This federal solicitation seeks dredging and earthmoving services. The contractor will excavate material from the Manatee Harbor Dredge Material Management Area and transport it by truck approximately 7.5 miles to construct a haul road and conduct a fill placement at the southern end of the road. Additional work includes clearing, grubbing, seeding, drainage structures, slope protection, and environmental monitoring. The period of performance is 365 calendar days from notice to proceed. Bids are due electronically by 2:00 PM on August 21, 2020. The solicitation is set aside for small businesses and issued by the Department of the Army Corps of Engineers Engineering District Jacksonville.

View the file

Other files for this federal contract opportunity

Other files attached to Manatee Harbor DMMA Offloading 2020, Manatee County, Florida, newest first.
File Type Posted
W912EP20B0006 Abstract Manatee Harbar DMMA signed DS.pdf PDF
Amendment 0005 Manatee Harbor DMMA 20B0006.pdf PDF
Amendment 0004 Manatee Harbor DMMA 20B0006 (2).pdf PDF
Amendment 0003 Manatee Harbor DMMA 20B0006.pdf PDF
Amendment 0002 Manatee Harbor DMMA 20B0006.pdf PDF
Amendment 0002_ Manatee Harbor DMMA 20B0006.pdf PDF
VOL 1 Manatee Harbor DMMA 20B0006.pdf PDF
PLANS_Manatee Offloading.pdf PDF
GDR FILES Manatee Offloading.pdf PDF
VOLUME 2 Manatee Offloading.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 15

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

06-Aug-2020

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY CODE W912EP 7. ADMINISTERED BY (If other than item 6) CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

See Item 6

8. NAME AND ADDRESS OF CONTRACT OR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W912EP20B0006

X 9B. DATED (SEE ITEM 11)

22-Jul-2020

10A. MOD. OF CONTRACT /ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. T HIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICIT ATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNT ING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT S/ORDERS.

IT MODIFIES THE CONTRACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONTRACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO THE AUT HORIT Y OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PURSUANT TO AUT HORIT Y OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT : Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPT ION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Manatee Harbor Dredge Material Management Area (DMMA) Off-loading 2020 Manatee County, Florida

This Amendment is being issued to add the Site Visit Clause to this requirement, Delete and Replace Section 00800 and to update the Standard Form 1442 to include the WEBEX information.

A. See continuation sheet for amendment details.

B. The Bid Opening date remains tthe same 21 August 2020 @ 2:00 P.M. local time. Bid Opening will be held virtually via WEBEX. See updated Standard Form 1442 for instructions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONT RACT OR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNIT ED STATES OF AMERICA

B Y (Signature of Contracting Officer)

16C. DATE SIGNED

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1 Amendment 0001 W912EP20B0006

SF 30 CONTINUATION SHEET

MANATEE HARBOR DREDGE MATERIAL MANAGEMENT AREA (DMMA) OFF-LOADING 2020

MANATEE COUNTY, FLORIDA

SUMMARY OF CHANGES

1. SPECIFICATIONS:

The text changes have been updated with asterisk (***) before and after the change. The entire section is replaced if there is any change.

Changes to Specifications:

Volume 1 of 2

ADD FAR Clause 52.236-27 Site Visit (Construction)(FEB 1995)(Alternate 1)(FEB 1995) DELETE Standard Form 1442 and REPLACE with the attached Standard Form 1442 DELETE Section 00800 and REPLACE with the attached REVISED Section 00800

Volume 2 of 2

No Changes

2. DRAWINGS:

No Changes

(End of Summary of Changes)

Manatee Harbor DMMA Off-loading 2020, Manatee County, Florida

DESCRIPTION OF WORK: Refer to Section 01 11 00 for a complete project description.

Draw ings - See DFARS Clause 252.236-7001, in Section 000700.

Magnitude Of Construction is betw een $3,500,00 AND $4,500.000.00.

This is an Unrestricted Procurement Set-Aside For Small Businesses.

The NAICS Code is 237990 and the Size Standard is $39.5 Million **Block 11 – See Section 00700, Clause 52.211-10 for Period of Performance.

***In accordance w ith (IAW) FAR Clause 52.236-27 has been scheduled. See Section 00100 for details.***

***ALL BIDS MUST BE SUBMITTED ELECTRONICALLY. SEE ELECTRONIC PROPOSALS IN SECTION 00800 FOR DETAILED

INSTRUCTIONS.***

***BID OPENING WILL BE HELD VIRTUALLY VIA WEBEX. PLEASE UTILIZE THE LINK AND CALL IN INFORMATION PROVIDED BELOW:

https://usace.w ebex.com/meet/claurice.m.dingle - Audio Teleconference: 1-877-402-9753, Access Code: 6546236, Security Code: 0003**

You must be registered in the System for Aw ard Management (SAM), per FAR Clause 52.204-7 - SYSTEM FOR AWARD MANAGEMENT (JUL 2013) in Section 00100 in order to receive an aw ard from this solicitation. The SAM w ebsite is located at http://w w w .sam.gov.

X

CLAURICE M DINGLE 904-232-1387

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

22-Jul-2020

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______45 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________See Sec. 00700

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Aug 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912EP20B0006 216

Amendment 0001

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Amendment 0001

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB 1995) (CESAJ

ADAPTATION)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for -- August 13, 2020 @ 10:30 A.M.

(c) Participants will meet at -- Port Manatee Visitor Parking, 13500 Reeder Rd, Palmetto, FL 34221

(d) Participants should call Yvette Powell at Yvette.L.Powell@usace.army.mil on or before August 12, 2020 to make arrangements.

(e) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 01 11 00 to make arrangements to inspect the borings. Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days.)

(f) After the site visit, a memorandum summarizing the visit will be posted to BetaSam.gov Website under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Standard Form 1442.

(End of Provision)

W912EP20B0006 Amendment 0001 mailto:Yvette.L.Powell@usace.army.mil

SECTION 00800 - SPECIAL REQUIREMENTS

5152.231-9000 EQUIPMENT OWNERSHIP AND OPERATING

EXPENSE SCHEDULE (MAR 1995)

MAY 1999

52.223-3 HAZARDOUS MATERIAL IDENTIFICA-Hazardous Material Identification And Material Safety Data

JAN 1997

UNAUTHORIZED INSTRUCTIONS FROM

GOVERNMENT OR OTHER PERSONNEL

DEC 1999

ELECTRONIC BIDS

ESTABLISHING AUTHORITY OF PERSON(S)

WHO SIGN(S) THE BID

DEC 1999

DISTRIBUTING SOLICITATION AMENDMENTS

VIA BETA.SAM.GOV

AUG 2016

OBTAINING INFORMATION REGARDING THIS

SOLICITATION

DEC 1999

NOTIFICATION TO UNSUCCESSFUL BIDDERS SEP 2006

RETAINAGE FOR FAILURE TO COMPLY WITH

SUBCONTRACTING PLAN REPORTING

REQUIREMENTS

SOURCES FOR ASSISTANCE IN LOCATING

SMALL BUSINESS CONTRACTORS

DEC 1999

U.S. ARMY CORPS OF ENGINEERS SAFETY

AND HEALTH REQUIREMENTS MANUAL, EM

385-1-1

JAN 2001

CONSTRUCTION CONTRACTOR

PERFORMANCE EVALUATIONS

FEB 2009

NOTICE TO MARINERS -- CONSTRUCTION

CONTRACTS

DEC 1999

CONTRACTORS USE OF ELECTRONIC

SOFTWARE FOR PROCESSING DAVIS-

BACON ACT CERTIFIED LABOR

PAYROLLS (APRIL 2011)

SEP 2011

W912EP20B0006 00800-i Amendment 0001

W912EP20B0006 SECTION 00800-1 AMENDMENT 0001

Section 00800 - SPECIAL REQUIREMENTS

CLAUSES INCORPORATED BY FULL TEXT

5152.231-9000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR

2013)

(a) This special contract requirement does not apply to terminations. See 52.249-5000, Basis for Termination Settlement Proposals, and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region III. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR31.205-

36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

(End of special contract requirement)

52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)

(a) "Hazardous material", as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).

(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract (see Note 1 below). The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.

Material Identification No.

(If none, insert "None") (See Note 2 below)

(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.

(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, W912EP20B0006 SECTION 00800-2 AMENDMENT 0001 for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items.

Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.

(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.

(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.

(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:

(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to--

(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;

(ii) Obtain medical treatment for those affected by the material; and

(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.

(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.

(3) The Government is not precluded from using similar or identical data acquired from other sources.

(End of clause)

Notes:

1. The phrase “to be delivered under this contract” shall be interpreted to include hazardous materials to be consumed in the performance of the work even though such materials may not be delivered to the Government as end items.

2. The use (or consumption) of some kind of hazardous material is required for the performance of almost every construction (including dredging) contract and in many service contracts. Therefore, the offeror should not enter “none” without first evaluating the work and making a positive determination that no such materials will be introduced to the job site. If the offeror is not sure of the identity of hazardous materials that may be used during the performance of the work, the offeror should enter “unknown at this time.” Regardless of the offeror’s entry, the successful offeror (the Contractor) will be required to submit material safety data sheets prior to introducing any hazardous materials to the job site.

(End of notes)

UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL

The Contractor shall not accept any instructions issued by any person, employed by the Government or otherwise, other than the Contracting Officer or the Contracting Officer's Representative (COR) acting within the limits of the COR’s authority. See the Contracting Officer's Representative clause of this contract.

(End of paragraph)

W912EP20B0006 SECTION 00800-3 AMENDMENT 0001

ESTABLISHING AUTHORITY OF PERSONS(S) WHO SIGN(S) THE BID

The Offeror shall check the paragraph below that corresponds with the Offeror’s status and shall submit appropriate documentation with the offer to confirm authority of person(s) who sign the offer.

(a) Individual. A contract with an individual shall be signed by that individual. A contract with an individual doing business as a firm shall be signed by that individual, and the signature shall be followed by the individual’s typed, stamped, or printed name and the words, “an individual doing business as

” [insert name of firm].

(b) Partnership. A contract with a partnership shall be signed in the partnership name. Before signing for the

Government, the contracting officer shall obtain a list of all partners and ensure that the individual(s) signing for the partnership have authority to bind the partnership.

(c) Corporation. A contract with a corporation shall be signed in the corporate name, followed by the word “by” and the signature and title of the person authorized to sign. The contracting officer shall ensure that the person signing for the corporation has authority to bind the corporation.

(d) Joint venture. A contract with a joint venture may involve any combination of individuals, partnerships, or corporations. The contract shall be signed by each participant in the joint venture in the manner prescribed in paragraphs (a) through (c) above for each type of participant. When a corporation is participating, the contracting officer shall verify that the corporation is authorized to participate in the joint venture.

(e) Agent. When an agent is to sign the contract, other than as stated in paragraphs (a) through (d) above, the agent’s authorization to bind the principal must be established by evidence satisfactory to the contracting officer.

(End of Note)

DISTRIBUTING SOLICITATION AMENDMENTS BETASAM.GOV

Solicitation amendments will be distributed using the beta.SAM.gov system at https://betaSAM.gov.

In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER TO RECEIVE NOTIFICATION on the beta.SAM.gov website at https://betaSAM.gov. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation.

In addition, in order to generate a Plan Holders List, all interested bidders must also REGISTER AS INTERESTED VENDOR which is also located on thebeta.SAM.gov website at https://betaSAM.gov

(End of provision)

ELECTRONIC BIDS

(a) Definition.

Electronic bid, as used in this provision, means a bid, revision or modification of a bid, or withdrawal of a bid that is transmitted to and received by the Government via email or other means for transmitting electronic data. No flash drives will be accepted.

(b) Bidders must submit electronic bids in responses to this solicitation in order to be considered for award.

Electronic bids are subject to the same rules as paper bids. In addition to the electronic version, bidders must also submit the bid bond in hard copy in a sealed envelope to Contracting Division, Attn: Claurice Dingle, 701 San Marco Blvd., Jacksonville, FL 32207 within 2 working days of the scheduled bid opening.

(c) If any portion of bid received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document -

(1) The Contracting Officer shall immediately notify the bidder and permit the bidder to resubmit the bid if the bid has been received prior to due date indicated in the solicitation;

(2) The method and time for resubmission shall by prescribed by the Contracting Officer after consultation with the bidder.

https://betasam.gov/ http://betasam.gov/ http://betasam.gov/

W912EP20B0006 SECTION 00800-4 AMENDMENT 0001

(d) The Government reserves the right to make award solely on the electronic bid. However, if requested to do so by the Contracting Officer, the apparently successful bidder shall submit the complete original signed bid.

(e) The Bidder’s bid shall be submitted electronically, as described below. The use of hyperlinks in the bid is prohibited. The bidder’s bid is due no later than 2:00 PM, local time on 21 August 2020.

NOTE: The only authorized transmission method of bids in response to the subject solicitation is electronically via SAFE online submission. No other transmission methods (Email, Facsimile, Regular mail, Hand carried, etc.) will be accepted.

The Bidder’s bid must be received by the Government no later than the date/time specified in the solicitation and cited above. Bidders shall submit their bid using the following link: h ttps://safe.apps.mil/

Please submit bids utilizing the link above to Contract Specialist, Dewayne Sparks at D ewayne.A.Sparks@usace.army.mil and to Contracting Officer, Claurice Dingle at Claurice.M.Dingle@usace.army.mil

Instructions for submitting electronic bids:

In an effort to reduce paperwork and cost, all bids shall be submitted electronically through the SAFE site. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, it is recommended that you combine or ZIP your files before uploading to the SAFE site. Bidders may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Request for upload code:

Bidders must email Contract Specialist, Dewayne Sparks at Dewayne.A.Sparks@usace.army.mil and to Contracting Officer, Claurice Dingle at Claurice.M.Dingle@usace.army.mil no later than three

(3) working days prior to the bid response date to receive a request code which will allow for file uploads via the SAFE site. Bidders that fail to email for request a code three (3) working days before bid submission date may not be able to receive a request code in time to upload their submission.

File Description:

To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention. Each file name shall begin with the solicitation number, followed by the word “RESPONSE”, followed by your firm’s name and finally a brief file description.

EXAMPLES:

(1) “W912EP20B0023 RESPONSE Firm name Volume I.pdf”

(2) “W912EP20B0023 RESPONSE Firm name Volume II.pdf”

File Organization, Formatting and other instructions. Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger.

Pages shall be letter sized--larger page sizes (such as 11x17 foldouts, etc.) will be counted as two pages. Bidders shall prepare bids in the English language. Bids shall be in a narrative format, organized and titled so that each section of the bid follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.

Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)

Upload Completion & Deadline:

Interested parties shall submit responses no later than the date cited above. The time & date of bid receipt will be the upload completion / delivery time & date recorded within Safe. Bidders should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal mailto:ewayne.A.Sparks@usace.army.mil mailto:Claurice.M.Dingle@usace.army.mil mailto:Dewayne.A.Sparks@usace.army.mil mailto:Claurice.M.Dingle@usace.army.mil

W912EP20B0006 SECTION 00800-5 AMENDMENT 0001

process. Submissions after the deadline may be emailed to Contract Specialist Timothy Humphrey (Timothy.G.Humphrey@usace.army.mil) but be advised, they will be considered late and as such, will be processed in accordance with FAR 15.208.

Submission shall be in Adobe PDF format.

Instructions to follow on the SAFE Website:

1. Once at the SAFE website, select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.

2. After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.

3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients for this solicitation, the recipients are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation is Dewayne Sparks:

Dewayne.A.Sparks@usace.army.mil and the Contracting Officer is Claurice Dingle:

Claurice.M.Dingle@usace.army.mil. The E-Mail address of the Government Employee who initiated the request code will be automatically entered. The Bidder must enter the E-Mail address for both the Contracting Officer and Specialist. The Bidder can enter an additional E-Mail address if desired. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your bid is submitted, a notification will be sent to the recipients you added.

NOTE: Do NOT send the SAFE site packages to group email accounts.

Even if you successfully upload your bid to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. A Bidder can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.

NOTE: It has been reported that documents may more quickly upload into the SAFE website when using the Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Bidders will have more success utilizing any particular browser.

Receipt of Submission:

For the purposes of establishing whether a bid submission is considered timely, the Government considers the date and time the submission is completely uploaded into the SAFE website. For bids larger than the 2GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.

The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive bids. Bidders are responsible for ensuring that bids are submitted so as to reach the designated recipient. Bidders are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.

OBTAINING INFORMATION REGARDING THIS SOLICITATION

Read this paragraph in conjunction with FAR 52.214-6, Explanation To Prospective Bidders, which is located in this Section 00100. Verbal requests for information must be directed to the person whose name appears in item 9 of the SF 1442. Collect calls cannot be accepted. Written requests for explanations must be sent to the person identified in item 9 of the SF 1442 and may be sent via facsimile to 904-232-2748. Inquiries and requests that are directed to any other person may not be relayed to the proper person and, therefore, may not be answered.

(End of paragraph)

BIDDER'S CHECKLIST -- CONSTRUCTION/DREDGING CONTRACTS

mailto:Dewayne.A.Sparks@usace.army.mil mailto:Dewayne.A.Sparks@usace.army.mil mailto:Claurice.M.Dingle@usace.army.mil

W912EP20B0006 SECTION 00800-6 AMENDMENT 0001

The following list should be used by bidders to avoid irregularities that have occurred in past bids.

1. Have amendments to the Invitation been acknowledged on the bid form in the spaces provided? If not, acknowledgment must be made by separate letter or telegram prior to opening of bids.

2. Have prices been inserted for all bid items of the Bidding Schedule?

3. Do prices inserted include subcontractors' and suppliers' quotations, indirect costs, and profit?

4. Does the total bid amount include the costs of obtaining performance and payment bonds?

5. Have all prices and computations been checked?

6. Is the bid submitted on the latest bid schedule?

7. Have changes been made to the Bidding Schedule if required by amendment?

8. Are decimal points in the bid prices in the proper places?

9. Have you checked for transposition of figures in prices inserted on the Bidding Schedule?

10. Is the bid form signed, and if so, is the bid form signed by a person legally authorized to bind the bidder? Is the bidder's address included?

11. If the bid is signed by an agent, is legal evidence of agent's authority to sign included with the bid?

12. If a bid guarantee is required, does your bid guarantee comply with the Bid Guarantee clause of the solicitation?

If the bid guarantee is in the form of a bid bond is it on Standard Form 24? If your bid guarantee does not firmly bind you (and your sureties, if applicable) to the United States of America, YOUR BID WILL BE CONSIDERED

NONRESPONSIVE.

13. If the bid guarantee is in the form of a bid bond, is it completely and properly executed, dated not later than the bid opening date, signed by Principal and Surety, corporate certificates executed, and seals affixed, all as contained in "Instructions" on Standard Form 24? Power of Attorney is also required to accompany the bond. Is the penal sum marked in? If an individual surety (or sureties) is (are) guaranteeing the bid bond, have the requirements of the Pledges Of Assets clause of this solicitation been satisfied and are the supporting documents included with the bond?

14. Have the appropriate boxes been checked in all paragraphs of the Representations And Certifications (Section 00101)?

15. Have all representations and certifications been submitted with the bid?

16. If required by the Invitation, is literature, data, catalogs, etc., specified by the Invitation included with the bid?

17. Have requirements of the Late Submissions, Modifications And Withdrawals Of Bids provision of this solicitation been met?

CAUTION: BIDS THAT ARE QUALIFIED BY THE BIDDER MAY BE CONSIDERED NONRESPONSIVE.

NOTIFICATION TO UNSUCCESSFUL BIDDERS

In accordance with FAR 14.409-1, unsuccessful bidders will be notified, in writing or electronically within 3 days of contract award, that their bid was not accepted. Award synopsis as well as the Bid Abstract will be posted to the Federal Business Opportunities website at w ww.fbo.gov. If a bid is rejected for any reason other than price, the unsuccessful bidder will receive written notification stating the reason for rejection of the bid.

(End of paragraph)

RETAINAGE FOR FAILURE TO COMPLY WITH SUBCONTRACTING PLAN REPORTING

REQUIREMENTS

(a) Read this paragraph in conjunction with Liquidated Damages--Small Business Subcontracting Plan (FAR 52.219-16) clause of this contract.

(b) Should the Contractor fail to submit Individual Subcontract Reports (ISR) and/or Summary Subcontract Reports in a timely manner, the Government will consider this failure as evidence of possible failure to make a good faith effort to achieve goals contained in the Contractor's small business subcontracting plan. In order to protect the Government's ability to assess liquidated damages in the event the Contractor does fail to meet the goals and such failure results from a lack of good faith effort, the Contracting Officer will retain from progress payments an amount deemed sufficient to satisfy the Contractor's liability. The amount of the retainage will be determined in accordance with the following formula:

Total dollar amount proposed for subcontracting to small business multiplied by the percentage of actual progress on the contract, up to a maximum of 10% of the progress payment, will be withheld from the next progress payment that is due after the Contractor's failure to submit a required report. If one or more reports have been submitted before a failure to submit a required report, this formula will be adjusted by deducting any amounts reported as

W912EP20B0006 SECTION 00800-7 AMENDMENT 0001

subcontracted to small business from the total dollar amount proposed to be subcontracted. See examples below.

Example 1 (No previous reports submitted)

Total prop osed subcontracting $500,000 Current pr ogress payment $100,000 Percent of work completed x .10 Maximum retainage percentage x .10 Retainage $50,000 Retainage $10,000

Maximum that can be retained is $10,000

Example 2 (Previous reports submitted) Total proposed subcontracting $500,000 Current progress payment $100,000 Subcontracting previously reported($100,000) Maximum retainage percentage x .10 Percent of work completed x .10 Retainage $10,000 Retainage $40,000

Maximum that can be retained is $10,000

(End of paragraph)

SOURCES FOR ASSISTANCE IN LOCATING SMALL BUSINESS SUBCONTRACTORS

(a) The Offeror's attention is directed to the Utilization of Small Business Concerns clause of this solicitation.

Assistance in identifying small, small disadvantaged and women-owned small business concerns may be obtained as follows:

(1) Internet Web Site Sources for searches throughout the U.S., Puerto Rico and the USVI:

(A) Small Business Administration PRO-Net Database h ttp://www.sba.gov

(B) Procurement Technical Assistance Center (PTAC) h ttp://www.dla.mil/ddas

(C) Veterans Business Outreach Center 800-542-7232 w ww.vboc.org

(D) Dynamic Small Business Database h ttp://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm

(2) Sources of information within Florida:

(A) Florida Atlantic University PTAC, Ft. Lauderdale 954-771-6520

(B) University of South Florida PTAC, Tampa 813-974-4371

(C) Chamber of Commerce PTAC, Jacksonville 904-928-1100

(D) University of West Florida PTAC, Pensacola 850-474-2919

(E) Florida A&M University PTAC, Tallahassee 850-599-3407

(F) Latin Builders Association, Miami-Dade Area 954-704-0345

(G) Broward County Minority Bldrs Coalition 305-792-1121

(3) Sources of information within the U.S. Virgin Islands:

Dept of Public Works, DBE Coordinator, St. Thomas 340-773-1290

(4) Sources of information within Puerto Rico:

(A) Puerto Rico General Contractors Association, San Juan 787-781-2200

(B) San Juan PTAC 787-753-6861

(End of paragraph)

U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL, EM 385-1-1

This paragraph applies to contracts and purchase orders that require the contractor to comply with EM 385-1-1 (e.g., contracts that include the Accident Prevention clause at FAR 52.236-13 and/or other safety provisions). EM 385-1-1 and its changes are available at http://www.usace.army.mil/ceso/pages/home.aspx. The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the date the solicitation for this contract/purchase order was issued.

(End of paragraph)

CONSTRUCTION CONTRACTOR PERFORMANCE EVALUATIONS

http://www.sba.gov/ http://www.dla.mil/ddas http://www.usace.army.mil/ceso/pages/home.aspx

W912EP20B0006 SECTION 00800-8 AMENDMENT 0001

In accordance with the provisions of Subpart 36.201 (Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractors’ performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering and Construction Bulletin 2014-13 to fulfill this FAR requirement. For construction contracts awarded at $650,000.00 or more, the USACE will evaluate contractor's performance and prepare a performance report using the Contractor Performance Assessment Reporting System (CPARS), which is a web-based system.

After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 60 days.

The evaluation will be transferred to the Past Performance Information Retrieval System (PPIRS) within 15 calendar days after issuance. However, it will remain with “Pending” status in PPIRS until the government official closes the form in CPARS. Contractors may access their own evaluations in PPIRS by registering as a user and obtaining specific software, called PKI certification, which is installed on the user's computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The average cost per certificate is about $100 - $120 per year and is purchased from an External Certificate Authorities (ECA) vendor.

Current information about CPARS, PKI certification process and for contacting vendors can be found on the web site: h ttp://www.cpars.gov. If the Contractor wishes to participate in the performance evaluation process, access to CPARS and PKI certification is the sole responsibility of the Contractor.

(End of Paragraph)

NOTICE TO MARINERS -- CONSTRUCTION CONTRACTS

Should the Contractor, during operations, encounter any objects on the channel bottom which could be a hazard to navigation, the Contractor shall immediately notify the Contracting Officer as to the location of said object and shall provide any other pertinent information necessary for the Contracting Officer to prepare and issue a Notice to Mariners.

(End of paragraph)

(S-102) CONTRACTOR SUPPLY and USE OF ELECTRONIC SOFTWARE FOR PROCESSING DAVIS- BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)

The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS.

If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations. When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.

The contractor’s provision and use of an electronic payroll processing system shall meet the following basic functional criteria; commercially available; compliant with appropriate Davis-Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at h ttp://www.rmssupport.com/guides.aspx) for export in an Excel spreadsheet to be imported into the contractor’s Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government’s Resident Management System (RMS); demonstrated security of data and http://www.cpars.gov/ http://www.rmssupport.com/guides.aspx)

W912EP20B0006 SECTION 00800-9 AMENDMENT 0001

data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Davis-Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.

All contractor-incurred costs related to the contractor’s provision and use of an electronic payroll processing service shall be included in the contractor’s price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.

(End of paragraph)

Section 00800.pdf
(a) Definition.
CONSTRUCTION CONTRACTOR PERFORMANCE EVALUATIONS