Libby_Emergency_Sluice_Gate_-_Attachment_A_-_Eval_Criteria.docx
DOCX document 17 KB Posted
- Attached to
- Emergency Sluice Gate Bulkhead, Libby Dam, Libby, MT Federal contract opportunity
- Solicitation number
- W912DW19R0016
About this file
Word version of Attachment A for Evaluation Criteria
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| W912DW19R0016_Amendment_0001.pdf | ||
| Request_for_Visitation_Authority_(RVA).pdf | ||
| Libby_Emergency_Sluice_Gate_FINAL_Contract_Drawings.pdf | ||
| Libby_Emergency_Sluice_Gate_Reference_Drawings.pdf | ||
| W912DW19R0016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION M - ATTACHMENT A
FACTOR 1: CORPORATE EXPERIENCE AND CAPABILITIES FOR FABRICATION OF HYDRAULIC STEEL GATES PROJECTS
USE ONE FORM PER PROJECT
Note: A separate Word version of this document will be accessible on fedbizopps at fbo.gov
1. Circle to indicate if work was performed as a Prime Contractor or Subcontractor:
FABRICATION OF HYDRAULIC STEEL GATES Prime Subcontractor
2. Name of Offeror: ______________________________________________
3. Project Title: ______________________________________________
4. Contract/Project Number: ______________________________________________
5. Project Location: ______________________________________________
6. Total Contract Value: $ ___________________
7. If Offeror performed as Subcontractor, the $ value of Subcontract: $ ______________
8. Construction Phase Start Date (Month/Year): ____________________________________
9. Construction Phase Completion Date (Month/Year): _______________________________ (Actual date if project has been completed, anticipated date and percent complete if project is not complete)
10. Name and Title of Customer/Client: _____________________________________________
11. Telephone Number of Customer/Client: _________________________________________
12. Email Address of Customer/Client: ____________________________________________
13. Describe General Scope of the Project (designed, built, and installed new major features, rebuilt select components, etc.; focus on fabrication aspects of the project):
14. Describe/demonstrate how the project is relevant to the solicitation in the following areas:
14.1. Describe what type of Hydraulic Steel Structure was welded to AWS D1.5/D1.5M and how it meets criteria of factor A:
14.2. Describe what type of Paint system was provided and how it meets criteria of factor A:
14.3. Describe what type of facility work was performed at:
14.4. Describe the Offeror’s role and responsibility during construction of the project. Indicate what portions of the project were self-performed, what parts were sub-contracted, and who the subcontractors were:
15. Your Performance Evaluation by Customer/Client, if known:
16. Provide at least 1 representative photo of the project.
Note: Use of additional pages as necessary to provide sufficient detail to satisfy Section M. However, information provided outside of this form will not be considered for Factor A
File details come from the government source that posted it.