This has been amended to provide answers to the questions posed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24__17-Q-0004-P0003amendedSOL.pdf | ||
| 17-Q-0004_P0002_site_visit_amendment.pdf | ||
| 17-Q-0004_Solicitation.pdf | ||
| FIO_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV63019180
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide answ ers to questions that w ere posed.
The solicitation is also extended to December 8, 2016 @ 10:00 AM.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Dec-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-17-Q-0004
X 9B. DATED (SEE ITEM 11)
29-Nov-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Dec-2016
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
PATRICIA THOMAS
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-17-Q-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
Questions and Answers- SCAFFOLDING AT ICE HARBOR DAM
Q1 What is the width of the gate, or desired distance the scaffolding shall be run? Drawings did not have width of gate. Top view dimension is blocked by information only stamp and only shows 7’-7 ¼”.
A1 The width of the gate is 87'7" and we need the top platform to at 60' min.
Q2 Will USACE provide crane service to lower scaffolding into area, or will that be contractor provided?
A2 USACE will provide crane services for unloading and staging of equip.
Q3 Are there any more detailed drawings to show potential anchor points for scaffold on downstream side, or will contractor need to weld some temporary ones of their own?
A3 Anchor points are the ribs of the gate and there will be no welding to the gate allowed.
Q4 Is 60’ the desired reach from scaffold top deck, or is the top deck to be at 60’ in height?
A4 We need the top platform to at 60' min.
Q5 Does it matter if it is system scaffold (tube/clamp) or modular frames?
A5 Type of scaffold doesn’t matter as long as it meets Ind. and OSHA standard.
Q6 Is the height for the single stair tower to be from EL 321’ to EL 365’ as marked in last drawing page?
A6 The stair tower will access the top platform.
Q7 Is the width of the scaffold limited to the width of the Downstream Gate?
Or can the scaffold be extended to the corners of the concrete towers on each side of the Downstream Gate? If so, what is the distance from the corners of the concrete towers?
A7 The gate and the towers are at the same distance, 87'7".
Q8 What is the desired height of the stair tower, needed to access the Downstream Sill Plate from the Floating Bulkhead? I did not see any dimensions on the drawings, showing the distance between the Downstream Sill Plate and Floating Bulkhead.
A8 The stair must reach the top of the highest platform of the scaffold.
Q9 Will there be any anchoring into the dam allowed? With the height of the scaffold, in addition to the requirement of the shrink wrap on the scaffold; the ability to safely secure all scaffold components is critical.
A9 Anchor points are the ribs of the gate and there will be no welding to the gate allowed.
Q10 How close is access/parking for scaffold trucks, in relation to the areas needing the scaffold and the stair tower?
A10 Within 100 yards.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 06-Dec-2016 10:00 AM to 08-Dec-2016 10:00 AM.