A.07.24_Amendment_0001.pdf
PDF 53 KB Posted
- Attached to
- Heise-Roberts Levee Rehabilitation Federal contract opportunity
- Solicitation number
- W912EF18B0017
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidOpeningWorksheet.doc | DOC document | |
| BidOpeningWorksheet.doc | DOC document | |
| Amend-0003_Plans_18B0017.pdf | ||
| TechSpec_Amend-0003.pdf | ||
| Amendment_0003.pdf | ||
| Amend-0003_Plans_18B0017.pdf | ||
| Amendment_0002.pdf | ||
| 18B0017-Amend-0001_Plans.pdf | ||
| 18B0017_TechSpec_Amend-0001.pdf | ||
| A.07.20_Site_Visit_Sign_in_Sheet_Attendees.pdf | ||
| A.07.23_18B0017_Final_Solicitation.pdf | ||
| 18B0017_TechSpec.pdf | ||
| 18B0017_Plans.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0001 is to incorporate revisions to the technical specif ications and plans as indicated in the Summary of Changes. The quantities for SUBCLINS 0003AB and 0003AC have also increased on the bid schedule.
The bid opening date has been extended to June 1, 2018 at 1:00 pm.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF18B0017
X 9B. DATED (SEE ITEM 11)
11-Apr-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-May-2018
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
JULIE M. MORRIS
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF18B0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES
Summary of changes for Amend 0001 Heise-Roberts Levee Rehabilitation
1. Revised the following Specifications:
a. SECTION 00 01 15.00 28, LIST OF DRAWINGS
• Updated the LIST OF DRAWINGS Section
b. SECTION 01 11 01.00 28, SUPPLEMENTARY REQUIREMENTS
• Revised the following paragraph:
o 1.10, FIRE CONTROL o 1.11 PROJECT SUPERINTENDENT o 1.15, USE OF RIVER WATER FOR CONSTRUCTION PURPOSES
c. SECTION 01 22 00.00 28, MEASUREMENT AND PAYMENT
• Revised the following paragraphs:
o 1.1, SUBMITTALS o 1.4, MEASURE FOR PAYMENT
d. SECTION 01 35 29.10 28, GOVERNMENT SAFETY REQUIREMENTS o 1.5, SITE QUALIFICATIONS, DUTIES AND MEETINGS
e. SECTION 01 57 20.00 28, ENVIRONMENTAL PROTECTION o 3.4.3, In-Stream Turbidity Control
f. SECTION 35 41 10.61 28 o 2.4, RIPRAP AND QUARRY SPALL MATERIAL SOURCE AND PRODUCT
DATA
See revised specification for details.
2. Revised the following Drawing (See clouded areas).
a. SHEET C-101
b. SHEET C-102
c. SHEET C-104
d. SHEET C-301
e. SHEET C-302
f. SHEET C-303
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 11-May-2018 01:00 PM to 01-Jun-2018 01:00 PM.
The following have been modified:
BID SCHEDULE
Walla Walla District Corps of Engineers Heise-Roberts Levee Rehabilitation
The magnitude of construction is estimated to be between $1,000,000 and $5,000,000
PROJECT IS 100% WOMAN-OWNED SMALL BUSINESS SET-ASIDE
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT
Items
0001 Site 17-1 Nebeker Drain Pipe 0001AA Reuse and Place Existing Riprap 1 JOB XXXXX $________ 0001AB Place Riprap Est 904 TONS $_______ $________ 0001AC Place Quarry Spalls Est 1915 TONS $_______ $________
0002 Site 17-2 Bob Harrop East 0002AA Reuse and Place Existing Riprap 1 JOB XXXXX $________ 0002AB Place Riprap Est 1041 TONS $_______ $________ 0002AC Place Quarry Spalls Est 2540 TONS $_______ $________
0003 Site 17-3 Randy Harmon Property 0003AA Reuse and Place Existing Riprap 1 JOB XXXXX $________ 0003AB Place Riprap Est 1130 TONS $_______ $________ 0003AC Place Quarry Spalls Est 4738 TONS $_______ $________
0004 Site 17-4 Downstream Lorenzo Boat Ramp 0004AA Reuse and Place Existing Riprap 1 JOB XXXXX $________ 0004AB Place Riprap Est 3948 TONS $_______ $________
0005 Site 17-5 Downstream Gasline Crossing 0005AA Reuse and Place Existing Riprap 1 JOB XXXXX $________ 0005AB Place Riprap Est 1272 TONS $_______ $________
0006 Site 17-6 Robinson Location 0006AA Reuse and Place Existing Riprap 1 JOB XXXXX $________ 0006AB Place Riprap Est 582 TONS $_______ $________
0006AC Place Quarry Spalls Est 758 TONS $_______ $________
0007 Site 17-7 Bannock Feeder 0007AA Reuse and Place Existing Riprap 1 JOB XXXXX $________ 0007AB Place Riprap Est 362 TONS $_______ $________ 0007AC Place Quarry Spalls Est 382 TONS $_______ $________
0008 Site 17-8 Pennock Location 0008AA Reuse and Place Existing Riprap 1 JOB XXXXX $________ 0008AB Place Riprap Est 1612 TONS $_______ $________ 0008AC Place Quarry Spalls Est 4612 TONS $_______ $________
SCHEDULE TOTAL $__________
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
Est = Estimated
Quantities identified as Estimated (“Est”) in the bid schedule are subject to FAR Clause 52.211-18, VARIATION IN ESTIMATED QUANTITY, located in Section 00 70 00.
Funds are not presently available for this acquisition. No contract award will be made until funds are made available.
Environmental clearance has not yet been obtained for this project. No contract award will be made until all applicable environmental clearances are obtained.
(End of Summary of Changes)
File details come from the government source that posted it.