W912EK-17-R-0020-0001.pdf

PDF 50 KB Posted

Attached to
Pool 13 Riprap Federal contract opportunity
Solicitation number
W912EK-17-R-0020
Issued by
Department of the Army Corps of Engineers Engineering District Rock Island

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Pool 13 Riprap, newest first.
File Type Posted
A22._W912EK-17-R-0020.pdf PDF
A02._Attachment_B_(400_-_IL_-_RR5_Tally_Chart_and_Gradation_Curve).pdf PDF
A02._Attachment__A_(Map_of_USACE_Recommended_Riprap_Delivery_Site).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96514770813624

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

General Purpose Grade IL DOT RR 5 Riprap for Riprap Island and Big Soupbone Island.

The reason for the amendment is to remove the Contracting Officers Representative(COR) description and replace w ith Technical Representative, correct the delivery date, address a submitted question, see summary of changes.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Apr-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK-17-R-0020

X 9B. DATED (SEE ITEM 11)

13-Apr-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Apr-2017

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK-17-R-0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

PURCHASE DESCRIPTION

Purchase Description

1. Scope of Work: Riprap (stone) 36,000 tons of General Purpose Grade IL DOT RR 5 Riprap.

Riprap will be placed at Riprap Island and Big Soupbone Islands (Upper Mississippi River Mile 540 to 543.5) by the Corps of Engineers personnel and floating plant assets.

2. List of Attachments:

Attachment A (Map of USACE Recommended Riprap Delivery Sites) Attachment B (ILDOT RR-5 Riprap Gradation Curve & Tally Chart)

3. Specifications: Total of 36,000 tons of General Purpose use riprap (400lb maximum size) well graded in accordance with specified gradation within the Scope of Work and Attachment B. The Contractor shall ensure the riprap is delivered as follows:

a. Minimum Rate of delivery – 1,500 tons per 10 hour workday (7:00 a.m. to 5:30 p.m.)

Applicable to base and all options.

b. Base: 36,000 tons of riprap (Stone) for GENERAL PURPOSE USE (NOT Submerged Use), to be delivered onto Government barges located on the Upper Mississippi River, in pool 13, between river mile markers 537 and 538.

c. Option – 1: 5,000 tons riprap. The Government reserves the right to exercise Option-1

No Later Than (NLT) 30-Sep-2017. The delivery start date is to be NLT two (2) weeks after exercising Option-1, while maintaining a 1,500 tons / 10 hour workday delivery rate.

d. Option – 2: 10,000 tons riprap. The Government reserves the right to exercise Option-2 No Later Than (NLT) 30-Sep-2017. The delivery start date is to be NLT two (2) weeks after exercising Option-2, while maintaining a 1,500 tons / 10 hour workday delivery

e. Option – 3: 15,000 tons riprap. The Government reserves the right to exercise Option-3 No Later Than (NLT) 30-Sep-2017. The delivery start-date is to be NLT two (2) weeks after exercising Option-3, while maintaining a 1,500 tons / 10 hour workday delivery

f. Loading Locations: There are loading sites in the vicinity of Riprap and Big Soupbone

Islands that potentially meet the U.S. Army Corps of Engineers (USACE) purposes. The loading sites are located in and around Savanna, IL; between River Miles 537 - 538 (see Attachment A). All costs incurred with the deliveries are at the CONTRACTOR’S EXPENSE. NOTE – at no time shall the loading site selected by the Contractor impede or otherwise interfere with the normal navigation of commercial barge traffic.

g. It is HIGHLY RECOMMENDED that all offerors coordinate all required approvals and/or costs associated with necessary agreements, permits etc., whether required by local city municipalities and/or privately owned businesses PRIOR to submission of offerors to USACE Rock Island District Contracting Office.

h. Barge Loading: Riprap (Stone) will be required to be placed on Government barges by a method that does not allow riprap to fall greater than four feet onto the barge deck surface. This will minimize damage to Government barges due to riprap impact.

(1) Regardless of the delivery method, riprap must be uniformly distributed on

Government barges. It will not be acceptable to simply dump riprap directly on the barge surface without a method of fully and evenly distributing (i.e., contractor provided wheel loader with operator).

(2) Securing Barges for Loading: Contractor will ensure that Government barges being loaded with riprap are securely tied off to the bank, ramps, or whatever structure is necessary to facilitate safe loading.

i. Delays by the Government to ensure a safe work environment may occur due to equipment maintenance, breakdowns, or any number of severe river or weather conditions that may arise during the course of deliveries. In the event that a delay occurs, the Government Technical Representative will immediately notify the Contractor and the Contracting Officer (KO) of the cause and the anticipated duration of the delay. The KO will then negotiate an extension to the contract completion date once the delay has been resolved. The Technical Representative will notify the contractor (within 24 hours) when deliveries can resume. Depending on the length of the delay, additional time (days) may be added to the duration of the contract.

j. Additional information: Specifications of the Government barges are 35 feet wide by

150 feet long. Average draft empty: 2 feet & average draft full: 6 to 7 feet. Load amounts of riprap per barge may vary between 400 – 700 tons depending on the loading arrangement, placement site water depth, and/or ramp configuration.

k. Delivery start date: Delivery shall begin no later than 31 May 2017.

l. Work Schedule: Contractor will be required to deliver riprap during a normal work week (Monday thru Friday) schedule. The contractor will (at its own expense) only be required to make deliveries during weekends or Federal holidays if daily delivery rates of 1,500 tons/day are not maintained during a normal week. The Technical Representative will verify rock receipts and notify the KO and Contractor of daily delivery rates and the running total by close of business Wednesday of each week that deliveries are in progress.

m. Delivery completion date: Based on contract award/start date and minimum Rate of

Delivery = 1,500 tons/day, the entire BASE quantity shall be delivered no later than five

(5) work weeks after first delivery. Additional time will be added to the contract completion date commensurate with quantity required and daily rate (min. 1,500 tons/day) for each option that is exercised (if exercised).

4. SCOPE OF WORK (cont.)

a. GENERAL

(1) These specifications cover the furnishing of all material, labor, equipment and all appurtenant facilities required to furnish, deliver and unload stone materials in conformity with these specifications. The stone shall be furnished “freight on board” (f.o.b.) Government barges.

(2) It is expected that all offerors will have acquainted themselves with all information concerning the existing conditions affecting transportation of stone materials from the quarry to the point of delivery and that adequate river depths exist which will permit access to mooring facilities and to the loading docks by Government barges. Failure to acquaint itself with all available information concerning roadways and other items affecting this ability to furnish and deliver the materials as specified will not relieve the Contractor from responsibility for making deliveries of materials at the rates prescribed. Examples of potential costs to be incurred to the Contractor could range from a cost for the use of a ramp or loader equipment, to a cost to the county for the use of the roadways and subsequent damage to such roads. These examples are not all inclusive and all costs should be reflected in the quote.

b. RIPRAP

(1) Riprap shall be supplied from a Rock Island District approved riprap source. Riprap stone shall be of a suitable quality to ensure permanence in the structure and in the climate in which it is to be used. It shall be free from cracks, seams, and other defects that would tend to increase unduly its deterioration from natural causes. The inclusion of objectionable quantities of dirt, sand, clay, and rock fines, as determined by the Technical Representative, will not be permitted. Stone shall be reasonably well graded over the entire range of sizes conforming to the limitations specified to follow and further delineated on the chart included as Attachment B titled (ILDOT RR-5 Riprap Gradation Curve & Tally Chart).

(2) Neither the breadth nor the thickness of any piece shall be less than one-third of its length. All stone shall be processed to remove fine particles by loading over a vibrating screen with not less than 6 inch bar spacing or by other approved methods and equipment that will result in satisfactory removal of fine particles. No individual piece shall exceed the maximum gradation size by more than twenty percent, i.e. 480 pounds, and the total combined weight of all over-sized pieces for each gradation shall not exceed 15 percent of the total sample size.

(3) MEASUREMENT

All stone for riprap will be measured for payment by weighing on state certified scales. Scales shall have been certified by the state or calibrated by a company licensed by the state using certified weights, within 30 days prior to start of delivery of riprap. Scale certification documents must be presented to the Technical Representative during the first riprap gradation, prior to first riprap delivery.

(4) RIPRAP SOURCES

http://www.mvr.usace.army.mil/About/Offices/Engineering-and- Construction/Geotechnical-Branch/

(a) Riprap meeting the requirements of these specifications can be produced from the

USACE approved sources listed in the LINK above.

(b) Riprap for stone protection shall be furnished from the above listed sources.

(c) After the award of the contract, the Contractor shall designate in writing only one listed source or combination of listed sources from which it proposes to furnish riprap.

(d) Listing of a source of stone is not to be construed as approval of all material from that source. The right is reserved to reject materials from certain localized areas, zones, strata, or channels, when such materials are unsuitable for riprap as determined by the Contracting Officer or Technical Representative. Materials produced from a listed source shall meet all requirements of these specifications.

(5) QUALITY CONTROL

(a) The Contractor shall establish and maintain quality control for the stone protection material and its operations to assure compliance with contract requirements and maintain records of its quality control for all operations including but not limited to the following:

i. Gradation of riprap - To assure compliance with the requirements of paragraph 4.b. (2), the Contractor shall determine the weight of each stone from the gradation sample. The weights shall be recorded on the tally chart, summed, and plotted on the gradation curve. The gradation test shall be conducted and approved before delivery of riprap.

ii. The Contracting Officer or Technical Representative reserves the right to determine the location and select the material for samples to be tested.

iii. Copies of these records and tests as well as the records of corrective action taken, shall be furnished to the Contractor, Contracting Officer and the Technical Representative. The Technical Representative will ensure that copies of the records and tests will be distributed to CEMVR-OD-MM and

CEMVR-EC-G.

iv. A sample ILDOT RR-5 Riprap Gradation Curve & Tally Chart is included as

Attachment “B”.

v. Upper Mississippi River Navigation Chart Map 67 as Attachment “A” (with text box/arrow identifying recommended loading locations).

(b) Rock gradation (sample testing) shall be conducted by the contractor and observed and recorded by the Technical Representative prior to the first rock delivery. The Contractor shall make as many additional tests under the Contractor's quality control program as are needed to ensure gradation requirements are met. If materials fail to meet requirements, the Contractor shall adjust its operation and verify with tests that acceptable materials are being produced. Failure to meet requirements will result in removal of materials already in place which the failed test represents. A copy of these records and tests, as well as the records of corrective action taken, shall be furnished to the Government.

5. SECURITY

Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. Documentation of company enrollment in E-verify, via a print screen of the company profile within the E-verify system, must be submitted to the Security Office no later than 3 business days after the initial notice to proceed.

*When contracts are with individuals, the individuals will be required to complete a Form I- 9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given.

6. SAFETY

All work performed within the jurisdiction of this contract shall be performed in compliance of the Corps of Engineers, Safety and Health Requirements Manual, 30 November 2014, EM 385-1-1, which can be accessed on the below link.

http://www.usace.army.mil/Safety-and-Occupational-Health/Safety-and-Health- Requirements-Manual/

QUESTION AND ANSWER:

Question 1. How high above the water line is the barge deck when empty?

Answer 1. For a 35ft. x 150ft. barge with an 8ft. hull (empty), which is what we plan on using for the upcoming riprap delivery, would place the barge deck approximately 6ft. above the water at the barge centerline and approximately 7ft. above the waterline at the rack end