILED NAD83 (NSRS2007), U.S. SURVEY FEET.

CONTRACTING OFFICER UPON CONTRACT AWARD.

VERTICAL CONTROL POINTS ARE AVAILABLE BY REQUEST TO THE

1. TIE DIAGRAMS AND DETAILS DESCRIPTIONS OF HORIZONTAL AND

DEMOLITION PLAN DROP STRUCTURE #4

EXISTING DROP STRUCTURE 4 PLAN, ELEVATION, AND ISOMETRIC

CONTROL AND WORK LIMIT TABLES

DETAILS

ROCK RIFFLES PLAN & DETAILS

BOULDER RIFFLE PLAN & DETAILS

PRE-FORMED SCOUR HOLE PLAN & DETAILS

FISHWAY RAMP 4 TYPICAL SECTION D1

FISHWAY RAMP 4 TYPICAL SECTIONS A1-C1

FISHWAY RAMP 4 PLAN AND PROFILE

SITE PLAN

SOIL BORING LOGS

GENERAL PLAN

DRAWING INDEX, GENERAL NOTES & LEGEND

VICINITY MAP & LOCATION MAP

COVER SHEET

R18-P-60/7

R18-P-44/9

R18-P-44/8.1

R18-P-10/5

R18-P-10/2

FLOW HYDROGRAPHS 2005-2015

FLOW DURATION CURVES JULY - DECEMBER

FLOW DURATION CURVES JANUARY - JUNE

*CHANNEL IMPROVEMENT ALIGNMENT AND PROFILE STA. 840+00 TO STA. 980+00

*CHANNEL IMPROVEMENT DROP STRUCTURE NO. 4 - WINGWALLS - MASONRY DETAILS

*CHANNEL IMPROVEMENT DROP STRUCTURE NO. 4 - SITE MAP, PLAN AND MASONRY DETAILS

*CHANNEL IMPROVEMENT BORINGS

*CHANNEL IMPROVEMENT BORINGS

* THIS DRAWING HAS BEEN REDUCED TO THE FIT THE FORMAT.

SAND_HILL_HYDROS.PDF

SAND_HILL_RIVER_DUR1.PDF

SAND_HILL_RIVER_DUR1.PDF

R18-P-60-7.PDF

R18-P-44-8.PDF

R18-P-44-8_1.PDF

R18-P-10-5.PDF

R18-P-10_2.PDF

D5 SUPPLEMENTAL INFORMATION

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

APPROXIMATELY 15000 FT

V 316 RESET

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

O

ID

N A

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

8 1

A

.9

SHEET C-101

/2

A N

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S T P

A U

L

M

IN

N E

S O

T A

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

T .S

U L L

Y

/0

/3

C A

A

C A

A

G C

W

G E

N E

R A

L P

L A

N

G-101

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

S T P

A U

L D

IS

T R

IC

T

ST. PAUL DISTRICT

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S H

R F P

G -1 d g n

N

0 600' 1200'

440TH ST SW

442ND ST SW

T

H A

V E S

W

SAND HILL RIVER

FLOW

1' = 600'

GENERAL PLAN

SAND HILL RIVER

SCALE:

GENERAL NOTES: THIS SHEET ONLY

CONTRACT.

2. 2014 BORING LOGS SHOWN ARE NOT SITE SPECIFIC FOR THIS

OTHER THUS CAUSING OVERLAPPING OF SYMBOLS.

1. CONTROL POINTS AND BORING LOGS ARE LOCATED NEAR EACH

SANDHILL 1

SANDHILL 214-1M

14-2M

S

U L L

Y

/0

B

/1

/2

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S T P

A U

L D

IS

T R

IC

T

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S H

R F P

B -2 d g n

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E

S

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

A N

S I

D

P R

F

J F

B-201

/0

/0

S

IL

B

O R

IN

G L

O G

S

N A

V D

V D

950950

E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

8 1

A

GENERAL BORING NOTES

GROUND SURFACE ELEVATION AT BORING

CLAYEY GRAVELS, GRAVEL - SAND - CLAY MIXTURES

WELL GRADED GRAVELS, GRAVEL - SAND MIXTURE, LITTLE OR NO FINES

SILTY GRAVELS, GRAVEL - SAND - SILT MIXTURES

POORLY GRADED GRAVELS, LITTLE OR NO FINES

WELL GRADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES

POORLY GRADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES

SILTY SANDS, SAND - SILT MIXTURES

CLAYEY SANDS, SAND - CLAY MIXTURES

INORGANIC SILTS, LIQUID LIMIT LESS THAN 50

INORGANIC SILTS, LIQUID LIMIT GREATER THAN 50

INORGANIC CLAYS, LOW TO MEDIUM PLASTICITY, LIQUID LIMIT LESS THAN 50

INORGANIC CLAYS, HIGH PLASTICITY, LIQUID LIMIT GREATER THAN 50

ORGANIC SILTS OR CLAYS, LOW PLASTICITY, LIQUID LIMIT LESS THAN 50

BORDERLINE MATERIAL

STRATIFIED MATERIAL

LOCATION AND SAMPLE NUMBER FOR UNDISTURBED SAMPLE

NO RECOVERY

WATER LEVEL ON DATE OF BORING

ELEVATION AT BOTTOM OF BORING

ELEVATION IN METERS

W.S. 1026.7

G.S. 1020.2

W.L. 726.7

700.1

(238.56)

GENERAL BORING LEGEND

SM

SP

SW

GC

GM

GP

GW

ML

MH

CL

CH

OL

OH

PT

SP-

SM

SP&

SM

DATE OF BORING

YEAR OF BORING-BORING NUMBER, BORING TYPE

( EG: M=MACHINE, A=AUGER, TP=TEST PIT, P=PIEZOMETER ).

1 MAY 1984

84-1M

SC

ORGANIC SILTS OR CLAYS, MEDIUM TO HIGH PLASTICITY, LIQUID LIMIT GREATER THAN 50

PEAT

.9

WATER SURFACE ELEVATION ON DAY OF BORING

11.

10.

9.

8.

7. % RECOVERY:

6. RQD:

5. D SIZE:

4. ATTERBERG LIMITS:

3. BLOW COUNT (SPT):

2. MOISTURE CONTENT:

1. GENERAL:

2014 BORING LOGS ARE NOT SITE SPECIFIC FOR THIS CONTRACT.

CONE PENETROMETER TEST (CPT) DATA ARE LOCATED IN THE CONTRACT SPECIFICATIONS.

LOGS ARE AVAILABLE FOR INSPECTION BY REQUEST TO THE CONTRACTING OFFICER.

THE BORINGS SHOW SUMMARIES OF INFORMATION RECORDED ON THE ORIGINAL FIELD LOGS. THESE

ELEVATIONS REFERENCED TO N.A.V.D. 1988 ADJ. UNLESS SPECIFIED OTHERWISE.

CORE IS 4-INCH DIAMETER.

LENGTH OF CORE RECOVERED/LENGTH OF CORE CUT X 100. UNLESS SPECIFIED OTHERWISE, ALL

PERCENT CORE RECOVERY IS SHOWN TO THE LEFT OF THE BORING STAFF. PERCENT RECOVERY IS

RQD IS THE PERCENT RECOVERY CONSISTING OF UNBROKEN PIECES LONGER THAN 4-INCHES.

ROCK QUALITY DESIGNATION (RQD) IS SHOWN TO THE LEFT OF THE PERCENT RECOVERY COLUMN.

LEFT OF THE BORING STAFF.

THE GRAIN SIZE IN MILLIMETERS OF WHICH 10% OF THE SAMPLE IS FINER IS SHOWN TO THE

LIQUID LIMIT (LL) AND PLASTIC LIMIT (PL) ARE SHOWN TO THE RIGHT OF THE BORING STAFF.

BLOW COUNTS SAMPLER SIZE, HAMMER WEIGHT, AND HEIGHT OF DROP ARE AS SHOWN.

X 2-INCH SAMPLER, 140 LB. HAMMER, AND A 30-INCH DROP. FOR NON-STANDARD 8

3SAMPLER,

STANDARD BLOW COUNTS ARE FOR A STANDARD PENETRATION TEST (SPT) USING A 1… X 2-INCH

NUMBER OF BLOWS NECESSARY TO DRIVE THE SAMPLER USED A DISTANCE OF 12-INCHES.

BLOW COUNTS ARE SHOWN TO THE LEFT OF THE BORING STAFF AND, EXCEPT AS NOTED, ARE THE

THE BORING STAFF.

THE NATURAL MOISTURE CONTENT IN PERCENT OF DRY WEIGHT (MC) IS SHOWN TO THE LEFT OF

SPECIFIC BORING ARE SHOWN BELOW THE BORING STAFF.

INFORMATION IS ADDED TO THE RIGHT OF THE BORING STAFF. NOTES PERTAINING TO A

LEGEND REPRESENTS ONLY THE BASIC SOILS. TO COMPLETE THE CLASSIFICATION, PERTINENT

THE UNIFIED SOIL CLASSIFICATION SYSTEM IS USED TO IDENTIFY BASIC SOIL TYPE. THE

NOTES:

CH

SM

CH

CL

CH

CH

SPT

844.5

G.S. 929.5

05 MAY 14

0.024

MC PLLL

25101

104 25

44 9

CL

CLCL

CL

G.S. 929.5 (CH) ORGANIC SILTY CLAY, MEDIUM STIFF, MOIST, BLACK. (TOPSOIL) 0' TO 1'

SATURATED, DK. BROWN. (ALLUVIUM)

(SM) SILTY SAND W/ GRAVEL ,FINE TO MED. , MED. DENSE, MOIST TO 1' TO 7.7'

OCC. SILT NODULES, TRACE FINE GRAVEL, GRAY. (GALCIO-LACUSTRINE)

7.7' TO 46.1' (CH) CLAY, SOFT, WET, STICKY, FORMS SLICKENSIDES W/ SHEARED,

GRAY TO V. LT. BRN. (TILL BLOCK OR FRAGMENT)

(CL) SANDY, GRAVELLY, CLAY, SOFT, WET, STICKY, JUMBLED APPEARANCE,46.1' TO 50'

W/ SHEARED IN ZONES, OCC. SILT NODULES, GRAY. CLAY. (GLACIO-LACUSTRINE)

(CH) CLAY W/ TRACE F. GRAVEL, SOFT, WET, STICKY, FORMS SLICKENSIDES 50' TO 57.6'

JUMBLED APPEARANCE, GRAY. (GLACIO-LACUSTRINE / TILL TRANSITION)

(CH) CLAY MIXED W/ SANDY CLAY, SOFT, WET, STICKY, TEARS W/ SHEARED, 57.6' TO 60.9'

921.8

TOP OF BRENNA FORMATION

868.6

TOP OF FALCONER FORMATION

14-1M/U

HOLE STABILIZED WITH DRILLING MUD BELOW EL. 906.5.

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 906.5.

4. BACKFILL BORING WITH TREMIED CEMENT BENTONITE GROUT.

IN OFFSET HOLE.

NOTE: TILL FRAGMENT (UD SAMPLE 3) WAS NOT RECOVERED

3. 5-INCH UNDISTURBED SAMPLES TAKEN IN OFFSET HOLE.

D10

WET TO MOIST, GRAY. (TILL)

(CL) GRAVELLY, SANDY, CLAY, MEDIUM STIFF TO V. STIFF, 60.9' TO 85'

ADJACENT SANDHILL RIVER = 919.4.

1. WATER LEVEL NOT DETERMINED. WATER SURFACE IN

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

NOTES:

CH

CL

SM

CH

CL

CH

CL

SPT

877.5

G.S. 939.5

14-2M

08 MAY 14

0.036

MC PLLL

CH

(CH) ORGANIC SILTY CLAY, MEDIUM STIFF, WET, BLACK. (TOPSOIL) 0' TO 2.5'

(CL) SANDY CLAY, MOIST, TR. ROOTS, MEALY TEXTURE, BRN-GREY. (ALLUVIUM)2.5' TO 8'

(SM) SILTY SAND, LOOSE, WET TO SAT., TRACE GRAVEL, BROWN. (ALLUVIUM)8' TO 14.8'

(CL) SANDY, GRAVELLY, CLAY, WEATHERED, TRACE GRAVEL, TAN. (TILL)39' TO 49'

(CH) CLAY SEAM, TRACE GRAVEL, DK. GRAY SLIGHTLY MOTTLED W/TAN-GRAY. 49' TO 50'

TOP OF FALCONER FORMATION900.5

924.7 TOP OF BRENNA FORMATION

AND SILT INCLUSIONS, STICKY, GRAY. (GLACIO-LACUSTRINE)

(CH) CLAY, WET, FORMS SLICKENSIDES W/ SHEARED, OCC. SAND 14.8' TO 39'

W.L. 928.5

APPROX.

1. WATER LEVEL DETERMINED AS DRILLING ENCOUNTER FROM CUTTINGS.

GRAY. (TILL)

(CL) GRAVELLY, SANDY, CLAY, MEDIUM STIFF TO HARD, MOIST, TR. SILT SEAMS, 50' TO 62'

HOLE STABILIZED WITH DRILLING MUD BELOW EL. 914.5.

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 914.5.

3. HOLE BACKFILLED WITH TREMIED CEMENT-BENTONITE GROUT.

10D

BM

WORK LIMITS

PROTECT IN PLACE

EXISTING CULVERTS

CABLE

EXISTING BURIED

PROTECT IN PLACE

EXISTING POWER POWER

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

D

D

D

D

D

D

D

D

D

AREA

STAGING

440TH ST SW

N D S

T S

W

T

H A

V E S

W

AREA

STAGING

PI-D5 PI-D6

PI-D7

PI-D8

PI-D9

PI-D10

PI-D11

100P

125P

105P

110P

120P

200T

205T

115P

100'0 50'

E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

/2

A N

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S T P

A U

L

M

IN

N E

S O

T A

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

T .S

U L L

Y

C A

A

C A

A

G C

W

C-101

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

S T P

A U

L D

IS

T R

IC

T

ST. PAUL DISTRICT

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S H

R F P

C -1 d g n

N A

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

SHEET C-102

S

IT

E P

L A

N

1" = 50'

SITE PLAN

FISHWAY STRUCTURE 4

EXISTING GROUND LINE

.2

4% 4% 4%

0% 0%

0%

0% 0.44% 0.41%

EXISTING CULVERTS

EXISTING DROP STRUCTURE

BOULDER RIFFLE, TYP.

ROCK RIFFLE, TYP.

1V ON 1H, TYP.

PROTECT IN PLACE

EXISTING CULVERTS

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

980980

980980

D 6+30 D 6+60 D 6+90 D 7+20 D 7+50 D 7+80 D 8+10 D 8+40 D 8+70 D 9+00 D 9+30 D 9+60 D 9+90 D 10+20 D 10+50 D 10+80 D 11+10 D 11+40 D 11+70 D 12+00 D 12+30 D 12+52

E L E

V A

T

IO

N

E L E

V A

T

IO

N

P V I S

T A D

.0

E L

.2

P V I S

T A D

.0

E L

.2

P V I S

T A D

.8

E L

.8

P

V I S

T A D

.8

E L

.8

P V I S

T A D

.0

E L

.9

P V I S

T A D

.0

E L

.9

P

V I S

T A D

.0

E L

.9

P V I S

T A D

.0

E L

.9

P V I S

T A D

.0

E L

.9

P

V I S

T A D

.0

E L

.9

P V I S

T A D

.0

E L

.0

P V I S

T A D

.0

E L

.0

P

V I S

T A D

.0

E L

.0

S= 0.0300

S= 0.0023

A4

A1

C-401

D

D

D

D

D

D

D

D

1V ON 3H

1V ON 3H

1V ON 3H

1V ON 3H

1V ON 3H

1V ON 3H

5%

5%

2%

2%

1V ON 3H

440TH ST SW

FLOW

D1

C-302

C-301

SAND HILL RIVER

440TH ST. SW.

WORK LIMITS

ROCK RIFFLE, TYP.

S T

A

D

S T

A

D

TRANSITION

PI-D6

PI-D7

PI-D8

PI-D9

PI-D10

PI-D11

BOULDER RIFFLE, TYP.

B1

C1

T

A

D

1V ON 4H

1V ON 4H

2%

2%

B1

C-401

S T

A

D

N D S

T S

S I

U L

Y

H R

F P

C -1 d g n

/6 /2

S A

N D H

IL

L R

IV

E R

S T P

A U

L D

IS

T R

IC

T

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C A

A

P L

A N A

N D P

R O

F

IL

E

C-102

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

P O

L K C

O U

N T

Y

M N

C A

A

F

IS

H W

A Y R

A M

P

PLAN VIEW

FISHWAY RAMP #4

PROFILE

FISHWAY RAMP #4

0 30'30' 10'20'

A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

SD102DROP STRUCTURE DEMOLITION

C-403ROCK RIFFLE DETAILS

C-402BOULDER RIFFLE DETAILS

SEE C-101

GENERAL NOTES: THIS SHEET ONLY

2. THE EXISTING ROADS ARE TO REMAIN OPEN DURING CONSTRUCTION.

10 FT.

BANKS A DISTANCE OF 70 FEET, WITH HEIGHTS NO GREATER THAN

1. STOCKPILES ARE TO BE LOCATED AWAY FROM THE TOP OF CHANNEL

SHEET ID:REFERENCES:

4" TOPSOIL AND SEED

GROUND LINE

EXISTING

SEE PROFILE

ELEVATION

AND SEED

4" TOPSOIL

6" STRIPPING

EL. 961.0

RANDOM FILL

RANDOM FILL

GRANULAR FILL

16.5' 16.5'

9" B2 BEDDING

6" STRIPPING

2 AND GEOTEXTILE

16" R45 RIPRAP

RIPRAP

24" R140

AND GEOTEXTILE

16" R45 RIPRAP

4" TOPSOIL AND SEED

24" R140 RIPRAP

EL. 961.0 EL. 961.0

GROUND LINE

EXISTING

SEE PROFILE

ELEVATION

6" STRIPPING

AND SEED

4" TOPSOIL

RANDOM FILL

GRANULAR FILL

RANDOM FILL

16.5' 16.5'

6" STRIPPING

AND GEOTEXTILE

16" R45 RIPRAP

AND GEOTEXTILE

16" R45 RIPRAP

9" B2 BEDDING

GROUND LINE

EXISTING

4" TOPSOIL AND SEED

GRANULAR FILL

SEE PROFILE

ELEVATION

16.5' 16.5'

EXCAVATION

U L

/2

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S T P

A U

L D

IS

T R

IC

T

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C A

A

C A

A

F

IS

H W

A Y R

A M

P

C-301

S H

R F P

C -3 d g n

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

A N

S I

D

N A

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

T Y

P

IC

A L S

E C

T

IO

N S A

-C

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

TYPICAL SECTION

STATION D8+89 TO D9+98

STATION D8+00 TO D8+89

STATION D9+98 TO D10+35

C1

SHEET KEYNOTES

INVERT.

6. RIPRAP TYPE AND THICKNESS CHANGE AT 5.5' VERTICALLY ABOVE THE CENTER OF THE CHANNEL

ABOVE THE CENTER OF THE CHANNEL INVERT.

THE CHANNEL INVERT. RANDOM FILL IS USED WHEN THE FILL IS MORE THAN 5.5' VERTICALLY

5. GRANULAR FILL IS USED WHEN THE FILL IS LESS THAN 5.5' VERTICALLY ABOVE THE CENTER OF

4. BOULDER RIFFLES AND ROCK RIFFLES ARE NOT SHOWN FOR CLARITY.

THE CENTER OF THE CHANNEL.

3. CONSTRUCT A 10' RIPRAP BENCH WHEN THE TOP OF BANK IS LESS THAN 10' VERTICALLY FROM

2. 4" CHINKING ON THE RIPRAP CHANNEL BOTTOM (1V ON 20H SLOPED SURFACE).

1. 6" STRIPPING TO EXISTING WATER LINE AT TIME OF CONSTRUCTION.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

2.0%

4.5'

5.5'

LINE

CONTROL

A2

C-501

A2

C-501

E L E

V A

T

IO

N

E L E

V A

T

IO

N

-40 -50 -60-10 -20 -30 -70 -110 -120 -130-80 -90 -100130 304050 0102060100110120 708090

2.0% 2.0%

LINE

CONTROL

5.5'

4.5'

E L E

V A

T

IO

N

130 120 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 -110 -120 -130-80 -90 -100

E L E

V A

T

IO

N

940 940

A2

C-501

A2

C-501

LINE

CONTROL

2.0%

5.5'

-10 -20 -30 -40 -50 -60 -70 -80

20304050607080

E L E

V A

T

IO

N

970 970

950 E L E

V A

T

IO

N

EXISTING

EXCAVATION

GRANULAR FILL

SEE PROFILE

ELEVATION

GRANULAR FILL

16.5' to 23.5'

VARIES

16.5' to 23.5'

VARIES

U L

/2

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S T P

A U

L D

IS

T R

IC

T

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C A

A

C A

A

F

IS

H W

A Y R

A M

P

C-302

S H

R F P

C -3 d g n

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

A N

S I

D

N A

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

T Y

P

IC

A L S

E C

T

IO

N S D

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

STATION D10+60 TO D11+15

D1

SHEET KEYNOTES

ABOVE THE CENTER OF THE CHANNEL INVERT.

THE CHANNEL INVERT. RANDOM FILL IS USED WHEN THE FILL IS MORE THAN 5.5' VERTICALLY

3. GRANULAR FILL IS USED WHEN THE FILL IS LESS THAN 5.5' VERTICALLY ABOVE THE CENTER OF

2. BOULDER RIFFLES AND ROCK RIFFLES ARE NOT SHOWN FOR CLARITY.

1. 6" STRIPPING TO EXISTING WATER LINE @ TIME OF CONSTRUCTION.

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

LINE

CONTROL

2.0%

5.5'

2.0%

-20-1001020

-80-70-60-50-40-30

E L E

V A

T

IO

N

304050607080

E L E

V A

T

IO

N 1

EXISTING

AND GEOTEXTILE

16" R45 RIPRAP

AND GEOTEXTILE

16" R45 RIPRAP

24" R140 RIPRAP

9" B2 BEDDING

16.5'16.5'

EL. 942.25

EL. 961.0

6" STRIPPING

AND SEED

4" TOPSOIL

RANDOM FILL

GRANULAR FILL

4" TOPSOIL AND SEED

36" R140 RIPRAP

9" B2 BEDDING

EL. 948.0

GROUND LINE

EXISTING

EL. 948.0

EL.942.25

16.5'16.5'

EL. 961.0

AND SEED

4" TOPSOIL

6" STRIPPING

RANDOM FILL

GRANULAR FILL

GROUND LINE

EXISTING

36" R140 RIPRAP

9" B2 BEDDING

EL. 948.0

EL. 948.0

1V ON 2H 1V ON 2HEL.940.25

12.5'TO 12.5'

VARIES 19.5'

GROUND LINE

EXISTING

EXISTING BOX CULVERTS

B A

B A

D

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

LINE

CONTROL

2.0%

A2

C-501

4.5'

5.5'

A2

C-501

E L E

V A

T

IO

N

E L E

V A

T

IO

N

7080 -1060 304050 -60 -70 -80-50-20 -30 -4020 010

LINE

CONTROL

0% 0%

2.0%

E L E

V A

T

IO

N

E L E

V A

T

IO

N

7080 -1060 304050 -60 -70 -80-50-20 -30 -4020 010

2.5

LINE

CONTROL

E L E

V A

T

IO

N

E L E

V A

T

IO

N

405060 102030 -40 -50 -60-10 -20 -300

2.5

D 7+40 D 7+50 D 7+60 D 7+70 D 7+80 D 7+90 D 8+00 D 8+10

E L E

V A

T

IO

N

E L E

V A

T

IO

N

P V I S

T A D

.0

P V I S

T A D

.0

E

L

.2

E L

.2

S= 0.0000

S= 0.0000

S= -0.5000 S= 0.

E L

.2

P V I S

T A D

.0

E L

.2

E L

.2

P V I S

T A D

.0

P V I S

T A D

.0

S= -0.0000

E L

.2

960960

P V I S

T A D

.0

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

/6 /2

A N

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S T P

A U

L

M

IN

N E

S O

T A

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

T .S

U L L

Y

C A

A

C A

A

G C

W

P R

E -F

O R

M E

D S

C O

U R H

O L E

C-401

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

S T P

A U

L D

IS

T R

IC

T

ST. PAUL DISTRICT

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S H

R F P

C -4 d g n

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

O

ID

A1 A1

C3

C3

B3

B3

A3

A3

0 20'10'

N

STATION 7+61 TO 7+86

TYPICAL SECTION

C3

STATION D7+90

TYPICAL SECTION

B3

STATION D8+00

SECTION

A3

SCOUR HOLE DIMENSIONS

D8+00

D7+90

D7+57

D7+50

16.5'

16.5'

23.5'

23.5'

16.5'

16.5'

16.5'

23.5'

STATION A B

P L

A N D

E T

A

IL

S

SHEET KEYNOTES

SLOPED SURFACE).

4. 4" CHINKING ON THE CHANNEL BOTTOM (1V ON 20H

CENTER OF THE CHANNEL INVERT.

FILL IS MORE THAN 5.5' VERTICALLY ABOVE THE

CHANNEL INVERT. RANDOM FILL IS USED WHEN THE

THAN 5.5' VERTICALLY ABOVE THE CENTER OF THE

3. GRANULAR FILL IS USED WHEN THE FILL IS LESS

CONSTRUCTION.

2. 6" STRIPPING TO EXISTING WATERLINE AT TIME OF

1. 4" TOPSOIL AND SEED

ALONG CHANNEL CONTROL LINE

PROFILE THROUGH SCOUR HOLEC-102

A1 DETAIL/SECTION

SCALE: 1"=10'

PREFORMED SCOUR HOLE

DETAIL

B2

C-

1 B4

C-501

B2

C-501

B4

C-501

D

D

GROUND LINE

EXISTING

BOULDERS (TYP.)

36" TO 48" DIAMETER

DESIGN LINE

GROUND LINE

EXISTING

BOULDERS (TYP.)

36" TO 48" DIAMETER

DESIGN LINE

SLOPE OF SCOUR HOLE

WRAP BOULDERS INTO SIDE

LINE

CONTROL 19' RADIUS

RIFFLE, TYP.

BOULDER

23.3' TYP.

D

D

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

950950

950950

-10-20-30-40-50

E L E

V A

T

IO

N

E L E

V A

T

IO

N

0 10 20 30 40 50

LINE

CONTROL

960 960

607080 304050 -10 -50 -60 -70-20 -30 -40

E L E

V A

T

IO

N

940940

01020

E L E

V A

T

IO

N

LINE

CONTROL

E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

/6 /2

A N

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S T P

A U

L

M

IN

N E

S O

T A

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

T .S

U L L

Y

C A

A

C A

A

G C

W

P L

A N D

E T

A

IL

S

B O

U L

D E

R R

IF

F L E

C-402

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

S T P

A U

L D

IS

T R

IC

T

ST. PAUL DISTRICT

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S H

R F P

C -4 d g n

0 20'10'

N

FLOW

A3

A3

A

A

30° TYP.

ALONG BOULDER RIFFLE

TYPICAL SECTION

A1

SCALE: 1"=10'

TYPICAL SECTION

A3

SCALE: 1"=10'

BOULDER RIFFLE PLAN

B1

INFORMATION AND DESIGN SECTION, SEE C-301.

SECTION. DETAILS ON DESIGN SECTION NOT SHOWN FOR CLARITY. FOR

5. SECTIONS SHOW HOW BOULDER RIFFLES ARE PLACED WITHIN THE DESIGN

CHANNEL ARE TO BE FILLED WITH R45 RIPRAP.

BOULDERS PLACED GREATER THAN 15 FT FROM THE CENTERLINE OF THE

BETWEEN THE BOULDERS AT THE END OF THE BOULDER RIFFLES AND ANY

4. BOULDER RIFFLES ARE TO BE INTEGRATED INTO THE BANKS. THE GAPS

TO PROVIDE MORE COMPLEX HYDRAULICS FOR FISH PASSAGE.

3. THE MID-CHANNEL PORTION OF THE BOULDER RIFFLES ARE TO BE STAGGERED

INTERVAL WILL BEGIN 23 FT FROM THE CREST OF THE FISHWAY RAMP.

IN RIFFLES SPACED AT APPROXIMATELY 23 FT INTERVALS. THE FIRST

2. 36"-48" BOULDERS WILL BE SET 1 FT ABOVE R140 RIPRAP TO RESULT

SIZE AND SPACING OF BOULDERS.

1. NUMBER OF BOULDERS FOR EACH BOULDER RIFFLE IS DEPENDENT ON

SHEET KEYNOTES

GROUND LINE

EXISTING

24" R140 RIPRAP

5.0'

5.0'

RANDOM FILLFILL

RANDOM

2 2DESIGN GRADE LINE

GROUND LINE

EXISTING

24" R140 RIPRAP

ROCK RIFFLE

24" R140 RIPRAP

ROCK RIFFLE

24" R140 RIPRAP

ROCK RIFFLE

GRADE LINE

DESIGN

FILL

GRANULARFILL

RANDOM

CONTROL LINE

ROCK RIFFLE, TYP.

19' RADIUS

25' RADIUS

4'

31'

.5

KEY-IN, TYP.

5'

4'

D

D

1V ON 4H

1V ON 4H

2%

2%

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

ID

Sheet

970970

970970

-10-20-30-40-50-60-70

E L E

V A

T

IO

N

LINE

CONTROL

0 10 20 30 40 50 60 70 80

4050 30 1020 -40 -50-30-10 -200

E L E

V A

T

IO

N

E L E

V A

T

IO

N

LINE

CONTROL

5.5'

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

/6 /2

A N

S I

D

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S T P

A U

L

M

IN

N E

S O

T A

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

T .S

U L L

Y

C A

A

C A

A

G C

W

P L

A N D

E T

A

IL

S

R O

C K R

IF

F L E

S

C-403

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

S T P

A U

L D

IS

T R

IC

T

ST. PAUL DISTRICT

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S H

R F P

C -4 d g n

0 20'10'

A4

ALONG ROCK RIFFLE

FLOW

A4A1

A1

A4

1V ON 3H

1V ON 3H

TRANSITION

TRANSITION

S T

A D

S T

A D

S T

A D

S T

A D

SHEET KEYNOTES:

F

LO

W

SLO

PI

NG

RI

PRAP

IS

SLO

PI

NG

RI

SLO

PI

NG

RI

V : 3

H

1V : 3H

0%

0%

0%

1V : 3H

1V : 20H

V : 2

H

V :3

H

LINE

CONTROL

B4

C-501

B2

C-501

B4

C-501

B2

C-501

0 20'10'

C1/C-301 AND D1/C-302.

ON SECTIONS FOR CLARITY. SEE SECTIONS

5. CHANNEL DESIGN INFORMATION IS NOT SHOWN

ALONG THE CHANNEL SECTION.

4. 0% SLOPE OF THE RIPRAP OF THE ROCK RIFFLE

ALONG THE CHANNEL SECTION.

3. 4% SLOPE OF THE RIPRAP OF THE ROCK RIFFLE

THE CHANNEL INVERT.

2. ELEVATION IS 5.5' VERTICAL ABOVE CENTER OF

MINIMUM OF 5'.

1. KEY-IN IS 4' WIDE AND KEYED INTO THE SLOPE A

1" = 10'

B4

SCALE:

ROCK RIFFLE

ISOMETRIC VIEW

1" = 10'

B1

SCALE:

ROCK RIFFLE

DETAIL PLAN

V : 2

H

1V : 20H

EXISTING GROUND LINE

GEOTEXTILE

EXISTING GROUND LINE

.7 '23'

BOULDER RIFFLE

EXISTING GROUND LINE

GEOTEXTILE

TOPSOIL

RANDOM FILL

M

IN

IM

U M

U L

A G

/2

A N

S I

D

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S T P

A U

L D

IS

T R

IC

T

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

A

N A

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

S H

R F P

C -5 d g n

RIPRAP

BEDDING

B4

C-501

B2 RIPRAP DETAIL

SCALE: N.T.S.

RIPRAP DETAIL

SCALE: N.T.S.

BOULDER RIFFLE DETAIL

SCALE: N.T.S.

A4

C-102

GEOTEXTILE KEY-IN DETAIL

SCALE: N.T.S.

A2

D E

T A

IL

S

C-403 C-401

C-403 C-401

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

/0

/2

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S T P

A U

L D

IS

T R

IC

T

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E

S

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

C A

A

T A

B L E

S

C O

N T

R O

L A

N D W

O R

K L

IM

IT

C-601

S H

R F P

C -6 d g n

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

A

N A

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

T S

U L L

Y

G

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

WALL - LEFT

UPPER WING

WALL - RIGHT

UPPER WING

- RIGHT

SIDE WALL

- LEFT

SIDE WALL

WING WALL - LEFT WING WALL - RIGHT

WEIR

END SILL

BASIN

STRUCTURE

- RIGHT

SIDE WALL

- LEFT

SIDE WALL

WING WALL - RIGHTWING WALL - LEFT

BASIN

STRUCTURE

- LEFT

SIDE WALL

WALL - LEFT

UPPER WING

WING WALL - LEFT

WALL - RIGHT

UPPER WING

- RIGHT

SIDE WALL

WING WALL - RIGHT

BASIN

STRUCTURE

Z-27 SHEET PILING Z-27 SHEET PILING

Z-27 SHEET PILINGZ-27 SHEET PILING

PILING

Z-27 SHEET

PILING

Z-27 SHEET

EL. 950.7

WEIREL. 951.7

WALL

TOP EL. 962.0

WALL - RIGHT

UPPER WING

TOP EL. 962.0

WALL - LEFT

UPPER WING

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

U L L

Y

/0

/2

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S T P

A U

L D

IS

T R

IC

T

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S H

R F P S

D d g n

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

A N

S I

SD101

X

IS

T

IN

G D

R O

P S

T R

U C

T U

R E

SCALE: 1"=10'

SCALE: 1"=10' SCALE: 1"=10'

0 10'10' 5'

FLOW FLOW

F L

O W

FLO

W

RIGHT VIEW

C

LEFT VIEW

B

FRONT VIEW

A

A

CB

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

M S

D

C A

A

MSD MSD

P L

A N E

L E

V A

T

IO

N A

N D I S

O M

E T

R

IC

P R

F

EXISTING DROP STRUCTURE 4 - ISOMETRIC

EXISTING DROP STRUCTURE 4 - PLAN

WALL - LEFT

UPPER WING

WALL - RIGHT

UPPER WING

- RIGHT

SIDE WALL

- LEFT

SIDE WALL

WING WALL - LEFT WING WALL - RIGHT

WEIR

END SILL

BASIN

STRUCTURE

- RIGHT

SIDE WALL

- LEFT

SIDE WALL

BASIN

STRUCTURE

- LEFT

SIDE WALL

WALL - LEFT

UPPER WING

WING WALL - LEFT

WALL - RIGHT

UPPER WING

- RIGHT

SIDE WALL

WING WALL - RIGHT

BASIN

STRUCTURE

WING WALL

PLANE - SIDE AND

DEMOLITION

I-WALL

PLANE - UPSTREAM

DEMOLITION

WALL

PLANE - WEIR

DEMOLITION

20:1 20:1

LINE

DEMOLITION

LINE

DEMOLITION

LINE

DEMOLITION LINE

DEMOLITION

Z-27 SHEET PILING

Z-27 SHEET PILING

PILING

Z-27 SHEET

Z-27 SHEET PILING

PILING

Z-27 SHEET

PILING

Z-27 SHEET

TOP EL. 962.0

WALL - RIGHT

UPPER WING

TOP EL. 962.0

WALL - LEFT

UPPER WING

EL. 947.45

WEIR OPENING

ORIGIN IS CENTER OF

LINE OF DEMOLITION

EL. 947.45

WEIR OPENING

ORIGIN IS CENTER OF

LINE OF DEMOLITION

LIMITS

EMBEDMENT

SHEETPILE

PILING

Z-27 SHEET

RIGHT

WALL -

WING

PILING

Z-27 SHEET

LIMITS

EMBEDMENT

SHEETPILE

LEFT

WALL -

WING

DEMOLITION.

BELOW LINE OF WALL

SHEETPILE 6 INCHES

STRUCTURE, CUT

BEYOND CONCRETE

DEMOLITION.

BELOW LINE OF WALL

SHEETPILE 6 INCHES

STRUCTURE, CUT

BEYOND CONCRETE

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

U L L

Y

/0

/2

P O

L K C

O U

N T

Y

M N

S A

N D H

IL

L R

IV

E R

S T P

A U

L D

IS

T R

IC

T

S T P

A U

L

M

IN

N E

S O

T A

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S H

R F P S

D d g n

S A

N D H

IL

L R

IV

E R F

IS

H P

A S

S A

G E S

T R

U C

T U

R E

S A

N D H

IL

L R

IV

E R D

R O

P S

T R

U C

T U

R E

S

A N

S I

SD102

CENTERLINE

STRUCTURE

ABOUT STRUCTURE CENTERLINE.

NOTE: DEMOLITION IS SYMMETRICAL

D E

M O

L

IT

IO

N P

L A

N

SCALE: 1"=10'

SCALE: 1"=10' SCALE: 1"=10'

0 10'10' 5'

FLO

W

F L

O W

FLOW FLOW

E L E

V A

T

IO

N D

A T

U M

V E

R T

IC

A L C

O N

T R

O L

C O

O R

D

IN

A T

E S

Y S

T E

M

H O

R

IZ

O N

T A

L C

O N

T R

O L

C O

M B

IN

E D F

A C

T O

R

C F

G E

D

M N S

P C

S

N O

R T

H Z

O N

E -U .S S

U R

V E

Y F

T

N A

V D

.9

A

3.0%3.0%

M S

D

C A

A

MSD MSD

D R

O P S

T R

U C

T U

R E

P R

F

DROP STRUCTURE #4

TOP VIEW

A

C D

B

LEFT VIEW

C

A

FRONT VIEW

B

RIGHT VIEW

D

: AREA TO BE REMOVED

GENERAL NOTES THIS SHEET

STRUCTURE.)

BELOW LINE OF WALL DEMOLITION. (TYP. BOTH SIDES OF

5. BEYOND CONCRETE STRUCTURE, CUT SHEETPILE 6 INCHES

COMMENCING DEMOLITION.

FOR VERIFICATION BY THE CONTRACTING OFFICE PRIOR TO

4. CONTRACTOR SHALL MARK DEMOLITION EXTENT IN THE FIELD

SPALLING, ETC.)

TO THE PORTION OF THE STRUCTURE TO REMAIN. (CRACKING,

3. DEMOLITION PROCEDURES SHALL NOT RESULT IN DAMAGE

TYPE OF APPLICATION. SEE SPECIFICATIONS.

INTENDED TO SERVE AS A CORROSION INHIBITOR IN THIS

AN EPOXY MODIFIED CEMENTITIOUS AGENT SPECIFICALLY

OF CUTTING/GRINDING/DEMOLITION SHALL BE COATED WITH

HAZARDS. METAL SURFACES EXPOSED AS A RESULT

CUT OFF/GROUND TO ELIMINATE PROTRUSIONS AND OTHER

REMAINING AS A RESULT OF CONCRETE DEMOLITION SHALL BE

2. ALL REINFORCING, PILING AND OTHER APPURTENANCES

THE SURFACE OF SURROUNDING STONE.

ROUGHENED TO A MINIMUM AMPLITUDE OF 2 INCHES TO MIMIC

1. SURFACES OF DEMOLITION LINES AND PLANES SHALL BE

SHRFP4_Dsize_6JUN2016
SHRFP4_REFERENCES_Dsize

File details come from the government source that posted it. Updated .