A.07.24__17-Q-0004-P0003amendedSOL.pdf
PDF 21 KB Posted
- Attached to
- HLD Scaffolding Erect & Disassemble Federal contract opportunity
- Solicitation number
- W912EF17Q0004
About this file
Amended for final questions and answers and to extend one day, until 2:00 PM PT on Friday, December 9th, 2016.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 17-Q-0004_P0002_site_visit_amendment.pdf | ||
| 17-Q-0004-P00001_Amended_Solicitation.pdf | ||
| 17-Q-0004_Solicitation.pdf | ||
| FIO_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV63019180
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to clarify all questions w ith answ ers and to extend the offer due date until 2:00 PM Friday, December 9, 2016.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Dec-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-17-Q-0004
X 9B. DATED (SEE ITEM 11)
29-Nov-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Dec-2016
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
PATRICIA THOMAS
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-17-Q-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SECOND SET QUESTIONS & ANSWERS
1. What is the tenting envelope/area, i.e. elevations and dimensions?
Answer: Tenting shall cover the scaffolding structure in order to protect against winds coming up the river. Tenting shall also cover the access stairs from the sill to the scaffold.
Clarification: Tenting shall be shrink wrapped.
2. Do we want a single tent that covers the access stairs and the gate?
Answer: No. Two separate tents shall be required, independent of each other. One on the access stairs from the sill to the scaffold and one on the scaffold itself.
3. Do we want 2 sets of access stairs; 1 from the Floating Bulkhead to the sill and 1 from the sill to the gate?
Answer: Yes. There shall be one set of access stairs from the uppermost deck on the Floating Bulkhead (above the valve operators on FIO drawing IHN-1-3-11/2) and one set of access stairs from the sill on El. 321 to the scaffold structure. The gate will be set above the sill approximately 3 to 5 inches.
4. What is the elevation of the bottom of the Roadway Deck/Navigation Lock Bridge?
Answer: The elevation of the bottom of the Roadway Deck/Navigation Lock Bridge is El. 410.
5. Will they need to provide lighting?
Answer: Yes. The Contractor shall supply lighting. Power is available from existing 480V, 30A and 120V, 15A receptacles around deck El. 365 on the riverside and the landside that are available for use. The receptacles are Crouse-Hinds Arktite style.
6. What is the estimated number of safe clearance/LOTO cards and how often will clearance cards need to be removed?
Answer: It is estimated that there will be approximately 35 clearance/LOTO cards required for this effort. The clearance cards will stay in place for the duration of the time that the scaffolding is in place. If the gate requires movement before the scaffolding is disassembled, a temporary lift (and eventual replacement) of the clearance cards will need to be performed. After final scaffolding disassembly, the clearance cards will be permanently removed.
7. Is there a sectional drawing showing the gate, the roadway deck, a tower, and the sill?
Answer: No, but we did find a drawing that shows the dimensions and station locations of the sill plate, the gate blockout and the Floating Bulkhead blockout. Drawing IHN-1-4-2/53 Navigation Lock Lower Sill Block has been added to the FIO drawings.
8. Can the bid opening be extended so that the west side guys have time to generate the bids after driving home today?
W912EF-17-Q-0004
Answer: The offer due date will be extended to Friday, 9 December 2016.
Clarification: A storage area is available for the duration of this contract at approximate El. 365 on the landside/north side of the Navigation Lock. Contractor shall be responsible for security of stored items.
Clarification: Restroom facilities are available at the Navigation Lock Visitor Building, located on the roadway deck on the riverside.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Dec-2016 10:00 AM to 09-Dec-2016 02:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .