TechSpecs_15-Q-0240.pdf

PDF 355 KB Posted

Attached to
Culvert Cleaning Jackson Hole Levee Federal contract opportunity
Solicitation number
W912EF-15-Q-0240
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Technical Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Culvert Cleaning Jackson Hole Levee, newest first.
File Type Posted
A.01.23_W912EF-15-Q-0240Rel.pdf PDF
15-Q-0240_Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jackson Hole 2015 Culvert Cleaning W912EF-15-Q-0240

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 28 GENERAL REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

DIVISION 33 - UTILITIES

33 49 10.51 28 CULVERT CLEANING AND INSPECTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

This page intentionally left blank

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00.00 28

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

1.2 PRE-SCREENING OF CONTRACTOR EMPLOYEES

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section Table of Contents --

SECTION 01 00 00.00 28

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx

Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/

Department of Veterans Affairs-VOW to Hire Heroes Act http://benefits.va.gov/vow/

Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html

U.S. Chamber of Commerce Foundation-Hiring Our Heroes http://www.hiringourheroes.org/

Guide to Hiring Veterans - Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house _business_council_-_guide_to_hiring_veterans_0.pdf

1.2 PRE-SCREENING OF CONTRACTOR EMPLOYEES

All Contractors must pre-screen all employees using the E-verify Program (http://www.uscis.gov/e-verify) website to ensure that workers meet the established employment eligibility requirements. The Contractor must ensure that the individuals undergoing screening have two valid forms of Government issued identification prior to pre-screening to ensure that the correct information is entered into the E-verify system. An initial list of verified/eligible employees must be provided to the contracting officer no later than 3 business days after contract Award.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 42 00

SOURCES FOR REFERENCE PUBLICATIONS

PART 1 GENERAL

1.1 REFERENCES

1.2 ORDERING INFORMATION

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 42 00

SOURCES FOR REFERENCE PUBLICATIONS

PART 1 GENERAL

1.1 REFERENCES

Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.

1.2 ORDERING INFORMATION

The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.

ASTM INTERNATIONAL (ASTM)

100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 877-909-2786 Internet: http://www.astm.org

U.S. ARMY CORPS OF ENGINEERS (USACE)

CRD-C DOCUMENTS available on Internet:

http://www.wbdg.org/ccb/browse_cat.php?c=68 Order Other Documents from:

USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.publications.usace.army.mil/ or http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

Not used

-- End of Section --

DIVISION 33 - UTILITIES

SECTION 33 49 10.51 28

CULVERT CLEANING AND INSPECTION

PART 1 GENERAL

1.1 SCOPE OF WORK

1.2 REFERENCES

1.3 SAFETY

1.3.1 Accident Prevention

1.3.1.1 Safety Requirements

1.3.1.2 Corrective Action by the Contractor

1.3.2 Subcontractors

1.3.3 Sanitation Facilities

1.4 PRE-WORK MEETING AND WORK SCHEDULE

1.4.1 Pre-Work Meeting

1.4.1.1 Requirements for the Pre-Work Meeting

1.4.1.2 Contractor's Schedule

1.4.1.3 Site Access Route Plan

1.5 KEY PERSONNEL SUBSTITUTION

1.6 SITE ACCESS

1.6.1 Site Access Restrictions

1.6.2 Gate Keys

1.6.3 Contractor Storage

1.7 OTHER CONTRACTS

1.8 REGULAR CLEANUP AND DEBRIS DISPOSAL

1.9 TESTING AND INSPECTION OF EQUIPMENT

1.9.1 Cranes or Derricks

1.10 COFFERDAMS FOR TEMPORARY CULVERT DEWATERING

1.11 CULVERT INSPECTION VIDEOS

1.12 PROTECTION AND RESTORATION OF EXISTING FACILITIES

1.12.1 Pre-Work Survey

1.12.2 Irrigation Supply Flows

1.13 ENVIRONMENT PROTECTION

1.13.1 Notification

1.13.2 Implementation

1.13.3 Protection Of Land Resources

1.13.3.1 Disposal of Waste Materials

1.13.4 Protection Of Water Resources

1.13.4.1 Spillage

1.13.4.2 Material Placement In Water

1.13.4.3 Greasing of Equipment

1.13.5 Protection Of Fish And Wildlife

1.14 GOVERNMENT QUALITY ASSURANCE

1.14.1 Monitoring

1.14.2 Inspections And Testing

1.14.3 Correction of Deficient Work

1.15 POST-WORK SURVEY AND REPORT

1.15.1 Post-Work Report

PART 2 EQUIPMENT

SECTION 33 49 10.51 28

2.1 CULVERT CLEANING EQUIPMENT

2.1.1 Water Jetting Equipment

2.1.2 Mechanical Culvert Cleaning Equipment

2.2 VIDEO INSPECTION EQUIPMENT

2.2.1 Video Camera Requirements

PART 3 EXECUTION

3.1 VEGETATION REMOVAL

3.1.1 Root Balls and Stumps

3.1.2 Surface Restoration

3.2 CULVERT CLEANING

3.2.1 Cofferdams for Temporary Culvert Dewatering

3.2.2 Adequacy of Cleaning

3.3 VIDEO INSPECTION

3.3.1 Culvert Flow

3.3.2 Speed of Video Inspections

3.3.3 Inspection Records

3.3.3.1 Digital Video Recordings

3.3.3.1.1 Introduction Information

3.3.3.1.2 Display Data

3.3.3.2 Digital Audio

3.3.3.3 Written Logs

3.3.4 Data Requirements

3.3.4.1 Exterior Observations

3.3.4.2 Interior Video Inspection Observations

3.3.4.3 Video Data Continuity

3.3.5 Report Submission

3.3.5.1 Report Content

3.3.5.2 Electronic Files

ATTACHMENTS:

Activity Hazard Analysis

Attachment 1

Attachment 2

-- End of Section Table of Contents --

CULVERT CLEANING AND INSPECTION

PART 1 GENERAL

1.1 SCOPE OF WORK

This Section specifies the requirements for vegetation maintenance, culvert cleaning, and video inspection of culverts in the Jackson Project as indicated. The work involves removal of weeds, brush, and trees; culvert cleaning and removal of sediment; and video inspection of identified culverts. A detailed report documenting post-work conditions and video inspection of culverts is required.

1.2 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008) Safety and Health Requirements Manual

Website for the safety manual is http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.a

National Association of Sewer Service Companies (NASSCO)

NASSCO Certification NASSCO Pipeline Assessment and Certification Program (PACP);

http://www.nassco.org/index.html

1.3 SAFETY

1.3.1 Accident Prevention

In accordance with Contract Clause ACCIDENT PREVENTION the Contractor shall provide and maintain work environments and procedures that will safeguard the public, Government personnel, Contractor personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities.

1.3.1.1 Safety Requirements

The Contractor shall comply with the requirements of EM 385-1-1.

1.3.1.2 Corrective Action by the Contractor

Whenever the Walla Walla District Representative (REP) detects any noncompliance with these requirements or any condition that poses a serious or imminent danger to the health or safety of any personnel, the REP will notify the Contractor and request immediate initiation of corrective action. Lack of notice from the REP does not relieve the Contractor from compliance requirements and responsibility. After receipt of notice from the REP, the Contractor shall immediately take corrective action. Such notice, when delivered to the Contractor at the site of the work, shall be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer (KO) may issue an order stopping all or part of the work until satisfactory corrective action has been taken.

1.3.2 Subcontractors

Compliance with the accident prevention and safety requirements by subcontractors will be the responsibility of the Contractor.

1.3.3 Sanitation Facilities

The Contractor shall furnish sanitation facilities in accordance with EM 385-1-1. Location of sanitation facilities shall be as approved by the REP. The Contractor shall maintain the sanitation facilities to prevent spillage. Freeze protection is necessary between the months of October and March, inclusive.

1.4 PRE-WORK MEETING AND WORK SCHEDULE

1.4.1 Pre-Work Meeting

Cooridinate with the REP to meet at the Teton County Office Building located in Jackson, Wyoming, at least five (5) working days prior to the beginning of work. The date of the meeting shall be coordinated with the REP. The purpose of this meeting is to discuss and develop general and technical aspects of the work, safety, quality control program, scheduling of work, and environmental protection provisions of the contract. At this meeting confirmation of the locations of cofferdams required to do this work will be determined.

1.4.1.1 Requirements for the Pre-Work Meeting

The Contractor shall prepare and bring to the pre-work meeting all of the following:

a. A list of all equipment to be used by the Contractor on this job.

The list shall include the make and model of all heavy equipment and also the license plate numbers of all vehicles.

b. A List of the Key Personnel on the project, including names and contact information. Key personnel include Field Supervisors or Foremen or Crew Leaders, and other on-site supervisory personnel, as well as Senior Management or Project Managers responsible for completion of the project. The list shall include Subcontractors and their employees.

c. Safety plan in accordance with EM 385-1-1, (2008) Safety and Health Requirements Manual.

d. An Activity Hazard Analyis (AHA) in accordance with EM 385-1-1.

Use the attached Activity Hazard Analysis form attached to this specification. The AHA form is avaialble electronically.

e. Environmental protection plan. See paragraph "ENVIRONMENT

PROTECTION".

f. A preliminary plan for accessing and securing work sites.

g. Plans and section diagrams of temporary coffer dams for culvert sites requiring de-watering. Provide a written description of construction methods that will be used.

h. Evidence of Pipeline Assessment and Certification Program (PACP) Certification.

i. Routine schedule for crews, subcontractors, and supervisors.

1.4.1.2 Contractor's Schedule

At the prework meeting, the Contractor shall furnish a schedule for the complete project detailing the dates and times the Contractor will be mobilizing into the area, working at each site, and demobilizing from the area. The Contractor shall furnish notification of any change of work schedule for each site, regular work hours, overtime work hours, and shifts of work crews and personnel at the site, complying with Section 1.5. This notification shall be provided a minimum of 48 hours prior to any schedule change to allow suitable scheduling of Government personnel and inspection.

Exception to this requirement may be allowed by the KO in case of schedule change due to emergency conditions.

1.4.1.3 Site Access Route Plan

At the Pre-Work Meeting, the access routes shall be confirmed with the REP to ensure access through locked gates, which are on private property.

1.5 KEY PERSONNEL SUBSTITUTION

If the Contractor plans on replacing any Key personnel, they must have the approval of the REP and the new personnel qualifications must meet or exceed the personnel they are replacing.

1.6 SITE ACCESS

All of the worksites are located along levees in the Jackson Project.

1.6.1 Site Access Restrictions

The Contractor shall meet the following site access restrictions at all times.

a. Work at the job sites shall be accomplished between the hours of 7:00 a.m. to 6:30 p.m. each workday unless otherwise specified herein, or authorized in advance by the REP.

b. Gate security shall be the responsibility of the Contractor and all the levees are protected by one or more gates. Except where specifically identified by the REP, all gates along access routes and levees shall be kept closed at all times, except when a truck/vehicle is passing through. The Contractor shall ensure that cattle or other livestock do not get through gates opened for site access.

c. The Contractor shall accomodate public access to the levees, except in work areas. The Contractor is responsible for maintaining safe speeds of any Contractor vehicle to ensure public safety while in proximity to pedestrians.

d. The speed limit is 15 mph while traveling on the levees.

e. The Levees and access roads are on private property. In no case shall the Contractor travel on, excavate, stockpile, park, remove brush, or otherwise disturb areas more than 50-feet away from the centerline of levees or the access roads.

1.6.2 Gate Keys

The Contractor shall maintain a key register to document employee possession of Project keys. Extra keys shall be kept in a locked and secured key cabinet. Discharged employees shall be required to turn in all issued project keys. All occurrences of lost keys shall be reported to the REP within 24 hours of loss. For each key that cannot be returned to the Government, the Contractor shall reimburse the Government for replacement of all the affected locks and a replacement set of keys. The Contractor shall not duplicate keys.

1.6.3 Contractor Storage

Walton Quarry is on the east side of the Snake River approximately three miles north of the Jackson-Wilson Bridge. The Quarry site is at Latitude 43 32.0833' North, Longitude 110 48.6500' West. Cooridinate with the REP for storage of equipment at Walton Quarry. The Contractor may store equipment at individual levee work sites only during periods of work activity at that site. The Government will not be liable for the theft or destruction of any Contractor's tools or equipment.

1.7 OTHER CONTRACTS

The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees and carefully fit his own work to such additional work as may be directed by the REP. The Contractor shall not commit or permit any act which will interfere with the performance of work by other contractors or Government employees.

1.8 REGULAR CLEANUP AND DEBRIS DISPOSAL

All debris resulting from the work regardless of size, such as vegetation, concrete debris, packing cases, scrap lumber, metal grindings, and all other debris shall be collected and removed from the project site daily and disposed of in a legal manner. All sandbags, wood supports, and other items used for construction of cofferdams shall be removed as soon as practicable after completion of work at the affected culvert.

1.9 TESTING AND INSPECTION OF EQUIPMENT

The Contractor shall ensure all equipment is in good working order, without leaks of coolant, oil, hydraulics, fuel, or other fluids. The Contractor shall ensure all equipment used at the sites is inspected daily to ensure there are no fluid leaks. Equipment with leaks shall not be permitted on site. All applicable environmental requirements shall be met.

1.9.1 Cranes or Derricks

Cranes or derricks shall be tested by the Contractor or a qualified testing agency in accordance with EM 385-1-1. Equipment shall be large enough to safely handle proposed picks or tasks without exceeding the crane rating established by these tests.

1.10 COFFERDAMS FOR TEMPORARY CULVERT DEWATERING

Small cofferdams shall be constructed at culverts identified in plan sheets G-003 through G-005 in coordination with the REP. Based on observations in August 2014, 12 sites may require cofferdams as indicated on the plans.

Cofferdams shall be constructed to ensure complete restoration of original site grades and surfaces upon removal. Except for required vegetation removal, and clearing of the flowline to/from the culvert within 10-feet of its mouth, the Contractor shall minimize disturbance of site soils where cofferdams are installed.

1.11 CULVERT INSPECTION VIDEOS

Provide a video recording and logs of culvert video inspections as indicated. The visual surveys and video inspection shall be completed after vegetation removal and culvert cleaning operations. Ensure all interior surfaces, visible flaws, holes, dents, corrosion, or other features pertinent to culvert condition are in focus and clearly discernable in the video. The final report shall document all aspects of the inspection, including a visual survey at each end of the culvert and the video inspection of the culvert interior. The report shall document flaws with an index listing approximate time stamp or distance along the culvert. Separate digital files in DVD format shall be submitted for each culvert, with a written inspection report that presents the logs of the inspections. Digital files and all logs shall reference culverts by levee name and station, for example: "Morgan Station 58+44".

1.12 PROTECTION AND RESTORATION OF EXISTING FACILITIES

The Contractor shall take precautions to prevent damage to existing facilities while performing work under this contract. Upon completion of the work, all existing facilities not included as a portion of the work shall be left in a condition equal to the condition existing at time of receipt of award as agreed to by the REP.

1.12.1 Pre-Work Survey

The Contractor and the REP shall conduct a pre-work survey of the proposed work areas. The Contractor shall take special care to identify and photograph damaged CMP ends, bent or broken trash rack attachment studs, cracked or damaged headwall concrete, or other conditions that could later appear to be the responsibility of the Contractor. Confirm which culverts will require cofferdams and which culverts will be inspected by the Government. The Contractor shall coordinate with the REP to complete repairs, restore revetment, and otherwise make right all existing facilities the Contractor has responsibility to protect.

1.12.2 Irrigation Supply Flows

The Contractor shall ensure legal water users have irrigation flows generally equlivant to pre-work conditions, and ensure minimal disruption to water flows during contract work.

1.13 ENVIRONMENT PROTECTION

Environment protection is defined as the retention of the environment in its natural state to the greatest possible extent during project operations and to enhance the natural appearance in its final condition. In order to prevent environmental degradation, the Contractor and his subcontractors in the performance of this contract, shall comply with all applicable Federal, State, and local laws, and regulations.

1.13.1 Notification

The Contractor shall promptly notify the REP, in writing, of any noncompliance with the aforementioned Federal, State, or local laws or regulations. In the event of a spill or release of pollutants the Contractor shall notify the REP immediately.

1.13.2 Implementation

Prior to commencement of the work the Contractor shall meet with the REP to discuss compliance with this provision and administration of the environment protection program. The Contractor shall then prepare a written environmental protection plan which shall be carried out throughout the life of this contract. The plan shall be submitted to the REP for approval within five working days after the meeting and no work shall commence until the plan has been approved. Acceptance of the Contractor's plan for environmental protection will not relieve the Contractor of the responsibility for adequate and continuing control of pollutants.

1.13.3 Protection Of Land Resources

The land resources within the project boundaries and outside the limits of work areas/zones performed under this contract shall be preserved in their present condition or be restored to a condition after completion of work that will appear to be natural and not detract from the appearance of the project. The Contractor shall limit his activities to the areas indicated for project work in the project plans. The Contractor shall prevent disturbance damage or equipment traffic outside these designated areas without specific approval from the REP.

1.13.3.1 Disposal of Waste Materials

The Contractor shall dispose of any materials, wastes, effluents, trash, garbage, oil, grease, chemicals, etc., in a legal manner. If any waste material is dumped in unauthorized areas, the Contractor shall remove the material and restore the area to its original condition. If necessary, contaminated ground shall be excavated, disposed of in accordance with Federal, State, County, and Local laws and regulations, and replaced with suitable fill material, compacted and finished with topsoil and planted as required to re-establish vegetation. The removal and disposal of any of the above materials shall be the responsibility of the Contractor.

1.13.4 Protection Of Water Resources

The Contractor shall not pollute streams, lakes, or reservoirs with fuels, oils, bitumens, concrete materials, calcium chloride, acids, herbicides, or other harmful materials. The Contractor shall comply with all applicable Federal, State, County, and Local laws and regulations concerning pollution of surface or subsurface waters. The REP will perform in-water turbidity monitoring for all locations where in-water work, such as the installation of coffer dams and any excavations to re-establish flow lines to/from the culvert. At any time when waters show an increase greater than 10 NTU, the contractor shall cease project work and make corrections to operations to bring turbidity readings to acceptable levels.

1.13.4.1 Spillage

Special measures shall be taken to prevent chemicals, fuels, oils, greases, bituminous materials, waste washings, and sewage from entering surface and subsurface waters. A drip pan shall be placed under every vehicle and piece of equipment with fluid leaks, when parked over night or longer. All prevention/cleanup materials shall comply with all applicable Federal, State, County, and Local laws and regulations. The Contractor shall provide and utilize the following prevention/cleanup materials:

a. Fuel dispensing vehicles shall carry a tanker fueling berm spill kit on board at all times.

b. An emergency spill response kit shall be carried on board each piece of equipment performing work.

1.13.4.2 Material Placement In Water

Equipment shall not track or drive into the river or flowing water in a side channel. The excavation bucket and thumb or grappler of the machine is the only part of the equipment permitted in river water.

1.13.4.3 Greasing of Equipment

The Contractor shall keep equipment free of excess or exposed grease to prevent its introduction into the river.

1.13.5 Protection Of Fish And Wildlife

The Contractor shall at all times perform all work and take such steps required to minimize interference with or disturbance to fish and wildlife.

The Contractor will not be permitted to alter waterflows or otherwise disturb native habitat adjacent to the project work areas/zones that coulds be critical to fish or wildlife. Keep equipment free of excess or exposed grease to prevent its introduction into the river. If the contractor encounters wildlife inhabiting any of the culverts, the contractor shall contact Wyoming Game and Fish or the local animal control office to have the wildlife removed from the culvert prior to performing contract work.

1.14 GOVERNMENT QUALITY ASSURANCE

1.14.1 Monitoring

The Government will monitor the Contractor's performance under this contract using quality assurance procedures developed by the Government.

1.14.2 Inspections And Testing

The Government reserves the right to inspect and test all work called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work.

1.14.3 Correction of Deficient Work

All work shall comply with the contract requirements. If upon Government inspection deficient work is identified, the Contractor shall correct the deficiencies at no additional cost to the Government.

1.15 POST-WORK SURVEY AND REPORT

After completion of the vegetation removal and culvert cleaning, and after all identified punchlist items are addressed, the Contractor and the REP shall conduct a post-work survey of the work areas.

1.15.1 Post-Work Report

The Contractor shall prepare and submit a written report documenting conditions after vegetation removal, culvert cleaning, and video inspections are completed. The report shall include written descriptions and color photographs showing vegetation and culvert conditions at both ends of all the culverts included in the Contract, as well as a description of the work completed. Logs of a visual survey at each culvert end and video inspection logs shall be included. Ratings of each culvert per the guidelines in Attachment 1 shall be presented with each log, and in a summary table. Electronic files on DVD diskettes shall also be included.

PART 2 EQUIPMENT

2.1 CULVERT CLEANING EQUIPMENT

The Contractor may use approved mechanical methods to clean culverts, though water jetting is anticipated. If mechanical methods are used, water jetting shall be used as a final cleaning method to prepare for video inspection.

2.1.1 Water Jetting Equipment

High velocity water jetting equipment shall be used and shall meet the following requirements:

a. High Velocity Jet Equipment shall be used on this project. All high velocity storm sewer cleaning equipment shall be constructed for ease and safety of operation and shall carry its own water tank.

b. The equipment shall have a selection of two or more high velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size culverts designated to be cleaned.

c. Water used for cleaning shall be provided by the Contractor. It shall be acquired consistent with all applicable environmental requirements.

2.1.2 Mechanical Culvert Cleaning Equipment

Approved mechanical culvert cleaning equipment (e.g. horizontal directional drilling/boring equipment) and tools may be used. The Contractor shall ensure that the interior of the culverts is not damaged by the equipment.

2.2 VIDEO INSPECTION EQUIPMENT

The camera used for the inspection shall be specifically designed and constructed for the purpose.

2.2.1 Video Camera Requirements

The Video Camera unit used for the video inspections shall include video cameras, a video monitor cable, power sources, and all equipment necessary to perform a video inspection. The unit shall meet the following requirements:

a. The unit shall have Pan-and-Tilt capabilities; its range shall be adequate to view the entire interior surface of the culverts.

b. Lighting and camera sensitivity shall be adequate and controllable to produce clear, in-focus images of the entire interior surface of the culverts for all conditions encountered.

c. The camera optics shall be adjustable for viewing surfaces that vary in distance from the camera from 25 mm (1-inch) to infinity.

d. All camera systems shall be able to navigate around minor objects, roots, and debris.

e. The system used to move the camera through the pipe shall not obstruct the camera’s view or interfere with proper documentation of culvert conditions.

f. The distance the camera travels along the culverts shall be measured between the mouth of the culvert and its distant end. The distance shall be recorded in feet, on the video display, and shall be accurate to within 1-foot.

g. The camera shall be fully functional in 100% humidity conditions and its lens shall be kept clear of condensation and debris during the inspection.

h. The equipment may initially record to VHS cassette tapes. However, the recordings shall be transferred to digital files in DVD format on DVD diskette for submittal. The final digital video shall be in color, and shall have a resolution not less than 640 x 480 dpi.

PART 3 EXECUTION

3.1 VEGETATION REMOVAL

All brush, weeds, shrubs, root balls, trees, and stumps shall be removed from within the limits of vegetation removal as indicated on the plans.

Removal of trees shall be in coordination with the REP.

3.1.1 Root Balls and Stumps

Root balls of woody vegetation and small trees shall be pulled up and removed as debris. Stumps and tree roots shall be removed to extract wood or roots larger than 4-inches in diameter or within 2-feet of the surface.

3.1.2 Surface Restoration

Levee surfaces disturbed by removal of vegetation shall be restored. Levee slopes that are not armored shall be regraded to a flat, smooth, sand and gravel surface consistent with the preexisting slopes along the levee.

Where revetment surfaces are disturbed by vegetation maintenance, the Contractor shall repair the underlying levee surface and restore the revetment.

3.2 CULVERT CLEANING

The cleaning equipment shall remove cobbles, sand and gravel, debris, dirt, cobwebs, and other materials or obstructions from the culverts. The following requirements also apply:

a. If cleaning of an entire culvert cannot be successfully performed from one end, the equipment shall be set up on the other end and cleaning again attempted.

b. Cleaning shall include clearing/cleaning of the culvert flow lines upstream and downstream of the culverts as indicated.

c. Excess cobbles, sand and gravel, and other materials from the cleaning operations shall be removed from the site and disposed of in accordance with Federal, State, County, and Local laws and regulations.

d. Water for cleaning operations shall be acquired in accordance with all applicable environmental and legal requirements.

3.2.1 Cofferdams for Temporary Culvert Dewatering

Cofferdams shall be constructed using sandbags, jersey barriers, plastic sheeting, stakes, and wood forms or other materials as approved. Sand, gravel, cobble materials are available at the Walton Quarry and may be suitable for use as sandbag fill. Contractor shall not place loose fill material in water to form cofferdams, at any location. The cofferdams shall meet the following requirements:

a. Cofferdams and all Contractor activities shall be restricted to areas within 50-feet of levee access road centerlines, except as specifically approved by the REP.

b. Excavations and subgrade disturbance for cofferdams shall be minimized except for clearing of the flow-lines within 10-feet of the culverts.

c. Cofferdams shall not be constructed to impound water to an elevation that causes any backwater flooding or is higher than the top of the culvert.

d. If necessary to prevent backwater flooding, clean water shall be pumped over the levee to bypass the dewatered culvert. The Contractor shall coordinate the work to minimize the time pumping is required.

e. Upon completion of work at each culvert, the cofferdam and all materials used to construct it shall be removed. Site surfaces shall be restored to original conditions to the extent practicable, except for ditch cleaning along the flowlines within 10-feet of the culverts.

f. Water pumped from within cofferdams may be pumped into an infiltration trench excavated on the landside slope of the levee, in coordination with the REP. The trench may be up to 2 feet in depth.

Length of trench will be commensurate with the amount of water to be pumped. Trench will be backfilled and the levee graded to original conditions upon completion of trench use.

3.2.2 Adequacy of Cleaning

Culvert cleaning shall be adequate to meet requirements for a video inspection. All cobbles, gravel, debris, and other coarse materials shall be removed from the culverts. Minor sand and silt sediments pooled in the culvert corrugations along the flowline will be considered acceptable provided all the corrugation highs along the flowline are exposed.

3.3 VIDEO INSPECTION

Unless otherwise approved by the REP, all video inspection shall be completed by an operator certified by the National Association of Sewer Service Companies (NASSCO). At minimum, the NASSCO Certification for the operator shall include the Pipeline Assessment and Certificate Program (PACP), and certification at the user level.

3.3.1 Culvert Flow

Video inspections shall be accomplished while the culverts are dewatered.

It may be necessary to temporarily block off a submerged culvert to facilitate video inspection after cleaning. It may also be necessary to dewater the inlet or pump water over the levee to prevent upstream flooding. The Contractor shall coordinate with the REP to use approved methods and equipment.

3.3.2 Speed of Video Inspections

The video unit shall be moved through the line in either direction at a uniform rate, stopping as needed to ensure proper documentation of inspection observations. In no case shall the unit advance faster than 30-feet per minute.

3.3.3 Inspection Records

3.3.3.1 Digital Video Recordings

The video inspection of each culvert shall be recorded in a standard high-resoloution DVD format. Each Culvert inspection shall be assembled into a single DVD file that includes the levee name and station in its filename.

3.3.3.1.1 Introduction Information

The first 15 seconds of each video inspection file shall present introductory information including the following:

a. The text, "JACKSON PROJECT, 2015 CULVERT CLEANING AND INSPECTION"

b. Date and time, the levee name, culvert field station, culvert type, diameter, and length

c. The direction the camera travels: either "RIVER TO LAND" or LAND TO

RIVER"

3.3.3.1.2 Display Data

The video recording of the inspection shall include a continuous readout of the distance along the pipe travelled by the camera.

3.3.3.2 Digital Audio

Voice recording of inspection data and observations is not required. If used, the voice data may be substituted for video introduction information or for video display data as approved.

3.3.3.3 Written Logs

Complete written logs of all information and observations gathered shall be created during the inspections. Logs shall include descriptions of both ends of the culvert, including trash racks and headwalls, and all observations from the video inspections. An example log of the video inspection of the interior of a culvert is included in Attachment 2

3.3.4 Data Requirements

3.3.4.1 Exterior Observations

In addition to the video inspection of the culvert interior, conditions at each end of the culvert shall also be surveyed. Information shall include a visual distress survey for each end of the culvert, including observations of exposed CMP, concrete headwalls, flap gates, slide valves, and other visual survey information suitable for characterizing the condition of the culverts. The visual condition information should include visible distress to the pipe or other features associated with the culvert.

3.3.4.2 Interior Video Inspection Observations

Pipe condition coding shall be consistent with the culvert rating guidelines for use during inspections included as Attachment 1. The information called out includes, but is not limited to the following:

a. Structural condition and deformation of the pipe walls

b. Blockages, obstructions, or penetrations

c. Condition of joints or seams and pipe walls

d. Standing water/sag conditions

e. Infiltration/exfiltration

f. Fluctuations in water level

g. Condition of corrosion protection materials

The severity of each defect or observation shall be recorded and rated according to the PACP method. Observations shall be recorded using PACP codes as outlined in NASSCO’s PACP Reference Manual. Where established NASSCO procedures are not directly applicable, the culvert rating guidelines in Attachment 1 shall be used.

3.3.4.3 Video Data Continuity

The Contractor shall pause the digital recording at any time there is a delay in the inspection and restart the digital video recording in the same digital file. The pause shall in no way affect, freeze, or interrupt the replay of the video and shall not close the video file during the inspection.

3.3.5 Report Submission

Contractor documentation shall be submitted to the REP. It shall be initially submitted as Preliminary. The Government will provide comments within 10 business days and the Contractor shall modifiy the report to address the comments. Once all comments are addressed, the Contractor shall submit three hard copies of the documents, in color, with electronic files attached.

3.3.5.1 Report Content

The Post-Work Report shall provide documentation and color photography for the following:

a. Descriptive and photographic documentation of post-work vegetation conditions on both sides of the levee at the indicated culverts.

b. Descriptive and photographic documentation of visual condition surveys at both ends of the indicated culverts.

c. Logs of video inspections of the indicated culverts.

The Contractor shall provide a single report that includes the culverts that are video inspected. A separate report shall be provided for the culverts where only vegetation removal and cleaning is completed.

3.3.5.2 Electronic Files

Electronic files shall also be provided as follows:

a. The post-work reports shall be provided in electronic form in Portable Document Format.

b. Condition survey information, photographs, and inspection logs with ratings shall be presented in separate documents for each culvert, in individual electronic files in Portable Document Format.

c. A summary table in Microsoft Excel format shall be provided to summarize the filenames of electronic files. Table headers shall include, but are not limited to, Culvert ID, Report Filename, Inspection Log of Video Filename, Land-side Image Filenames, and River-side Image Filenames.

-- End of Section --

ACTIVITY HAZARDS ANALYSIS

Date Prepared (mm/dd/yyy) Risk Assessment Code (RAC):

Project: Job: E = Extremely High Risk H = High Risk M = Moderate Risk

Acceptance Authority Signature L = Low Risk

Probability Frequent Likely Occasional Seldom

Unlikely

Activity:

Analyzed By/Date:

S e v e r i t y

Catastrophic E E H H M Critical E H H M L

Marginal H M M L L Negligible M L L L L

PRINCIPAL STEPS (Identify the principal steps involved and the sequence of work activities)

POTENTIAL SAFETY/HEALTH HAZARDS

(Analyze each principal step for potential hazards)

RECOMMENDED CONTROLS (Develop specific controls for potential hazard)

EQUIPMENT TO BE USED (List equipment to be used in the work activity) INSPECTION REQUIREMENTS (List inspection requirements for the work activity) TRAINING REQUIREMENTS (List training requirements, including hazard communication)

CENWW-1, (Revised March 2000 Page 1 of 5

Date Prepared (mm/dd/yyy)

Project: Job:

JOB STEPS

HAZARDS ACTIONS TO ELIMINATE OR MINIMIZE

HAZARDS

CENWW-1, (Revised March 2000 Page 2 of 5

CENWW-1, (Revised March 2000 Page 3 of 5

CENWW-1, (Revised March 2000 Page 4 of 5

EQUIPMENT TO BE USED

INSPECTION REQUIREMENTS

TRAINING REQUIREMENTS

CENWW-1, (Revised March 2000 Page 5 of 5

ATTACHMENT 1

CORPS OF ENGINEERS

RATING GUIDELINES FOR CULVERTS

Levee Embankments For use during Initial and Continuing Eligibility Inspections of levee segments / systems

Key: A = Acceptable. M = Minimally Acceptable; Maintenance is required. U = Unacceptable. N/A = Not Applicable. FDR = Flood Damage Reduction

Levee Embankments

Flood Damage Reduction Segment / System Inspection Report

US Army Corps of Engineers®

Rated Item Rating Rating Guidelines Location/Remarks/Recommendations

U Cracks exceed 6 inches in depth. Longitudinal cracks are longer than the height of the levee and/or exhibit vertical movement along the crack. Transverse cracks extend through the entire levee width.

A Continuous animal burrow control program in place that includes the elimination of active burrowing and the filling in of existing burrows.

M The existing animal burrow control program needs to be improved. Several burrows are present which may lead to seepage or slope stability problems, and they require immediate attention.

10. Animal Control

U Animal burrow control program is not effective or is nonexistent. Significant maintenance is required to fill existing burrows, and the levee will not provide reliable flood protection until this maintenance is complete.

A

There are no breaks, holes, cracks in the discharge pipes/ culverts that would result in significant water leakage. The pipe shape is still essentially circular. All joints appear to be closed and the soil tight. Corrugated metal pipes, if present, are in good condition with 100% of the original coating still in place (either asphalt or galvanizing) or have been relined with appropriate material, which is still in good condition. Condition of pipes has been verified using television camera video taping or visual inspection methods within the past five years, and the report for every pipe is available for review by the inspector.

M

There are a small number of corrosion pinholes or cracks that could leak water and need to be repaired, but the entire length of pipe is still structurally sound and is not in danger of collapsing. Pipe shape may be ovalized in some locations but does not appear to be approaching a curvature reversal. A limited number of joints may have opened and soil loss may be beginning. Any open joints should be repaired prior to the next inspection.

Corrugated metal pipes, if present, may be showing corrosion and pinholes but there are no areas with total section loss. Condition of pipes has been verified using television camera video taping or visual inspection methods within the past five years, and the report for every pipe is available for review by the inspector.

U

Culvert has deterioration and/or has significant leakage; it is in danger of collapsing or as already begun to collapse. Corrugated metal pipes have suffered 100% section loss in the invert. HOWEVER: Even if pipes appear to be in good condition, as judged by an external visual inspection, an Unacceptable Rating will be assigned if the condition of pipes has not been verified using television camera video taping or visual inspection methods within the past five years, and reports for all pipes are not available for review by the inspector.

11. Culverts/ Discharge Pipes3 (This item includes both concrete and corrugated metal pipes.)

N/A There are no discharge pipes/ culverts.

12. Riprap Revetments & A No riprap displacement or stone degradation that could pose an immediate threat to the integrity of channel bank. Riprap intact with no woody vegetation present.

ATTACHMENT 2

CORPS OF ENGINEERS

EXAMPLE CULVERT INSPECTION LOG

JACKSON PROJECT

2010 Culvert Cleaning and Inspection – VIDEO INSPECTION LOG

Example Levee, Field Sta XXX + XX

ITEM COMMENTS

Date: Date of inspection Time: Time of inspection

Inspection Company: Company performing inspection

Inspector: Inspector’s name Video Unit: Technical designation for video equipment unit

Culvert Type: CMP – irrigation return length: 65 feet Culvert Diameter: 42 inches

Direction of video: Land to River (downstream in culvert)

Inspection Notes: Video from LS (inlet) end of pipe to and thru the GW. Distances shown below are reference from the LS end of the pipe to the GW and from the GW to the RS end of the pipe.

DISTANCE COMMENTS/OBSERVATIONS

Inlet (LS) Invert rusted through to soil at approximately 5 and 7 o'clock positions with 6 o’clock being the centerline of the pipe.

36.2 ft. Joint in CMP. Good condition

42.4 ft. Ponded water in invert starts

47.8 ft. Coating peeled on right springline.

60.5 ft. Holes in pipe at 3 o'clock and 9 o'clock immediately LS of GW.

64.0 ft. End of LS pipe 0 ft RS of GW. Start of RS pipe inspection.

1.9 ft. Water coming through the rusted pipe at just below the springline. ~12" of water in the pipe.

4.3 ft. Water seeping thru pipe at springline.

6.0 ft. Rt. Side water seeping thru pipe.

6.7 - 7.0 ft Rust / water thru pipe at 3 o'clock.

17.0 ft Mud in pipe

32.0 ft. Water ponded to RS end of pipe. Pipe has low (depressed) area in flowline between GW and end of pipe.

Summary Water is ponded in the pipe from approximately 20 feet landward of the gatewell to the riverside end of the pipe indicating settlement of the levee and pipe. Rusted holes were observed in the pipe immediately landward and riverward of the gatewell. Rust and water infiltration were noted at several locations in the pipe on the river side of the gatewell.

Rating M - Minimally Acceptable

PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
GENERAL REQUIREMENTS
01 00 00.00 28 - GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS
1.2 PRE-SCREENING OF CONTRACTOR EMPLOYEES
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
SOURCES FOR REFERENCE PUBLICATIONS
01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
PART 2 PRODUCTS
PART 3 EXECUTION
DIVISION 33 - UTILITIES
CULVERT CLEANING AND INSPECTION
33 49 10.51 28 - CULVERT CLEANING AND INSPECTION
PART 1 GENERAL
1.1 SCOPE OF WORK
1.2 REFERENCES
1.3 SAFETY
1.3.1 Accident Prevention
1.3.1.1 Safety Requirements
1.3.1.2 Corrective Action by the Contractor
1.3.2 Subcontractors
1.3.3 Sanitation Facilities
1.4 PRE-WORK MEETING AND WORK SCHEDULE
1.4.1 Pre-Work Meeting
1.4.1.1 Requirements for the Pre-Work Meeting
1.4.1.2 Contractor's Schedule
1.4.1.3 Site Access Route Plan
1.5 KEY PERSONNEL SUBSTITUTION
1.6 SITE ACCESS
1.6.1 Site Access Restrictions
1.6.2 Gate Keys
1.6.3 Contractor Storage
1.7 OTHER CONTRACTS
1.8 REGULAR CLEANUP AND DEBRIS DISPOSAL
1.9 TESTING AND INSPECTION OF EQUIPMENT
1.9.1 Cranes or Derricks
1.10 COFFERDAMS FOR TEMPORARY CULVERT DEWATERING
1.11 CULVERT INSPECTION VIDEOS
1.12 PROTECTION AND RESTORATION OF EXISTING FACILITIES
1.12.1 Pre-Work Survey
1.12.2 Irrigation Supply Flows
1.13 ENVIRONMENT PROTECTION
1.13.1 Notification
1.13.2 Implementation
1.13.3 Protection Of Land Resources
1.13.3.1 Disposal of Waste Materials
1.13.4 Protection Of Water Resources
1.13.4.1 Spillage
1.13.4.2 Material Placement In Water
1.13.4.3 Greasing of Equipment

1.13.5 Protection Of Fish And Wildlife

1.14 GOVERNMENT QUALITY ASSURANCE
1.14.1 Monitoring
1.14.2 Inspections And Testing
1.14.3 Correction of Deficient Work
1.15 POST-WORK SURVEY AND REPORT
1.15.1 Post-Work Report
PART 2 EQUIPMENT
2.1 CULVERT CLEANING EQUIPMENT
2.1.1 Water Jetting Equipment
2.1.2 Mechanical Culvert Cleaning Equipment
2.2 VIDEO INSPECTION EQUIPMENT
2.2.1 Video Camera Requirements
PART 3 EXECUTION
3.1 VEGETATION REMOVAL
3.1.1 Root Balls and Stumps
3.1.2 Surface Restoration
3.2 CULVERT CLEANING
3.2.1 Cofferdams for Temporary Culvert Dewatering
3.2.2 Adequacy of Cleaning
3.3 VIDEO INSPECTION
3.3.1 Culvert Flow
3.3.2 Speed of Video Inspections
3.3.3 Inspection Records
3.3.3.1 Digital Video Recordings
3.3.3.1.1 Introduction Information
3.3.3.1.2 Display Data
3.3.3.2 Digital Audio
3.3.3.3 Written Logs
3.3.4 Data Requirements
3.3.4.1 Exterior Observations
3.3.4.2 Interior Video Inspection Observations
3.3.4.3 Video Data Continuity
3.3.5 Report Submission
3.3.5.1 Report Content
3.3.5.2 Electronic Files

File details come from the government source that posted it. Updated .