B.08.02 20B0009_TechSpecs.pdf
PDF 3 MB Posted
- Attached to
- Mill Creek Maintenance Building Interior Federal contract opportunity
- Solicitation number
- W912EF20B0009
About this file
This document provides details for an upcoming federal construction solicitation. The U.S. Army Corps of Engineers Walla Walla District intends to issue an Invitation for Bids for interior renovations to the Mill Creek Maintenance Building near Walla Walla, Washington. Renovations include construction of interior walls, electrical and lighting upgrades, installation of HVAC systems, plumbing connections, and asphalt paving. The solicitation will be set aside for women-owned small businesses with a size standard of $39.5 million. The construction magnitude is estimated between $250,000 to $500,000. The solicitation is expected to be posted to beta.sam.gov in late May 2020 with a bid opening approximately 30 days later. The acquisition will result in a single firm fixed-price contract to a small business. Performance and payment bonds will be required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Info W912EF20B0009.pdf | ||
| B.08.02 Solicitation W912EF20B0009.pdf | ||
| B.08.02 20B0009_Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mi l l Cr eek Mai nt enance Bui l di ng I nt er i or Upgr ades W912EF20B0009
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15. 00 28 LI ST OF DRAWI NGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00. 00 28 GENERAL REQUI REMENTS
01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS
01 14 00. 10 28 PROJECT SI TE RESTRI CTI ONS
01 14 00. 90 28 I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY
(OPSEC)
01 22 00. 00 28 MEASUREMENT AND PAYMENT
01 32 01. 00 28 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 01 28 CONTRACTOR QUALI TY CONTROL
01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)
01 51 00. 00 28 TEMPORARY UTI LI TI ES
01 55 10. 00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
01 57 20. 00 28 ENVI RONMENTAL PROTECTI ON
01 78 00. 00 28 CLOSEOUT SUBMI TTALS
DI VI SI ON 05 - METALS
05 40 00. 00 28 COLD- FORMED METAL FRAMI NG
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 41 16. 01 28 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS
06 61 16. 01 28 SOLI D SURFACI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 92 00. 00 28 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13. 00 28 STEEL DOORS AND FRAMES
08 71 00. 00 28 DOOR HARDWARE
08 91 00. 00 28 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00. 00 28 SUPPORTS FOR GYPSUM BOARD
09 29 00. 00 28 GYPSUM BOARD
09 90 00. 00 28 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 21 23. 16 28 OVERHEAD CURTAI N TRACK AND HARDWARE
10 26 00. 00 28 WALL PROTECTI ON
10 28 13. 00 28 TOI LET ACCESSORI ES
DI VI SI ON 22 - PLUMBI NG
22 00 00. 00 28 I NTERI OR PLUMBI NG, GENERAL PURPOSE
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00. 00 28 MECHANI CAL GENERAL REQUI REMENTS
23 00 01. 00 28 SUPPLY AI R DUCTWORK
23 05 24. 00 28 METAL SUPPORTS FOR MECHANI CAL SYSTEMS
23 05 93. 00 28 TESTI NG, ADJUSTI NG, AND BALANCI NG OF HVAC SYSTEMS
23 07 00. 00 28 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 35 00. 00 28 OVERHEAD WELDI NG FUME EXHAUST REMOVAL SYSTEMS
23 81 00. 01 28 DECENTRALI ZED UNI TARY HVAC EQUI PMENT
DI VI SI ON 26 - ELECTRI CAL
26 05 00. 00 28 GENERAL ELECTRI CAL WORK
26 05 19. 00 28 I NSULATED WI RE AND CABLE
DI VI SI ON 31 - EARTHWORK
31 00 00. 10 28 EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 17. 00 28 FLEXI BLE PAVEMENT REPAI R
32 15 00. 10 28 TOP COURSE
32 31 01. 00 28 FENCES AND GATES
DI VI SI ON 33 - UTI LI TI ES
33 05 10. 10 28 WATER LI NE AND PACKAGE LI FT STATI ON
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 2
SECTI ON TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
SECTI ON 00 01 15. 00 28
LI ST OF DRAWI NGS
PART 1 GENERAL
1. 1 SUMMARY
1. 2 CONTRACT DRAWI NGS
1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es
1. 3 RESOURCE DRAWI NGS
- - End of Sect i on Tabl e of Cont ent s - -
DOCUMENT 00 01 15. 00 28
This page intentionally left blank
SECTI ON 00 01 15. 00 28
LI ST OF DRAWI NGS
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "
1. 2 CONTRACT DRAWI NGS
Cont r act dr awi ngs ar e as f ol l ows:
FI LE NUMBER SHEET
NUMBER
DESCRIPTION Revision Number
Date
GENERAL
MC-1-161/1 G-001 COVER SHEET AND LOCATI ON MAPS
MC-1-161/2 G-002 I NDEX SHEET
CIVIL
MC-1-161/3 C-001 LEGEND SHEET
MC-1-161/4 C-101 CI VI L SI TE PLAN EXI STI NG UTI LI TES
MC-1-161/5 C-102 WATER SI TE PLAN
MC-1-161/6 C-103 LI FT AND SEWER SI TE PLAN OPTI ONAL I TEM
MC-1-161/7 C-501 LI FT STATI ON SCHEMATI C SHEET OPTI ONAL
BI D I TEM
MC-1-161/8 C-502 TRENCH, THRUST BLOCK AND GRAVEL
SURFACE RESTORATI ON DETAI L SHEET
ARCHITECTURAL
MC-1-161/9 A-001 GENERAL ABBREVI ATI ONS AND NOTES
MC-1-161/10 A-101 FI RST FLOOR PLAN
MC-1-161/11 A-102 MEZZANI NE FLOOR PLAN
FI LE NUMBER SHEET
NUMBER
DESCRIPTION Revision Number
Date
MC-1-161/12 A-103 FI RST FLOOR REFLECTED CEI LI NG PLAN
MC-1-161/13 A-104 MEZZANI NE REFLECTED CEI LI NG PLAN
MC-1-161/14 A-201 EXTERI OR ELEVATI ONS
MC-1-161/15 A-301 BUI LDI NG SECTI ON I
MC-1-161/16 A-302 BUI LDI NG SECTI ON I I
MC-1-161/17 A-303 BUI LDI NG SECTI ON I I I
MC-1-161/18 A-304 BUI LDI NG SECTI ON I V
MC-1-161/19 A-305 BUI LDI NG SECTI ON V
MC-1-161/20 A-306 BUI LDI NG SECTI ON VI
MC-1-161/21 A-307 BUI LDI NG SECTI ON VI I
MC-1-161/22 A-401 FI RST FLOOR LARGE SCALE PLAN
MC-1-161/23 A-402 MEZZANI NE FLOOR LARGE SCALE PLAN
MC-1-161/24 A-601 CASEWORK DI AGRAMS
PLUMBING
MC-1-161/25 P-001 PLUMBI NG SCHEDULE & SYMBOLS
MC-1-161/26 P-101 POTABLE WATER PI PI NG FI RST FLOOR PLAN
MC-1-161/27 P-102 PLAN VI EW NEW WASTE PI PI NG
MC-1-161/28 P-103 PLAN VI EW NEW VENT PI PI NG
MC-1-161/29 P-501 PI PI NG CLAMPS DETAI LS
MC-1-161/30 P-601 SUPPY, VENT, & WASTE PI PI NG RI SER
DIAGRAMS
MC-1-161/31 P-602 VENT PI PI NG RI SER DI AGRAMS 2
MC-1-161/32 P-901 SUPPLY, VENT AND WATER PI PI NG I SOMETRI C
MECHANICAL
NUMBER
DESCRIPTION Revision Number
Date
MC-1-161/33 M-001 GENERAL ABBREVI ATI ONS, LEGENDS & NOTES
MC-1-161/34 MH101 HVAC FI RST FLOOR PLAN
MC-1-161/35 MH102 HVAC SECOND FLOOR ( MEZZANI NE) PLAN
OPTI ONAL I TEM - HVAC
MC-1-161/36 MH401 PARTI AL SECTI ONS HVAC MI XI NG BOXES
OPTI ONAL I TEM - HVAC
MC-1-161/37 MH402 HVAC SECOND FLOOR ( MEZZANI NE) PLAN
OPTI ONAL I TEM - HVAC
MC-1-161/38 MH501 DETAI LS PNEUMATI C CONDENSATE DRAI N
SEAL OPTI ONAL I TEM - HVAC
MC-1-161/39 MH502 DETAI LS WELDI NG EXHAUST STACK
MC-1-161/40 MH601 SCHEMATI C HEATI NG, VENTI LATI NG,
AIR-CONDITIONING
MC-1-161/41 MH701 SCHEMATI C OPTI ONAL I TEM - HVAC
ELECTRICAL
MC-1-161/42 E-601 SCHEDULES
MC-1-161/43 EL101 GROUND FLOOR LI GHTI NG PLAN
MC-1-161/44 EL102 MEZZANI NE LI GHTI NG PLAN
MC-1-161/45 EP101 GROUND FLOOR POWER / SPECI AL SYSTEMS
PLAN
MC-1-161/46 EP102 MEZZANI NE POWER / SPECI AL SYSTEMS PLAN
1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es
a. No Resour ce dr awi ngs ar e avai l abl e on CAD.
b. The Cont r act or assumes al l r i sks associ at ed i n usi ng el ect r oni c CAD dr awi ngs.
c. El ect r oni c copi es of CAD dr awi ngs ar e onl y avai l abl e i n Bent l ey DGN f or mat .
d. The cont r act dr awi ngs shal l gover n i f t her e ar e any di scr epanci es bet ween t he el ect r oni c copy and t he cont r act dr awi ng. The Cont r act or shal l pr ompt l y not i f y t he Cont r act i ng Of f i cer of any di scr epanci es.
The Gover nment wi l l not be r esponsi bl e t o cor r ect t he el ect r oni c CAD drawing.
1. 3 RESOURCE DRAWI NGS
These Resour ce dr awi ngs ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on.
The Gover nment does not war r ant t he accur acy of t he Resour ce dr awi ngs. The Gover nment r ecommends t hat t he Cont r act or ver i f y t he accur acy of Resour ce drawings.
Resour ce dr awi ngs ar e as f ol l ows:
FI LE NUMBER SHEET
NUMBER
DESCRIPTION Revision Number
Date
RESOURCE
MC-1-145/11 R-001 MAI NTENANCE BUI LDI NG REPLACEMENT
FI RST FLOOR PLAN
MC-1-145/12 R-002 MAI NTENANCE BUI LDI NG REPLACEMENT
MEZZANI NE FLOOR PLAN ROOF PLAN
MC-1-145/13 R-003 MAI NTENANCE BUI LDI NG REPLACEMENT
EXTERI OR ELEVATI ONS
MC-1-145/14 R-004 MAI NTENANCE BUI LDI NG REPLACEMENT
BUI LDI NG SECTI ON
MC-1-145/15 R-005 MAI NTENANCE BUI LDI NG REPLACEMENT
DETAILS
MC-1-145/16 R-006 MAI NTENANCE BUI LDI NG REPLACEMENT
LEGENDS AND ABBREVI ATI ONS / SCHEDULES
MC-1-145/17 R-007 MAI NTENANCE BUI LDI NG REPLACEMENT
FOUNDATI ON PLAN PLUMBI NG
MC-1-145/18 R-008 MAI NTENANCE BUI LDI NG REPLACEMENT
FLOOR PLAN PLUMBI NG
MC-1-145/19 R-009 MAI NTENANCE BUI LDI NG REPLACEMENT
ELECTRI CAL SI TE PLAN
MC-1-145/20 R-010 MAI NTENANCE BUI LDI NG REPLACEMENT
FI RST FLOOR POWER / SPECI AL SYSTEMS
PLAN
MC-1-145/21 R-011 MAI NTENANCE BUI LDI NG REPLACEMENT
FI RST FLOOR LI GHTI NG PLAN
MC-1-145/22 R-012 MAI NTENANCE BUI LDI NG REPLACEMENT
SECOND FLOOR POWER / SPECI AL SYSTEMS
PLAN
MC-1-145/23 R-013 MAI NTENANCE BUI LDI NG REPLACEMENT
SECOND FLOOR LI GHTI NG PLAN
MC-1-145/24 R-014 MAI NTENANCE BUI LDI NG REPLACEMENT
ONE- LI NE DI AGRAM
MC-1-145/25 R-015 MAI NTENANCE BUI LDI NG REPLACEMENT
ELECTRI CAL SCHEDULES
MC-1-140/6 R-016 PROJECT - PUBLI C RESTROOMS MI LL CREEK
OFFI CE PUMP STATI ON PLAN AND PROFI LE
NUMBER
DESCRIPTION Revision Number
Date
- - End of Document - -
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 00 00. 00 28
GENERAL REQUI REMENTS
PART 1 GENERAL
1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS
CONTRACTS
PART 2 PRODUCTS ( NOT USED)
PART 3 EXECUTI ON ( NOT USED)
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 00 00. 00 28
GENERAL REQUI REMENTS
PART 1 GENERAL
1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS CONTRACTS
I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS
222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:
Feder al Vet er an Empl oyment I nf or mat i on http://www.fedshirevets.gov/index.aspx
Depar t ment of Labor Vet er ans Empl oyment Assi st ance http://www.dol.gov/vets/
Depar t ment of Vet er ans Af f ai r s- VOW t o Hi r e Her oes Act http://benefits.va.gov/vow/
Ar my Wounded War r i or Pr ogr am -http://wtc.army.mil/modules/employers/index.html
U. S. Chamber of Commer ce Foundat i on- Hi r i ng Our Her oes http://www.hiringourheroes.org/
Gui de t o Hi r i ng Vet er ans - Ref er ence Mat er i al ht t ps: / / obamawhi t ehouse. ar chi ves. gov/ si t es/ def aul t / f i l es/ docs/ whi t e_house_busi ness_counci l _- _gui de_t o_hi r i ng_vet er ans_0. pdf
PART 2 PRODUCTS ( NOT USED)
PART 3 EXECUTI ON ( NOT USED)
- - End of Sect i on - -
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 01. 00 28
SUPPLEMENTARY REQUI REMENTS
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SUBMI TTALS
1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS
1. 4 DEFI NI TI ONS
1. 5 REGULAR CLEANUP AND DEBRI S DI SPOSAL
1. 6 GOVERNMENT- FURNI SHED PROPERTY
1. 7 GOVERNMENT I SSUED I TEMS
1. 8 EQUI PMENT LI ST
1. 9 TESTI NG OF EQUI PMENT
1. 10 DI SPOSI TI ON OF REMOVED MATERI ALS AND EQUI PMENT
1. 11 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES
1. 12 PRE- CONSTRUCTI ON ON- SI TE I NSPECTI ON
1. 13 CONSTRUCTI ON PROGRESS PHOTOS
1. 14 PROJECT TECHNI CAL SUPPORT
1. 15 PROJECT SUPERI NTENDENT
1. 16 KEY PERSONNEL SUBSTI TUTI ON
1. 17 POST AWARD MEETI NGS
1. 17. 1 Pr e- Wor k Meet i ng
1. 17. 2 Pr e- Const r uct i on Meet i ng
1. 17. 2. 1 Mi nut es
1. 17. 2. 2 Demobi l i z i ng And Remobi l i z i ng
1. 18 WEEKLY PRODUCTI ON MEETI NGS
1. 18. 1 Mi nut es
1. 19 ADDI TI ONAL MEETI NGS
PART 2 PRODUCTS ( Not Used)
PART 3 EXECUTI ON ( Not Used)
ATTACHMENTS:
Weekl y Meet i ng Agenda
Look-Ahead
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 01. 00 28
SUPPLEMENTARY REQUI REMENTS
PART 1 GENERAL
The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual
Compl y wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y.
Desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr oper t y Management Pl an; G C
Equi pment Li st ; I C
Pr e- Const r uct i on On- si t e I nspect i on Repor t ; I C
Pr oj ect Super i nt endent ; I C
SD- 07 Cer t i f i cat es
Key Per sonnel Subst i t ut i on; G C
SD- 11 Cl oseout Submi t t al s
Gover nment I ssued I t ems; G C
Weekl y Pr ogr ess Phot ogr aphs; G, C
1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS
Fi el d ver i f y al l el evat i ons, di mensi ons, and coor di nat es of exi st i ng f eat ur es i ndi cat ed on t he cont r act dr awi ngs t hat af f ect new const r uct i on.
Any devi at i ons shal l be updat ed as per SECTI ON 01 78 00. 00 28, CLOSEOUT
SUBMI TTALS, par agr aphs WORKI NG AS- BUI LT DRAWI NGS.
1. 4 DEFINITIONS
a. Qual i f i ed Per son.
As def i ned i n EM 385- 1- 1; " DEFI NI TI ONS" , unl ess ot her wi se specified.
b. F. O. B.
An abbr evi at i on f or f r ee on boar d, whi ch means t hat a vendor or consi gnor wi l l del i ver goods on a r ai l r oad car , t r uck, vessel , or ot her conveyance wi t hout any expense t o t he pur chaser or consi gnee.
1. 5 REGULAR CLEANUP AND DEBRI S DI SPOSAL
Wi t h t he except i on of mat er i al s speci f i cal l y i ndi cat ed or speci f i ed t o be sal vaged f or r euse i n const r uct i on, or t ur ned over t o t he Gover nment , al l wast es and demol i shed mat er i al s shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om t he j ob s i t e dai l y i n accor dance wi t h Feder al , St at e, and l ocal r egul at i ons. The Cont r act or shal l f ur ni sh wast e cont ai ner s. Al l smal l wast e cont ai ner s pr ovi ded by t he cont r act or shal l be empt i ed dai l y, l ar ge bi n cont ai ner s shal l be empt i ed when f ul l or once a week.
1. 6 GOVERNMENT- FURNI SHED PROPERTY
Submi t a Pr oper t y Management Pl an i n accor dance wi t h FAR Cl ause 52. 245- 1 Gover nment Pr oper t y.
1. 7 GOVERNMENT I SSUED I TEMS
Ret ur n t o t he Gover nment al l i t ems i ssued t o t he Cont r act or f r om t he Gover nment , i ncl udi ng but not l i mi t ed t o t he f ol l owi ng: keys, I D and secur i t y badges, r adi os, pager s, and excess/ unused Gover nment Fur ni shed Pr oper t y/ Equi pment . Submi t document at i on s i gned by t he Cont r act or and Cont r act i ng Of f i cer i ndi cat i ng i t ems have been r et ur ned or f ul l y account ed f or . For mat of submi t t al wi l l be di scussed and agr eed upon at t he Pr e- Wor k Meet i ng.
1. 8 EQUI PMENT LI ST
Fur ni sh a compl et e l i s t of al l equi pment t o be used on t he Pr oj ect 30 days pr i or t o commencement of on- si t e wor k. Submi t a r evi sed l i s t i n t he event of change of equi pment . Li st s shal l i ncl ude r ent ed equi pment as wel l as l ease- pur chase or sal e- l easeback equi pment . The i ni t i al l i s t and t he r evi sed l i s t s shal l i ndi cat e dat es equi pment i s assi gned t o or r emoved f r om t he Pr oj ect and adequat e i dent i f i cat i on or descr i pt i on of each i t em of equi pment i ncl udi ng manuf act ur er ' s name ( abbr evi at ed) , model number , manuf act ur er ' s ser i al number , year of manuf act ur e, and Cont r act or ' s assi gned ser i al or r ecor d number .
1. 9 TESTI NG OF EQUI PMENT
Bef or e any machi ner y or mechani zed equi pment i s put t o use on t he j ob, i t shal l be i nspect ed and t est ed by a qual i f i ed per son and det er mi ned t o be i n saf e oper at i ng condi t i on. Cr anes or der r i cks shal l be t est ed by t he Cont r act or or a qual i f i ed t est i ng agency i n accor dance wi t h EM 385- 1- 1.
Equi pment shal l be l ar ge enough t o saf el y handl e pr oposed pi cks or t asks wi t hout exceedi ng t he cr ane r at i ng est abl i shed by t hese t est s.
1. 10 DI SPOSI TI ON OF REMOVED MATERI ALS AND EQUI PMENT
Unl ess ot her wi se speci f i ed i n ot her sect i ons of t he speci f i cat i ons, al l exi st i ng equi pment r emoved and not r ei nst al l ed shal l become t he pr oper t y of t he Cont r act or , r emoved f r om t he Pr oj ect s i t e, and di sposed of i n a l egal manner . Mat er i al s t hat cannot be r emoved dai l y may be t empor ar i l y st or ed on- si t e at an appr oved ar ea. Sal vaged mat er i al s shal l not be sol d on t he pr oj ect s i t e.
1. 11 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES
Ref er ence FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s ( Apr 1984) .
1. 12 PRE- CONSTRUCTI ON ON- SI TE I NSPECTI ON
Conduct a Pr e- Const r uct i on On- Si t e I nspect i on of exi st i ng condi t i ons, pr i or t o st ar t of on- si t e wor k, wi t h t he Cont r act i ng Of f i cer Repr esent at i ve ( QAR) / Pr oj ect Engi neer of t he Gover nment f aci l i t i es at t he wor k ar eas. Thi s i nspect i on i s t o document exi st i ng s i t e condi t i ons pr i or t o Const r uct i on. Resul t s of t hi s i nspect i on shal l be document ed by di gi t al phot ogr aphs and/ or v i deos al ong wi t h descr i pt i ve nar r at i ve r epor t . A col or copy of t he i nspect i on phot ogr aphs/ vi deos and a nar r at i ve r epor t shal l be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n f i ve ( 5) days af t er i nspect i on has been compl et ed.
1. 13 CONSTRUCTI ON PROGRESS PHOTOS
Dur i ng on si t e const r uct i on act i v i t i es r ecor d const r uct i on pr ogr ess wi t h weekl y pr ogr ess phot ogr aphs. Phot ogr aphs pr ovi ded ar e f or unr est r i ct ed use by t he Gover nment .
a. Phot os shal l be submi t t ed at t he end of each wor k week.
b. Fur ni sh di gi t al phot ogr aphs, Ut i l i ze JPEG f i l e f or mat f or al l phot ogr aph and i mage f i l es.
c. Pr ovi de f ul l - col or phot os wi t h phot o r esol ut i on of not l ess t han 4 megapi xel s and not mor e t han 12 megapi xel s. Phot os sahl l show t he sequence and pr ogr ess of wor k.
d. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect .
e. Submi t weekl y t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) .
Ensur e t hat t he phot ogr aphs ar e di gi t al l y dat ed. Log shal l be f ur ni shed f or each phot ogr aph t hat r ecor ds t he f ol l owi ng i nf or mat i on:
a. Phot ogr aph number ( t he speci f i c f or mat shoul d be t i ed t o t he f i l ename of t he el ect r oni c phot ogr aph) .
b. Dat e t he phot ogr aph was t aken.
c. A br i ef descr i pt i on of t he l ocat i on, what t he phot ogr aph depi ct s, and t he or i ent at i on of t he v i ew.
1. 14 PROJECT TECHNI CAL SUPPORT
a. Pr ovi de 20 hour s of pr oj ect t echni cal suppor t af t er Gover nment accept ance of t he compl et ed pr oj ect . One or mor e Cont r act or per sonnel exper i enced i n t he oper at i onal r equi r ement s of al l newl y i nst al l ed equi pment , and cont r ol f eat ur es shal l be avai l abl e f or Techni cal Suppor t dur i ng nor mal Gover nment Wor k Schedul e hour s. See par agr aph " Gover nment ' s Wor k Schedul e" i n SECTI ON 01 14 00. 10 28.
b. Suppor t shal l i ncl ude si t e v i s i t s by Cont r act or per sonnel .
Cont r act or per sonnel shal l be avai l abl e at t he pr oj ect wi t hi n 48 hour s, or t he next nor mal Gover nment Wor k Schedul e day f ol l owi ng not i f i cat i on by t he Gover nment - whi chever i s l at er . Techni cal suppor t shal l be avai l abl e f or 60 days f ol l owi ng Gover nment accept ance of t he newl y i nst al l ed oi l wat er separ at or s and HVAC syst em or unt i l f i nal Oper at i on and Mai nt enance Manual s and Par t s Cat al ogs have been appr oved and r ecei ved by t he Gover nment - whi chever i s l at er . See
SECTIONS 01 78 00. 00 28 CLOSEOUT.
c. Techni cal Suppor t shal l i ncl ude al l cont r act or Super vi s i on, Saf et y and QC per sonnel r equi r ed t o mai nt ai n pr oper cont r ol of wor k i n accor dance wi t h cont r act r equi r ement s
1. 15 PROJECT SUPERI NTENDENT
The Cont r act or ' s Pr oj ect Super i nt endent shal l be on t he wor ksi t e dur i ng per f or mance of wor k on t hi s cont r act . The Pr oj ect Super i nt endent i s r equi r ed on t he wor ksi t e, at al l t i mes wor k i s bei ng per f or med, unt i l wor k on t hi s cont r act i s compl et ed and accept ed. Assi gn a compet ent super i nt endent as per FAR Cl ause 52. 236- 6 " Super i nt endence by t he Cont r act or " . Submi t Super i nt endent name and cont act i nf or mat i on pr i or t o st ar t of on- si t e const r uct i on.
1. 16 KEY PERSONNEL SUBSTI TUTI ON
I f t he Cont r act or pl ans on r epl aci ng any Key per sonnel ( Pr oj ect Super i nt endent , CQC Syst em Manager , or CQC st af f Member s) t hey must have t he appr oval of t he Cont r act i ng Of f i cer . Per sonnel shal l possess t he qual i f i cat i ons t hat meet or exceed t hose st at ed i n t hi s cont r act f or t he posi t i on of t he i ndi v i dual t hey ar e r epl aci ng. Submi t qual i f i cat i ons of new per sonnel at l east 15 cal endar days i n advance of dat e of r epl acement .
1. 17 POST AWARD MEETI NGS
1. 17. 1 Pr e- Wor k Meet i ng
Wi t hi n Thi r t y ( 30) cal endar days af t er r ecei pt of Not i ce t o Pr oceed, at t end a Pr e- Wor k Meet i ng. Seni or Level member s of t he Cont r act or ' s st af f i nvol ved wi t h t hi s cont r act shal l par t i c i pat e i n t hi s meet i ng t o di scuss t he over al l cont r act r equi r ement s. The Gover nment wi l l l ead t hi s meet i ng and t ake t he meet i ng mi nut es.
1. 17. 2 Pr e- Const r uct i on Meet i ng
Coor di nat e wi t h t he Cont r act i ng Of f i cer and est abl i sh t he dat e of t he Pr e- Const r uct i on Meet i ng. The meet i ng wi l l be hel d at t he Pr oj ect s i t e at l east [ one ( 1) week] pr i or t o mobi l i z i ng t o t he j ob s i t e. Lead t he
Pr e- Const r uct i on Meet i ng di scussi ng t he Cont r act or ' s pl an on execut i ng t he wor k at t he pr oj ect s i t e, schedul e, r equi r ed cl ear ances and t i mef r ame f or t hem, and pl an f or i mpl ement i ng saf et y and qual i t y cont r ol . The Gover nment wi l l have key member s f r om t he Pr oj ect st af f t o di scuss envi r onment al and cl ear ance i ssues. Key member s of t he cont r act or st af f shal l at t end t hi s meet i ng i ncl udi ng t he Qual i t y Cont r ol ( QC) Syst em Manager , Si t e Saf et y and Heal t h Of f i cer ( SSHO) and any ot her member s det er mi ned by t he Gover nment t o be r equi r ed.
1. 17. 2. 1 Minutes
Cont r act or i s r esponsi bl e f or t aki ng t he meet i ng mi nut es and shal l send t hem el ect r oni cal l y wi t hi n 48 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer .
1. 17. 2. 2 Demobi l i z i ng And Remobi l i z i ng
Anyt i me t he Cont r act or demobi l i zes f r om t he si t e and r emobi l i zes at a l at er dat e, anot her Pr e- Const r uct i on Meet i ng shal l be hel d and shal l f ol l ow t he r equi r ement s l i s t ed above.
1. 18 WEEKLY PRODUCTI ON MEETI NGS
Dur i ng al l f abr i cat i on and onsi t e const r uct i on wor k, hol d a weekl y pr oduct i on meet i ng t o br i ef t he Gover nment on t he st at us of t he pr oj ect .
a. Use t he at t ached " Weekl y Meet i ng Agenda" and di scuss al l el ement s of t hi s agenda.
b. Pr ovi de a t hr ee ( 3) week ' l ook ahead' . The " Look- Ahead" shal l be gener at ed i n P6 and t hen copi ed i nt o Excel f or mor e det ai l ( see l ook- ahead exampl es at t he end of t hi s sect i on) .
1. Descr i be al l pl anned const r uct i on act i v i t i es, on- si t e and of f - s i t e over t he next t hr ee ( 3) weeks.
2. ENSURE t hese act i v i t i es al i gn t o t he over al l const r uct i on SCHEDULE submi t t ed under SECTI ON 01 32 01. 00 28 PROJECT SCHEDULE.
3. RECORD any changes t o t he Pr oj ect Schedul e AND I NCLUDE I N t he next schedul ed updat e.
c. Key member s of t he Cont r act or ' s st af f i ncl udi ng t he Qual i t y Cont r ol Syst em Manager and t he SI TE SAFETY AND HEALTH OFFI CER shal l at t end.
d. The Qual i t y Cont r ol Syst em Manager shal l di scuss al l QC aspect s out l i ned i n SECTI ON 01 45 00. 01 28 CONTRACTOR QUALI TY CONTROL.
e. The Gover nment r eser ves t he r i ght t o r equi r e any per son f r om t he Cont r act or ' s st af f such as t he Pr oj ect Manager , Engi neer , Schedul er or Key Subcont r act or Per sonnel t o at t end t he meet i ng.
f . Submi t each meet i ng agenda t o t he COR 24 hour s pr i or t o t he meet i ng.
1. 18. 1 Minutes
The Cont r act or shal l be r esponsi bl e f or t aki ng t he meet i ng mi nut es and shal l send t hem el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and
Resi dent Engi neer .
1. 19 ADDI TI ONAL MEETI NGS
Recor d t he mi nut es of al l meet i ngs, i ncl udi ng al l conf er ence cal l s, t hat occur bet ween t he Cont r act or and Gover nment . Send mi nut es el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Cont r act i ng Of f i cer f or concur r ence.
E- mai l subj ect l i ne shal l i ncl ude pr oj ect name and meet i ng t opi c.
PART 2 PRODUCTS ( Not Used)
PART 3 EXECUTI ON ( Not Used)
- - End of Sect i on - -
Weekly Meeting agenda template
Schedule - Work scheduled over the next week Three week look ahead Overall Schedule Review
Submittals Review- Submittal Register Submittals approved by QC Outstanding Submittals RFI’s Letters
Coordination - Clearances required over the next week, include the following:
A description of the work to be performed under the Clearance.
Determine the correct energy isolation points needed to perform the work safely.
Physical barriers, protective grounds, piping blanks, or bulkheads that shall be used, including locations.
Determine the procedure and method of testing for stored energy if applicable.
The date and time the Clearance shall be required.
The estimated length of time the system or equipment shall be out of service and the time to return the system or equipment to service in an emergency.
Coordination issues
Safety- Review of AHA’s for ongoing work Pending AHA’s
Required for new work Status of Gov’t approval
Safety issues
QC -
Preparatory meetings Held over last week- status of meeting minutes
Required over the next week Initial meetings over the next week Follow up over the next week Rework list Review Deficiency tracking log
Activity ID Activity Name Original Duration
Remaining Duration
Start Finish Physical
C l t
Total Float Critical
TotalTotal 32d 32d 26-Feb-15 11-Apr-15 194d
3 Week Look A3 Week Look Ahead 32d 32d 26-Feb-15 11-Apr-15 194d
Preparatory & AdPreparatory & Admin 5d 5d 26-Feb-15 02-Mar-15 311d 0001 Dive Operations 5d 5d 26-Feb-15 02-Mar-15 0% 311d
PreconstructionPreconstruction 20d 20d 26-Feb-15 25-Mar-15 167d Design & SubmitDesign & Submittals 20d 20d 26-Feb-15 25-Mar-15 162d
0002 Tests,Insp, and Verifications 20d 20d 26-Feb-15 25-Mar-15 0% 162d ProcurementProcurement 0d 0d 0d Fabrication & MaFabrication & Machining 0d 0d 0d Pre-Work CoordiPre-Work Coordination 0d 0d 0d
Field WorkField Work 16d 16d 26-Feb-15 19-Mar-15 210d Unit AUnit A 0d 0d 0d Unit BUnit B 0d 0d 0d Unit CUnit C 16d 16d 26-Feb-15 19-Mar-15 210d
Unit C Pre-RehUnit C Pre-Rehab Inspections 0d 0d 0d Unit C Box #1 Unit C Box #1 Removal 13d 13d 26-Feb-15 16-Mar-15 205d
0006 Remove Box 1 Screen 2d 2d 26-Feb-15 27-Feb-15 0% 93d 0007 Remove Box 2 Screen 2d 2d 02-Mar-15 03-Mar-15 0% 93d 0008 Remove Box 3 Screen 2d 2d 04-Mar-15 05-Mar-15 0% 93d 0009 Screen Slot 1 Measurement 1d 1d 06-Mar-15 06-Mar-15 0% 205d 0010 Install shafts 21-24 4d 4d 09-Mar-15 12-Mar-15 0% 205d 0011 Pressure Wash Slot 2 1d 1d 13-Mar-15 13-Mar-15 0% 205d 0012 Pressure Wash Slot 3 1d 1d 16-Mar-15 16-Mar-15 0% 205d
Unit C Box #2 Unit C Box #2 Removal 10d 10d 06-Mar-15 19-Mar-15 100d 0013 Lower Lifting Beam & Attach 2d 2d 06-Mar-15 09-Mar-15 0% 93d 0014 Raise Screen to Deck & Support 1d 1d 10-Mar-15 10-Mar-15 0% 93d 0015 Fuel Removal 1d 1d 11-Mar-15 11-Mar-15 0% 93d 0016 Fuel Screen Inspect & Measure 1d 1d 12-Mar-15 12-Mar-15 0% 93d 0017 Separate Widget from Screen 1d 1d 13-Mar-15 13-Mar-15 0% 93d 0018 Haul Screen to Laydown 1d 1d 16-Mar-15 16-Mar-15 0% 103d 0019 Remove Box 4 Screen 2d 2d 16-Mar-15 17-Mar-15 0% 93d 0020 Remove Box 5 Screen 2d 2d 18-Mar-15 19-Mar-15 0% 93d
Unit C Box #3 Unit C Box #3 Removal 0d 0d 0d Unit C Fuel ScUnit C Fuel Screen Field Modifications 14d 14d 26-Feb-15 17-Mar-15 103d
0039 Position Screen 1 on Slab 1d 1d 26-Feb-15 26-Feb-15 0% 116d 0040 Position Screen 2 on Slab 1d 1d 17-Mar-15 17-Mar-15 0% 103d
Unit C Wagner Unit C Wagner Horn Plugs Installation 0d 0d 0d Unit C Fish ScUnit C Fish Screens Installatin 0d 0d 0d Unit C Fish ScUnit C Fish Screen Slot Closure 0d 0d 0d
Unit DUnit D 0d 0d 0d Unit D Pre-RehUnit D Pre-Rehab Inspections 0d 0d 0d Unit D Screen Unit D Screen #1 Removal 0d 0d 0d
A S O N D J F M A M J J A S O N D J F 2015 2016
11-Apr-15, Total
11-Apr-15, 3 Week Look Ah
02-Mar-15, Preparatory & Admi Dive Operations
25-Mar-15, Preconstruction 25-Mar-15, Design & Submitt Tests,Insp, and Verifications
19-Mar-15, Field Work
19-Mar-15, Unit C
16-Mar-15, Unit C Box #1 Rem Remove Box 1 Screen Remove Box 2 Screen Remove Box 3 Screen Screen Slot 1 Measurement Install shafts 21-24 Pressure Wash Slot 2 Pressure Wash Slot 3 19-Mar-15, Unit C Box #2 Rem
Lower Lifting Beam & Attach Raise Screen to Deck & Suppo Fuel Removal Fuel Screen Inspect & Measur Separate Widget from Screen Haul Screen to Laydown Remove Box 4 Screen Remove Box 5 Screen
17-Mar-15, Unit C Fuel Scree Position Screen 1 on Slab
Position Screen 2 on Slab
3 Week Look Ahead Three Week Look Ahead 02-Mar-15 10:02
Actual Work Remaining Work
Critical Remaining Work Milestone
Summary Page 1 of 3 TASK filter: 3 Week Look Ahead.
© Oracle Corporation
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 14 00. 10 28
PROJECT SI TE RESTRI CTI ONS
PART 1 GENERAL
1. 1 REFERENCES
1. 2 PROJECT SECURI TY
1. 2. 1 Cont r act or Vehi c l e Access
1. 2. 2 I dent i f i cat i on of Empl oyees
1. 3 FACI LI TY OCCUPANCY CLOSURE
1. 4 WORK SCHEDULES
1. 4. 1 Cont r act or ' s Wor k Schedul e
PART 2 PRODUCTS ( Not Used)
PART 3 EXECUTI ON ( Not Used)
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 14 00. 10 28
PROJECT SI TE RESTRI CTI ONS
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual
Cont r act or shal l be r esponsi bl e f or compl yi ng wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s solicitation.
1. 2 PROJECT SECURI TY
Weapons, al cohol , and i l l egal dr ugs ar e not al l owed on t he pr oj ect s i t e.
1. 2. 1 Cont r act or Vehi c l e Access
Onl y Cont r act or ' s wor k vehi c l es and equi pment t hat ar e essent i al t o t he conduct of t he wor k wi l l be al l owed i n t he wor k ar eas. Al l Cont r act or vehi c l es shal l di spl ay sui t abl e per manent or t empor ar y i dent i f i cat i on.
1. 2. 2 I dent i f i cat i on of Empl oyees
Ever y Cont r act or empl oyee ( pr i me or subcont r act or ) shal l have a har d hat meet i ng t he r equi r ement s of EM 385- 1- 1. Har dhat s shal l di spl ay t he Pr i me Cont r act or name, subcont r act or name, and t he empl oyee' s name. Cont r act or empl oyee har dhat s shal l not be whi t e wi t h r ed mar ki ngs. I t shal l be t he r esponsi bi l i t y of t he Pr oj ect Super i nt endent t o enf or ce t hi s r equi r ement .
1. 3 FACI LI TY OCCUPANCY CLOSURE
St r eet s, wal ks, and ot her f aci l i t i es occupi ed and used by t he Gover nment shal l not be c l osed or obst r uct ed wi t hout wr i t t en per mi ssi on f r om t he Cont r act i ng Of f i cer . Pr ovi de f i f t een ( 15) days advance not i ce t o t he Cont r act i ng Of f i cer pr i or t o c l osur e of st r eet s, wal ks, and ot her f aci l i t i es at t he pr oj ect s i t e.
1. 4 WORK SCHEDULES
1. 4. 1 Cont r act or ' s Wor k Schedul e
At t he Pr e- Wor k Meet i ng, f ur ni sh a schedul e of number of wor ki ng days per week, shi f t s per day, and hour s per shi f t f or cont r act wor k. Fur ni sh not i f i cat i on of any change of schedul e of r egul ar wor k hour s, over t i me wor k hour s, and shi f t s of wor k cr ews and per sonnel at t he s i t e. Thi s not i f i cat i on shal l be pr ovi ded a mi ni mum of 48 hour s pr i or t o any schedul e change t o al l ow sui t abl e schedul i ng of Gover nment per sonnel and i nspect i on. Except i on t o t hi s r equi r ement may be al l owed i n case of schedul e change due t o emer gency condi t i ons.
PART 2 PRODUCTS ( Not Used)
PART 3 EXECUTI ON ( Not Used) - - End of Sect i on - -
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 14 00. 90 28
I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 AT LEVEL 1 TRAI NI NG
1. 3 SUSPI CI OUS ACTI VI TY REPORTI NG TRAI NI NG ( i WATCH, CORPS Wat ch, or
See Somet hi ng, Say Somet hi ng)
1. 4 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM
PART 2 PRODUCTS ( NOT USED)
PART 3 EXECUTI ON ( NOT USED)
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 14 00. 90 28
I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)
PART 1 GENERAL
The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS. Thi s cont r act does not r equi r e access t o or handl i ng of c l assi f i ed mat er i al .
Thi s cont r act does not r equi r e access t o secur ed and r est r i ct ed ar eas, sensi t i ve i nf or mat i on, or equi pment .
1. 1 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. The desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Ant i Ter r or i sm ( AT) Level 1; I , SLE i WATCH, CORPS Wat ch, or See Somet hi ng, Say Somet hi ng; I , C
Pr e- Scr een Candi dat es Usi ng E- Ver i f y Pr ogr am; I , SLE
1. 2 AT LEVEL 1 TRAI NI NG
Al l cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees shal l compl et e Ant i Ter r or i sm ( AT) Level 1 awar eness t r ai ni ng wi t hi n 30 cal endar days af t er Not i ce t o Pr oceed. Submi t cer t i f i cat es of compl et i on f or each empl oyee t o t he Cont r act i ng Of f i cer Repr esent at i ve ( COR) or t o t he Cont r act i ng Of f i cer ( KO) ( i f a COR i s not assi gned) , wi t hi n 5 cal endar days af t er i ni t i al compl et i on of t r ai ni ng.
The cont r act or shal l r et ai n empl oyee t r ai ni ng cer t i f i cat es f or t he dur at i on of t he cont r act and mai nt ai n a cur r ent r ost er . The r ost er shal l cont ai n t he names of empl oyees who have compl et ed t he t r ai ni ng al ong wi t h t hei r most r ecent t r ai ni ng compl et i on dat e.
AT Level I awar eness t r ai ni ng can be compl et ed i n appr oxi mat el y t wo ( 2) hour s and i s avai l abl e at t he f ol l owi ng websi t e:
http://jko.jten.mil/courses/atl1/launch.html
1. 3 SUSPI CI OUS ACTI VI TY REPORTI NG TRAI NI NG ( i WATCH, CORPS Wat ch, or See Somet hi ng, Say Somet hi ng)
The cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, shal l t ake t he f ol l owi ng t r ai ni ng on suspi c i ous act i v i t y r epor t i ng pr ogr am; i WATCH, CORPS WATCH, SEE SOMETHI NG, SAY SOMETHI NG. Thi s t r ai ni ng i s avai l abl e on t he i nt er net and t he l i nk t o t he t r ai ni ng si t e i s shown bel ow.
Thi s t r ai ni ng i s t o i nf or m empl oyees of t he t ypes of behavi or t o wat ch f or and i nst r uct empl oyees t o r epor t suspi c i ous act i v i t y t o t he secur i t y r epr esent at i ve. Thi s t r ai ni ng shal l be compl et ed wi t hi n 30 cal endar days of Not i ce t o Pr oceed wi t h t he r esul t s r epor t ed t o t he COR or t o t he KO ( i f a COR i s not assi gned) , NLT 5 cal endar days af t er t he compl et i on of t he training.
iWATCH
Websi t e: ht t ps: / / www. ar my. mi l / st andt o/ 2018- 07- 25
CORPS Wat ch Website:
https://www.nww.usace.army.mil/NWWSuspiciousActivityReport/
SEE SOMETHI NG, SAY SOMETHI NG
Websi t e: ht t ps: / / www. dhs. gov/ see- somet hi ng- say- somet hi ng
1. 4 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM
The Cont r act or must pr e- scr een Candi dat es usi ng t he E- ver i f y Pr ogr am ( ht t p: / / www. usci s. gov/ e- ver i f y) websi t e t o meet t he est abl i shed empl oyment el i gi bi l i t y r equi r ement s. The Cont r act or must ensur e t hat t he Candi dat e has t wo val i d f or ms of Gover nment i ssued i dent i f i cat i on pr i or t o enr ol l ment t o ensur e t he cor r ect i nf or mat i on i s ent er ed i nt o t he E- ver i f y system.
An i ni t i al l i s t of ver i f i ed/ el i gi bl e Candi dat es must be pr ovi ded t o t he Cont r act i ng Of f i cer ( KO) , no l at er t han t hi r t y ( 30) busi ness days af t er r ecei pt of r ecei pt of Not i ce of Awar d.
PART 2 PRODUCTS ( NOT USED)
PART 3 EXECUTI ON ( NOT USED)
- - End of Sect i on - -
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00. 00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 RETAI NAGE OF PAYMENT
1. 2 BASE I TEMS
1. 2. 1 CLI N 0001 Al l I nt er i or Wor k On Fi r st Fl oor
1. 2. 2 CLI N 0002 Al l I nt er i or Wor k On Mezzani ne Fl oor ( 2nd) Fl oor
1. 2. 3 CLI N 0003 Al l Wor k For New Wat er Li ne Connect i ons, and
I nt er i or Pi pi ng
1. 3 OPTI ONAL I TEMS
1. 3. 1 CLI N 0004 Al l Wor k For Li f t St at i on Syst em and Sewer Li ne
(Optional)
1. 3. 2 CLI N 0005 HVAC ( Opt i onal )
PART 2 PRODUCTS ( Not Appl i cabl e)
PART 3 EXECUTI ON ( Not Appl i cabl e)
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00. 00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
I n each i nst ance, t he cont r act pr i ce f or an i t em shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , and mat er i al s, and f or per f or mi ng al l oper at i ons r equi r ed t o compl et e t he wor k i ncl uded i n t he i t em as her ei n speci f i ed, or as ot her wi se appr oved.
1. 1 RETAI NAGE OF PAYMENT
Ret ai nage i n t he amount of 10 per cent of or i gi nal cont r act awar d amount wi l l be wi t hhel d unt i l t he f i nal submi t t al s, l i s t ed bel ow, have been appr oved by t he Gover nment . The 10 per cent r et ai nage f or f i nal submi t t al s wi l l be hel d unt i l such t i me as t he Cont r act or has ear ned 90 per cent of t he or i gi nal cont r act val ue. See SECTI ON 01 78 00. 00 28 " CLOSEOUT SUBMI TTALS" f or addi t i onal i nf or mat i on.
a. Fi nal Oper at i on and Mai nt enance Manual s and Par t s Cat al ogs.
b. Fi nal Appr oved Ver si ons of Cont r act or Pr epar ed Dr awi ngs.
c. As- bui l t cont r act dr awi ngs and FI O dr awi ngs.
d. Ret ur n of Gover nment I ssued I t ems.
1. 2 BASE I TEMS
1. 2. 1 CLI N 0001 Al l I nt er i or Wor k On Fi r st Fl oor
CLI N 0001 wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) .
Payment wi l l be made at t he l ump sum pr i ce f or CLI N No. 0001, " Al l I nt er i or Wor k On Fi r st Fl oor " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed on t he i nt er i or of f i r st f l oor , compl et e, as speci f i ed and appr oved.
1. 2. 2 CLI N 0002 Al l I nt er i or Wor k On Mezzani ne Fl oor ( 2nd) Fl oor
CLI N 0002 wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) .
Payment wi l l be made at t he l ump sum pr i ce f or CLI N No. 0002, " Al l I nt er i or Wor k On Mezzani ne Fl oor ( 2nd) Fl oor , " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed on t he Mezzani ne f l oor , except f or HVAC, compl et e, as speci f i ed and appr oved.
1. 2. 3 CLI N 0003 Al l Wor k For New Wat er Li ne Connect i ons, and I nt er i or Piping
CLI N 0003 wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) .
Payment wi l l be made at t he l ump sum pr i ce f or CLI N No. 0003, " Al l Wor k For New Wat er Li ne Connect i ons, and I nt er i or Pi pi ng, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed t o const r uct new wat er l i ne connect i ons and i nt er i or pi pi ng, compl et e, as speci f i ed and approved.
1. 3 OPTI ONAL I TEMS
1. 3. 1 CLI N 0004 Al l Wor k For Li f t St at i on Syst em and Sewer Li ne ( Opt i onal )
CLI N 0004 wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) .
Payment wi l l be made at t he l ump sum pr i ce f or CLI N No. 0004, " Al l Wor k For Li f t St at i on Syst em and Sewer Li ne, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k f or l i f t s t at i on syst em and sewer l i ne, compl et e, as speci f i ed and appr oved. Feat ur es i ncl uded wi t h t hi s i t em wi l l i ncl ude, but not be l i mi t ed t o: .
a. Li f t St at i on Syst em, Dr awi ng Sheet s: C- 103, and C- 501.
b. Sewer pi pel i ne, pi pe connect i ons and cl eanout pi pel i ne, Dr awi ng Sheet s:
C- 103, C- 501 and C- 502.
c. Tr enchi ng and Back Fi l l i ng, Dr awi ng Sheet s: C- 103, C- 501 and C- 502.
d. Asphal t Concr et e Pat chi ng Tr ench Repai r , Dr awi ng Sheet s: C- 103 and C- 502.
1. 3. 2 CLI N 0005 HVAC ( Opt i onal )
CLI N 0005 wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) .
Payment wi l l be made at t he l ump sum pr i ce f or CLI N No. 0005, " HVAC ( Opt i onal ) , " whi ch pr i ce and payment shal l be f ul l compensat i on f or HVAC, compl et e, as speci f i ed and appr oved. Feat ur es i ncl uded wi t h t hi s i t em wi l l i ncl ude, but not be l i mi t ed t o:
a. Spl i t Syst em Ai r Sour ce Heat Pumps, As I ndi cat ed on t he f ol l owi ng Dr awi ng Sheet s: MH001, MH101, MH102, MH401, MH501, MH601, and MH701
b. Exhaust Fan ( EF- 2) , As I ndi cat ed on t he f ol l owi ng Dr awi ng Sheet s:
MH001, MH101, MH601, and MH701
c. Occupancy Sensor s/ Door Open Pr oxi mi t y Sensor , As I ndi cat ed on t he f ol l owi ng Dr awi ng Sheet s: MH101, MH601, and MH701
PART 2 PRODUCTS ( Not Appl i cabl e)
PART 3 EXECUTI ON ( Not Appl i cabl e)
- - End of Sect i on - -
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 32 01. 00 28
PROJECT SCHEDULE
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SUBMI TTALS
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
PART 2 PRODUCTS
2. 1 SOFTWARE
2. 1. 1 Gover nment Def aul t Sof t war e
2. 1. 2 Cont r act or Sof t war e
2. 1. 2. 1 Pr i maver a
2. 1. 2. 2 Ot her Than Pr i maver a
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
3. 2 BASI S FOR PAYMENT AND COST LOADI NG
3. 2. 1 Act i v i t y Cost Loadi ng
3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on
3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS
3. 3. 1 Level of Det ai l Requi r ed
3. 3. 2 Act i v i t y Dur at i ons
3. 3. 3 Pr ocur ement Act i v i t i es
3. 3. 4 Mandat or y Tasks
3. 3. 5 Gover nment Act i v i t i es
3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y
3. 3. 6. 1 Wor ker s Per Day ( WRKP)
3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)
3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)
3. 3. 6. 4 Modi f i cat i on Number ( MODF)
3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )
3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)
3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)
3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)
3. 3. 7 Cont r act Mi l est ones and Const r ai nt s
3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt
3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt
3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s
3. 3. 7. 3. 1 St ar t Phase
3. 3. 7. 3. 2 End Phase
3. 3. 8 Cal endar s
3. 3. 9 Open Ended Logi c
3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed
3. 3. 11 Out - of - Sequence Pr ogr ess
3. 3. 12 Added and Del et ed Act i v i t i es
SECTI ON 01 32 01. 00 28
3. 3. 13 Or i gi nal Dur at i ons
3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps
3. 3. 15 Ret ai ned Logi c
3. 3. 16 Per cent Compl et e
3. 3. 17 Remai ni ng Dur at i on
3. 3. 18 Cost Loadi ng of Cl oseout Act i v i t i es
3. 3. 19 Ant i c i pat ed Adver se Weat her
3. 3. 20 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y
3. 4 PROJECT SCHEDULE SUBMI SSI ONS
3. 4. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on
3. 4. 2 I ni t i al Pr oj ect Schedul e Submi ssi on
3. 4. 3 Per i odi c Schedul e Updat es
3. 5 SUBMI SSI ON REQUI REMENTS
3. 5. 1 Cur r ent Pr oj ect Schedul e Dat a
3. 5. 2 Nar r at i ve Repor t
3. 5. 3 Schedul e Repor t s
3. 5. 3. 1 Act i v i t y Repor t
3. 5. 3. 2 Logi c Repor t
3. 5. 3. 3 Tot al Fl oat Repor t
3. 5. 3. 4 Ear ni ngs Repor t by CLI N
3. 5. 3. 5 Schedul e Log
3. 5. 4 Gant t Char t
3. 5. 4. 1 Cont i nuous Fl ow
3. 5. 4. 2 Pr oj ect Mi l est one Dat es
3. 5. 4. 3 Cr i t i cal Pat h
3. 5. 4. 4 Bandi ng
3. 5. 4. 5 Cash Fl ow / Schedul e Var i ance Cont r ol ( SVC) Di agr am
3. 6 PERI ODI C SCHEDULE UPDATE
3. 6. 1 Per i odi c Schedul e Updat e Meet i ngs
3. 6. 2 Updat e Submi ssi on Fol l owi ng Pr ogr ess Meet i ng
3. 7 WEEKLY PROGRESS MEETI NGS
3. 8 REQUESTS FOR TI ME EXTENSI ONS
3. 8. 1 Just i f i cat i on of Del ay
3. 8. 2 Ti me I mpact Anal ysi s ( Pr ospect i ve Anal ysi s)
3. 8. 3 For ensi c Schedul e Anal ysi s ( Ret r ospect i ve Anal ysi s)
3. 8. 4 Fr agment ar y Net wor k ( Fr agnet )
3. 8. 5 Ti me Ext ensi on
3. 8. 6 I mpact t o Ear l y Compl et i on Schedul e
3. 9 FAI LURE TO ACHI EVE PROGRESS
3. 9. 1 Ar t i f i c i al l y I mpr ovi ng Pr ogr ess
3. 9. 2 Fai l ur e t o Per f or m
3. 9. 3 Recover y Schedul e
3. 10 OWNERSHI P OF FLOAT
3. 11 TRANSFER OF SCHEDULE DATA I NTO RMS- CM
3. 12 PRI MAVERA P6 MANDATORY REQUI REMENTS
- - End of Sect i on Tabl e of Cont ent s - -
PROJECT SCHEDULE
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AACE I NTERNATI ONAL ( AACE)
AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s
AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
ER 1- 1- 11 ( 2017) Pr oj ect Schedul es
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y.
Desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr oj ect Schedul er Qual i f i cat i ons; G, C Pr el i mi nar y Pr oj ect Schedul e; G, C I ni t i al Pr oj ect Schedul e; G, C Per i odi c Schedul e Updat e; G, C
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The aut hor i zed r epr esent at i ve must have a mi ni mum of 2- year s exper i ence schedul i ng const r uct i on pr oj ect s s i mi l ar i n s i ze and nat ur e t o t hi s pr oj ect wi t h schedul i ng sof t war e t hat meet s t he r equi r ement s of t hi s speci f i cat i on. Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nci pl es and appl i cat i on.
PART 2 PRODUCTS
2. 1 SOFTWARE
The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s specification.
2. 1. 1 Gover nment Def aul t Sof t war e
The Gover nment i nt ends t o use Pr i maver a P6.
2. 1. 2 Cont r act or Sof t war e
Schedul i ng sof t war e used by t he cont r act or must be commer ci al l y avai l abl e f r om t he sof t war e vendor f or pur chase wi t h vendor sof t war e suppor t agr eement s avai l abl e. The sof t war e r out i ne used t o cr eat e t he r equi r ed sdef f i l e must be cr eat ed and suppor t ed by t he sof t war e manuf act ur er .
2. 1. 2. 1 Primavera
I f Pr i maver a P6 i s sel ect ed f or use, pr ovi de t he " xer " expor t f i l e i n a ver si on of P6 i mpor t abl e by t he Gover nment syst em.
2. 1. 2. 2 Ot her Than Pr i maver a
I f t he cont r act or chooses sof t war e ot her t han Pr i maver a P6, t hat i s compl i ant wi t h t hi s speci f i cat i on, pr ovi de f or t he Gover nment ' s use t wo l i censes, t wo comput er s, and t r ai ni ng f or t wo Gover nment empl oyees i n t he use of t he sof t war e. These comput er s wi l l be st and- al one and not connect ed t o Gover nment net wor k. Comput er s and l i censes wi l l be r et ur ned at pr oj ect compl et i on.
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n, pur suant t o FAR Cl ause 52. 236- 15, SCHEDULE FOR CONSTRUCTI ON CONTRACTS. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed.