Amendment 0001 Technical Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Carmen Levee Rehabilitation, newest first.
File Type Posted
BidOpeningWorksheet.pdf PDF
18B0021_Plans_Amend-0001.pdf PDF
Amendment_0001.pdf PDF
A.07.23_Solicitation_Carmen_Levee_Rehab.pdf PDF
18B0021_Plans.pdf PDF
18B0021_TechSpec.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Car men Levee Rehabi l i t at i on W912EF18B0021 Amend-0001

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15. 00 28 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00. 00 28 GENERAL REQUI REMENTS

01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS

01 22 00. 00 28 MEASUREMENT AND PAYMENT

01 33 00 SUBMI TTAL PROCEDURES

01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL

01 55 10. 00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20. 00 28 ENVI RONMENTAL PROTECTI ON

01 78 00. 00 28 CLOSEOUT SUBMI TTALS

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 41 10. 62 28 LEVEE REPAI R

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1 g4ecdbas Line g4ecdbas Line g4ecdbas Line

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 01 15. 00 28

Carmen Levee Rehabilitation W912EF18B0021

SECTION 00 01 15.00 28

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

FILE NUMBER SHEET NUMBER DESCRIPTION

SA-250-1/1 G-001 COVER SHEET AND LOCATION MAPS

SA-250-1/2 G-002 INDEX TO DRAWINGS

SA-250-1/3 C-101 SITE PLAN

SA-250-1/6 C-102 ROCK BARB PLANS

SA-250-1/4 C-301 TYPICAL CROSS SECTION

SA-250-1/5 C-901 PHOTOS

SA-250-1/5 C-901 PHOTOS

1.2.1 Use Of Government Prepared Contract CAD Electronic Files

a. No For Information Only drawings are available on CAD.

b. The Contractor assumes all risks associated in using electronic CAD drawings.

c. Electronic copies of CAD drawings are only available in Bentley MicroStation format.

d. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies.

The Government will not be responsible to correct the electronic CAD drawing.

-- End of Document --

DOCUMENT 00 01 15.00 28

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

1. 4 PROJECT SCHEDULE

1. 5 REGULAR CLEANUP AND DEBRI S DI SPOSAL

1. 6 EQUI PMENT LI ST

1. 7 TESTI NG OF EQUI PMENT

1. 8 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

1. 9 PRE- WORK AND POST WORK PHOTO SURVEYS

1. 10 CONSTRUCTI ON PROGRESS PHOTOS

1. 11 FI RE CONTROL

1. 11. 1 Fi r e Hazar ds

1. 11. 2 Fi r e Equi pment

1. 11. 3 Fi r e Pr ocedur es

1. 12 PROJECT SUPERI NTENDENT

1. 13 KEY PERSONNEL SUBSTI TUTI ON

1. 14 POST AWARD MEETI NGS

1. 14. 1 Pr e- Wor k/ Pr e- Const r uct i on

1. 14. 2 Pr e- Const r uct i on

1. 14. 2. 1 Mi nut es

1. 15 CONTRACTORS EMPLOYEE REQUI REMENTS

1. 15. 1 Wor k Schedul es

1. 15. 2 Cont r act or I dent i f i cat i on

1. 15. 3 Pr e- Scr een Candi dat es Usi ng E- Ver i f y Pr ogr am

1. 16 USE OF RI VER WATER FOR CONSTRUCTI ON PURPOSES

1. 17 TEMPORARY UTI LI TI ES

1. 17. 1 Sani t at i on Faci l i t i es

1. 17. 2 Wat er

1. 17. 3 El ect r i c i t y

1. 17. 4 Compr essed Ai r

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 01. 00 28

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

Compl y wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y.

Desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr oj ect Schedul e; G C

Equi pment Li st ; I C

Pr e- Wor k Phot o Sur vey Repor t ; I C

Wi l d Land Fi r e Cont r ol Pl an; G C

Pr oj ect Super i nt endent ; I C

Pr e- Scr een Candi dat es Usi ng E- Ver i f y Pr ogr am; I C

SD- 07 Cer t i f i cat es

Key Per sonnel Subst i t ut i on; G C

SD- 09 Manuf act ur er ' s Fi el d Repor t s

Weekl y Pr ogr ess Phot ogr aphs; I C

SD- 11 Cl oseout Submi t t al s

SECTI ON 01 11 01. 00 28

Post - Wor k Phot o Sur vey Repor t ; I C

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

Fi el d ver i f y al l el evat i ons, di mensi ons, and coor di nat es of exi st i ng f eat ur es i ndi cat ed on t he cont r act dr awi ngs. Any devi at i ons shal l be updat ed i n accor dance wi t h Sect i on 01 78 00. 00 28, CLOSEOUT SUBMI TTALS, par agr aph MAI NTAI N WORKI NG AS- BUI LT CONTRACT DRAWI NGS AND FI O DRAWI NGS.

1. 4 PROJECT SCHEDULE

a. Fur ni sh a schedul e f or t he compl et e pr oj ect i n accor dance wi t h Cl ause 52. 236- 15 Schedul es f or Const r uct i on Cont r act s wi t hi n 15 days af t er r ecei pt of Not i ce t o Pr oceed.

b. E- mai l an el ect r oni c copy of t he schedul e, i n t he or i gi nal f or mat t he schedul e was devel oped i n ( e. g. . xer , . x l s. , . mpp, et c. ) , t o t he Cont r act i ng Of f i cer ( KO) . See SECTI ON 01 33 00 SUBMI TTAL PROCEDURES par agr aph " El ect r oni c Copi es" f or emai l addr ess.

1. 5 REGULAR CLEANUP AND DEBRI S DI SPOSAL

Wi t h t he except i on of mat er i al s speci f i cal l y i ndi cat ed or speci f i ed t o be sal vaged f or r euse i n const r uct i on, or t ur ned over t o t he Gover nment , al l wast es and demol i shed mat er i al s shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om t he j ob s i t e dai l y i n accor dance wi t h Feder al , St at e, and l ocal r egul at i ons. The Cont r act or shal l f ur ni sh wast e cont ai ner s. Al l smal l wast e cont ai ner s pr ovi ded by t he cont r act or shal l be empt i ed dai l y, l ar ge bi n cont ai ner s shal l be empt i ed when f ul l or once a week.

1. 6 EQUI PMENT LI ST

Fur ni sh a compl et e l i s t of al l equi pment t o be used on t he Pr oj ect 30 days pr i or t o commencement of on- si t e wor k. Submi t a r evi sed l i s t i n t he event of change of equi pment . Li st s shal l i ncl ude r ent ed equi pment as wel l as l ease- pur chase or sal e- l easeback equi pment . The i ni t i al l i s t and t he r evi sed l i s t s shal l i ndi cat e dat es equi pment i s assi gned t o or r emoved f r om t he Pr oj ect and adequat e i dent i f i cat i on or descr i pt i on of each i t em of equi pment i ncl udi ng manuf act ur er ' s name ( abbr evi at ed) , model number , manuf act ur er ' s ser i al number , year of manuf act ur e, and Cont r act or ' s assi gned ser i al or r ecor d number .

1. 7 TESTI NG OF EQUI PMENT

Bef or e any machi ner y or mechani zed equi pment i s put t o use on t he j ob, i t shal l be i nspect ed and t est ed by a qual i f i ed per son and det er mi ned t o be i n saf e oper at i ng condi t i on. Cr anes or der r i cks shal l be t est ed by t he Cont r act or or a qual i f i ed t est i ng agency i n accor dance wi t h EM 385- 1- 1.

Equi pment shal l be l ar ge enough t o saf el y handl e pr oposed pi cks or t asks wi t hout exceedi ng t he cr ane r at i ng est abl i shed by t hese t est s.

1. 8 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

Take pr ecaut i ons t o pr event damage t o exi st i ng f aci l i t i es whi l e per f or mi ng wor k under t hi s cont r act . Upon compl et i on of t he wor k, al l t he exi st i ng f aci l i t i es not i ncl uded as a por t i on of t he wor k shal l be l ef t i n a condi t i on bet t er t han or equal t o t he condi t i on exi st i ng at t i me of cont r act awar d. Cost s f or mai nt enance, r epai r and r est or at i on of any

SECTI ON 01 11 01. 00 28

f aci l i t i es shal l be consi der ed as i nci dent al t o and i ncl uded i n t he cont r act pr i ce.

1. 9 PRE- WORK AND POST WORK PHOTO SURVEYS

Conduct a pr e- wor k phot o sur vey pr i or t o st ar t of on- si t e wor k and a post - wor k phot o sur vey dur i ng pr oj ect c l oseout , wi t h t he KO, of t he Gover nment f aci l i t i es at t he wor k ar eas. The r esul t s of t he sur veys shal l be document ed by di gi t al phot ogr aphs and descr i pt i ve nar r at i ve r epor t s. A col or copy of t he sur vey phot ogr aphs and nar r at i ve r epor t s shal l be submi t t ed t o t he KO wi t hi n f i ve ( 5) days af t er sur vey has been compl et ed.

1. 10 CONSTRUCTI ON PROGRESS PHOTOS

Dur i ng on si t e const r uct i on act i v i t i es r ecor d const r uct i on pr ogr ess wi t h weekl y pr ogr ess phot ogr aphs. Phot ogr aphs pr ovi ded ar e f or unr est r i ct ed use by t he Gover nment .

a. Phot os shal l be submi t t ed at t he end of each wor k week.

b. Fur ni sh di gi t al phot ogr aphs, Ut i l i ze JPEG f i l e f or mat f or al l phot ogr aph and i mage f i l es.

c. Pr ovi de f ul l - col or phot os wi t h phot o r esol ut i on of not l ess t han 4 megapi xel s and not mor e t han 12 megapi xel s. showi ng t he sequence and pr ogr ess of wor k.

d. Take a mi ni mum of 6- 12 di gi t al phot ogr aphs each day t hr oughout t he ent i r e pr oj ect .

e. Submi t weekl y t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) .

Ensur e t hat t he phot ogr aphs ar e di gi t al l y dat ed. Log shal l be f ur ni shed f or each phot ogr aph t hat r ecor ds t he f ol l owi ng i nf or mat i on:

a. Phot ogr aph number ( t he speci f i c f or mat shoul d be t i ed t o t he f i l ename of t he el ect r oni c phot ogr aph)

b. Dat e t he phot ogr aph was t aken;

c. A br i ef descr i pt i on of t he l ocat i on, what t he phot ogr aph depi ct s, and t he or i ent at i on of t he v i ew.

1. 11 FI RE CONTROL

1. 11. 1 Fi r e Hazar ds

The Cont r act or shal l el i mi nat e al l pot ent i al f i r e hazar ds t hat may r esul t f r om hi s/ her oper at i ons of bui l di ngs, gr ounds, equi pment , and t he st or age of suppl i es, f uel s, or c l eani ng agent s. Thi s i ncl udes t he r emoval of any accumul at i on of bur nabl e or f l ammabl e mat er i al s or debr i s ar ound chai n- l i nked f ences, s i gns, and ot her f i x t ur es wi t hi n t he cont r act ar ea.

1. 11. 2 Fi r e Equi pment

The Cont r act or shal l t ake pr ecaut i ons t o mi ni mi ze f i r e hazar ds caused by wor k under t hi s cont r act . Al l Cont r act or vehi c l es and equi pment shal l be equi pped wi t h a shovel , bucket , and an A: B: C f i r e ext i ngui sher at al l t i mes dur i ng t he per f or mance of wor k on Gover nment l ands. Al l f i r e ext i ngui sher s shal l have been checked wi t hi n s i x ( 6) mont hs pr i or t o commencement of wor k by a cer t i f i ed f i r e ext i ngui sher r epr esent at i ve. A v i sual i nspect i on shal l be per f or med by t he Cont r act or t he f i r st wor ki ng day of each mont h t o i nsur e t hat ext i ngui sher s ar e pr oper l y char ged, r eady f or use, and l ocat ed pr oper l y. A r ecor d t ag f or ver i f y i ng i nspect i ons shal l be at t ached t o each ext i ngui sher and shal l be pr oper l y mai nt ai ned t hr oughout t he l i f e of t he cont r act . The Cont r act or shal l al so have on si t e at al l t i mes a f our wheel dr i ve pi ckup wi t h a bed mount ed or t r ai l er mount ed f i r e pumper uni t wi t h a wat er capaci t y of not l ess t han 200 gal l ons f ul l y f i l l ed and r eady t o use wi t h a t r ai ned oper at or on si t e.

1. 11. 3 Fi r e Pr ocedur es

I n t he case of a f i r e wi t hi n t he cont r act ar ea, t he Cont r act or shal l f i r st at t empt t o put out t he f i r e. I f t hi s i s not possi bl e, not i f y t he f i r e depar t ment . The appr opr i at e COR must be not i f i ed as soon as possi bl e of t he f i r e and any damage est i mat es.

1. 11. 4 Wi l d Land Fi r e Cont r ol

The Cont r act or shal l pr epar e a Wi l d Land Fi r e Cont r ol Pl an as pr escr i bed in EM 385- 1- 1. The pl an shal l addr ess at a mi ni mum t he pr ecaut i ons t o mi ni mi ze f i r e hazar ds, f i r e f i ght i ng pl an and not i f i cat i ons of l ocal authorities.

1. 12 PROJECT SUPERI NTENDENT

At al l t i mes dur i ng per f or mance of t hi s cont r act and unt i l t he wor k i s compl et ed and accept ed, assi gn and have on t he wor ksi t e, a compet ent super i nt endent as per FAR Cl ause 52. 236- 6 " Super i nt endence by t he Cont r act or " . Submi t Super i nt endent name and cont act i nf or mat i on pr i or t o st ar t of on- si t e const r uct i on.

1. 13 KEY PERSONNEL SUBSTI TUTI ON

I f t he Cont r act or pl ans on r epl aci ng any Key per sonnel ( Pr oj ect Super i nt endent , CQC Syst em Manager , or CQC st af f Member s) t hey must have t he appr oval of t he KO. Per sonnel shal l possess t he qual i f i cat i ons t hat meet or exceed t hose st at ed i n t hi s cont r act f or t he posi t i on of t he i ndi v i dual t hey ar e r epl aci ng. Submi t qual i f i cat i ons of new per sonnel at l east 15 cal endar days i n advance of dat e of r epl acement .

1. 14 POST AWARD MEETI NGS

1. 14. 1 Pre-Work/Pre-Construction

A combi ned Pr e- Wor k/ Pr e- Const r uct i on Tel econf er ence Meet i ng wi l l be hel d wi t hi n seven ( 7) cal endar days af t er r ecei pt of Not i ce t o Pr oceed. Seni or l evel member s of t he Cont r act or ' s st af f and t he Cont r act or ' s Pr oj ect Super i nt endent and QC syst em manager shal l par t i c i pat e i n t hi s meet i ng.

The Gover nment wi l l l ead t he f i r st por t i on of t he meet i ng and t ake t he meet i ng mi nut es. The Gover nment wi l l di scuss t he over al l cont r act requirements.

1. 14. 2 Pre-Construction

For t he Pr e- Const r uct i on par t of t he meet i ng, t he Pr oj ect Super i nt endent shal l di scuss t he Cont r act or ' s pl an on execut i ng t he wor k at t he Pr oj ect

SECTI ON 01 11 01. 00 28

g4ecdbas Line si t e, schedul e, r equi r ed cl ear ances and t i mef r ame f or c l ear ances, and pl an f or i mpl ement i ng saf et y and qual i t y cont r ol . The Gover nment wi l l have key member s f r om t he Pr oj ect st af f t o di scuss Envi r onment al and cl ear ance i ssues f or t he Pr oj ect .

1. 14. 2. 1 Minutes

Cont r act or i s r esponsi bl e f or t aki ng t he meet i ng mi nut es f or t hi s por t i on of t he meet i ng and shal l send t hem el ect r oni cal l y wi t hi n 48 hour s af t er t he meet i ng t o t he Gover nment ' s Cont r act i ng Of f i cer , Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer .

1. 15 CONTRACTORS EMPLOYEE REQUI REMENTS

1. 15. 1 Wor k Schedul es

The Gover nment s wor k schedul e i s Monday t hr ough Fr i day, except f or Feder al Hol i days. At t he Pr e- Wor k Meet i ng, f ur ni sh a schedul e of t he number of shi f t s per day, and hour s per shi f t f or cont r act wor k. The Cont r act or i s l i mi t ed t o Monday t hr ough Fr i day, except Feder al Hol i days. The Cont r act or may r equest a var i ance due t o unusual or unf or eseen ci r cumst ances. Submi t a r equest f or var i ance t o t he KO a mi ni mum of one ( 1) week pr i or t o t he var i ance. The KO wi l l r evi ew t hi s r equest , but t her e i s no guar ant ee t hat t he var i ance wi l l be gr ant ed.

1. 15. 2 Cont r act or I dent i f i cat i on

Ever y Cont r act or empl oyee ( pr i me or subcont r act or ) shal l have a har d hat meet i ng t he r equi r ement s of EM 385- 1- 1. Har dhat s shal l di spl ay t he Pr i me Cont r act or name, subcont r act or name, and t he empl oyee' s name. Cont r act or empl oyee har dhat s shal l not be whi t e wi t h r ed mar ki ngs. I t shal l be t he r esponsi bi l i t y of t he Pr oj ect Super i nt endent t o enf or ce t hi s r equi r ement .

1. 15. 3 Pr e- Scr een Candi dat es Usi ng E- Ver i f y Pr ogr am

The Cont r act or must pr e- scr een Candi dat es usi ng t he E- ver i f y Pr ogr am ( http://www.uscis.gov/e-verify ) websi t e t o meet t he est abl i shed empl oyment el i gi bi l i t y r equi r ement s. The Vendor must ensur e t hat t he Candi dat e has t wo val i d f or ms of Gover nment i ssued i dent i f i cat i on pr i or t o enr ol l ment t o ensur e t he cor r ect i nf or mat i on i s ent er ed i nt o t he E- ver i f y syst em.

An i ni t i al l i s t of ver i f i ed/ el i gi bl e Candi dat es must be pr ovi ded t o t he KO no l at er t han 30 busi ness days af t er r ecei pt of r ecei pt of Not i ce t o Proceed.

1. 16 USE OF RI VER WATER FOR CONSTRUCTI ON PURPOSES

The use of r i ver wat er f or const r uct i on pur poses i s under t he j ur i sdi ct i on of t he St at e of I daho Depar t ment of Wat er Resour ces. Mor e i nf or mat i on i s avai l abl e at t hei r websi t e - ht t ps: / / www. i dwr . i daho. gov

1. 17 TEMPORARY UTI LI TI ES

1. 17. 1 Sani t at i on Faci l i t i es

The Cont r act or shal l f ur ni sh sani t at i on f aci l i t i es i n accor dance wi t h EM 385- 1- 1. The l ocat i on of al l f aci l i t i es wi l l be subj ect t o KO appr oval . The Cont r act or shal l pr ovi de wi nd anchor age t o pr event any spi l l age. I n addi t i on, f r eeze pr ot ect i on shal l be pr ovi ded dur i ng t he mont hs Oct ober t hr ough Mar ch.

1. 17. 2 Water

No wat er i s avai l abl e f or Cont r act or use.

1. 17. 3 Electricity

No el ect r i c i t y i s avai l abl e f or Cont r act or use.

1. 17. 4 Compr essed Ai r

No compr essed ai r i s avai l abl e f or Cont r act or use.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on - -

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 RETAI NAGE OF PAYMENT

1. 2 CLI N 0001 MI SCELLANEOUS SI TE WORK

1. 3 MEASUREMENT FOR PAYMENT

1. 4 CLI N 0002 PLACE RI PRAP

1. 5 CLI N 0003 PLACE QUARRY SPALLS

1. 6 CLI N 0004 REMOVE EXCESS RI PRAP AND QUARRY SPALLS

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00. 00 28

SECTI ON 01 22 00. 00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

I n each i nst ance, t he cont r act pr i ce f or an i t em shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , and mat er i al s, and f or per f or mi ng al l oper at i ons r equi r ed t o compl et e t he wor k i ncl uded i n t he i t em as her ei n speci f i ed, or as ot her wi se appr oved.

The r i pr ap and quar r y spal l s wi l l be st ockpi l ed on- si t e pr i or t o cont r act commencement , at no cost t o t he Cont r act or . Do not i ncl ude t he cost t o suppl y t hese mat er i al s t o t he j ob- si t e.

1. 1 RETAI NAGE OF PAYMENT

Ret ai nage i n t he amount of 10 per cent of or i gi nal cont r act awar d amount wi l l be wi t hhel d unt i l t he f i nal submi t t al s, l i s t ed bel ow, have been appr oved by t he Gover nment . The 10 per cent r et ai nage f or f i nal submi t t al s wi l l be hel d unt i l such t i me as t he Cont r act or has ear ned 90 per cent of t he or i gi nal cont r act val ue. See SECTI ON 01 78 00. 00 28 " CLOSEOUT SUBMI TTALS" f or addi t i onal i nf or mat i on.

a. As- bui l t cont r act dr awi ngs and FI O dr awi ngs.

1. 2 CLI N 0001 MI SCELLANEOUS SI TE WORK

CLI N 0001 wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) .

Payment wi l l be made at t he l ump sum pr i ce f or CLI N No. 0001, " Mi scel l aneous Si t e Wor k, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or c l ear i ng exi st i ng veget at i on and debr i s, r eusi ng and pl aci ng exi st i ng r i pr ap, and gr adi ng t he st agi ng ar ea compl et e, as speci f i ed and appr oved. Feat ur es i ncl uded wi t h t hi s i t em wi l l i ncl ude, but not be l i mi t ed t o:

a. Removi ng exi st i ng r i pr ap

b. Sor t i ng exi st i ng r i pr ap

c. Keyi ng exi st i ng r i pr ap

d. Remove exi st i ng veget at i on, gr ass c l umps and weeds.

e. Af t er compl et i on of t he wor k, gr ade t he st agi ng ar ea t o mat ch t he condi t i on pr i or t o t he wor k commenci ng, speci f i ed i n SECTI ON 35 41 10. 62 28 LEVEE REPAI R, par agr aph FI NAL GRADI NG OF LEVEE ROADWAY

AND ACCESS ROAD.

1. 3 MEASUREMENT FOR PAYMENT

a. Ri pr ap and quar r y spal l s wi l l be measur ed f or payment by t he cubi c yar d ( CY) .

b. The Cont r act i ng Of f i cer ( KO) wi l l pr ovi de t o t he Cont r act or t he act ual quant i t y of r i pr ap and quar r y spal l s st ockpi l ed pr i or t o

SECTI ON 01 22 00. 00 28

placement.

c. When t he wor k i s compl et ed as speci f i ed, t he KO wi l l det er mi ne t he quant i t y of r i pr ap and quar r y spal l s r emai ni ng.

d. Payment wi l l be made based on t hi s di f f er ence i n quant i t i es.

1. 4 CLI N 0002 PLACE RI PRAP

CLI N 0002, " PLACE RI PRAP" , wi l l be measur ed f or payment as t he number of CY of Ri pr ap pl aced. Pr i ce and payment wi l l be made at t he uni t pr i ce f or t he number of CY of r i pr ap pl aced, compl et e as speci f i ed and appr oved. The r i pr ap i s suppl i ed and st ockpi l ed at no cost t o t he contractor.

1. 5 CLI N 0003 PLACE QUARRY SPALLS

CLI N 0003, " PLACE QUARRY SPALLS" , wi l l be measur ed f or payment as t he number of CY of Quar r y Spal l s pl aced. Pr i ce and payment wi l l be made at t he uni t pr i ce f or quar r y spal l s pl aced, compl et e as speci f i ed and appr oved. The quar r y spal l s ar e suppl i ed and st ockpi l ed at no cost t o t he contractor.

1. 6 CLI N 0004 REMOVE EXCESS RI PRAP AND QUARRY SPALLS

CLI N 0004, " REMOVE EXCESS RI PRAP AND QUARRY SPALLS" , wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) of excess r i pr ap and quar r y spal l s l oaded and haul ed back t o t he Lemhi Count y Zi egl er Quar r yoff-site quarry , l ocat ed appr oxi mat el y t wo mi l es away f r om t he pr oj ect s i t e. Keep quar r y spal l s and r i pr ap separ at e. Pr i ce and payment wi l l be made at t he uni t pr i ce, compl et e as speci f i ed and appr oved. Dump t hi s mat er i al i n t he l ocat i on appr oved by t he Cont r act i ng Of f i cer ( KO) .

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

- - End of Sect i on - -

SECTI ON 01 22 00. 00 28

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15. 00 28 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00. 00 28 GENERAL REQUI REMENTS

01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS

01 22 00. 00 28 MEASUREMENT AND PAYMENT

01 33 00 SUBMI TTAL PROCEDURES

01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL

01 55 10. 00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20. 00 28 ENVI RONMENTAL PROTECTI ON

01 78 00. 00 28 CLOSEOUT SUBMI TTALS

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 41 10. 62 28 LEVEE REPAI R

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 55 10. 00 28

CONTRACTOR WORK, ACCESS AND STORAGE AREAS

PART 1 GENERAL

1. 1 CONTRACTOR' S STORAGE AND STAGI NG AREA

1. 2 STOCKPI LE AREA

1. 3 PROJECT SI TE RESTRI CTI ONS

1. 4 TRAFFI C CONTROL AND PUBLI C ACCESS

1. 4. 1 Publ i c Access Bar r i er s

1. 5 DUST CONTROL PLAN

1. 6 HAULI NG MATERI AL

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 55 10. 00 28

SECTI ON 01 55 10. 00 28

CONTRACTOR WORK, ACCESS AND STORAGE AREAS

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.

1. 1 CONTRACTOR' S STORAGE AND STAGI NG AREA

St or age and st agi ng ar eas shal l be at l ocat i ons i ndi cat ed or as ot her wi se appr oved by t he Cont r act i ng Of f i cer ( KO) . The st or age and st agi ng ar eas may be used f or act i v i t i es such as set up of an of f i ce t r ai l er , par ki ng of pr i vat e vehi c l es, st or age of mat er i al s and equi pment , and f or wor k act i v i t i es. Secur i t y at t he st or age and st agi ng si t e wi l l be t he Cont r act or ' s r esponsi bi l i t y . I nst al l t empor ar y secur i t y f enci ng i n a manner appr oved by t he KO. Secur i t y f enci ng may not be i nst al l ed i n a manner t hat damages exi st i ng f aci l i t i es, such as punchi ng post hol es i n exi st i ng pavement .

1. 2 STOCKPI LE AREA

The Gover nment suppl i ed mat er i al s wi l l be st ockpi l ed i n t he st agi ng ar ea as i ndi cat ed. I f t he mat er i al i s not on- si t e at t he pr oj ect commencement , t he Cont r act or may r equest di f f er ent st ockpi l e l ocat i ons. Thi s r equest shal l be made t o Lemhi Count y and i s subj ect t o Lemhi Count y appr oval .

1. 3 PROJECT SI TE RESTRI CTI ONS

Remai n wi t hi n t he pr oj ect boundar i es as det er mi ned by t he KO. Ther e i s a gat e acr oss t he access r oad t o t he pr oj ect s i t e. Except dur i ng ent r y and depar t ur e, keep t hi s gat e c l osed unl ess di r ect l y di f f er ent l y by t he KO.

1. 4 TRAFFI C CONTROL AND PUBLI C ACCESS

Exi st i ng publ i c r oads shal l be kept open t o vehi c l e t r af f i c at al l t i mes.

The i ndi cat ed access r oad wi l l be c l osed t o t he publ i c. Conduct t hi s wor k i n such a manner as wi l l obst r uct and i nconveni ence t r af f i c as l i t t l e as possi bl e. When necessar y t o oper at e on or cr oss exi st i ng hi ghways or r oads, f ur ni sh s i gns, l i ght s, and/ or ot her necessar y saf eguar ds t o saf el y cont r ol and di r ect t he f l ow of t r af f i c . Obt ai n any and al l r equi r ed per mi t s f or such oper at i ons f r om t he appr opr i at e pr i vat e or publ i c aut hor i t y at no addi t i onal cost t o t he Gover nment .

1. 4. 1 Publ i c Access Bar r i er s

The pr oj ect s i t e wi l l be c l osed t o t he publ i c, I nst al l s i gns at t he ent r y poi nt s i ndi cat i ng t hat t he ar ea i s c l osed t o t he publ i c.

1. 5 DUST CONTROL PLAN

Pr event dust f r om spr eadi ng dur i ng dust gener at i ng act i v i t i es.

SECTI ON 01 55 10. 00 28

1. 6 HAULI NG MATERI AL

No mat er i al shal l be al l owed t o dr op of f vehi c l es whi l e i n t r ansi t . I n or der t o pr event any mat er i al f r om dr oppi ng of f t he vehi c l e ont o l ocal r oads, al l vehi c l es t hat have ent er ed t he mat er i al l oadi ng si t e shal l be washed of f pr i or t o l eavi ng t he si t e. Wash- of f s i t e shal l be i n an ar ea t hat has been appr oved by t he KO.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used) - - End of Sect i on - -

SECTI ON 01 55 10. 00 28

PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
Amend-0001
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
1.2.1 Use Of Government Prepared Contract CAD Electronic Files
SECTION 01 11 01.00 28 - SUPPLEMENTARY REQUIREMENTS
Amend-0001
Amend-0001
SECTION 01 22 00.00 28-MEASUREMENT AND PAYMENT
Amend-0001
SECTION 01 55 10.00 28 - CONTRACTOR WORK, ACCESS AND STORAGE AREAS
Amend-0001

File details come from the government source that posted it.