16-R-0001_0004.pdf
PDF 69 KB Posted
- Attached to
- Little Goose Adjustable Spillway Weir Federal contract opportunity
- Solicitation number
- W912EF-16-R-0001
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Plans-Amend-0006.pdf | ||
| 16-R-0001_0006.pdf | ||
| TechSpecs-Amend-0006.pdf | ||
| 16-R-0001_0005.pdf | ||
| TechSpecs-Amend-0004.pdf | ||
| Plans_Amend-0004.pdf | ||
| 16-R-0001_0003.pdf | ||
| TechSpecs-Amend-0003.pdf | ||
| Plans_Amend-0003.pdf | ||
| Amend-0002_Plans.pdf | ||
| 16-R-0001_0002.pdf | ||
| TechSpecs-Amend-0002.pdf | ||
| 16-R-0001_0001.doc | DOC document | |
| ENCL_3_Small_Business_Participation_Plan_Form.pdf | ||
| TechSpecs-Amend-0001.pdf | ||
| Site_Visit_Attendance.pdf | ||
| A.03.13_Single_Source_(Allen_Bradley).pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Enclosure_4_Offeror_Experience_Form.pdf | ||
| W912EF-16-R-0001_Plans.pdf | ||
| W912EF-16-R-0001.pdf | ||
| W912EF-16-R-0001TechSpec.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV52599013
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the plans and specifications for this project.
The deadline date for proposals remains the same, June 23rd at 2:00 pm Pacific time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-16-R-0001
X 9B. DATED (SEE ITEM 11)
10-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2016
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
CRISTINA VEGA
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-16-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
Summary of changes for Amend -0004
16-R-0001 Little Goose Adjustable Spillway Weir (ASW)
W912EF-15-R-0001
1. Revised the following Specifications:
a. SECTION 05 59 13.00 28 FABRICATION OF HYDRAULIC STEEL STRUCTURES
Revised the following paragraphs:
1.4 DELIVERY, STORAGE, AND HANDLING
3.1.1 Structural Fabrication
3.1.7 Seals
b. SECTION 22 15 10.00 28 SPILLWAY WEIR COMPRESSED AIR SYSTEM
Revised the following paragraph:
2.7.4 Pressure Regulator
c. SECTION 35 01 42.00 28 SPILLWAY WEIR HOIST SYSTEMS
Revised the following paragraphs:
2.4.1 General
2.4.3 Gearing
2.4.9 Parallel Shaft Reducer
2.5.3.2 Bull Gears
2.6.1 General Requirements
2.17 Fasteners
2. Revised the following drawing. See bracketed areas on drawing for details
MJ401 MECHANICAL – HOIST MACHINERY – GEARS AND MACHINERY DATA
3. Revised the following clause See yellow highlights
SECTION I - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number
Sheet Number
Title
Revision Number
Date
LITTLE GOOSE LOCK AND DAM
ADJUSTABLE SPILLWAY WEIR
GENERAL
LGG-1-0-1/330 G-001 COVER SHEET AND LOCATION MAPS
LGG-1-0-1/331 G-002 INDEX TO DRAWINGS
LGG-1-0-1/390 G-003 INDEX TO DRAWINGS - CONTINUED
LGG-1-0-1/332 G-004 INDEX TO - FOR INFORMATION ONLY -
DRAWINGS
LGG-1-0-1/333 GC101 SITE PLAN
LGG-1-0-1/334 GC102 TSW STORAGE AREA - PLAN AND PHOTOS -
SHEET TITLE LINE 3
LGG-1-0-1/335 GC103 EXISTING SPILLWAY - ASW OPERATION AND
STORAGE - PLAN
LGG-1-0-1/336 GJ101 SPILLWAY - BAY 1 EXISTING CONDITIONS -
PLAN AT ROADWAY DECK
LGG-1-0-1/337 GJ201 EXISTING SPILLWAY - SECTION AT OGEE
LGG-1-0-1/338 GJ901 ASW OPERATION - ISOMETRIC VIEW - CREST
LOWERED - UPSTREAM SIDE
LGG-1-0-1/339 GJ902 ASW OPERATION - ISOMETRIC VIEW - CREST
LOWERED - DOWNSTREAM SIDE
LGG-1-0-1/340 GJ903 ASW OPERATION - ISOMETRIC VIEW - CREST
RAISED - UPSTREAM SIDE
LGG-1-0-1/341 GJ904 ASW OPERATION - ISOMETRIC VIEW - CREST
RAISED - DOWNSTREAM SIDE
LGG-1-0-1/342 GJ905 SPILLWAY BAY 1 - ASW OPERATION - PLAN
AND SECTIONAL PLAN
LGG-1-0-1/343 GJ906 SPILLWAY BAY 1 - ASW OPERATION -
SECTIONS AT CENTERLINE
LGG-1-0-1/344 GJ907 ISOMETRIC VIEW - HOIST ASSEMBLY
LGG-1-0-1/345 GJ908 ASW OPERATION - ISOMETRIC VIEW - WHEEL
TRACKS
LGG-1-0-1/346 GJ909 ISOMETRIC VIEW - CREST ASSEMBLY
LGG-1-0-1/347 GJ910 ISOMETRIC VIEW - TOP STOPLOG
LGG-1-0-1/375 GJ911 ISOMETRIC VIEW - INTERMEDIATE STOPLOG
LGG-1-0-1/376 GJ912 ISOMETRIC VIEW - BASE STOPLOG
LGG-1-0-1/377 GK101 INSTALLATION SEQUENCE - SHEET 1
LGG-1-0-1/378 GK102 INSTALLATION SEQUENCE - SHEET 2
LGG-1-0-1/379 GK103 INSTALLATION SEQUENCE - SHEET 3
STRUCTURAL
LGD-1-5-8/141 SJ001 CREST ASSEMBLY - ISOMETRIC SECTIONS -
AND GENERAL NOTES
LGD-1-5-8/142 SJ101 CREST ASSEMBLY - PLAN AND ELEVATION -
UPSTREAM SIDE
LGD-1-5-8/143 SJ102 CREST ASSEMBLY - PLAN AND ELEVATION -
DOWNSTREAM SIDE
LGD-1-5-8/144 SJ301 CREST ASSEMBLY - FRAMING SECTIONS -
SHEET 1 OF 4
LGD-1-5-8/145 SJ302 CREST ASSEMBLY - FRAMING SECTIONS -
SHEET 2 OF 4
LGD-1-5-8/146 SJ303 CREST ASSEMBLY - FRAMING SECTIONS -
SHEET 3 OF 4
LGD-1-5-8/147 SJ304 CREST ASSEMBLY - FRAMING SECTIONS -
SHEET 4 OF 4
LGD-1-5-8/148 SJ401 CREST ASSEMBLY - FRAMING DETAILS -
SHEET 1 OF 3
LGD-1-5-8/149 SJ402 CREST ASSEMBLY - FRAMING DETAILS -
SHEET 2 OF 2
LGD-1-5-8/150 SJ403 SHEET TITLE LINE 1 - CREST ASSEMBLY -
HANDLING LINK DETAILS
LGD-1-5-8/151 SK001 BASE STOPLOG - ISOMETRIC VIEWS - AND
GENERAL NOTES
LGD-1-5-8/152 SK101 BASE STOPLOG - PLAN AND ELEVATION -
LGD-1-5-8/153 SK102 BASE STOPLOG - PLAN AND ELEVATION -
LGD-1-5-8/154 SK301 BASE STOPLOG - FRAMING SECTIONS -
SHEET 1 OF 2
LGD-1-5-8/155 SK302 BASE STOPLOG - FRAMING SECTIONS -
LGD-1-5-8/156 SK303 BASE STOPLOG - ISOMETRIC VIEWS - END
FRAMING
LGD-1-5-8/157 SK401 BASE STOPLOG - SEAL ASSEMBLIES AND
CREST SEAT - ELEVATION AND SECTION
LGD-1-5-8/158 SK402 BASE STOPLOG - SEAL ASSEMBLIES -
DETAILS 2
LGD-1-5-8/159 SK403 BASE STOPLOG - SEAL ASSEMBLIES -
LGD-1-5-8/160 SL001 INTERMEDIATE STOPLOG - ISOMETRIC
VIEWS - AND GENERAL NOTES
LGD-1-5-8/161 SL101 INTERMEDIATE STOPLOG - PLAN AND
ELEVATION - DOWNSTREAM SIDE
LGD-1-5-8/162 SL102 INTERMEDIATE STOPLOG - PLAN AND
ELEVATION - UPSTREAM SIDE
LGD-1-5-8/163 SL301 INTERMEDIATE STOPLOG - FRAMING
SECTIONS - SHEET 1 OF 2
LGD-1-5-8/164 SL302 INTERMEDIATE STOPLOG - FRAMING
SECTIONS - SHEET 2 OF 2
LGD-1-5-8/165 SL401 INTERMEDIATE STOPLOG - SEAL
ASSEMBLIES - ELEVATIONS AND SECTIONS
LGD-1-5-8/166 SL402 INTERMEDIATE STOPLOG - SEAL
ASSEMBLIES - DETAILS 1
LGD-1-5-8/167 SL403 INTERMEDIATE STOPLOG - SEAL
ASSEMBLIES - DETAILS 2
LGD-1-5-8/168 SM001 TOP STOPLOG - ISOMETRIC VIEWS - AND
LGD-1-5-8/169 SM101 TOP STOPLOG - PLAN AND ELEVATION -
LGD-1-5-8/170 SM102 TOP STOPLOG - PLAN AND ELEVATION -
LGD-1-5-8/171 SM301 TOP STOPLOG - FRAMING SECTIONS - SHEET
LGD-1-5-8/172 SM302 TOP STOPLOG - FRAMING SECTIONS - SHEET
LGD-1-5-8/173 SM401 TOP STOPLOG - SEAL ASSEMBLIES - DETAILS
LGD-1-5-8/174 SM402 TOP STOPLOG - SEAL ASSEMBLIES - DETAILS
LGD-1-5-8/175 SM403 TOP STOPLOG - SEAL ASSEMBLIES - DETAILS
LGD-1-5-8/176 SN001 HOIST ASSEMBLY - ISOMETRIC SECTIONS -
AND GENERAL NOTES
LGD-1-5-8/177 SN101 HOIST ASSEMBLY - PLAN AND ELEVATION -
LGD-1-5-8/178 SN102 HOIST ASSEMBLY - PLAN AND ELEVATION -
LGD-1-5-8/179 SN301 HOIST ASSEMBLY - FRAMING SECTIONS -
SHEET 1 OF 4
LGD-1-5-8/180 SN302 HOIST ASSEMBLY - FRAMING SECTIONS -
SHEET 2 OF 4
LGD-1-5-8/181 SN303 HOIST ASSEMBLY - FRAMING SECTIONS -
SHEET 3 OF 4
LGD-1-5-8/182 SN304 HOIST ASSEMBLY - FRAMING SECTIONS -
SHEET 4 OF 4
LGD-1-5-8/183 SN501 HOIST ASSEMBLY - DETAILS
LGD-1-5-8/184 SS501 ALIGNING PIN, GUIDE BLOCKS - BEARING
SHOE, AND BUMPER BLOCK - SECTIONS AND
DETAILS
LGD-1-5-8/185 SS502 CREST ASSEMBLY - ASSEMBLY
TOLERANCES
LGD-1-5-8/186 SS503 STOPLOGS, WHEEL TRACKS, - AND HOIST
ASSEMBLY GIRDERS - ASSEMBLY
TOLERANCES
LGD-1-5-8/187 SS701 AIR VENT ASSEMBLY - ELEVATION, PLAN
AND DETAILS
LGD-1-5-8/188 ST401 HOIST ASSEMBLY - FLOOR GRATING AND
GUARDRAIL - ARRANGEMENT
LGD-1-5-8/189 ST402 PIER 1 - GUARDRAIL - ARRANGEMENT
LGD-1-5-8/190 ST403 PIER 2 - GUARDRAIL - ARRANGEMENT
LGD-1-5-8/191 ST404 PIER 3 - GUARDRAIL AND HATCH COVER -
ARRANGEMENT
LGD-1-5-8/192 ST405 PIERS 4, 5, 6 & 7 - HATCH COVERS -
LGD-1-5-8/193 ST406 NORTH NON-OVERFLOW MONOLITH -
STORAGE PIT GUARDRAIL - ARRANGEMENT
LGD-1-5-8/194 SV001 NORTH NON-OVERFLOW - CREST ASSEMBLY
STOWED - ISOMETRIC
LGD-1-5-8/195 SV002 SPILLWAY - MAINTENANCE STOPLOG -
STOWED - ISOMETRIC
LGD-1-5-8/196 SV202 SPILLWAY - EXISTING MAINTENANCE
STOPLOG - NEW STORAGE HANGER
LGD-1-5-8/197 SV301 STORAGE STAND - FOR BASE STOPLOG -
LGD-1-5-8/198 SV302 STORAGE STAND - FOR INTERMEDIATE
STOPLOG - SHEET TITLE LINE 3
LGD-1-5-8/199 SV303 STORAGE STAND - FOR TOP STOPLOG -
LGD-1-5-8/200 SV501 STORAGE STANDS - FOR ASW STOPLOGS -
SECTIONS AND DETAILS
LGD-1-5-8/201 SV503 SPILLWAY - EXISTING MAINTENANCE
STOPLOG - STORAGE HANGER - DETAILS
LGD-1-5-8/202 SW001 WHEEL TRACK - ISOMETRIC SECTIONS - AND
LGD-1-5-8/203 SW101 WHEEL TRACK - PLAN AND ELEVATION -
DOWNSTREAM AND SOUTH SIDES
LGD-1-5-8/204 SW102 WHEEL TRACK - PLAN AND ELEVATION -
UPSTREAM AND NORTH SIDES
LGD-1-5-8/205 SW301 WHEEL TRACK - FRAMING SECTIONS -
SHEET 1 OF 2
LGD-1-5-8/206 SW302 WHEEL TRACK - FRAMING SECTIONS -
LGD-1-5-8/207 SW303 WHEEL TRACK - ELEVATIONS - SHEET 1 OF 2
LGD-1-5-8/208 SW304 WHEEL TRACK - ELEVATIONS - SHEET 2 OF 2
LGD-1-5-8/209 SW401 WHEEL TRACK - SEAL ASSEMBLIES -
SECTIONS AND DETAILS
LGD-1-5-8/210 SY001 LIFTING BEAM - ISOMETRIC VIEW
LGD-1-5-8/211 SY101 LIFTING BEAM - PLAN AND ELEVATION -
LGD-1-5-8/212 SY102 LIFTING BEAM - CARRIAGE - PLAN AND
ELEVATIONS
LGD-1-5-8/213 SY301 LIFTING BEAM - FRAMING SECTIONS
LGD-1-5-8/214 SY302 LIFTING BEAM - END FRAMING SECTIONS
LGD-1-5-8/215 SY303 LIFTING BEAM - DOGGING BEAM - ELEVATION
AND SECTIONS
LGD-1-5-8/216 SY401 LIFTING BEAM - CARRIAGE ATTACHMENT -
AND GUIDE - SECTIONS 1
LGD-1-5-8/217 SY501 LIFTING BEAM - CARRIAGE ATTACHMENT &
GUIDE - MISC SECTIONS
LGD-1-5-8/218 SY502 LIFTING BEAM - CARRIAGE ALIGNMENT AND -
COUNTERWEIGHT DETAILS
MECHANICAL
LGD-1-3-8/97 M-101 MECHANICAL - GENERAL MECHANICAL PLAN
LGD-1-3-8/98 MD401 MECHANICAL - SEAL HEATER DEMOLITION -
AND PHOTOS
LGD-1-3-8/99 MJ101 MECHANICAL - HOIST PLAN AND ELEVATION
LGD-1-3-8/100 MJ102 MECHANICAL - HOIST MACHINERY -
ASSEMBLY AND ISOMETRIC
LGD-1-3-8/101 MJ401 MECHANICAL - HOIST MACHINERY - GEARS
AND MACHINERY DATA
A 6-15-16
LGD-1-3-8/102 MJ402 MECHANICAL - HOIST MACHINERY - DRUM
LGD-1-3-8/103 MJ403 MECHANICAL - HOIST MACHINERY - SHEAVE
ASSEMBLY
LGD-1-3-8/104 MJ404 MECHANICAL - HOIST MACHINERY - DRUM
DOGGING LATCH
LGD-1-3-8/105 MJ405 MECHANICAL - HOIST MACHINEY - DRUM
DOG LATCH DETAILS
LGD-1-3-8/106 MJ406 MECHANICAL - HOIST MACHINEY - LIFTING
CLEVIS
LGD-1-3-8/107 MJ407 MECHANICAL - MACHINERY BASES 1
LGD-1-3-8/108 MJ408 MECHANICAL - MACHINERY BASES 2
LGD-1-3-8/109 MJ409 MECHANICAL - MACHINERY BASES 3
LGD-1-3-8/110 MJ410 MECHANICAL - MISC DETAILS
LGD-1-3-8/111 MK101 MECHANICAL - WHEEL ASSEMBLY - CREST
WHEEL ARRANGEMENT
LGD-1-3-8/112 MK401 MECHANICAL - WHEEL ASSEMBLY -
COMPONENTS
LGD-1-3-8/113 MK402 MECHANICAL - DOGGING BEAM ROLLER -
LGD-1-3-8/114 MQ101 MECHANICAL - TRACK DOG ASSSEMBLY -
LGD-1-3-8/115 MQ401 MECHANICAL - TRACK DOG - COMPONENT
DETAILS 1
LGD-1-3-8/116 MQ402 MECHANICAL - TRACK DOG - COMPONENT
LGD-1-3-8/117 MR101 MECHANICAL - PNEUMATIC GATE SEAL - AIR
SYSTEM PLAN AND ELEVATION
LGD-1-3-8/118 MR401 MECHANICAL - PNEUMATIC GATE SEAL -
COMPONENTS
LGD-1-3-8/119 MR402 MECHANICAL - PNEUMATIC GATE SEAL -
SEAL AND RETAINER
LGD-1-3-8/120 MR403 MECHANICAL - PNEUMATIC SEAL SYSTEM -
SCHEMATIC
LGD-1-3-8/121 MT101 MECHANICAL - LIFTING BEAM - PLAN AND
ELEVATION
A 6-8-16
LGD-1-3-8/122 MT401 MECHANICAL - LIFTING BEAM - DETAILS 1
LGD-1-3-8/123 MT402 MECHANICAL - LIFTING BEAM - DETAILS 2
LGD-1-3-8/124 MT403 MECHANICAL - LIFTING BEAM - GUIDE
ROLLERS
ELECTRICAL
LGD-1-6-8/43 E-401 DCQ1 ROOM - DEMOLITION & INSTALLATION
LGD-1-6-8/44 E-402 ELECTRICAL DECK PLAN
LGD-1-6-8/45 E-403 ELECTRICAL PLAN - ELEVATION 651
LGD-1-6-8/46 E-503 SPILLWAY GATE 1 TAINTER GATE - HOIST
MOTOR CONTROL
A 6-3-16
LGD-1-6-8/47 E-601 ELECTRICAL - ONE LINE DIAGRAM -
DEMOLITION & PROPOSED
LGD-1-6-8/48 E-602 MCC - ELEVATION
LGD-1-6-8/49 E-603 ELECTRICAL CONTROL - PNEUMATIC SEAL
SYSTEM - SCHEMATIC
LGD-1-6-8/50 EI501 INSTRUMENTATION & CONTROL - PANEL
LAYOUTS - PROPOSED
LGD-1-6-8/51 EI601 INSTRUMENTATION & CONTROL - ONE LINE
DIAGRAM - PROPOSED
LGD-1-6-8/52 EI602 INSTRUMENTATION & CONTROL - WIRING
LGD-1-6-8/53 EI603 ANNUNCIATION - SCHEMATIC - PROPOSED
LGD-1-6-8/54 EI604 ELECTRIC BRAKE - CONTROL AND WIRING
LGD-1-6-8/55 ES401 FIBER OPTIC ROUTING 1
LGD-1-6-8/56 ES402 FIBER OPTIC ROUTING 2
LGD-1-6-8/57 ES403 FIBER OPTIC ROUTING 3
LGD-1-6-8/58 ES404 FIBER OPTIC ROUTING 4
FOR INFORMATION ONLY (FIO)
The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
LGD-1-4-2/4 I-001 SOUTH, CENTRAL AND NORTH - NON-
OVERFLOW - DECK DRAINAGE AND WATER
STOPS
LGD-1-4-2/5 I-002 CENTRAL NON-OVERFLOW - PLAN AND
LGD-1-4-2/6 I-003 CENTRAL NON-OVERFLOW - ELEVATIONS
LGD-1-4-2/7 I-004 CENTRAL NON-OVERFLOW - SECTIONS
LGD-1-4-2/8 I-005 CENTRAL NON-OVERFLOW - PLAN AND
SECTIONS
LGD-1-4-2/9 I-006 SOUTH AND CENTRAL - NON-OVERFLOW -
DRAINAGE DETAILS
LGD-1-4-2/11 I-007 CENTRAL NON-OVERFLOW -
REINFORCEMENT I
LGD-1-4-2/12.1 I-008 CENTRAL NON-OVERFLOW -
REINFORCEMENT I I I
LGD-1-4-2/12.2 I-009 CENTRAL NON-OVERFLOW -
REINFORCEMENT IV
LGD-1-4-2/12.3 I-010 CENTRAL NON-OVERFLOW -
REINFORCEMENT V
LGD-1-4-2/12.5 I-011 CENTRAL NON-OVERFLOW -
REINFORCEMENT VI I
LGD-1-4-2/12.6 I-012 CENTRAL NON-OVERFLOW -
REINFORCEMENT VI I I
LGD-1-4-2/15 I-013 NORTH NON-OVERFLOW - MONOLITHS 1
AND 2 - ELEVATIONS AND SECTIONS
LGD-1-5-11/3 I-014 NORTH AND CENTRAL - NON-OVERFLOW -
MISCELLANEOUS METALS
LGD-1-4-3/1 I-015 SPILLWAY DAM - GENERAL PLAN
LGD-1-4-3/2 I-016 SPILLWAY DAM - DOWNSTREAM ELEVATION
LGD-1-4-3/3 I-017 SPILLWAY DAM - UPSTREAM ELEVATION
LGD-1-4-3/4 I-018 SPILLWAY DAM - PIER PLAN & SECTIONS
LGD-1-4-3/5 I-019 SPILLWAY DAM - OGEE & STILLING BASIN
SECTION
LGD-1-4-3/8 I-020 SPILLWAY DAM - WATERSTOP DETAILS
LGD-1-4-4/1 I-021 SPILLWAY DAM - PIER ELEVATION -
REINFORCEMENT I
LGD-1-4-4/3 I-022 SPILLWAY DAM - PIER ELEVATION -
REINFORCEMENT I I I
LGD-1-4-4/4 I-023 SPILLWAY DAM - PIER SECTIONS -
REINFORCEMENT IV
LGD-1-4-5/1 I-024 SPILLWAY BRIDGE - CONCRETE OUTLINE
LGD-1-5-8/1 I-025 SPILLWAY GATES - ELEVATION AND
GENERAL - ARRANGEMENT
LGD-1-5-8/2 I-026 SPILLWAY GATES - SECTIONAL PLANS AND
LGD-1-5-8/3 I-027 SPILLWAY GATES - SKIN PLATE AND
MISCELLANEOUS - DETAILS
LGD-1-5-8/4 I-028 SPILLWAY GATES - SEAL DETAILS
LGD-1-5-8/5 I-029 SPILLWAY GATES - TRUNNION ASSEMBLY
LGD-1-5-8/6 I-030 SPILLWAY GATES - TRUNNION YOKE
LGD-1-5-8/7 I-031 SPILLWAY GATES - HEATED SEAL PLATES
LGD-1-5-8/8 I-032 SPILLWAY GATES - ANCHORAGE
LGD-1-5-10/1 I-033 SPILLWAY STOPLOG GUIDES - PLAN,
SECTIONS & DETAILS
LGD-1-5-10/2 I-034 SPILLWAY DAM - PIER HANDRAIL - AND
MISCELLANEOUS DETAILS
LGD-1-5-10/3 I-035 SPILLWAY DAM - STOPLOGS - PLAN,
ELEVATION, SECTIONS & DETAILS
LDG-1-5-10/4 I-036 SPILLWAY DAM - STOPLOG - SECTIONS &
LGD-1-5-10/5 I-037 SPILLWAY DAM - SPILLWAY STOPLOG
LIFTING BEAM - PLAN, SECTIONS
LGD-1-5-10/6 I-038 SPILLWAY DAM - SPILLWAY STOPLOG
LIFTING BEAM - DETAILS
LGF-1-0-6/1 I-040 CENTRAL NON-OVERFLOW - PLAN AND
LGP-1.12-0-0/2 I-041 POWERHOUSE INTAKE DECK - BULKHEAD
SLOTS HANDRAIL - GENERAL PLAN
LGP-8-0-0/21 I-042 POWERHOUSE - LOADING DIAGRAMS -
GENERATOR BAY
LGN-1-5-22/1 I-043 NAVIGATION LOCK - UPPER BRIDGE -
GENERAL - PLAN, ELEVATION AND SECTION
28.02-2 I-044 MUSCLE TRUCK LOADING - (UPSTREAM
BRIDGE)
LGD-1-5-8/113 I-045 TEMPORARY SPILLWAY WEIR - TSW
ASSEMBLY - GENERAL - ARRANGEMENT -
KEY PLANS
LGD-1-5-8/114 I-046 TEMPORARY SPILLWAY WEIR - TSW
ASSEMBLY - GENERAL - TYPICAL
ARRANGEMENT AND NOTES
LGD-1-5-8/115 I-047 TEMPORARY SPILLWAY WEIR - LIFTING
BEAM - PLAN AND DETAILS
LGD-1-5-8/119 I-048 TEMPORARY SPILLWAY WEIR - TYPE 2
STOPLOGS - ASSEMBLY AND SEAL DETAILS
LGD-1-5-8/120 I-049 TEMPORARY SPILLWAY WEIR - TYPE 2
STOPLOGS - PLANS AND ELEVATIONS
LGD-1-5-8/121 I-050 TEMPORARY SPILLWAY WEIR - TYPE 2
STOPLOGS - SECTIONS AND DETAILS
LGD-1-5-8/122 I-051 TEMPORARY SPILLWAY WEIR - TYPE 2
STOPLOGS - PIN AND RECEIVER DETAILS
LGD-1-5-8/123 I-052 TEMPORARY SPILLWAY WEIR - TSW CREST
ASSEMBLY - UPSTREAM ELEVATION
LGD-1-5-8/124 I-053 TEMPORARY SPILLWAY WEIR - TSW CREST
ASSEMBLY - SECTIONAL PLANS A AND B,
LGD-1-5-8/125 I-054 TEMPORARY SPILLWAY WEIR - TSW CREST
ASSEMBLY - SECTIONS C AND D
LGD-1-5-8/126 I-055 TEMPORARY SPILLWAY WEIR - TSW CREST
ASSEMBLY - SECTIONS E-H, DETAIL
LGD-1-5-8/127 I-056 TEMPORARY SPILLWAY WEIR - TSW CREST
ASSEMBLY - SECTIONS J AND K
LGD-1-5-8/128 I-057 TEMPORARY SPILLWAY WEIR - TSW CREST
ASSEMBLY - SIDE ELEVATION AND DETAILS
LGD-1-5-8/129 I-058 TEMPORARY SPILLWAY WEIR - TSW HOLD
DOWN DEVICE - PLAN VIEW
LGD-1-5-8/130 I-059 TEMPORARY SPILLWAY WEIR - TSW HOLD
DOWN DEVICE - SECTIONS AND DETAILS
LGD-1-5-8/131 I-060 TEMPORARY SPILLWAY WEIR - TSW
DOGGING BEAMS - PLAN, ELEVATION AND
SECTIONS
LGD-1-5-8/132 I-061 TEMPORARY SPILLWAY WEIR - TSW
DOGGING BEAM DETAILS
LGD-1-5-8/133 I-062 TEMPORARY SPILLWAY WEIR - TSW AIR
VENTS AND SLOT FILLER - DETAILS
LGD-1-5-8/134 I-063 TEMPORARY SPILLWAY WEIR - CLOSURE
GATE ASSEMBLY - PLAN AND ELEVATION
LGD-1-5-8/135 I-064 TEMPORARY SPILLWAY WEIR - CLOSURE
GATE ASSEMBLY - SECTIONS AND DETAILS 1
LGD-1-5-8/136 I-065 TEMPORARY SPILLWAY WEIR - CLOSURE
GATE ASSEMBLY - SECTIONS AND DETAILS 2
LGD-1-5-8/137 I-066 TEMPORARY SPILLWAY WEIR - CLOSURE
GATE ASSEMBLY - SEAL DETAILS
LGD-1-5-8/138 I-067 TEMPORARY SPILLWAY WEIR - CLOSURE
GATE - STORAGE PLAN
LGD-1-5-8/139 I-068 TEMPORARY SPILLWAY WEIR - CLOSURE
GATE - DOGGING BEAM DETAILS
LGD-1-3-8/81 I-069 TEMPORARY SPILLWAY WEIR - CLOSURE
GATE - GUIDE WHEEL DETAILS 1
LGD-1-3-8/82 I-070 TEMPORARY SPILLWAY WEIR - CLOSURE
GATE - GUIDE WHEEL DETAILS 2
LGD-1-3-8/83 I-071 TEMPORARY SPILLWAY WEIR - TSW AND
CLOSURE GATE LIFTING
LGP-1.34-0/5 I-072 COVERAGE DIAGRAM - ELEVATION
LGP-1.34-0/6 I-073 DECK CLEARANCES
LGP-1.34-0/7 I-074 CRANE ARRANGEMENT - EAST ELEVATION
LGP-1.34-0/8 I-075 CRANE ARRANGEMENT - WEST ELEVATION
LGP-1.34-3-1/1 I-076 EQUIPMENT ARRANGEMENT
LGP-1.34-3-1/2 I-077 TROLLEY PLAN
LGP-1.34-3-1/3 I-078 TROLLEY ELEVATIONS
LGP-1.34-3-1/4 I-079 TROLLEY SECTION
LGP-1-5-0/7 I-080 POWERHOUSE MISCELLANEOUS - METAL
RAIL DETAILS - GENERAL PLAN
LGD-1-6-13/22 I-081 SPILLWAY DAM 480 VOLT CONTROL -
CENTERS DCQ1, DCQ2, DCQ3 AND - DCQ4
ELECTRICAL DIAGRAM
LGD-1-6-13/23 I-082 CONTROL CENTERS DCQ1, DCQ2, - DCQ3,
DCQ4 & POWER CENTER - DSPI
ELEMENTARY DIAGRAM
LGD-1-6-13/25 I-083 SPILLWAY AND NAVIGATION LOCK -
ANNUNCIATION - ELEMENTARY DIAGRAM
GO 1115-DCQ1 I-084 LIST OF MATERIAL FOR - 480 VOLT CONTROL
CENTER - DCQ1
D-31870 I-085 480 VOLT MOTOR CONTROL - CENTERS
DCQ1, DCQ2, DCQ3, DCQ4, - LCQ1 AND LCQ2
D-31979 I-086 480 VOLT MOTOR CONTROL - CENTER DCQ1
D-31983 I-087 ONE LINE & SCHEMATIC DIAGRAM - FOR 480
VOLT MCC - DCQ1, DCQ2, DCQ3 & DCQ4
6591-4-CD I-088 WIRING DIAGRAM - GRAPHIC SWBD SG1 &
SG2 - GENERAL PLAN
LGD-1-6-13/17.4 I-089 SPILLWAY & NON-OVERFLOW DAM - 480
VOLT CONTROL CENTER DCQ1 - WIRING
DIAGRAM
LGP-9-6-13/106 I-090 DAM AND POWERHOUSE - POWER AND
LIGHTING - ONE LINE DIAGRAM
LGP-9-6-13/107 I-091 DAM AND POWERHOUSE - POWER AND
LGP-9-6-13/108 I-092 DAM AND POWERHOUSE - POWER AND
LGP-9-6-13/109 I-093 DAM AND POWERHOUSE - POWER AND
LGP-9-6-13/110 I-094 DAM AND POWERHOUSE - POWER AND
LGP-9-6-13/111 I-095 DAM AND POWERHOUSE - POWER AND
LGP-9-6-13/112 I-096 DAM AND POWERHOUSE - POWER AND
LGD-1-4-2/14 I-097 NORTH NON-OVERFLOW - MONOLITHS 1, 2 &
3 - PLAN AND SECTIONS
LGD-1-4-2/24 I-098 NORTH NON-OVERFLOW - SECTIONS
LGD-1-4-2/20 I-099 NORTH NON-OVERFLOW - MONOLITH 3 -
REINFORCEMENT III
LGD-1-4-2/4 I-100 SOUTH, CENTRAL AND - NORTH NON-
OVERFLOW - DECK DRAINAGE AND WATER
STOPS
LGD-1-4-2/16 I-101 NORTH NON-OVERFLOW - MONOLITH 3 -
ELEVATIONS AND SECTIONS
LGD-1-5-11/3 I-102 NORTH & CENTRAL NON-OVERFLOW -
MISCELLANEOUS METALS
LGD-1-4-2/22 I-103 NORTH & CENTRAL NON-OVERFLOW -
HATCH COVERS AND FRAMES
LGD-1-4-2/23 I-104 NORTH NON-OVERFLOW - MONOLITH 2 -
ELEVATOR BUILDING
60-167-1_R5 I-105 GENERAL ARRANGEMENT
60-167-2_R1 I-106 FLOOR LAYOUT
60-150-1_R3 I-107 GANTRY LEGS
62-131-1_R3 I-108 STRUCTURE ASSEMBLY
33-611-1_R3 I-109 MAIN LOWER BLOCK
33-611-2_R2 I-110 MAIN LOWER BLOCK
33-611-3_R3 I-111 MAIN LOWER BLOCK
LGG-1-0-1/320 I-112 COVER SHEET AND LOCATION MAPS
LGG-1-0-1/321 I-113 INDEX TO DRAWINGS
LGD-1-5-10/8 I-114 UPSTREAM ISOMETRIC
LGD-1-5-10/9 I-115 DOWNSTREAM ISOMETRIC
LGD-1-5-10/10 I-116 ISOMETRIC SECTIONS 1
LGD-1-5-10/11 I-117 ISOMETRIC SECTIONS 2
LGD-1-5-10/12 I-118 PLAN AND ELEVATIONS
LGD-1-5-10/13 I-119 PLAN, SECTIONS, AND DETAILS
LGD-1-5-10/14 I-120 SECTIONS AND DETAILS
LGD-1-5-10/15 I-121 ASSEMBLY AND SEAL DETAILS
(End of clause)
Contract drawings created on CAD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CAD. The Contractor assumes all risks associated in using electronic CAD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CAD drawing. If contract modifications are issued, the associated electronic CAD drawings will not be available to the Contractor. Electronic copies of CAD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .