Amendment_R0004.pdf
PDF 41 MB Posted
- Attached to
- MV Puget Drydock Maintenance Federal contract opportunity
- Solicitation number
- W912DW18Q0065
About this file
Amendment R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_R0005.pdf | ||
| Site_Visit_Attendance.docx | DOCX document | |
| A.03.21_Limited_Source_memo_(Brand_Name)_rev1.pdf | ||
| W912DW18Q0065R0003.pdf | ||
| Amendment_R0002.pdf | ||
| W912DW18Q0065R0001.pdf | ||
| W912DW18Q0065_Solicitation_.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see continuation sheet
(Amendment R0004)
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW18Q0065
X 9B. DATED (SEE ITEM 11)
06-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jul-2018
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW18Q0065
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT R0004
1. This amendment provides for the following changes:
a. Drawings are included. See attached.
2. The bid submittal time and date is July 26th 2018 at 10:00 AM PST.
3. NOTICE: Quoters must acknowledge receipt of this amendment by number and date on offer.
4. Below are answers to Quoter inquiries:
-Is the contractor to install sound proofing insulation?
Yes
-Is the contractor to paint the insulation once installed?
No
‐Is the contractor going to reuse or replace the shaft seals, rubber seals entering the tunnel?
The Shaft Seals were replaced less than 2 years ago. We are hoping the contractor can reuse them and only replace if they are damaged.
‐If the contractor is to replace the shaft seals. What size and manufacture are they?
4” Shaft Seal, Not sure Manufacture
‐If the contractor is to replace the rudder seals. What size and manufacture are they?
The Rudder Seals were replaced less than 2 years ago. We are hoping the contractor can reuse them and only replace if they are damaged Not Sure size or Manufacture
‐Due to the complexity of this section of the project. Can the POP be extended?
Period of Performance: Still determining if the POP can be extended
‐Contractor request the paint schedule for the preservation of the hull tunnel exterior and interior.
Interior: 2 coats primers and 2 coats of white Exterior: 2 coats primer and 2 coats anti fouling
‐In lieu of replacing the entire tunnels. Will the government entertain conducting UT hull/tunnel inspection to check for material thickness? (suggestions)
W912DW18Q0065
The Hull/Tunnel was inspected back in March and was suggested to replace the entire tunnels. Another inspection is not need
‐Is the contractor to bid an electric or hydraulic anchoring winch system? Reason is the there is a cost difference between the both. This could technically bid a contractor out the job.
USACE does not have a preference on type of winch system. Capstan needs to hold a minimum of 200’ ¾” wire.
USACE will provide Anchor and Chain.
‐Contractor request make, model of the winch system to be installed for uniformity for bidding purposes?
Per PWS 5.1.4 Contractor will need to design and install Anchoring system with a windless.
‐Orientation, is the winch a vertical or horizontal unit?
Horizontal
‐How long is the anchor chain?
20’
‐What is the orientation of the winch on the deck?
Facing Forward
‐What is the wiring configuration?
From Below deck
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 20-Jul-2018 10:00 AM to 26-Jul-2018 12:00 AM.
(End of Summary of Changes)