W912DW-17-B-0001-R0003.pdf

PDF 424 KB Posted

Attached to
Emergency Lighting at Libby Dam Federal contract opportunity
Solicitation number
W912DW-17-B-0001
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

Amendment R0003 to solicitation W912DW-17-B-0001.

View the file

Other files for this federal contract opportunity

Other files attached to Emergency Lighting at Libby Dam, newest first.
File Type Posted
B.01.01_-_ABSTRACT_17B0001.pdf PDF
W912DW-17-B-0001-R0010.pdf PDF
W912DW-17-B-0001-R0009.pdf PDF
W912DW-17-B-0001-R0008.pdf PDF
R0007_corrected.pdf PDF
R0007.pdf PDF
W912DW-17-B-0001-R0006.pdf PDF
W912WDW-17-B-0001-R0005.pdf PDF
W912DW-17-B-0001-R0004.pdf PDF
W912DW-17-B-0001-R0002.pdf PDF
W912DW-17-B-0001-R0001.pdf PDF
PN402251_LIEL-18-REFERENCE_DRAWINGS-RTA.pdf PDF
PN402251_LIBBY_DAM_EMERGENCY_LIGHTING-COMPILATION-RTA.pdf PDF
W912DW-17-B-0001.PDF PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68MD960336658

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912DW-17-B-0001 Libby Dam Pow erhouse Emergency Lighting, Libby, Montana

(see continuation page)

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Dec-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-17-B-0001

X 9B. DATED (SEE ITEM 11)

16-Nov-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Dec-2016

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CECT-NWS

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW-17-B-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CONTINUATION PAGE

1. This amendment three (0003) provides for the following:

a. Revision of Spec Sections

b. Revision of Drawings

2. The date and time of bid opening of 16 December 2016 at 10:00:00 a.m. LOCAL TIME remains the same.

3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.

4. NOTICE TO BIDDERS: Bidders must acknowledge receipt of this amendment by number and date on bid.

Please mark outside of envelope in which your bid is enclosed to show amendment received.

Encl:

Section 01 78 00 (revised) Section 03 11 13.00 10 (revised) Section 07 84 00 (revised) Section 14 21 23 (revised) Drawing PN402251_LIEL-E-104FP4R (revised)

SUMMARY OF CHANGES

(End of Summary of Changes)

FY16 Libby Dam Emergency Lighting 15003 Libby, MT W912DW-17-B-0001

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 78 00

CLOSEOUT SUBMITTALS

05/09

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 PAYMENT

1.4 PROJECT RECORD DOCUMENTS

1.4.1 Record Drawings

1.4.1.1 Government Furnished Materials

1.4.1.2 AS-BUILT FIELD DATA

1.4.1.3 Drawing Preparation

1.4.1.4 Computer Aided Design and Drafting (CADD) Drawings

1.5 CLEANUP

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 AS-BUILT FIELD DATA

3.2 AS-BUILT ELECTRONIC FILE DRAWINGS

3.2.1 Government Furnished Computer Aided Design And Drafting (CADD)

Drawings

3.2.2 Contractor Prepared As-Built Drawings

3.2.2.1 Drafting Quality

3.2.2.2 Marking of Final Drawings

3.2.3 Electronic File Format Requirements

3.2.3.1 General

3.2.3.2 Levels

3.2.3.3 Electronic File Deliverable Media

3.3 SYSTEM ACCEPTANCE TESTING

3.4 FINAL AS-BUILT RECORD DRAWINGS

3.4.1 Preliminary Final As-Built Record Drawings

3.4.2 Final As-Built Record Drawings

-- End of Section Table of Contents --

SECTION 01 78 00 Page 1 R0003

SECTION 01 78 00

CLOSEOUT SUBMITTALS

05/09

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

TR-12-X (2012) A/E/C CADD Standard Release 5.0

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

As-Built Field Data; G

System Acceptance Testing

SD-11 Closeout Submittals

As-Built Record Drawings; G

1.3 PAYMENT

Payment for the preparation and furnishing of as-built records and as-built drawings in electronic file format will be made in accordance with the BID SCHEDULE and Section 01 22 00.00 10 MEASUREMENT & PAYMENT.

No partial or total payment will be made for as-built drawings or O&M manuals until the complete sets are fully approved by the Government (A or B action) and all copies are received by the Government.

1.4 PROJECT RECORD DOCUMENTS

1.4.1 Record Drawings

This paragraph covers record drawings complete, as a requirement of the contract. The terms "drawings," "contract drawings," "drawing files," "working record drawings" and "final record drawings" refer to contract drawings which are revised to be used for final record drawings showning as-built conditions.

SECTION 01 78 00 Page 2 R0003

1.4.1.1 Government Furnished Materials

One set of electronic CADD files in the specified software and format revised to reflect all bid amendments will be provided by the Government at the preconstruction conference for projects requiring CADD file record drawings.

1.4.1.2 AS-BUILT FIELD DATA

Revise 2 sets of paper drawings by red-line process to show the as-built conditions during the prosecution of the project. Keep these working as-built marked drawings current on a weekly basis and at least one set available on the jobsite at all times. Changes from the contract plans which are made in the work or additional information which might be uncovered in the course of construction must be accurately and neatly recorded as they occur by means of details and notes. Prepare final record (as-built) drawings after the completion of each definable feature of work as listed in the Contractor Quality Control Plan. The working as-built marked prints and final record (as-built) drawings will be jointly reviewed for accuracy and completeness by the Contracting Officer and the Contractor prior to submission of each monthly pay estimate. If the Contractor fails to maintain the working and final record drawings as specified herein, the Contracting Officer will deduct from the monthly progress payment an amount representing the estimated cost of maintaining the record drawings. This monthly deduction will continue until an agreement can be reached between the Contracting Officer and the Contractor regarding the accuracy and completeness of updated drawings. Show on the working and final record drawings , but not limited to, the following information:

a. The location and dimensions of any changes within the building structure.

b. Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor; including but not limited to fabrication, erection, installation plans and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc.

c. Changes or modifications which result from the final inspection.

d. Where contract drawings or specifications present options, show only the option selected for construction on the final as-built prints.

e. Systems designed or enhanced by the Contractor, such as HVAC controls, fire alarm, fire sprinkler, and irrigation systems.

f. All changes or modifications from the original design and from the final inspection.

g. Where contract drawings or specifications allow options, only the option actually used in the construction shall be shown on the as-built drawings. The option not used shall be deleted.

These deviations shall be shown in the same general detail utilized in the contract drawings. Marking of the prints shall be pursued continuously during construction to keep them up to date. In addition, maintain full size marked-up drawings, survey notes, sketches, nameplate data, pricing information, description, and serial numbers of all installed equipment.

This information shall be maintained in a current condition at all times

SECTION 01 78 00 Page 3 R0003 until the completion of the work. The resulting field-marked prints and data shall be referred to and marked as "As-Built Field Data," and shall be used for no other purpose. They shall be made available for inspection by the Contracting Officer's representative whenever requested during construction and shall be jointly inspected for accuracy and completeness by the Contracting Officer's representative and a responsible representative of the Contractor prior to submission of each monthly pay estimate. Failure to keep the As-Built Field Data (including Equipment-in-Place lists) current shall be sufficient justification to withhold a retained percentage from the monthly pay estimate.

1.4.1.3 Drawing Preparation

Modify the record drawings as may be necessary to correctly show the features of the project as it has been constructed by bringing the contract set into agreement with approved working as-built prints, and adding such additional drawings as may be necessary. These working as-built marked prints must be neat, legible and accurate. These drawings are part of the permanent records of this project and must be returned to the Contracting Officer after approval by the Government. Any drawings damaged or lost by the Contractor must be satisfactorily replaced by the Contractor at no expense to the Government.

1.4.1.4 Computer Aided Design and Drafting (CADD) Drawings

Only employ personnel proficient in the preparation of CADD drawings to modify the contract drawings or prepare additional new drawings. Additions and corrections to the contract drawings must be equal in quality and detail to that of the originals. Line colors, line weights, lettering, layering conventions, and symbols must be the same as the original line colors, line weights, lettering, layering conventions, and symbols. If additional drawings are required, prepare them using the specified electronic file format applying TR-12-X. The title block and drawing border to be used for any new final record drawings must be identical to that used on the contract drawings. Accomplish additions and corrections to the contract drawings using CADD files. The Contractor will be furnished "as-designed" drawings in Microstation V8 format compatible with a Windows XP operating system. The electronic files will be supplied on compact disc, read-only memory (CD-ROM). Provide all program files and hardware necessary to prepare final record drawings. The Contracting Officer will review final record drawings for accuracy and return them to the Contractor for required corrections, changes, additions, and deletions.

a. Provide CADD "base" colors of red, green, and blue. Color code for changes as follows:

(1) Deletions (Red) - Over-strike deleted graphic items (lines), lettering in notes and leaders.

(2) Additions (Green) - Added items, lettering in notes and leaders.

(3) Special (Blue) - Items requiring special information, coordination, or special detailing or detailing notes.

b. Rename the Contract Drawing files in a manner related to the contract number (i.e., 98-C-10.DGN) as instructed in the Pre-Construction conference. Use only those renamed files for the Marked-up changes.

All changes shall be made on the layer/level as the original item.

SECTION 01 78 00 Page 4 R0003

c. When final revisions have been completed, show the wording "RECORD DRAWINGS / AS-BUILT CONDITIONS" followed by the name of the Contractor in letters at least 3/16 inch high on the cover sheet drawing. Mark all other contract drawings either "Record" drawing denoting no revisions on the sheet or "Revised Record" denoting one or more revisions. Date original contract drawings in the revision block.

d. Within 10 days after Government approval of all of the working record drawings for a phase of work, prepare the final CADD record drawings for that phase of work and submit two sets of blue-lined prints of these drawings for Government review and approval. The Government will promptly return one set of prints annotated with any necessary corrections. Within 7 days revise the CADD files accordingly at no additional cost and submit one set of final prints for the completed phase of work to the Government. Within 10 days of substantial completion of all phases of work, submit the final record drawing package for the entire project. Submit one set of electronic files on compact disc, read-only memory (CD-ROM), two sets of blue-line prints and one set of the approved working record drawings. They must be complete in all details and identical in form and function to the contract drawing files supplied by the Government. Any transactions or adjustments necessary to accomplish this is the responsibility of the Contractor. The Government reserves the right to reject any drawing files it deems incompatible with the customer's CADD system. Paper prints, drawing files and storage media submitted will become the property of the Government upon final approval. Failure to submit final record drawing files and marked prints as specified will be cause for withholding any payment due the Contractor under this contract.

Approval and acceptance of final record drawings must be accomplished before final payment is made to the Contractor.

1.5 CLEANUP

Leave premises "broom clean." Clean interior and exterior glass surfaces exposed to view; remove temporary labels, stains and foreign substances;

polish transparent and glossy surfaces; vacuum carpeted and soft surfaces.

Clean equipment and fixtures to a sanitary condition. Replace filters of operating equipment. Clean debris from roofs, gutters, downspouts and drainage systems. Sweep paved areas and rake clean landscaped areas.

Remove waste and surplus materials, rubbish and construction facilities from the site.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 AS-BUILT FIELD DATA

Keep at the construction site, two complete sets of full size prints of the contract drawings, reproduced at Contractor expense, one for the Contractor's use, one for the Government. During construction, both sets of prints shall be marked to show all deviations in actual construction from the contract drawings. The color red shall be used to indicate all additions and green to indicate all deletions. The drawings shall show the following information but not be limited thereto:

a. The locations and dimension of any changes within the building or structure.

SECTION 01 78 00 Page 5 R0003

b. Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor including, but not limited to, fabrication erection, installation, and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc.

c. All changes or modifications from the original design and from the final inspection.

These deviations shall be shown in the same general detail utilized in the contract drawings. Marking of the prints shall be pursued continuously during construction to keep them up to date. In addition, maintain full size marked-up drawings, survey notes, sketches, nameplate data, pricing information, description, and serial numbers of all installed equipment.

This information shall be maintained in a current condition at all times until the completion of the work. The resulting field-marked prints and data shall be referred to and marked as "As-Built Field Data," and shall be used for no other purpose. They shall be made available for inspection by the Contracting Officer's representative whenever requested during construction and shall be jointly inspected for accuracy and completeness by the Contracting Officer's representative and a responsible representative of the Contractor prior to submission of each monthly pay estimate. Failure to keep the As-Built Field Data (including Equipment-in-Place lists) current shall be sufficient justification to withhold a retained percentage from the monthly pay estimate.

3.2 AS-BUILT ELECTRONIC FILE DRAWINGS

3.2.1 Government Furnished Computer Aided Design And Drafting (CADD) Drawings

No earlier than 30 days after award the Government will have available for the Contractor one set of MicroStation electronic file format contract drawings to be used for preparation of as-built drawings. The electronic file drawings will be available on ISO-9660 CD-ROM. The Contractor has 30 days after the receipt of the electronic file to verify the usability of the MicroStation files, and bring any discrepancies to the attention of the Contracting Officer. Any discrepancies will be corrected within 15 days and files returned to the Contractor.

3.2.2 Contractor Prepared As-Built Drawings

Incorporate all deviations from the original contract drawings as recorded in the approved 'As-built Field Data' (see paragraph above). Incorporate all the written modifications to the contract drawings which were issued by amendment during the bidding period or by modification after award of the contract. All revisions and changes shall be incorporated, i.e. items marked "deleted" shall be deleted, clouds around new items shall be removed, etc. Prepare the complete set of preliminary final and final as-built drawings in MicroStation electronic file format. The electronic file format, layering standards and submittal requirements are specified in the paragraph "Electronic File Format Requirements.

3.2.2.1 Drafting Quality

The as-built drawings shall be done in a quality equal to that of the originals. Line work, line weights, lettering, and use of symbols shall be the same as the original line work, line weights, and lettering, and symbols. If additional drawings are required they shall be prepared in

SECTION 01 78 00 Page 6 R0003 electronic file format under the same guidance.

3.2.2.2 Marking of Final Drawings

When final revisions have been completed, each drawing shall be identified with the words "AS-BUILT" in block letters at least 3/8-inch high placed above the title block if space permits, or if not, below the title block between the border and the trim line. The date of completion and the words "REVISED AS-BUILT" shall be placed in the revision block above the latest revision notation.

3.2.3 Electronic File Format Requirements

3.2.3.1 General

The MicroStation electronic as-built file(s) deliverable shall be in MicroStation 'DGN' or Autocad 'DWG' binary format. All support files required to display or plot the file(s) in the same manner as they were developed shall be delivered along with the files. These files include but are not limited to font libraries, pen tables, and referenced files.

3.2.3.2 Levels

Levels shall remain as provided in the electronic files. An explanatory list of which levels are in each drawing, including any additional levels needed to complete incorporation of the As-Built data shall be provided with each submittal.

3.2.3.3 Electronic File Deliverable Media

All electronic files shall be submitted in ISO 9660 format CD-ROM (CD).

Zip drive disks shall not be provided. Each CD shall have a clearly marked label stating the Contractor's firm name, project name and location, submittal type (AS-BUILT), and date the CD was made. Each submittal shall be accompanied by a hard copy transmittal sheet that contains the above information along with tabulated information about all files submitted, as shown below:

Electronic File Name Plate Number Drawing Title

Electronic version of the table shall be included with each submittal set of disks.

3.3 SYSTEM ACCEPTANCE TESTING

One set of marked-up as-built prints shall be furnished at the time of system acceptance testing. These as-built prints shall be in addition to the submittals of marked-up as-built prints specified elsewhere in the contract.

3.4 FINAL AS-BUILT RECORD DRAWINGS

3.4.1 Preliminary Final As-Built Record Drawings

After substantial completion of all work and no later than 10 calendar days after completion of the pre-final inspection, submit preliminary final CADD as-built record drawings. Also submit two sets of prints of these drawings for Government review and approval (preliminary as-built drawings). The Government will promptly return one set of prints annotated with any

SECTION 01 78 00 Page 7 R0003 necessary corrections. All drawings from the original contract drawings set shall be included, including the drawings where no changes were made.

The Government will review all as-built record drawings for accuracy and conformance to the drafting standards and other requirements contained in DIVISION 1 GENERAL REQUIREMENTS. They shall be complete in all details and identical in form and function to the contract drawing files supplied by the Government. Any transactions or adjustments necessary to accomplish this is the responsibility of the Contractor. The Government reserves the right to reject any drawing files it deems incompatible with the specified CADD system. Paper prints, drawing files and storage media submitted will become the property of the Government upon final approval.

3.4.2 Final As-Built Record Drawings

After completion of all work and acceptance by the Contracting Officer and no later than 30 calendar days after completion of the final inspection, submit final CADD as-built record drawings. All drawings from the original contract drawings set shall be included, including the drawings where no changes were made. The Government will review all final as-built record drawings for accuracy and conformance to the drafting standards and other requirements contained in DIVISION 1 GENERAL REQUIREMENTS. The drawings will be returned to the Contractor if corrections are necessary. Within 7 calendar days,revise the CADD files accordingly at no additional cost.

-- End of Section --

SECTION 01 78 00 Page 8 R0003

SECTION TABLE OF CONTENTS

DIVISION 03 - CONCRETE

SECTION 03 11 13.00 10

STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

08/10

PART 1 GENERAL

1.1 REFERENCES

1.2 SYSTEM DESCRIPTION

1.3 SUBMITTALS

1.4 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 FORM MATERIALS

2.1.1 Forms For Class A Finish

2.1.2 Forms For Class B Finish

2.1.3 Forms For Class C Finish

2.1.4 Forms For Class D Finish

2.1.5 Retain-In-Place Metal Forms

2.1.6 Pan-Form Units

2.1.7 Form Ties

2.1.8 Form Releasing Agents

2.1.9 Fiber Voids

2.2 FIBER VOID RETAINERS

2.2.1 Polystyrene Rigid Insulation

2.2.2 Precast Concrete

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Formwork

3.1.2 Fiber Voids

3.1.3 Fiber Void Retainers

3.2 CHAMFERING

3.3 COATING

3.4 FORM REMOVAL

3.4.1 Formwork Not Supporting Weight of Concrete

3.4.2 Formwork Supporting Weight of Concrete

3.4.3 Tunnel Forms

3.5 INSPECTION

SECTION 03 11 13.00 10 Page 1 R0003

SECTION 03 11 13.00 10

STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

08/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE (ACI)

ACI 347 (2004; Errata 2008) Guide to Formwork for Concrete

AMERICAN HARDBOARD ASSOCIATION (AHA)

AHA A135.4 (1995; R 2004) Basic Hardboard

APA - THE ENGINEERED WOOD ASSOCIATION (APA)

APA L870 (2010) Voluntary Product Standard, PS 1-09, Structural Plywood

ASTM INTERNATIONAL (ASTM)

ASTM C1077 (2011c) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation

ASTM C31/C31M (2010) Standard Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C39/C39M (2011) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

ASTM C578 (2011b) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation

1.2 SYSTEM DESCRIPTION

The design, engineering, and construction of the formwork is the responsibility of the Contractor. Design formwork in accordance with methodology of ACI 347 for anticipated loads, lateral pressures, and stresses, and capable of withstanding the pressures resulting from placement and vibration of concrete. , paragraph CONSTRUCTION TOLERANCES.

However, for surfaces with an ACI Class A surface designation, limit the allowable deflection for facing material between studs, for studs between walers and walers between bracing to 0.0025 times the span. Design the formwork as a complete system with consideration given to the effects of cementitious materials and mixture additives such as fly ash, cement type, SECTION 03 11 13.00 10 Page 2 R0003 plasticizers, accelerators, retarders, air entrainment, and others.

Monitor the adequacy of formwork design and construction prior to and during concrete placement as part of the Contractor's approved Quality Control Plan. Submit design analysis and calculations for form design and methodology used in the design.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Formwork; G

SD-03 Product Data

Design Form Materials Form Releasing Agents

SD-04 Samples

Sample Panels; G Fiber Voids; G

SD-06 Test Reports

Inspection Formwork Not Supporting Weight of Concrete; G.

SD-07 Certificates

Fiber Voids

1.4 QUALITY ASSURANCE

Sample Panels shall be of sufficient size to contain joints and shall be not less than 6 feet long and 4 feet wide. The panels shall be of typical wall thickness and constructed containing the full allocation of reinforcing steel that will be used in the structure, with the forming system that duplicates in every detail the one that will be used in construction of the structure. Use the same concrete mixture proportion and materials, the same placement techniques and equipment, and the same finishing techniques and timing that are planned for the structure.

Construction of Class A finish will not be permitted until sample panels have been approved. Protect sample panels from construction operations in a manner to protect approved finish, and are not to be removed until all Class A finish concrete has been accepted. After shop drawings have been reviewed, submit sample panels for Class A finish with applied architectural treatment; panels shall be built on the project site where directed.

1.4 DELIVERY, STORAGE, AND HANDLING

Store fiber voids above ground level in a dry location. Fiber voids shall

SECTION 03 11 13.00 10 Page 3 R0003 be kept dry until installed and overlaid with concrete.

PART 2 PRODUCTS

2.1 FORM MATERIALS

Submit manufacturer's data, including literature describing form materials, accessories, and form releasing agents.

2.1.1 Forms For Class A Finish

Forms for Class A finished surfaces shall be plywood panels conforming to APA L870, Grade B-B concrete form panels, Class I or II. Other form materials or liners may be used provided the smoothness and appearance of concrete produced will be equivalent to that produced by the plywood concrete form panels. Forms for round columns shall be the prefabricated seamless type.

2.1.2 Forms For Class B Finish

This class of finish shall apply to all surfaces except those specified to receive Class A. Forms for Class B finished surfaces shall be plywood panels conforming to APA L870, Grade B-B concrete form panels, Class I or II. Other form materials or liners may be used provided the smoothness and appearance of concrete produced will be equivalent to that produced by the plywood concrete form panels. Forms for round columns shall be the prefabricated seamless type. Steel lining on wood sheathing will not be permitted.

2.1.3 Forms For Class C Finish

Forms for Class C finished surfaces shall be shiplap lumber; plywood conforming to APA L870, Grade B-B concrete form panels, Class I or II;

tempered concrete form hardboard conforming to AHA A135.4; other approved concrete form material; or steel, except that steel lining on wood sheathing shall not be used. Forms for round columns may have one vertical seam.

2.1.4 Forms For Class D Finish

Forms for Class D finished surfaces, except where concrete is placed against earth, shall be wood or steel or other approved concrete form material.

2.1.5 Retain-In-Place Metal Forms

Retain-in-place metal forms for concrete slabs and roofs shall be as specified .

2.1.6 Pan-Form Units

Pan-form units for one-way or two-way concrete joist and slab construction shall be factory-fabricated units of the approximate section indicated.

Units shall consist of steel or molded fiberglass concrete form pans.

Closure units shall be furnished as required.

2.1.7 Form Ties

Form ties shall be factory-fabricated metal ties, shall be of the removable

SECTION 03 11 13.00 10 Page 4 R0003 or internal disconnecting or snap-off type, and shall be of a design that will not permit form deflection and will not spall concrete upon removal.

Provide solid backing for each tie. Except where removable tie rods are used, ties shall not leave holes in the concrete surface less than 1/4 inch nor more than 1 inch deep and not more than 1 inch in diameter. Terminate the embedded portion of metal ties not less that 2 inches from any concrete surface exposed to water. Removable tie rods shall be not more than 1-1/2 inches in diameter. Plastic snap ties may be used in locations where the surface will not be exposed to view.

2.1.8 Form Releasing Agents

Form releasing agents shall be commercial formulations that will not bond with, stain or adversely affect concrete surfaces. Agents shall not impair subsequent treatment of concrete surfaces depending upon bond or adhesion nor impede the wetting of surfaces to be cured with water or curing compounds. If special form liners are to be used, follow the recommendation of the form coating manufacturer. Submit manufacturer's recommendation on method and rate of application of form releasing agents.

2.1.9 Fiber Voids

Fiber voids shall be the product of a reputable manufacturer regularly engaged in the commercial production of fiber voids. The voids shall be constructed of double faced, corrugated fiberboard. The corrugated fiberboard shall be fabricated of wet strength paper liners, impregnated with paraffin, and laminated with moisture resistant adhesive, and shall have a board strength of 275 psi. Voids which are impregnated with paraffin after construction, in lieu of being constructed with paraffin impregnated fiberboard, are acceptable. Voids shall be designed to support not less than 1000 psf. To prevent separation during concrete placement fiber voids shall be assembled with steel or plastic banding at 4 feet on center maximum, or by adequate stapling or gluing as recommended by the manufacturer. Fiber voids placed under concrete slabs and that are 8 inches in depth may be heavy duty "waffle box" type, constructed of paraffin impregnated corrugated fiberboard. Submit one sample unit of fiber voids prior to installation of the voids and certificates attesting that fiber voids conform to the specified requirements.

2.2 FIBER VOID RETAINERS

2.2.1 Polystyrene Rigid Insulation

Polystyrene rigid insulation shall conform to ASTM C578, Type V, VI, or VII, square edged. Size shall be 1-1/2 inches thick by 16 inches in height by 3 feet in length, unless otherwise indicated.

2.2.2 Precast Concrete

Precast concrete units shall have a compressive strength of not less than 2500 psi, reinforced with 6 inch by 6 inch by W1.4 WWF wire mesh, and 12 inches (height) by 3 feet (length) by 1-5/8 inches (thickness) in size unless indicated.

SECTION 03 11 13.00 10 Page 5 R0003

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Formwork

Forms shall be constructed true to the structural design and required alignment. Forms shall be mortar tight, properly aligned and adequately supported to produce concrete surfaces meeting the surface requirements specified and conforming to construction tolerance given in TABLE 1.

Continuously monitor the alignment and stability of the forms during all phases to assure the finished product will meet the required surface class specified. Failure of any supporting surface either due to surface texture, deflection or form collapse shall be the responsibility of the Contractor as will the replacement or correction of unsatisfactory surfa ces. Where concrete surfaces are to have a Class A or Class B finish, joints in form panels shall be arranged as approved. When forms for continuous surfaces are placed in successive units, care shall be taken to fit the forms over the completed surface to obtain accurate alignment of the surface and to prevent leakage of mortar. Forms shall not be re-used if there is any evidence of defects which would impair the quality of the resulting concrete surface. All surfaces of used forms shall be cleaned of mortar and any other foreign material before reuse. Form ties that are to be completely withdrawn shall be coated with a nonstaining bond breaker.

Submit drawings showing details of formwork, including dimensions of fiber voids, joints, supports, studding and shoring, and sequence of form and shoring removal. 3.1.2 Fiber Voids

Voids shall be placed on a smooth firm dry bed of suitable material, to avoid being displaced vertically, and shall be set tight, with no buckled cartons, in order that horizontal displacement cannot take place. Each section of void shall have its ends sealed by dipping in paraffin, with any additional cutting of voids at the jobsite to be field dipped in the same type of sealer, unless liners and flutes are completely impregnated with paraffin. Prior to placing reinforcement, the entire formed area for slabs shall be covered with a 4 x 8 feet minimum flat sheets of fiber void corrugated fiberboard. Joints shall be sealed with a moisture resistant tape having a minimum width of 3 inches. If voids are destroyed or damaged and are not capable of supporting the design load, they shall be replaced prior to placing of concrete.

3.1.3 Fiber Void Retainers

Fiber void retainers shall be installed, continuously, on both sides of fiber voids placed under grade beams in order to retain the cavity after the fiber voids biodegrade.

3.2 CHAMFERING

All exposed joints, edges and external corners shall be chamfered by molding placed in the forms unless the drawings specifically state that chamfering is to be omitted or as otherwise specified. Chamfered joints shall not be permitted where earth or rockfill is placed in contact with concrete surfaces. Chamfered joints shall be terminated twelve inches outside the limit of the earth or rockfill so that the end of the chamfers will be clearly visible.

SECTION 03 11 13.00 10 Page 6 R0003

3.3 COATING

Forms for Class A and Class B finished surfaces shall be coated with a form releasing agent before the form or reinforcement is placed in final position. The coating shall be used as recommended in the manufacturer's printed or written instructions. Forms for Class C and D finished surfaces may be wet with water in lieu of coating immediately before placing concrete, except that in cold weather with probable freezing temperatures, coating shall be mandatory. Surplus coating on form surfaces and coating on reinforcing steel and construction joints shall be removed before placing concrete.

3.4 FORM REMOVAL

Forms shall not be removed without approval. The minimal time required for concrete to reach a strength adequate for removal of formwork without risking the safety of workers or the quality of the concrete depends on a number of factors including, but not limited to, ambient temperature, concrete lift heights, type and amount of concrete admixture, and type and amount of cementitious material in the concrete. It is the responsibility of the Contractor to consider all applicable factors and leave the forms in place until it is safe to remove them. In any case forms shall not be removed unless the minimum compressive strength requirements below are met, except as otherwise directed or specifically authorized. When conditions are such as to justify the requirement, forms will be required to remain in place for a longer period. All removal shall be accomplished in a manner which will prevent damage to the concrete and ensure the complete safety of the structure. Where forms support more than one element, the forms shall not be removed until the form removal criteria are met by all supported elements. Evidence that concrete has gained sufficient strength to permit removal of forms shall be determined by tests on control cylinders. All control cylinders shall be stored in the structure or as near the structure as possible so they receive the same curing conditions and protection methods as given those portions of the structure they represent. Control cylinders shall be removed from the molds at an age of no more than 24 hours. All control cylinders shall be prepared and tested in accordance with ASTM C31/C31M and ASTM C39/C39M at the expense of the Contractor by an independent laboratory that complies with ASTM C1077 and shall be tested within 4 hours after removal from the site.

3.4.1 Formwork Not Supporting Weight of Concrete

Formwork for walls, columns, sides of beams, gravity structures, and other vertical type formwork not supporting the weight of concrete shall not be removed in less than 24 hours after concrete placement is completed. If forms are to be removed in less than 24 hours on formwork not supporting the weight of concrete, submit the evaluation and results of the control cylinder tests shall be submitted to and approved before the forms are removed.

3.4.2 Formwork Supporting Weight of Concrete

Formwork supporting weight of concrete and shoring shall not be removed until structural members have acquired sufficient strength to safely support their own weight and any construction or other superimposed loads to which the supported concrete may be subjected. As a minimum, forms shall be left in place until control concrete test cylinders indicate evidence the concrete has attained at least 80 percent of the compressive strength required for the structure in accordance with the quality and

SECTION 03 11 13.00 10 Page 7 R0003 location requirements.

3.4.3 Tunnel Forms

Tunnel lining bulkhead forms shall not be removed in less than 12 hours and tunnel lining forms in not less than 16 hours.

3.5 INSPECTION

Forms and embedded items shall be inspected in sufficient time prior to each concrete placement in order to certify to the Contracting Officer that they are ready to receive concrete. The results of each inspection shall be reported in writing. Submit field inspection reports for concrete forms and embedded items.

TABLE 1

TOLERANCES FOR FORMED SURFACES

1. Variations from the plumb:

a. In the lines and surfaces of columns, piers, walls and in arises

1/4 inch in any 10 feet of length Maximum for entire length -- 1 inch

2. Variation of distance between walls, columns, partitions

1/4 inch per 10 feet of distance, but not more than 1/2 inch in any one bay, and not more than 1 inch total variation

SECTION 03 11 13.00 10 Page 8 R0003

TABLE 1

TOLERANCES FOR FORMED SURFACES

3. Variation in cross-sectional dimensions of columns and beams and in the thickness of slabs and walls

Minus 1/4 inch, Plus 1/2 inch

SECTION 03 11 13.00 10 Page 9 R0003

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 84 00

FIRESTOPPING

05/10

PART 1 GENERAL

1.1 REFERENCES

1.2 SYSTEM DESCRIPTION

1.2.1 General

1.2.2 Sequencing

1.2.3 Submittals Requirements

1.3 SUBMITTALS

1.4 QUALITY ASSURANCE

1.5 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 FIRESTOPPING MATERIALS

2.1.1 Fire Hazard Classification

2.1.2 Toxicity

2.1.3 Fire Resistance Rating

2.1.3.1 Through-Penetrations

2.1.3.2 Construction Joints and Gaps

2.1.4 Material Performance

PART 3 EXECUTION

3.1 PREPARATION

3.2 INSTALLATION

3.2.1 Insulated Pipes and Ducts

3.2.2 Fire Dampers

3.2.3 Data and Communication Cabling

3.3 INSPECTION

3.3.1 General Requirements

3.3.2 Inspection Standards

SECTION 07 84 00 Page 1 R0003

SECTION 07 84 00

FIRESTOPPING

05/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E119 (2016) Standard Test Methods for Fire Tests of Building Construction and Materials

ASTM E1399 (1997; R 2009) Cyclic Movement and Measuring the Minimum and Maximum Joint Widths of Architectural Joint Systems

ASTM E1966 (2007) Fire-Resistive Joint Systems

ASTM E2174 (2010a) Standard Practice for On-Site Inspection of Installed Fire Stops

ASTM E2307 (2010) Standard Test Method for Determining Fire Resistance of Perimeter Fire Barrier Systems Using Intermediate-Scale, Multi-story Test Apparatus

ASTM E2393 (2010a) Standard Practice for On-Site Inspection of Installed Fire Resistive Joint Systems and Perimeter Fire Barriers

ASTM E814 (2011) Standard Test Method for Fire Tests of Through-Penetration Fire Stops

ASTM E84 (2012) Standard Test Method for Surface Burning Characteristics of Building Materials

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

FM AS 4991 (2001) Approval of Firestop Contractors

UNDERWRITERS LABORATORIES (UL)

UL 1479 (2003; Reprint 2010) UL Standard for Safety Fire Tests of Through-Penetration Firestops - Third Edition

SECTION 07 84 00 Page 2 R0003

UL 2079 (2004; Reprint Jun 2008) Tests for Fire Resistance of Building Joint Systems

UL 723 (2008; Reprint 2010) Standard for Test for Surface Burning Characteristics of Building Materials

UL Fire Resistance (2014) Fire Resistance Directory

1.2 SYSTEM DESCRIPTION

1.2.1 General

Furnish and install tested and listed firestopping systems, combination of materials, or devices to form an effective barrier against the spread of flame, smoke and gases, and maintain the integrity of fire resistance rated walls, partitions, floors, and ceiling-floor assemblies, including through-penetrations and construction joints and gaps.

a. Through-penetrations include the annular space around pipes, tubes, conduit, wires, cables and vents.

b. Construction joints include those used to accommodate expansion, contraction, wind, or seismic movement; firestopping material shall not interfere with the required movement of the joint.

c. Gaps requiring firestopping include gaps between the curtain wall and the floor slab and between the top of the fire-rated walls and the roof or floor deck above and at the intersection of shaft assemblies and adjoining fire resistance rated assemblies.

In addition to furnishing and installing tested and listed firestop systems for all new penetrations through fire rated assemblies, furnish and install tested and listed firestop systems for existing utility penetrations. Do not route new utilities through stair enclosures, or the exit passageways on Elevation 2131.5 unless utility serves specific enclosure or passageway. Quantity of existing utilities requiring fire stopping is approximately as follows:

1) Conduit and pipe up to 2 inches in diameter: 35 to 50 penetrations.

2) Conduit and pipe greater than 2 inches but not greater than 6 inches in diameter: 10 to 13 penetrations.

3) Ductwork and vents: 10 to 12 penetrations.

1.2.2 Sequencing

Coordinate the specified work with other trades. Apply firestopping materials, at penetrations of pipes and ducts, prior to insulating, unless insulation meets requirements specified for firestopping. Apply firestopping materials. at building joints and construction gaps, prior to completion of enclosing walls or assemblies. Cast-in-place firestop devices shall be located and installed in place before concrete placement.

Pipe, conduit or cable bundles shall be installed through cast-in-place device after concrete placement but before area is concealed or made inaccessible. Firestop material shall be inspected and approved prior to final completion and enclosing of any assemblies that may conceal installed firestop.

SECTION 07 84 00 Page 3 R0003

1.2.3 Submittals Requirements

a. Submit detail drawings including manufacturer's descriptive data, typical details conforming to UL Fire Resistance or other details certified by another nationally recognized testing laboratory, installation instructions or UL listing details for a firestopping assembly in lieu of fire-test data or report. For those firestop applications for which no UL tested system is available through a manufacturer, a manufacturer's engineering judgment, derived from similar UL system designs or other tests, shall be submitted for review and approval prior to installation. Submittal shall indicate the firestopping material to be provided for each type of application.

When more than a total of 5 penetrations and/or construction joints are to receive firestopping, provide drawings that indicate location, "F" "T" and "L" ratings, and type of application.

b. Submit certificates attesting that firestopping material complies with the specified requirements. For intumescent firestop materials used in through penetration systems, manufacturer shall provide certification from UL of passing the "Aging and Environmental Exposure Testing " portion of UL 1479.

c. Submit documentation of training and experience for Installer.

d. Submit manufacturer's representative certification stating that firestopping work has been inspected and found to be applied according to the manufacturer's recommendations and the specified requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Firestopping Materials; G.

SD-07 Certificates

Firestopping Materials

Installer Qualifications

Inspection; G

1.4 QUALITY ASSURANCE

Engage an experienced Installer who is:

a. FM Research approved in accordance with FM AS 4991, operating as a UL Certified Firestop Contractor, or

b. Certified, licensed, or otherwise qualified by the firestopping manufacturer as having the necessary staff, training, and a minimum of 3 years experience in the installation of manufacturer's products in accordance with specified requirements. A manufacturer's willingness

SECTION 07 84 00 Page 4 R0003 to sell its firestopping products to the Contractor or to an installer engaged by the Contractor does not in itself confer installer qualifications on the buyer. The Installer shall have been trained by a direct representative of the manufacturer (not distributor or agent) in the proper selection and installation procedures. The installer shall obtain from the manufacturer written certification of training, and retain proof of certification for duration of firestop installation.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver materials in the original unopened packages or containers showing name of the manufacturer and the brand name. Store materials off the ground, protected from damage and exposure to elements. Remove damaged or deteriorated materials from the site.

PART 2 PRODUCTS

2.1 FIRESTOPPING MATERIALS

Provide firestopping materials, supplied from a single domestic manufacturer, consisting of commercially manufactured, asbestos-free, nontoxic, water-based, noncombustible products FM APP GUIDE approved, or UL listed, for use with applicable construction and penetrating items, complying with the following minimum requirements:

2.1.1 Fire Hazard Classification

Material shall have a flame spread of 25 or less, and a smoke developed rating of 50 or less, when tested in accordance with ASTM E84 or UL 723.

Material shall be an approved firestopping material as listed in UL Fire Resistance or by a nationally recognized testing laboratory.

2.1.2 Toxicity

Material shall be nontoxic and carcinogen free to humans at all stages of application or during fire conditions and shall not contain hazardous chemicals or require harmful chemicals to…