About this file
This solicitation is for a dredge material management project located in Manatee County, Florida. The scope of work includes excavating material from the Manatee Harbor Dredge Material Management Area and transporting it approximately 7.5 miles south to construct a haul road and fill template at the Washington Park Placement Site. Additional requirements consist of clearing and grubbing, seeding, installing drainage structures and slope protection features, and conducting environmental monitoring. The period of performance is 365 calendar days from notice to proceed. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Jacksonville.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EP20B0006 Abstract Manatee Harbar DMMA signed DS.pdf | ||
| Amendment 0005 Manatee Harbor DMMA 20B0006.pdf | ||
| Amendment 0003 Manatee Harbor DMMA 20B0006.pdf | ||
| Amendment 0002 Manatee Harbor DMMA 20B0006.pdf | ||
| Amendment 0002_ Manatee Harbor DMMA 20B0006.pdf | ||
| Amendment 0001 Manatee Harbor DMMA 20B0006.pdf | ||
| VOL 1 Manatee Harbor DMMA 20B0006.pdf | ||
| GDR FILES Manatee Offloading.pdf | ||
| VOLUME 2 Manatee Offloading.pdf | ||
| PLANS_Manatee Offloading.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Manatee Harbor Dredge Material Management Area (DMMA) Off-loading 2020 Manatee County, Florida
This Amendment is being issued to DELETE Section 31 11 00 and REPLACE Section 31 11 00; and DELETE Section 31 00 00 and REPLACE Section 31 00 00 in their entirety.
Also, this Amendment changes the receipt of bid opening date from 28 August 2020 @ 2:00 PM Eastern Time to 31 August 2020 @ 2:00 PM Eastern Time.
All other conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP20B0006
X 9B. DATED (SEE ITEM 11)
22-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2020
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EP20B0006 Amendment 0004
SF 30 CONTINUATION
SHEET
Manatee Harbor DMMA Offloading 2020, Manatee County, Florida
Amendment 0004
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.
Changes to Specifications:
Volume 1 of 2 – Technical Specifications:
NA
Volume 2 of 2 – Technical Specifications:
DELETE Section 31 00 00 and REPLACE with the attached revised Section 31 00 00.
DELETE Section 31 11 00 and REPLACE with the attached revised Section 31 11 00.
2. DRAWINGS:
NA
(End of Summary of
Changes)
Manatee Harbor DMMA Off-loading 2020 Manatee County, Florida
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Satisfactory Materials
1.2.2 Unsatisfactory Materials
1.2.3 Cohesionless and Cohesive Materials
1.2.4 Degree of Compaction
1.2.5 Topsoil
1.2.6 Hard/Unyielding Materials
1.2.7 Rock
1.2.8 Unstable Material
1.3 SYSTEM DESCRIPTION
1.3.1 Classification of Excavation
1.3.1.1 Common Excavation
1.3.2 Dewatering Work Plan
1.4 SUBMITTALS
PART 2 PRODUCTS
2.1 REQUIREMENTS FOR OFFSITE SOILS
PART 3 EXECUTION
3.1 STRIPPING OF TOPSOIL
3.2 GENERAL EXCAVATION
3.2.1 Ditches, Gutters, and Channel Changes
3.2.2 Drainage
3.2.3 Dewatering
3.2.4 Trench Excavation Requirements
3.2.4.1 Bottom Preparation
3.2.4.2 Removal of Unstable Material
3.2.4.3 Excavation for Appurtenances
3.2.5 Underground Utilities
3.3 SELECTION OF MATERIAL
3.4 OPENING AND DRAINAGE OF EXCAVATION AND BORROW PITS
3.5 SHORING
3.5.1 General Requirements
3.6 GRADING AREAS
3.7 GROUND SURFACE PREPARATION
3.7.1 General Requirements
3.8 UTILIZATION OF EXCAVATED MATERIALS
3.9 BACKFILLING AND COMPACTION
3.9.1 Trench Backfill
3.9.1.1 Replacement of Unyielding Material
3.9.1.2 Replacement of Unstable Material
SECTION 31 00 00 Page 1 W912EP-20-B-0006 Amendment 0004
3.9.1.3 Final Backfill
3.9.1.3.1 Roadways
3.9.1.3.2 Soil mound Turfed or Seeded Areas and Miscellaneous
Areas
3.9.2 Backfill for Appurtenances
3.10 SPECIAL REQUIREMENTS
3.10.1 Culvert Pipe
3.11 EMBANKMENTS
3.11.1 Earth Embankments
3.12 SUBGRADE PREPARATION
3.12.1 Proof Rolling
3.12.2 Construction
3.12.3 Compaction
3.12.3.1 Subgrade for Roads
3.13 FINISHING
3.13.1 Subgrade and Embankments
3.13.2 Grading around HDPE pipes
3.14 PLACING TOPSOIL
3.15 TESTING
3.15.1 In-Place Densities
3.15.2 Optimum Moisture and Laboratory Maximum Density
3.15.3 Tolerance Tests for Subgrades
3.16 DISPOSITION OF SURPLUS MATERIAL
-- End of Section Table of Contents --
SECTION 31 00 00 Page 2
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse Particles in the Soil Compaction Test
ASTM INTERNATIONAL (ASTM)
ASTM D698 (2012; E 2014; E 2015) Laboratory Compaction Characteristics of Soil Using Standard Effort
ASTM D2487 (2017) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D6938 (2017a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM D698 (2012; E 2014; E 2015) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft.
(600 kN-m/cu. m.))
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 600/4-79/020 (1983) Methods for Chemical Analysis of Water and Wastes
EPA SW-846.3-3 (1999, Third Edition, Update III-A) Test Methods for Evaluating Solid Waste:
Physical/Chemical Methods
SECTION 31 00 00 Page 3
1.2 DEFINITIONS
1.2.1 Satisfactory Materials
Satisfactory materials comprise any materials classified by ASTM D2487 as
GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SP-SM, SW-SM, SC,
SW-SC, SP-SM, SP-SC, CL, ML, CL-ML, CH, MH.-. Satisfactory materials for grading comprise stones less than 3 inches in any dimension.
1.2.2 Unsatisfactory Materials
Unsatisfactory materials include trash, refuse; vegetative debris, tree branches and stumps, or environmentally contaminated materials. Notify the Contracting Officer when encountering any contaminated materials.
1.2.3 Cohesionless and Cohesive Materials
Cohesionless materials include materials classified in ASTM D2487 as GW, GP, SW, SP-SM, SP-SC, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM, SC, and SM will be identified as cohesionless only when the fines are nonplastic.
1.2.4 Degree of Compaction
Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D698 abbreviated as a percent of laboratory maximum density. Since ASTM D698 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4 inch sieve, express the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve as a percentage of the maximum density in accordance with AASHTO T 180 and corrected with AASHTO T 224 . To maintain the same percentage of coarse material, use the "remove and replace" procedure as described in NOTE 8 of Paragraph 7.2 in AASHTO T 180 .
1.2.5 Topsoil
Material suitable for topsoils obtained is defined as: Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.
1.2.6 Hard/Unyielding Materials
Hard/Unyielding materials comprise weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" with stones greater than 6 inch in any dimension or as defined by the pipe manufacturer, whichever is smaller. These materials usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal.
1.2.7 Rock
Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the
SECTION 31 00 00 Page 4 use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1/2 cubic yard in volume. Removal of hard material (boulders, broken concrete, etc.) will not be considered rock excavation
1.2.8 Unstable Material
Unstable materials are too wet or soft to properly support the utility pipe, conduit, or appurtenant structure.
1.3 SYSTEM DESCRIPTION
Subsurface soil boring logs are provided in the GDR. The subsoil investigation report and samples of materials taken from subsurface investigations may be examined at The USACE Jacksonville Warehouse. These data represent the best subsurface information available; however, variations may exist in the subsurface between boring locations.
1.3.1 Classification of Excavation
No consideration will be given to the nature of the materials, and all excavation will be designated as unclassified excavation.
1.3.1.1 Common Excavation
Include common excavation with the satisfactory removal and disposal of all materials not classified as rock excavation.
1.3.2 Dewatering Work Plan
Submit procedures for accomplishing dewatering work.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Shoring ; G, DO
Dewatering Work Plan ; G, DO
SD-02 Shop Drawings
Stockpile Plan ; G, DO
Submit a stockpile plan 30 days prior to the beginning of any placement of DMMA stockpile material. As a minimum, the plan must contain the slopes, heights, and limits.
SD-03 Product Data
Utilization of Excavated Materials ; G, DO
SECTION 31 00 00 Page 5
Opening of any Excavation or Borrow Pit
SD-06 Test Reports
Testing ; G, DO
Borrow Site Testing ; G, DO
Within 24 hours of conclusion of physical tests, submit 2 copies of test results, including calibration curves and results of calibration tests.
SD-07 Certificates
Testing
PART 2 PRODUCTS
2.1 REQUIREMENTS FOR OFFSITE SOILS
Test offsite soils excavated from the DMMA for Total Petroleum Hydrocarbons (TPH), Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and full Toxicity Characteristic Leaching Procedure (TCLP) including ignitability, corrosivity and reactivity. Fill shall contain a maximum of 100 parts per million (ppm) of total petroleum hydrocarbons (TPH) and a maximum of 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and shall pass the TCPL test. Determine TPH concentrations by using EPA 600/4-79/020 Method 418.1. Determine BTEX concentrations by using EPA SW-846.3-3 Method 5030/8020. Perform TCLP in accordance with EPA SW-846.3-3 Method 1311. Provide Borrow Site Testing for TPH, BTEX and TCLP from a composite sample of material from the borrow site, with at least one test from each quadrant of the DMMA borrow site. Do not bring material onsite until tests have been approved by the Contracting Officer.
PART 3 EXECUTION
3.1 STRIPPING OF TOPSOIL
Where indicated or directed, strip topsoil to a depth of 6 inches . Spread topsoil on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive application of the topsoil later, or at locations indicated or specified.
Keep topsoil separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 2 inches in diameter, and other materials that would interfere with planting and maintenance operations. Remove from the site any surplus of topsoil from excavations and gradings.
3.2 GENERAL EXCAVATION
Perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Perform the grading in accordance with the typical sections shown and the tolerances specified in paragraph FINISHING. Transport excavated materials and place in fill or embankment within the limits of the work. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times.
SECTION 31 00 00 Page 6
3.2.1 Ditches, Gutters, and Channel Changes
Finish excavation of ditches, gutters, and channel changes by cutting accurately to the cross sections, grades, and elevations shown on Drawings. Do not excavate ditches and gutters below grades shown.
Backfill the excessive open ditch or gutter excavation with satisfactory, thoroughly compacted, material or with suitable stone or cobble to grades shown. Dispose excavated material as shown or as directed, except in no case allow material be deposited a maximum 4 feet from edge of a ditch.
Maintain excavations free from detrimental quantities of leaves, brush, sticks, trash, and other debris until final acceptance of the work.
3.2.2 Drainage
Provide for the collection and disposal of surface and subsurface water encountered during construction. Completely drain construction site during periods of construction to keep soil materials sufficiently dry.
Construct storm drainage features (ditches) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed.
3.2.3 Dewatering
Control groundwater flowing toward or into excavations to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. Take control measures by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, maintain the water level continuously, at least 2 feet below the working level. Operate dewatering system continuously until construction work below existing water levels is complete.
3.2.4 Trench Excavation Requirements
Excavate the trench as recommended by the manufacturer of the pipe to be installed and in accordance with OSHA requirements. Slope trench walls below the top of the pipe, or make vertical, and of such width as recommended in the manufacturer's printed installation manual. Provide vertical trench walls only when the soils allow for a safe vertical cut.
Shore trench walls more than 3 feet high, cut back to a stable slope, or provide with equivalent means of protection for employees who may be exposed to moving ground or cave in. Shore vertical trench walls more than 4 feet high. Excavate trench walls which are cut back to at least the angle of repose of the soil. Give special attention to slopes which may be adversely affected by weather or moisture content. Do not exceed the trench width below the pipe top of 24 inches plus pipe outside diameter (O.D.) for pipes of less than 24 inches inside diameter, and do not exceed 36 inches plus pipe outside diameter for sizes larger than 24 inches inside diameter. Where recommended trench widths are exceeded, provide redesign, stronger pipe, or special installation procedures by the
SECTION 31 00 00 Page 7
Contractor. The Contractor is responsible for the cost of redesign, stronger pipe, or special installation procedures without any additional cost to the Government.
3.2.4.1 Bottom Preparation
Grade the bottoms of trenches accurately to provide uniform bearing and support for the bottom quadrant of each section of the pipe. Excavate bell holes to the necessary size at each joint or coupling to eliminate point bearing. Remove stones of 6 inch or greater in any dimension, or as recommended by the pipe manufacturer, whichever is smaller, to avoid point bearing.
3.2.4.2 Removal of Unstable Material
Where unstable material is encountered in the bottom of the trench, remove such material to the depth directed and replace it to the proper grade as provided in paragraph BACKFILLING AND COMPACTION. When removal of unstable material is required due to the Contractor's fault or neglect in performing the work, the Contractor is responsible for excavating the resulting material and replacing it without additional cost to the Government.
3.2.4.3 Excavation for Appurtenances
Provide excavation for culverts, sufficient to leave at least 12 inches clear between the outer structure surfaces and the face of the excavation or support members. Clean rock or loose debris and cut to a firm surface either level, stepped, or serrated, as shown or as directed. Remove loose disintegrated rock and thin strata. Specify removal of unstable material.
Do not excavate to the final grade level until just before the pipe is to be placed.
3.2.5 Underground Utilities
The Contractor is responsible for movement of construction machinery and equipment over pipes and utilities during construction. Perform work adjacent to non-Government utilities as indicated in accordance with procedures outlined by utility company. Excavation made with power-driven equipment is not permitted within 2 feet of known Government-owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer.
3.3 SELECTION OF MATERIAL
The Contractor shall be responsible for selecting materials from the DMMA for placement in the Washington Park soil mound. From the available dredge materials, soils classified as SC or SM will likely be less complicated to dry, place, and compact, and easier to maintain, whereas the high plasticity silts(ML, MH) and clays (CL, CH) would likely be more difficult to place, dry and compact.
For the haul road construction, the contractor shall be required to import
SECTION 31 00 00 Page 8 satisfactory cohesionless sand fill from off-site sources.
3.4 OPENING AND DRAINAGE OF EXCAVATION AND BORROW PITS
Notify the Contracting Officer sufficiently in advance of the opening of any excavation or borrow pit or borrow areas to permit elevations and measurements of the undisturbed ground surface to be taken. Except as otherwise permitted, excavate borrow pits and other excavation areas providing adequate drainage. Transport excavated DMMA offload material dredge spoil material from the DMMA to the county park. Ensure that excavation of any area, operation of borrow pits, or dumping of DMMA offload material spoil material results in minimum detrimental effects on the DMMA embankments and the natural environmental conditions. It is recommended that the sequence of DMMA offload material DMMA dredge spoil excavation begin from the interior of the pit, then proceeding outward towards the perimeter dike. The material in contact with the interior perimeter dike slope face should be removed last. An offset from the perimeter dike interior toe of at least 25 feet shall be used during the final stages of DMMA offload material dredge spoil removal along the interior edges. In the later stages of DMMA offload material dredge spoil excavation, as more water pressure accumulates against the interior perimeter dike slope face, increased seepage through or under the perimeter dike could occur. Daily or weekly inspections of the perimeter dike exterior slopes and toe may be warranted if seepage is observed.
3.5 SHORING
3.5.1 General Requirements
If required submit a Shoring and Sheeting plan for approval 15 days prior to starting work. Submit drawings and calculations, certified by a registered professional engineer, describing the methods for shoring and sheeting of excavations. Finish shoring, including sheet piling, and install as necessary to protect workmen, banks, adjacent paving, structures, and utilities. Remove shoring, bracing, and sheeting as excavations are backfilled, in a manner to prevent caving.
3.6 GRADING AREAS
Where indicated, divide work into grading areas within which satisfactory excavated material will be placed in embankments, fills, and required backfills. Do not haul satisfactory material excavated in one grading area to another grading area except when so directed in writing. Place and grade stockpiles of satisfactory and unsatisfactory and wasted materials as specified. Keep stockpiles in a neat and well drained condition, giving due consideration to drainage at all times. Clear, grub, and seal by rubber-tired equipment, the ground surface at stockpile locations; separately stockpile excavated satisfactory and unsatisfactory materials. Protect stockpiles of satisfactory materials from contamination which may destroy the quality and fitness of the stockpiled material. If the Contractor fails to protect the stockpiles, and any material becomes unsatisfactory, remove and replace such material with satisfactory material from approved sources.
3.7 GROUND SURFACE PREPARATION
3.7.1 General Requirements
Strip and remove any unsatisfactory vegetative material, trash, or topsoil
SECTION 31 00 00 Page 9 and replace-with satisfactory materials, as directed by the Contracting Officer, in surfaces to receive fill or in excavated areas. Scarify the surface to a depth of 6 inches before the fill is started. Plow, step, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so that the fill material will bond with the existing material. When subgrades are less than the specified density, break up the ground surface to a minimum depth of 6 inches , pulverizing, and compacting to the specified density. When the subgrade is part fill and part excavation or natural ground, scarify the excavated or natural ground portion to a depth of 12 inches and compact it as specified for the adjacent fill.
3.8 UTILIZATION OF EXCAVATED MATERIALS
Do not waste any satisfactory excavated material without specific written authorization. Dispose of satisfactory material, authorized to be wasted, in designated areas approved for surplus material storage or designated waste areas as directed. Clear and grub newly designated waste areas on Government-controlled land before placement of fill.
3.9 BACKFILLING AND COMPACTION
Place backfill adjacent to any and all types of structures, in successive horizontal layers of loose material not more than 12 inches in depth.
Compact to at least 92 percent laboratory maximum density for cohesive materials or 95 percent laboratory maximum density for cohesionless materials, to prevent wedging action or eccentric loading upon or against the structure. Backfill material must be within the range of -10 to +10 percent of optimum moisture content at the time of compaction.
Prepare ground surface on which backfill is to be placed and provide compaction requirements for backfill materials in conformance with the applicable portions of paragraphs GROUND SURFACE PREPARATION. Finish compaction by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.
3.9.1 Trench Backfill
Backfill trenches to the grade shown.
3.9.1.1 Replacement of Unyielding Material
Replace unyielding material removed from the bottom of the trench with select granular material or initial backfill material.
3.9.1.2 Replacement of Unstable Material
Replace unstable material removed from the bottom of the trench or excavation with select granular material placed in layers not exceeding 6 inches loose thickness.
3.9.1.3 Final Backfill
Fill the remainder of the trench, with satisfactory material. Place backfill material and compact as follows:
3.9.1.3.1 Roadways
Place backfill up to the required elevation as specified. Do not permit water flooding or jetting methods of compaction.
SECTION 31 00 00 Page 10
3.9.1.3.2 Soil mound Turfed or Seeded Areas and Miscellaneous Areas
Deposit backfill in layers of a maximum of 12 inches loose thickness, and compact it to 92 percent maximum density for cohesive soils and 95 percent maximum density for cohesionless soils. Do not permit compaction by water flooding or jetting. Apply this requirement to all other areas not specifically designated above.
3.9.2 Backfill for Appurtenances
After the culvert, catchbasin, inlet, or similar structure has been constructed, place backfill in such a manner that the structure is not be damaged by the shock of falling earth. Deposit the backfill material, compact it as specified for final backfill, and bring up the backfill evenly on all sides of the structure to prevent eccentric loading and excessive stress.
3.10 SPECIAL REQUIREMENTS
Special requirements for both excavation and backfill relating to the specific utilities are as follows:
3.10.1 Culvert Pipe
Excavate trenches to a depth that provides a minimum cover of 2 feet from the existing ground surface, or from the indicated finished grade, whichever is lower, to the top of the pipe.
3.11 EMBANKMENTS
3.11.1 Earth Embankments
Construct earth embankments from excavated DMMA materials. Place the material in successive horizontal layers of loose material not more than 12 inches in depth. Spread each layer uniformly on a soil surface that has been moistened or aerated as necessary, and scarified or otherwise broken up so that the fill will bond with the surface on which it is placed. After spreading, plow, disk, or otherwise break up each layer;
moisten or aerate as necessary; thoroughly mix; and compact to at least 92 percent laboratory maximum density for cohesive materials or 95 percent laboratory maximum density for cohesionless materials. Backfill material must be within the range of -10 to +10 percent of optimum moisture content at the time of compaction.
3.12 SUBGRADE PREPARATION
3.12.1 Proof Rolling
Finish proof rolling on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping, proof roll the existing subgrade with six passes of a dump truck loaded with 4 cubic yards of soil Operate the truck in a systematic manner to ensure the number of passes over all areas, and at speeds between 2-1/2 to 3-1/2 mph . Notify the Contracting Officer a minimum of 3 days prior to proof rolling. Perform proof rolling in the presence of the Contracting Officer or representative.
SECTION 31 00 00 Page 11
3.12.2 Construction
Shape subgrade to line, grade, and cross section, and compact as specified. Include plowing, disking, and any moistening or aerating required to obtain specified compaction for this operation. Remove soft or otherwise unsatisfactory material and replace with satisfactory excavated material or other approved material as directed. Bring up low areas resulting from removal of unsatisfactory material or excavation of rock to required grade with satisfactory materials, and shape the entire subgrade to line, grade, and cross section and compact as specified. Do not vary the elevation of the finish subgrade more than 0.05 foot from the established grade and cross section.
3.12.3 Compaction
Finish compaction by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment. Compact each layer of the embankment to at least 95 percent of laboratory maximum.
3.12.3.1 Subgrade for Roads
Compact subgrade for roads to at least 95 percent laboratory maximum densit for cohesionless soils. Compact cohesive materials to at least 92 percent of the material's maximum dry density.
3.13 FINISHING
Finish the surface of excavations, embankments, and subgrades to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 0.1 foot of the grades and elevations indicated except that the degree of finish for subgrades specified in paragraph SUBGRADE PREPARATION. Finish gutters and ditches in a manner that will result in effective drainage. Finish the surface of areas to be turfed from settlement or washing to a smoothness suitable for the application of turfing materials. Repair graded, topsoiled, or backfilled areas prior to acceptance of the work, and re-established grades to the required elevations and slopes.
3.13.1 Subgrade and Embankments
During construction, keep embankments and excavations shaped and drained.
Maintain ditches and drains along subgrade to drain effectively at all times. Do not disturb the finished subgrade by traffic or other operation. Protect and maintain the finished subgrade in a satisfactory condition.
3.13.2 Grading around HDPE pipes
Construct areas within 5 feet outside of any culvert structure line true-to-grade, shape to drain, and maintain free of trash and debris until final inspection has been completed and the work has been accepted.
3.14 PLACING TOPSOIL
On the soil mound slope areas to receive topsoil, prepare the compacted soil to a 2 inches depth for bonding of topsoil with subsoil. Spread topsoil evenly to a thickness of 4 inches and grade to the elevations and
SECTION 31 00 00 Page 12 slopes shown. Do not spread topsoil when excessively wet or dry. Obtain material required for topsoil from on-site stripping operations.
3.15 TESTING
Perform testing by a Corps validated commercial testing laboratory or the Contractor's validated testing facility. Submit qualifications of the Corps validated commercial testing laboratory or the Contractor's validated testing facilities. If the Contractor elects to establish testing facilities, do not permit work requiring testing until the Contractor's facilities have been inspected, Corps validated and approved by the Contracting Officer.
a. Determine field in-place density in accordance with ASTM D6938. When test results indicate, as determined by the Contracting Officer, that compaction is not as specified, remove the material, replace and recompact to meet specification requirements.
b. Perform tests on recompacted areas to determine conformance with specification requirements. Appoint a registered professional civil engineer to certify inspections and test results. These certifications shall state that the tests and observations were performed by or under the direct supervision of the engineer and that the results are representative of the materials or conditions being certified by the tests.
3.15.1 In-Place Densities
a. One test per 1,000 square feet , or fraction thereof, of each lift of fill or backfill areas compacted by other than hand-operated machines.
b. One test per 1,000 square feet , or fraction thereof, of each lift of fill or backfill areas compacted by hand-operated machines.
c. One test per 1,000 linear feet , or fraction thereof, of each lift of embankment or backfill for roads.
3.15.2 Optimum Moisture and Laboratory Maximum Density
Perform tests for each type material or source of material including borrow material to determine the optimum moisture and laboratory maximum density values. One representative test per 500 cubic yards of fill and backfill, or when any change in material occurs which may affect the optimum moisture content or laboratory maximum density.
3.15.3 Tolerance Tests for Subgrades
Perform continuous checks on the degree of finish specified in paragraph SUBGRADE PREPARATION during construction of the subgrades.
3.16 DISPOSITION OF SURPLUS MATERIAL
Remove surplus material or other soil material not required, brush, refuse, stumps, roots, and timber as indicated to a location approved by the Contracting Officer.
-- End of Section --
SECTION 31 00 00 Page 13
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 11 00
CLEARING AND GRUBBING
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Protection
3.1.1.1 Roads and Walks
3.1.1.2 Trees, Shrubs, and Existing Facilities
3.1.1.3 Utility Lines
3.2 CLEARING
3.2.1 Tree Removal
3.2.2 Pruning
3.2.3 Grubbing
3.3 DISPOSAL OF MATERIALS
-- End of Section Table of Contents --
SECTION 31 11 00 Page 1
SECTION 31 11 00
CLEARING AND GRUBBING
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Nonsaleable Materials ; G, RO
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Protection
3.1.1.1 Roads and Walks
Keep Washington park roads and walks free of dirt and debris at all times.
3.1.1.2 Trees, Shrubs, and Existing Facilities
Protect trees and vegetation to be left standing from damage incident to clearing, grubbing, and construction operations by the erection of barriers or by such other means as the circumstances require.
3.1.1.3 Utility Lines
Protect existing utility lines that are indicated to remain from damage.
Notify the Contracting Officer immediately of damage to or an encounter with an unknown existing utility line. The Contractor is responsible for the repair of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations. When utility lines which are to be removed are encountered within the area of operations, notify the Contracting Officer in ample time to minimize interruption of the service.
3.2 CLEARING
Clearing consists of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Clearing also includes the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work. Cut off flush with or below the original
SECTION 31 11 00 Page 2 ground surface trees, stumps, roots, brush, and other vegetation in areas to be cleared, except such trees and vegetation as may be indicated or directed to be left standing. Trim dead branches 1-1/2 inches or more in diameter on trees designated to be left standing within the cleared areas and trim all branches to the heights indicated or directed. Neatly cut close to the bole of the tree or main branches, limbs and branches to be trimmed. Paint, with an approved tree-wound paint, cuts more than 1-1/2 inches in diameter.
3.2.1 Tree Removal
Where indicated or directed, trees and stumps that are designated as trees shall be removed from areas outside those areas designated for clearing and grubbing. This work includes the felling of such trees and the removal of their stumps and roots as specified in paragraph GRUBBING.
Dispose of trees as specified in paragraph DISPOSAL OF MATERIALS.
3.2.2 Pruning
Prune trees designated to be left standing within the cleared areas of dead branches 1-1/2 inches or more in diameter; and trim branches to heights and in a manner as indicated. Neatly cut limbs and branches to be trimmed close to the bole of the tree or main branches. Paint cuts more than 1-1/4 inches in diameter with an approved tree wound paint.
3.2.3 Grubbing
Grubbing consists of the removal and disposal of stumps larger than 12 inches in diameter, and , roots larger than 6 3 inches in diameter , .
Smaller "finger" roots and matted roots at the ground surface may remain within from the designated grubbing areas. Remove material to be grubbed, together with logs , topsoil, and other organic or metallic debris not suitable for fill placement subgrade foundation purposes, to a depth of not less than 618 inches below the original surface level of the ground in areas indicated to be grubbed and in areas indicated as construction areas under this contract, such as areas for haul road construction. buildings, and areas to be paved. For the haul road alignment, Ff ill depressions made by grubbing with suitable material and compact in compliance with Section 31 00 00 EARTHWORKto make the surface conform with the original adjacent surface of the ground. For the DMMA offload material mound location, depressions may be filled with either DMMA offload material or imported sands.
3.3 DISPOSAL OF MATERIALS
Dispose of excess materials in accordance with the approved solid waste management permit and include those materials in the solid waste management report.
All wood or wood like materials, except for salable timber, remaining from clearing, prunning or grubbing such as limbs, tree tops, roots, stumps, logs, rotten wood, and other similiar materials shall become the property of the Contractor and disposed of as specified. All non-saleable timber and wood or wood like materials remaining from timber harvesting such as limbs, tree tops, roots, stumps, logs, rotten wood, and other similiar materials shall become the property of the Contractor and disposed as specified.
SECTION 31 11 00 Page 3
-- End of Section --
SECTION 31 11 00 Page 4
| 3 31 00 00.pdf |
| 31 00 00 - EARTHWORK |
| 31 00 00 - EARTHWORK |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Satisfactory Materials |
| 1.2.2 Unsatisfactory Materials |
| 1.2.3 Cohesionless and Cohesive Materials |
| 1.2.4 Degree of Compaction |
| 1.2.5 Topsoil |
| 1.2.6 Hard/Unyielding Materials |
| 1.2.7 Rock |
| 1.2.8 Unstable Material |
| 1.3 SYSTEM DESCRIPTION |
| 1.3.1 Classification of Excavation |
| 1.3.1.1 Common Excavation |
1.3.2 Dewatering Work Plan
1.4 SUBMITTALS
| PART 2 PRODUCTS |
| 2.1 REQUIREMENTS FOR OFFSITE SOILS |
| PART 3 EXECUTION |
| 3.1 STRIPPING OF TOPSOIL |
| 3.2 GENERAL EXCAVATION |
| 3.2.1 Ditches, Gutters, and Channel Changes |
| 3.2.2 Drainage |
| 3.2.3 Dewatering |
| 3.2.4 Trench Excavation Requirements |
| 3.2.4.1 Bottom Preparation |
| 3.2.4.2 Removal of Unstable Material |
| 3.2.4.3 Excavation for Appurtenances |
3.2.5 Underground Utilities
| 3.3 SELECTION OF MATERIAL |
| 3.4 OPENING AND DRAINAGE OF EXCAVATION AND BORROW PITS |
| 3.5 SHORING |
| 3.5.1 General Requirements |
| 3.6 GRADING AREAS |
| 3.7 GROUND SURFACE PREPARATION |
| 3.7.1 General Requirements |
| 3.8 UTILIZATION OF EXCAVATED MATERIALS |
| 3.9 BACKFILLING AND COMPACTION |
| 3.9.1 Trench Backfill |
| 3.9.1.1 Replacement of Unyielding Material |
| 3.9.1.2 Replacement of Unstable Material |
| 3.9.1.3 Final Backfill |
| 3.9.1.3.1 Roadways |
| 3.9.1.3.2 Soil mound Turfed or Seeded Areas and Miscellaneous Areas |
3.9.2 Backfill for Appurtenances
| 3.10 SPECIAL REQUIREMENTS |
| 3.10.1 Culvert Pipe |
| 3.11 EMBANKMENTS |
| 3.11.1 Earth Embankments |
| 3.12 SUBGRADE PREPARATION |
| 3.12.1 Proof Rolling |
| 3.12.2 Construction |
| 3.12.3 Compaction |
| 3.12.3.1 Subgrade for Roads |
| 3.13 FINISHING |
| 3.13.1 Subgrade and Embankments |
| 3.13.2 Grading around HDPE pipes |
| 3.14 PLACING TOPSOIL |
| 3.15 TESTING |
| 3.15.1 In-Place Densities |
| 3.15.2 Optimum Moisture and Laboratory Maximum Density |
| 3.15.3 Tolerance Tests for Subgrades |
3.16 DISPOSITION OF SURPLUS MATERIAL
| 4 31 11 00.pdf |
| 31 11 00 - CLEARING AND GRUBBING |
| 31 11 00 - CLEARING AND GRUBBING |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.1.1 Protection |
| 3.1.1.1 Roads and Walks |
| 3.1.1.2 Trees, Shrubs, and Existing Facilities |
| 3.1.1.3 Utility Lines |
| 3.2 CLEARING |
| 3.2.1 Tree Removal |
| 3.2.2 Pruning |
| 3.2.3 Grubbing |
3.3 DISPOSAL OF MATERIALS