B07 - SIte Visit Q&A.pdf

PDF 144 KB Posted

Attached to
Dredge Hurley Dry Dock Repairs Federal contract opportunity
Solicitation number
W912EQ20Q0006
Issued by
Department of the Army Corps of Engineers Engineering District Memphis

About this file

This document contains questions and answers from a site visit for a solicitation seeking dry dock repairs of a dredge and crane barge. The U.S. Army Corps of Engineers, Memphis District is seeking a vendor to dry-dock and effect repairs on the Dredge Hurley and Alaskan Crane Barge 8501 at the vendor's location within 90 days of receipt. Repairs include blasting and coating potable water tanks, cleaning and replacing sea chest covers, replacing the MSD system with a RED FOX RF-1000-M or approved equal, replacing a 60-ton chiller and upgrading a 30-ton chiller to 60-tons, repairing the crane barge's spud well, and cleaning fuel tanks. AutoCAD as-built drawings of the vessels will be provided upon request. Interested parties were required to attend a mandatory site visit on December 3, 2019 at 9:00 am CST in Baton Rouge, LA and notify the contract specialist by December 2, 2019.

View the file

Other files for this federal contract opportunity

Other files attached to Dredge Hurley Dry Dock Repairs, newest first.
File Type Posted
B08 - W912EQ20Q0006 Amend 1.pdf PDF
B08 - Hurley Drawings.pdf PDF
B08 - W912EQ20Q0006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dredge Hurley Dry Dock Repairs, Solicitation W912EQ-20-Q-0006, Questions and Answers from 3 Dec 19 Site Visit

1. What is the make and model of the currently installed chiller units?

Answer: 60 Ton Chiller Carrier Model 30 HK-060-630 Serial #1091J02067 MOD

EPS

30 Ton Chiller Carrier Model 30HK 030 -630 Serial #3991J03164

2. Are there detailed drawings for the sea chests and other areas requiring repair?

Answer: We have approximately 500 AutoCAD as-built drawings. We can share these files upon request to the Contracts Specialist via secure file transfer.

3. The Performance Work Statement (PWS), paragraph 1.5 doesn’t prescribe a specific MSD system. Will you add verbiage prescribing a particular system or equal?

Answer: Yes, we’ll add the following MSD system to PWS, paragraph 1.5: RED FOX RF-1000-M with Vacuum Collection or approved equal.

4. Does the MSD system process gray water?

Answer: No, only black water.

5. Does the MSD pipe replacement noted in PWS paragraph 1.5.5 have to be welded joints or will crimp joints be acceptable.

Answer: Yes, crimp joints will be acceptable as long as there are no leaks. We will amend the PWS to be less restrictive.

6. Are there general arrangement drawings available for the Alaskan Crane Barge?

Answer: No. However, repair work needed shouldn’t require general arrangement drawings.

7. What is the specified area for painting?

Answer: The water tanks.

8. Is the contractor responsible for creating a dry dock plan that accounts for the additional length added to the Hurley?

Answer: Yes.

9. What is the length and draft of the Hurley?

Answer: Length is 350’, draft is approximately 8’.

10. PWS paragraph 1.4.1 has no verbiage requiring the contractor to treat potable water tanks after blasting and coating. Will that be a requirement?

Answer: Yes, we will add the following verbiage in an amendment:

“Water tanks will be treated after paint is cured. Treatment consist of super chlorinating the water tanks with full tank of water, then draining and refilling tanks.”

11. Are there any sewage pipe drawings available?

Answer: Yes, as noted these AutoCAD drawings are available via secured file transfer upon request to the Contract Specialist.

12. Does the Government require a certified dry dock?

Answer: We don’t want to be overly prescriptive in a commercial contract but the Government must be assured the contractor has a dry dock with the capacity to safely perform the work. The USCG has a standard describing various methods of obtaining dry dock certification: SFLC Standard Specification 8634, paragraph 3.2.3, Table 1, which can be found at the following link:

https://www.dcms.uscg.mil/Portals/10/CG- 4/documents/SFLC/StandardSpec2014/SFLC-Std-Spec- 8634.pdf?ver=2017-05-15-153701-780

13. Can both 60-ton chillers be mounted in the same compartment/area?

Answer: Yes, it’s possible. Coordinate placement with the Contracting Officer’s Representative.

https://www.dcms.uscg.mil/Portals/10/CG-4/documents/SFLC/StandardSpec2014/SFLC-Std-Spec-8634.pdf?ver=2017-05-15-153701-780 https://www.dcms.uscg.mil/Portals/10/CG-4/documents/SFLC/StandardSpec2014/SFLC-Std-Spec-8634.pdf?ver=2017-05-15-153701-780 https://www.dcms.uscg.mil/Portals/10/CG-4/documents/SFLC/StandardSpec2014/SFLC-Std-Spec-8634.pdf?ver=2017-05-15-153701-780