16-R-0001_0004.pdf

PDF 69 KB Posted

Attached to
Little Goose Adjustable Spillway Weir Federal contract opportunity
Solicitation number
W912EF-16-R-0001
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Little Goose Adjustable Spillway Weir, newest first.
File Type Posted
Plans-Amend-0006.pdf PDF
16-R-0001_0006.pdf PDF
TechSpecs-Amend-0006.pdf PDF
16-R-0001_0005.pdf PDF
TechSpecs-Amend-0004.pdf PDF
Plans_Amend-0004.pdf PDF
16-R-0001_0003.pdf PDF
TechSpecs-Amend-0003.pdf PDF
Plans_Amend-0003.pdf PDF
Amend-0002_Plans.pdf PDF
16-R-0001_0002.pdf PDF
TechSpecs-Amend-0002.pdf PDF
16-R-0001_0001.doc DOC document
ENCL_3_Small_Business_Participation_Plan_Form.pdf PDF
TechSpecs-Amend-0001.pdf PDF
Site_Visit_Attendance.pdf PDF
A.03.13_Single_Source_(Allen_Bradley).pdf PDF
Past_Performance_Questionnaire.pdf PDF
Enclosure_4_Offeror_Experience_Form.pdf PDF
W912EF-16-R-0001_Plans.pdf PDF
W912EF-16-R-0001.pdf PDF
W912EF-16-R-0001TechSpec.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV52599013

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the plans and specifications for this project.

The deadline date for proposals remains the same, June 23rd at 2:00 pm Pacific time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-16-R-0001

X 9B. DATED (SEE ITEM 11)

10-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jun-2016

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

CRISTINA VEGA

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-16-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

Summary of changes for Amend -0004

16-R-0001 Little Goose Adjustable Spillway Weir (ASW)

W912EF-15-R-0001

1. Revised the following Specifications:

a. SECTION 05 59 13.00 28 FABRICATION OF HYDRAULIC STEEL STRUCTURES

Revised the following paragraphs:

1.4 DELIVERY, STORAGE, AND HANDLING

3.1.1 Structural Fabrication

3.1.7 Seals

b. SECTION 22 15 10.00 28 SPILLWAY WEIR COMPRESSED AIR SYSTEM

Revised the following paragraph:

2.7.4 Pressure Regulator

c. SECTION 35 01 42.00 28 SPILLWAY WEIR HOIST SYSTEMS

Revised the following paragraphs:

2.4.1 General

2.4.3 Gearing

2.4.9 Parallel Shaft Reducer

2.5.3.2 Bull Gears

2.6.1 General Requirements

2.17 Fasteners

2. Revised the following drawing. See bracketed areas on drawing for details

MJ401 MECHANICAL – HOIST MACHINERY – GEARS AND MACHINERY DATA

3. Revised the following clause See yellow highlights

SECTION I - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Drawing Number

Sheet Number

Title

Revision Number

Date

LITTLE GOOSE LOCK AND DAM

ADJUSTABLE SPILLWAY WEIR

GENERAL

LGG-1-0-1/330 G-001 COVER SHEET AND LOCATION MAPS

LGG-1-0-1/331 G-002 INDEX TO DRAWINGS

LGG-1-0-1/390 G-003 INDEX TO DRAWINGS - CONTINUED

LGG-1-0-1/332 G-004 INDEX TO - FOR INFORMATION ONLY -

DRAWINGS

LGG-1-0-1/333 GC101 SITE PLAN

LGG-1-0-1/334 GC102 TSW STORAGE AREA - PLAN AND PHOTOS -

SHEET TITLE LINE 3

LGG-1-0-1/335 GC103 EXISTING SPILLWAY - ASW OPERATION AND

STORAGE - PLAN

LGG-1-0-1/336 GJ101 SPILLWAY - BAY 1 EXISTING CONDITIONS -

PLAN AT ROADWAY DECK

LGG-1-0-1/337 GJ201 EXISTING SPILLWAY - SECTION AT OGEE

LGG-1-0-1/338 GJ901 ASW OPERATION - ISOMETRIC VIEW - CREST

LOWERED - UPSTREAM SIDE

LGG-1-0-1/339 GJ902 ASW OPERATION - ISOMETRIC VIEW - CREST

LOWERED - DOWNSTREAM SIDE

LGG-1-0-1/340 GJ903 ASW OPERATION - ISOMETRIC VIEW - CREST

RAISED - UPSTREAM SIDE

LGG-1-0-1/341 GJ904 ASW OPERATION - ISOMETRIC VIEW - CREST

RAISED - DOWNSTREAM SIDE

LGG-1-0-1/342 GJ905 SPILLWAY BAY 1 - ASW OPERATION - PLAN

AND SECTIONAL PLAN

LGG-1-0-1/343 GJ906 SPILLWAY BAY 1 - ASW OPERATION -

SECTIONS AT CENTERLINE

LGG-1-0-1/344 GJ907 ISOMETRIC VIEW - HOIST ASSEMBLY

LGG-1-0-1/345 GJ908 ASW OPERATION - ISOMETRIC VIEW - WHEEL

TRACKS

LGG-1-0-1/346 GJ909 ISOMETRIC VIEW - CREST ASSEMBLY

LGG-1-0-1/347 GJ910 ISOMETRIC VIEW - TOP STOPLOG

LGG-1-0-1/375 GJ911 ISOMETRIC VIEW - INTERMEDIATE STOPLOG

LGG-1-0-1/376 GJ912 ISOMETRIC VIEW - BASE STOPLOG

LGG-1-0-1/377 GK101 INSTALLATION SEQUENCE - SHEET 1

LGG-1-0-1/378 GK102 INSTALLATION SEQUENCE - SHEET 2

LGG-1-0-1/379 GK103 INSTALLATION SEQUENCE - SHEET 3

STRUCTURAL

LGD-1-5-8/141 SJ001 CREST ASSEMBLY - ISOMETRIC SECTIONS -

AND GENERAL NOTES

LGD-1-5-8/142 SJ101 CREST ASSEMBLY - PLAN AND ELEVATION -

UPSTREAM SIDE

LGD-1-5-8/143 SJ102 CREST ASSEMBLY - PLAN AND ELEVATION -

DOWNSTREAM SIDE

LGD-1-5-8/144 SJ301 CREST ASSEMBLY - FRAMING SECTIONS -

SHEET 1 OF 4

LGD-1-5-8/145 SJ302 CREST ASSEMBLY - FRAMING SECTIONS -

SHEET 2 OF 4

LGD-1-5-8/146 SJ303 CREST ASSEMBLY - FRAMING SECTIONS -

SHEET 3 OF 4

LGD-1-5-8/147 SJ304 CREST ASSEMBLY - FRAMING SECTIONS -

SHEET 4 OF 4

LGD-1-5-8/148 SJ401 CREST ASSEMBLY - FRAMING DETAILS -

SHEET 1 OF 3

LGD-1-5-8/149 SJ402 CREST ASSEMBLY - FRAMING DETAILS -

SHEET 2 OF 2

LGD-1-5-8/150 SJ403 SHEET TITLE LINE 1 - CREST ASSEMBLY -

HANDLING LINK DETAILS

LGD-1-5-8/151 SK001 BASE STOPLOG - ISOMETRIC VIEWS - AND

GENERAL NOTES

LGD-1-5-8/152 SK101 BASE STOPLOG - PLAN AND ELEVATION -

LGD-1-5-8/153 SK102 BASE STOPLOG - PLAN AND ELEVATION -

LGD-1-5-8/154 SK301 BASE STOPLOG - FRAMING SECTIONS -

SHEET 1 OF 2

LGD-1-5-8/155 SK302 BASE STOPLOG - FRAMING SECTIONS -

LGD-1-5-8/156 SK303 BASE STOPLOG - ISOMETRIC VIEWS - END

FRAMING

LGD-1-5-8/157 SK401 BASE STOPLOG - SEAL ASSEMBLIES AND

CREST SEAT - ELEVATION AND SECTION

LGD-1-5-8/158 SK402 BASE STOPLOG - SEAL ASSEMBLIES -

DETAILS 2

LGD-1-5-8/159 SK403 BASE STOPLOG - SEAL ASSEMBLIES -

LGD-1-5-8/160 SL001 INTERMEDIATE STOPLOG - ISOMETRIC

VIEWS - AND GENERAL NOTES

LGD-1-5-8/161 SL101 INTERMEDIATE STOPLOG - PLAN AND

ELEVATION - DOWNSTREAM SIDE

LGD-1-5-8/162 SL102 INTERMEDIATE STOPLOG - PLAN AND

ELEVATION - UPSTREAM SIDE

LGD-1-5-8/163 SL301 INTERMEDIATE STOPLOG - FRAMING

SECTIONS - SHEET 1 OF 2

LGD-1-5-8/164 SL302 INTERMEDIATE STOPLOG - FRAMING

SECTIONS - SHEET 2 OF 2

LGD-1-5-8/165 SL401 INTERMEDIATE STOPLOG - SEAL

ASSEMBLIES - ELEVATIONS AND SECTIONS

LGD-1-5-8/166 SL402 INTERMEDIATE STOPLOG - SEAL

ASSEMBLIES - DETAILS 1

LGD-1-5-8/167 SL403 INTERMEDIATE STOPLOG - SEAL

ASSEMBLIES - DETAILS 2

LGD-1-5-8/168 SM001 TOP STOPLOG - ISOMETRIC VIEWS - AND

LGD-1-5-8/169 SM101 TOP STOPLOG - PLAN AND ELEVATION -

LGD-1-5-8/170 SM102 TOP STOPLOG - PLAN AND ELEVATION -

LGD-1-5-8/171 SM301 TOP STOPLOG - FRAMING SECTIONS - SHEET

LGD-1-5-8/172 SM302 TOP STOPLOG - FRAMING SECTIONS - SHEET

LGD-1-5-8/173 SM401 TOP STOPLOG - SEAL ASSEMBLIES - DETAILS

LGD-1-5-8/174 SM402 TOP STOPLOG - SEAL ASSEMBLIES - DETAILS

LGD-1-5-8/175 SM403 TOP STOPLOG - SEAL ASSEMBLIES - DETAILS

LGD-1-5-8/176 SN001 HOIST ASSEMBLY - ISOMETRIC SECTIONS -

AND GENERAL NOTES

LGD-1-5-8/177 SN101 HOIST ASSEMBLY - PLAN AND ELEVATION -

LGD-1-5-8/178 SN102 HOIST ASSEMBLY - PLAN AND ELEVATION -

LGD-1-5-8/179 SN301 HOIST ASSEMBLY - FRAMING SECTIONS -

SHEET 1 OF 4

LGD-1-5-8/180 SN302 HOIST ASSEMBLY - FRAMING SECTIONS -

SHEET 2 OF 4

LGD-1-5-8/181 SN303 HOIST ASSEMBLY - FRAMING SECTIONS -

SHEET 3 OF 4

LGD-1-5-8/182 SN304 HOIST ASSEMBLY - FRAMING SECTIONS -

SHEET 4 OF 4

LGD-1-5-8/183 SN501 HOIST ASSEMBLY - DETAILS

LGD-1-5-8/184 SS501 ALIGNING PIN, GUIDE BLOCKS - BEARING

SHOE, AND BUMPER BLOCK - SECTIONS AND

DETAILS

LGD-1-5-8/185 SS502 CREST ASSEMBLY - ASSEMBLY

TOLERANCES

LGD-1-5-8/186 SS503 STOPLOGS, WHEEL TRACKS, - AND HOIST

ASSEMBLY GIRDERS - ASSEMBLY

TOLERANCES

LGD-1-5-8/187 SS701 AIR VENT ASSEMBLY - ELEVATION, PLAN

AND DETAILS

LGD-1-5-8/188 ST401 HOIST ASSEMBLY - FLOOR GRATING AND

GUARDRAIL - ARRANGEMENT

LGD-1-5-8/189 ST402 PIER 1 - GUARDRAIL - ARRANGEMENT

LGD-1-5-8/190 ST403 PIER 2 - GUARDRAIL - ARRANGEMENT

LGD-1-5-8/191 ST404 PIER 3 - GUARDRAIL AND HATCH COVER -

ARRANGEMENT

LGD-1-5-8/192 ST405 PIERS 4, 5, 6 & 7 - HATCH COVERS -

LGD-1-5-8/193 ST406 NORTH NON-OVERFLOW MONOLITH -

STORAGE PIT GUARDRAIL - ARRANGEMENT

LGD-1-5-8/194 SV001 NORTH NON-OVERFLOW - CREST ASSEMBLY

STOWED - ISOMETRIC

LGD-1-5-8/195 SV002 SPILLWAY - MAINTENANCE STOPLOG -

STOWED - ISOMETRIC

LGD-1-5-8/196 SV202 SPILLWAY - EXISTING MAINTENANCE

STOPLOG - NEW STORAGE HANGER

LGD-1-5-8/197 SV301 STORAGE STAND - FOR BASE STOPLOG -

LGD-1-5-8/198 SV302 STORAGE STAND - FOR INTERMEDIATE

STOPLOG - SHEET TITLE LINE 3

LGD-1-5-8/199 SV303 STORAGE STAND - FOR TOP STOPLOG -

LGD-1-5-8/200 SV501 STORAGE STANDS - FOR ASW STOPLOGS -

SECTIONS AND DETAILS

LGD-1-5-8/201 SV503 SPILLWAY - EXISTING MAINTENANCE

STOPLOG - STORAGE HANGER - DETAILS

LGD-1-5-8/202 SW001 WHEEL TRACK - ISOMETRIC SECTIONS - AND

LGD-1-5-8/203 SW101 WHEEL TRACK - PLAN AND ELEVATION -

DOWNSTREAM AND SOUTH SIDES

LGD-1-5-8/204 SW102 WHEEL TRACK - PLAN AND ELEVATION -

UPSTREAM AND NORTH SIDES

LGD-1-5-8/205 SW301 WHEEL TRACK - FRAMING SECTIONS -

SHEET 1 OF 2

LGD-1-5-8/206 SW302 WHEEL TRACK - FRAMING SECTIONS -

LGD-1-5-8/207 SW303 WHEEL TRACK - ELEVATIONS - SHEET 1 OF 2

LGD-1-5-8/208 SW304 WHEEL TRACK - ELEVATIONS - SHEET 2 OF 2

LGD-1-5-8/209 SW401 WHEEL TRACK - SEAL ASSEMBLIES -

SECTIONS AND DETAILS

LGD-1-5-8/210 SY001 LIFTING BEAM - ISOMETRIC VIEW

LGD-1-5-8/211 SY101 LIFTING BEAM - PLAN AND ELEVATION -

LGD-1-5-8/212 SY102 LIFTING BEAM - CARRIAGE - PLAN AND

ELEVATIONS

LGD-1-5-8/213 SY301 LIFTING BEAM - FRAMING SECTIONS

LGD-1-5-8/214 SY302 LIFTING BEAM - END FRAMING SECTIONS

LGD-1-5-8/215 SY303 LIFTING BEAM - DOGGING BEAM - ELEVATION

AND SECTIONS

LGD-1-5-8/216 SY401 LIFTING BEAM - CARRIAGE ATTACHMENT -

AND GUIDE - SECTIONS 1

LGD-1-5-8/217 SY501 LIFTING BEAM - CARRIAGE ATTACHMENT &

GUIDE - MISC SECTIONS

LGD-1-5-8/218 SY502 LIFTING BEAM - CARRIAGE ALIGNMENT AND -

COUNTERWEIGHT DETAILS

MECHANICAL

LGD-1-3-8/97 M-101 MECHANICAL - GENERAL MECHANICAL PLAN

LGD-1-3-8/98 MD401 MECHANICAL - SEAL HEATER DEMOLITION -

AND PHOTOS

LGD-1-3-8/99 MJ101 MECHANICAL - HOIST PLAN AND ELEVATION

LGD-1-3-8/100 MJ102 MECHANICAL - HOIST MACHINERY -

ASSEMBLY AND ISOMETRIC

LGD-1-3-8/101 MJ401 MECHANICAL - HOIST MACHINERY - GEARS

AND MACHINERY DATA

A 6-15-16

LGD-1-3-8/102 MJ402 MECHANICAL - HOIST MACHINERY - DRUM

LGD-1-3-8/103 MJ403 MECHANICAL - HOIST MACHINERY - SHEAVE

ASSEMBLY

LGD-1-3-8/104 MJ404 MECHANICAL - HOIST MACHINERY - DRUM

DOGGING LATCH

LGD-1-3-8/105 MJ405 MECHANICAL - HOIST MACHINEY - DRUM

DOG LATCH DETAILS

LGD-1-3-8/106 MJ406 MECHANICAL - HOIST MACHINEY - LIFTING

CLEVIS

LGD-1-3-8/107 MJ407 MECHANICAL - MACHINERY BASES 1

LGD-1-3-8/108 MJ408 MECHANICAL - MACHINERY BASES 2

LGD-1-3-8/109 MJ409 MECHANICAL - MACHINERY BASES 3

LGD-1-3-8/110 MJ410 MECHANICAL - MISC DETAILS

LGD-1-3-8/111 MK101 MECHANICAL - WHEEL ASSEMBLY - CREST

WHEEL ARRANGEMENT

LGD-1-3-8/112 MK401 MECHANICAL - WHEEL ASSEMBLY -

COMPONENTS

LGD-1-3-8/113 MK402 MECHANICAL - DOGGING BEAM ROLLER -

LGD-1-3-8/114 MQ101 MECHANICAL - TRACK DOG ASSSEMBLY -

LGD-1-3-8/115 MQ401 MECHANICAL - TRACK DOG - COMPONENT

DETAILS 1

LGD-1-3-8/116 MQ402 MECHANICAL - TRACK DOG - COMPONENT

LGD-1-3-8/117 MR101 MECHANICAL - PNEUMATIC GATE SEAL - AIR

SYSTEM PLAN AND ELEVATION

LGD-1-3-8/118 MR401 MECHANICAL - PNEUMATIC GATE SEAL -

COMPONENTS

LGD-1-3-8/119 MR402 MECHANICAL - PNEUMATIC GATE SEAL -

SEAL AND RETAINER

LGD-1-3-8/120 MR403 MECHANICAL - PNEUMATIC SEAL SYSTEM -

SCHEMATIC

LGD-1-3-8/121 MT101 MECHANICAL - LIFTING BEAM - PLAN AND

ELEVATION

A 6-8-16

LGD-1-3-8/122 MT401 MECHANICAL - LIFTING BEAM - DETAILS 1

LGD-1-3-8/123 MT402 MECHANICAL - LIFTING BEAM - DETAILS 2

LGD-1-3-8/124 MT403 MECHANICAL - LIFTING BEAM - GUIDE

ROLLERS

ELECTRICAL

LGD-1-6-8/43 E-401 DCQ1 ROOM - DEMOLITION & INSTALLATION

LGD-1-6-8/44 E-402 ELECTRICAL DECK PLAN

LGD-1-6-8/45 E-403 ELECTRICAL PLAN - ELEVATION 651

LGD-1-6-8/46 E-503 SPILLWAY GATE 1 TAINTER GATE - HOIST

MOTOR CONTROL

A 6-3-16

LGD-1-6-8/47 E-601 ELECTRICAL - ONE LINE DIAGRAM -

DEMOLITION & PROPOSED

LGD-1-6-8/48 E-602 MCC - ELEVATION

LGD-1-6-8/49 E-603 ELECTRICAL CONTROL - PNEUMATIC SEAL

SYSTEM - SCHEMATIC

LGD-1-6-8/50 EI501 INSTRUMENTATION & CONTROL - PANEL

LAYOUTS - PROPOSED

LGD-1-6-8/51 EI601 INSTRUMENTATION & CONTROL - ONE LINE

DIAGRAM - PROPOSED

LGD-1-6-8/52 EI602 INSTRUMENTATION & CONTROL - WIRING

LGD-1-6-8/53 EI603 ANNUNCIATION - SCHEMATIC - PROPOSED

LGD-1-6-8/54 EI604 ELECTRIC BRAKE - CONTROL AND WIRING

LGD-1-6-8/55 ES401 FIBER OPTIC ROUTING 1

LGD-1-6-8/56 ES402 FIBER OPTIC ROUTING 2

LGD-1-6-8/57 ES403 FIBER OPTIC ROUTING 3

LGD-1-6-8/58 ES404 FIBER OPTIC ROUTING 4

FOR INFORMATION ONLY (FIO)

The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.

LGD-1-4-2/4 I-001 SOUTH, CENTRAL AND NORTH - NON-

OVERFLOW - DECK DRAINAGE AND WATER

STOPS

LGD-1-4-2/5 I-002 CENTRAL NON-OVERFLOW - PLAN AND

LGD-1-4-2/6 I-003 CENTRAL NON-OVERFLOW - ELEVATIONS

LGD-1-4-2/7 I-004 CENTRAL NON-OVERFLOW - SECTIONS

LGD-1-4-2/8 I-005 CENTRAL NON-OVERFLOW - PLAN AND

SECTIONS

LGD-1-4-2/9 I-006 SOUTH AND CENTRAL - NON-OVERFLOW -

DRAINAGE DETAILS

LGD-1-4-2/11 I-007 CENTRAL NON-OVERFLOW -

REINFORCEMENT I

LGD-1-4-2/12.1 I-008 CENTRAL NON-OVERFLOW -

REINFORCEMENT I I I

LGD-1-4-2/12.2 I-009 CENTRAL NON-OVERFLOW -

REINFORCEMENT IV

LGD-1-4-2/12.3 I-010 CENTRAL NON-OVERFLOW -

REINFORCEMENT V

LGD-1-4-2/12.5 I-011 CENTRAL NON-OVERFLOW -

REINFORCEMENT VI I

LGD-1-4-2/12.6 I-012 CENTRAL NON-OVERFLOW -

REINFORCEMENT VI I I

LGD-1-4-2/15 I-013 NORTH NON-OVERFLOW - MONOLITHS 1

AND 2 - ELEVATIONS AND SECTIONS

LGD-1-5-11/3 I-014 NORTH AND CENTRAL - NON-OVERFLOW -

MISCELLANEOUS METALS

LGD-1-4-3/1 I-015 SPILLWAY DAM - GENERAL PLAN

LGD-1-4-3/2 I-016 SPILLWAY DAM - DOWNSTREAM ELEVATION

LGD-1-4-3/3 I-017 SPILLWAY DAM - UPSTREAM ELEVATION

LGD-1-4-3/4 I-018 SPILLWAY DAM - PIER PLAN & SECTIONS

LGD-1-4-3/5 I-019 SPILLWAY DAM - OGEE & STILLING BASIN

SECTION

LGD-1-4-3/8 I-020 SPILLWAY DAM - WATERSTOP DETAILS

LGD-1-4-4/1 I-021 SPILLWAY DAM - PIER ELEVATION -

REINFORCEMENT I

LGD-1-4-4/3 I-022 SPILLWAY DAM - PIER ELEVATION -

REINFORCEMENT I I I

LGD-1-4-4/4 I-023 SPILLWAY DAM - PIER SECTIONS -

REINFORCEMENT IV

LGD-1-4-5/1 I-024 SPILLWAY BRIDGE - CONCRETE OUTLINE

LGD-1-5-8/1 I-025 SPILLWAY GATES - ELEVATION AND

GENERAL - ARRANGEMENT

LGD-1-5-8/2 I-026 SPILLWAY GATES - SECTIONAL PLANS AND

LGD-1-5-8/3 I-027 SPILLWAY GATES - SKIN PLATE AND

MISCELLANEOUS - DETAILS

LGD-1-5-8/4 I-028 SPILLWAY GATES - SEAL DETAILS

LGD-1-5-8/5 I-029 SPILLWAY GATES - TRUNNION ASSEMBLY

LGD-1-5-8/6 I-030 SPILLWAY GATES - TRUNNION YOKE

LGD-1-5-8/7 I-031 SPILLWAY GATES - HEATED SEAL PLATES

LGD-1-5-8/8 I-032 SPILLWAY GATES - ANCHORAGE

LGD-1-5-10/1 I-033 SPILLWAY STOPLOG GUIDES - PLAN,

SECTIONS & DETAILS

LGD-1-5-10/2 I-034 SPILLWAY DAM - PIER HANDRAIL - AND

MISCELLANEOUS DETAILS

LGD-1-5-10/3 I-035 SPILLWAY DAM - STOPLOGS - PLAN,

ELEVATION, SECTIONS & DETAILS

LDG-1-5-10/4 I-036 SPILLWAY DAM - STOPLOG - SECTIONS &

LGD-1-5-10/5 I-037 SPILLWAY DAM - SPILLWAY STOPLOG

LIFTING BEAM - PLAN, SECTIONS

LGD-1-5-10/6 I-038 SPILLWAY DAM - SPILLWAY STOPLOG

LIFTING BEAM - DETAILS

LGF-1-0-6/1 I-040 CENTRAL NON-OVERFLOW - PLAN AND

LGP-1.12-0-0/2 I-041 POWERHOUSE INTAKE DECK - BULKHEAD

SLOTS HANDRAIL - GENERAL PLAN

LGP-8-0-0/21 I-042 POWERHOUSE - LOADING DIAGRAMS -

GENERATOR BAY

LGN-1-5-22/1 I-043 NAVIGATION LOCK - UPPER BRIDGE -

GENERAL - PLAN, ELEVATION AND SECTION

28.02-2 I-044 MUSCLE TRUCK LOADING - (UPSTREAM

BRIDGE)

LGD-1-5-8/113 I-045 TEMPORARY SPILLWAY WEIR - TSW

ASSEMBLY - GENERAL - ARRANGEMENT -

KEY PLANS

LGD-1-5-8/114 I-046 TEMPORARY SPILLWAY WEIR - TSW

ASSEMBLY - GENERAL - TYPICAL

ARRANGEMENT AND NOTES

LGD-1-5-8/115 I-047 TEMPORARY SPILLWAY WEIR - LIFTING

BEAM - PLAN AND DETAILS

LGD-1-5-8/119 I-048 TEMPORARY SPILLWAY WEIR - TYPE 2

STOPLOGS - ASSEMBLY AND SEAL DETAILS

LGD-1-5-8/120 I-049 TEMPORARY SPILLWAY WEIR - TYPE 2

STOPLOGS - PLANS AND ELEVATIONS

LGD-1-5-8/121 I-050 TEMPORARY SPILLWAY WEIR - TYPE 2

STOPLOGS - SECTIONS AND DETAILS

LGD-1-5-8/122 I-051 TEMPORARY SPILLWAY WEIR - TYPE 2

STOPLOGS - PIN AND RECEIVER DETAILS

LGD-1-5-8/123 I-052 TEMPORARY SPILLWAY WEIR - TSW CREST

ASSEMBLY - UPSTREAM ELEVATION

LGD-1-5-8/124 I-053 TEMPORARY SPILLWAY WEIR - TSW CREST

ASSEMBLY - SECTIONAL PLANS A AND B,

LGD-1-5-8/125 I-054 TEMPORARY SPILLWAY WEIR - TSW CREST

ASSEMBLY - SECTIONS C AND D

LGD-1-5-8/126 I-055 TEMPORARY SPILLWAY WEIR - TSW CREST

ASSEMBLY - SECTIONS E-H, DETAIL

LGD-1-5-8/127 I-056 TEMPORARY SPILLWAY WEIR - TSW CREST

ASSEMBLY - SECTIONS J AND K

LGD-1-5-8/128 I-057 TEMPORARY SPILLWAY WEIR - TSW CREST

ASSEMBLY - SIDE ELEVATION AND DETAILS

LGD-1-5-8/129 I-058 TEMPORARY SPILLWAY WEIR - TSW HOLD

DOWN DEVICE - PLAN VIEW

LGD-1-5-8/130 I-059 TEMPORARY SPILLWAY WEIR - TSW HOLD

DOWN DEVICE - SECTIONS AND DETAILS

LGD-1-5-8/131 I-060 TEMPORARY SPILLWAY WEIR - TSW

DOGGING BEAMS - PLAN, ELEVATION AND

SECTIONS

LGD-1-5-8/132 I-061 TEMPORARY SPILLWAY WEIR - TSW

DOGGING BEAM DETAILS

LGD-1-5-8/133 I-062 TEMPORARY SPILLWAY WEIR - TSW AIR

VENTS AND SLOT FILLER - DETAILS

LGD-1-5-8/134 I-063 TEMPORARY SPILLWAY WEIR - CLOSURE

GATE ASSEMBLY - PLAN AND ELEVATION

LGD-1-5-8/135 I-064 TEMPORARY SPILLWAY WEIR - CLOSURE

GATE ASSEMBLY - SECTIONS AND DETAILS 1

LGD-1-5-8/136 I-065 TEMPORARY SPILLWAY WEIR - CLOSURE

GATE ASSEMBLY - SECTIONS AND DETAILS 2

LGD-1-5-8/137 I-066 TEMPORARY SPILLWAY WEIR - CLOSURE

GATE ASSEMBLY - SEAL DETAILS

LGD-1-5-8/138 I-067 TEMPORARY SPILLWAY WEIR - CLOSURE

GATE - STORAGE PLAN

LGD-1-5-8/139 I-068 TEMPORARY SPILLWAY WEIR - CLOSURE

GATE - DOGGING BEAM DETAILS

LGD-1-3-8/81 I-069 TEMPORARY SPILLWAY WEIR - CLOSURE

GATE - GUIDE WHEEL DETAILS 1

LGD-1-3-8/82 I-070 TEMPORARY SPILLWAY WEIR - CLOSURE

GATE - GUIDE WHEEL DETAILS 2

LGD-1-3-8/83 I-071 TEMPORARY SPILLWAY WEIR - TSW AND

CLOSURE GATE LIFTING

LGP-1.34-0/5 I-072 COVERAGE DIAGRAM - ELEVATION

LGP-1.34-0/6 I-073 DECK CLEARANCES

LGP-1.34-0/7 I-074 CRANE ARRANGEMENT - EAST ELEVATION

LGP-1.34-0/8 I-075 CRANE ARRANGEMENT - WEST ELEVATION

LGP-1.34-3-1/1 I-076 EQUIPMENT ARRANGEMENT

LGP-1.34-3-1/2 I-077 TROLLEY PLAN

LGP-1.34-3-1/3 I-078 TROLLEY ELEVATIONS

LGP-1.34-3-1/4 I-079 TROLLEY SECTION

LGP-1-5-0/7 I-080 POWERHOUSE MISCELLANEOUS - METAL

RAIL DETAILS - GENERAL PLAN

LGD-1-6-13/22 I-081 SPILLWAY DAM 480 VOLT CONTROL -

CENTERS DCQ1, DCQ2, DCQ3 AND - DCQ4

ELECTRICAL DIAGRAM

LGD-1-6-13/23 I-082 CONTROL CENTERS DCQ1, DCQ2, - DCQ3,

DCQ4 & POWER CENTER - DSPI

ELEMENTARY DIAGRAM

LGD-1-6-13/25 I-083 SPILLWAY AND NAVIGATION LOCK -

ANNUNCIATION - ELEMENTARY DIAGRAM

GO 1115-DCQ1 I-084 LIST OF MATERIAL FOR - 480 VOLT CONTROL

CENTER - DCQ1

D-31870 I-085 480 VOLT MOTOR CONTROL - CENTERS

DCQ1, DCQ2, DCQ3, DCQ4, - LCQ1 AND LCQ2

D-31979 I-086 480 VOLT MOTOR CONTROL - CENTER DCQ1

D-31983 I-087 ONE LINE & SCHEMATIC DIAGRAM - FOR 480

VOLT MCC - DCQ1, DCQ2, DCQ3 & DCQ4

6591-4-CD I-088 WIRING DIAGRAM - GRAPHIC SWBD SG1 &

SG2 - GENERAL PLAN

LGD-1-6-13/17.4 I-089 SPILLWAY & NON-OVERFLOW DAM - 480

VOLT CONTROL CENTER DCQ1 - WIRING

DIAGRAM

LGP-9-6-13/106 I-090 DAM AND POWERHOUSE - POWER AND

LIGHTING - ONE LINE DIAGRAM

LGP-9-6-13/107 I-091 DAM AND POWERHOUSE - POWER AND

LGP-9-6-13/108 I-092 DAM AND POWERHOUSE - POWER AND

LGP-9-6-13/109 I-093 DAM AND POWERHOUSE - POWER AND

LGP-9-6-13/110 I-094 DAM AND POWERHOUSE - POWER AND

LGP-9-6-13/111 I-095 DAM AND POWERHOUSE - POWER AND

LGP-9-6-13/112 I-096 DAM AND POWERHOUSE - POWER AND

LGD-1-4-2/14 I-097 NORTH NON-OVERFLOW - MONOLITHS 1, 2 &

3 - PLAN AND SECTIONS

LGD-1-4-2/24 I-098 NORTH NON-OVERFLOW - SECTIONS

LGD-1-4-2/20 I-099 NORTH NON-OVERFLOW - MONOLITH 3 -

REINFORCEMENT III

LGD-1-4-2/4 I-100 SOUTH, CENTRAL AND - NORTH NON-

OVERFLOW - DECK DRAINAGE AND WATER

STOPS

LGD-1-4-2/16 I-101 NORTH NON-OVERFLOW - MONOLITH 3 -

ELEVATIONS AND SECTIONS

LGD-1-5-11/3 I-102 NORTH & CENTRAL NON-OVERFLOW -

MISCELLANEOUS METALS

LGD-1-4-2/22 I-103 NORTH & CENTRAL NON-OVERFLOW -

HATCH COVERS AND FRAMES

LGD-1-4-2/23 I-104 NORTH NON-OVERFLOW - MONOLITH 2 -

ELEVATOR BUILDING

60-167-1_R5 I-105 GENERAL ARRANGEMENT

60-167-2_R1 I-106 FLOOR LAYOUT

60-150-1_R3 I-107 GANTRY LEGS

62-131-1_R3 I-108 STRUCTURE ASSEMBLY

33-611-1_R3 I-109 MAIN LOWER BLOCK

33-611-2_R2 I-110 MAIN LOWER BLOCK

33-611-3_R3 I-111 MAIN LOWER BLOCK

LGG-1-0-1/320 I-112 COVER SHEET AND LOCATION MAPS

LGG-1-0-1/321 I-113 INDEX TO DRAWINGS

LGD-1-5-10/8 I-114 UPSTREAM ISOMETRIC

LGD-1-5-10/9 I-115 DOWNSTREAM ISOMETRIC

LGD-1-5-10/10 I-116 ISOMETRIC SECTIONS 1

LGD-1-5-10/11 I-117 ISOMETRIC SECTIONS 2

LGD-1-5-10/12 I-118 PLAN AND ELEVATIONS

LGD-1-5-10/13 I-119 PLAN, SECTIONS, AND DETAILS

LGD-1-5-10/14 I-120 SECTIONS AND DETAILS

LGD-1-5-10/15 I-121 ASSEMBLY AND SEAL DETAILS

(End of clause)

Contract drawings created on CAD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CAD. The Contractor assumes all risks associated in using electronic CAD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CAD drawing. If contract modifications are issued, the associated electronic CAD drawings will not be available to the Contractor. Electronic copies of CAD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .