TECHNICAL_SPECIFICATIONS_.pdf
PDF 2 MB Posted
- Attached to
- Construct Fire Station, Joint Base-McGuire-Dix-Lakehurst, New Jersey Federal contract opportunity
- Solicitation number
- W912DS-15-R-0010
About this file
W912DS-15-R-0010- SOLICITATION TECHNICAL SPECIFICATIONS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DS-15-R-0010-0001.pdf | ||
| APPENDICES.pdf | ||
| W912DS-15-R-0010_SOLICITATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW YORK DISTRICT
Request for Proposal
Construct New
FY15 Satellite Fire Station
PN: HEKP103001
Joint Base-McGuire/Dix/Lakehurst Fort Dix, New Jersey
RFP No. W912DS-15-R-0010
Specifications
THIS PAGE IS BLANK
CHECKLIST - 1
US ARMY ENGINEER DISTRICT, NEW YORK
INVITATION FOR BIDS NO. W912DS-15-R-0010
CHECK LIST FOR BIDDERS
ATTACHED IS IFB NO. W912DS-15-R-0010
Satellite Fire Station Joint Base McGuire/Dix/Lakehurst New Jersey
ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION
MUST BE FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR
OFFER INELIGIBLE FOR AWARD. IMPORTANT ITEMS FOR YOU TO CHECK
ARE INCLUDED IN BUT NOT LIMITED TO THOSE LISTED BELOW. THIS
INFORMATION IS FURNISHED ONLY TO ASSIST YOU IN SUBMITTING A
PROPER BID
__HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?
__HAVE YOU COMPLETED THE “REPRESENTATIONS AND CERTIFICATIONS”
(SECTION 00600) PORTION OF THE SOLICITATION?
__IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?
__IS YOUR BID PROPERLY SIGNED?
__IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND
SURETY AND ARE ALL SEALS AFFIXED?
__DO THE BID BOND AND ACCOMPANYING DOCUMENTS BEAR
SIGNATURES AND SEALS AFFIXED AFTER THE DOCUMENT WAS
GENERATED, AS OPPOSED TO COMPUTER PRINTER-GENERATED
SIGNATURES AND/OR SEALS?
__HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR OFFER
BY ALTERING THE PROVISIONS OF THE SOLICITATION?
__WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH PRICE
ITEM? (THE SOLICITATION SPECIFICALLY STATES WHEN THIS IS
NECESSARY.)
__ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR
FIGURES LEGIBLE?
CHECKLIST - 2
__IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE
THEY INITIALED BY THE PERSON SIGNING THE BID?
__DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY
THAT IT ISA SEALED BID AND DOES IT CONTAIN THE CORRECT
SOLICITATION NUMBER AND BID OPENING TIME?
__WILL YOUR OFFER ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED “LATE
SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS” IN THE
INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00100
OF THE SOLICITATION.)
NOTE: THERE ARE INCREASED SECURITY MEASURES AT JACOB K.
JAVITS FEDERAL BUILDING, 26 FEDERAL PLAZA THAT MAY AFFECT THE
TIME IT TAKES TO ENTER THE BUILDING. BIDDERS IS RESPONSIBLE TO
ENSURE THAT ITS BID IS SUBMITTED TIMELY.
COVER SHEET
NEW YORK DISTRICT
CORPS OF ENGINEERS
NEW YORK, NEW YORK 10278-0090
REQUEST FOR PROPOSALS
FOR
Joint Base McGuire/Dix/Lakehurst New Jersey
1. Attached is REQUEST FOR PROPOSALS (RFP) NO. W912DS-15-R-0010
2. BIDS/OFFERS MUST BE SET FORTH full, accurate, and complete information as required by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed under Title 18, United States Code, Section 1001.
3. SUBMISSION OF BIDS/OFFERS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 16).
4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL
OPPORTUNITY clause as it applies to the contract resulting from this solicitation.
(See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 21 16 of this
RFP).
5. REPRESENTATIONS AND CERTIFICATIONS – SECTION 00 45 00
Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.
Within Section 00 45 00, note in particular the PROHIBITION SEGREGATED FACILITIES. Failure of a bidder or Offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause (1984 APR).
6. This project is funded by the Department of Defense and is NOT a Civil Works program. Buy American Act - Construction Materials (May 1993) in accordance with FAR 52.225-5 DOES NOT applies.
7. Please review all bonds and accompanying documents required to be submitted.
Bonds, Powers of Attorney, statements of authenticity and continuing validity, and all related documents MUST NOT bear computer printer-generated signatures and/or seals. Documents bearing signatures and/or seals generated as part of a document, as opposed to being affixed to the document after its generation, will not be accepted.
Submission of such documents may render the bid or offer non-responsive and ineligible for award.
TOC-1
REQUEST FOR PROPOSAL
DESIGN BUILD
PN: HEKP103001
Joint Base McGuire-Dix-Lakehurst, New Jersey
MAIN TABLE OF CONTENTS
Section Title
00 01 00 SF 1442 And Bidding Schedule
(To be Included in Solicitation under Separate Cover)
00 21 16 Instructions, Conditions And Notice To Bidders
(To be Included in Solicitation under Separate Cover)
00 45 00 Representations And Certifications
(To be Included in Solicitation under Separate Cover)
00 72 00 Contract Clauses
(To be Included in Solicitation under Separate Cover)
00 73 00 Special Contract Requirements
(To be Included in Solicitation under Separate Cover)
00 73 46 Wage Determinations
(To be Included in Solicitation under Separate Cover)
LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS
TECHNICAL PROVISIONS
Section Title
01 02 10.00 06 Project Description And Requirements 01 12 00 Design Submission Requirements after Award 01 12 00.00 18 Design and Record Drawing Requirements 01 32 01.00 18 Project Schedule 01 33 00.00 18 Submittal Procedures Design Build Construction 01 33 29.00 20 Sustainable Requirements 01 35 26 Government Safety Requirements 01 42 00 Sources for Reference Publications 01 45 02.00 18 Quality Control System (QCS) 01 45 04.00 18 Contractor Quality Control Design Build Construction 01 45 20.00 18 Testing for Mechanical and Electrical Systems 01 45 30.00 18 Contractor Warranty Management 01 45 35 Special Inspections 01 52 60.00 18 Construction Indoor Air Quality (IAQ) Management 01 57 20.00 10 Environmental Protection 01 67 00.00 18 Recycled/Recovered Materials (Adopted from McGuire AFB Section 01540 Affirmative Procurement July 2010) 01 74 19 Construction and Demolition Waste Management 01 78 00.00 18 Closeout Submittals 01 78 23.00 18 Operation and Maintenance Data
TOC-2
APPENDICES
A. Upgrade of Range Wells, Fort Dix, NJ 08600, 18 July 1996 (Times Square)
B. UFC4-730-10, Fire Stations, 15 June 2006
C. McGuire Air Force Base Architectural Compatibility Plan
D. Air Force Handbook 32-1084 Facility Requirements
E. AFDG Interior Design Standards
F. DD Form 1354 - Transfer And Acceptance Of DoD Real Property
G. Telecommunications Installation Criteria
H. LEED's Checklist
I. Interior Design Presentation Format
J. AMC Supplement to AFCEE CID Guidance
K. McGuire Air Force Base Electrical Standards
L. Water supply analysis
M. JB MDL Air Installation Compatible Use Zone (AICUZ) Study, July 2013
N. CENAB-EN-EESS UXO Report, 28 February 2014
O. Geotechnical Investigation
P. Architectural Review Checklist
Q. Q-Building 9518 Water & Sewer - New Work
R. DD Form 1354 - Transfer And Acceptance Of DoD Real Property
S. STRUCTURAL
T. Joint Base McGuire-Dix-Lakehurst Contractor Security
U. Construction Project Signs
V. Room Data Sheets
W. McGuire Air Force Building Exterior Guidelines NOT USED
X. Conceptual Design Drawings
Y. NOT USED
Z. NOT USED
FY15 Satellite Fire Station Joint Base McGuire/Dix/Lakehurst - Project Number: HEKP103001
01 02 10.00 06 - 1
SECTION 01 02 10.00 06
PROJECT DESCRIPTION AND DESIGN REQUIREMENTS
02/15
PART 1
ARCHITECTURAL
DESIGN OBJECTIVES
02/15
PART 1 DESIGN OBJECTIVES
1.1 SCOPE OF WORK
This Request for Proposal (RFP) provides the conceptual guideline for site; architecture; interior finishes;
furnishings; mechanical, electrical, lighting, communication, plumbing, fire protection and fire detection systems for the design and construction of a one story, 9,236 gross square footage (GSF), satellite fire station building. The aforementioned is the maximum GSF and cannot be exceeded. This fire station is comprised of three main essential elements: Apparatus Equipment & Maintenance, Administrative and Training, and Living Areas. The program is further defined in the Architectural Narrative.
1.2 DESIGN AND CONSTRUCTION CRITERIA (REFERENCES)
The conceptual building design shown in this RFP is based upon and shall meet the criteria and scope specified in:
• Air Force Handbook 32-1084 Facility Requirements, chapter 7, section 7.3.1. Fire Station.
o NOTE: Air Force Fire Station Design Guide was replaced by UFC 4-730-10
• UFC 4-730-10 - Fire Stations
Exterior construction is prescribed by:
• Architectural Compatibility Guide, McGuire AFB (Appendix __)
• Building Exterior Design Guidelines & Standards for McGuire AFB (Appendix __)
The reinforced concrete foundation shall consist of a foundation wall, strip wall footings and column footings with a slab on grade. All exterior walls shall be finished primarily with CMU veneer to match other buildings on site using a running bond with accents, and a metal truss gable roof structure with standing seam metal roofing system. The exterior envelope shall include operable metal frame windows with bronze tint low-emissivity double pane glazing, entry doors with thermal insulation and automatic door closers, and large overhead doors for vehicle access at the apparatus bay. For windows, roof, and sound attenuation requirements refer to PART 2 DESIGN REQUIREMENTS.
Design development, construction drawings, technical specifications and construction shall at minimum comply with the requirements and quality standards outlined herein and in the Unified Facilities Guide Specifications (UFGS). Specifically, the UFGS dictates Department of Defense (DoD) antiterrorism/force protection requirements. In addition, per EPACT 2005 energy performance requirements and Executive Order (EO) 13423 life-cycle cost-effective practices shall be integrated into the design, development, and construction of the Fire House.
The Architect-Engineer (AE) shall employ safety and health standards promulgated under the Occupational Safety and Health Act (OSHA) of 1970 as published in the Federal Register, October 18, 1972, Volume 37, Number 202, Part II (Title 29, Chapter 17, Part 1910) and subsequently issued OSHA standards or standards consistent therewith in the design of this facility. In addition, the AE shall follow the National Institute of Occupational Safety and Health (NIOSH) Standards.
Air Force Criteria is available from the National Institute of Building Sciences’ Whole Building Design Guide Construction Criteria Base (CCB)1, from their website (http://www.wbdg.org/ccb). The resources
1 With the exception of Command and Installation produced material.
01 02 10.00 06 - 2 found on the CCB include US Army Corps of Engineers requirements and Air Force Base Design Guides (AFDG), Engineering Technical Letters (AFETL), Pamphlets (AFP), and Regulations (AFR).
Applicable design and construction criteria is specifically indicated, but not limited to that mentioned in this Section 01 02 10.00 06. Criteria shall be taken from the most current references as of the date of issue of the RFP, unless noted otherwise. Referenced codes and standards are minimum acceptable criteria. Administrative, contractual, and procedural features of the contract shall be as described in other sections of this RFP.
1.3 SPECIFICATIONS
The technical specifications shall be developed from those provided with this RFP and the Unified Facilities Guide Specifications (UFGS) by the Designers of Record. If not available in UFGS, the Designer of Record shall develop specific sections using a Specs Intact template. See Section 01 03
00.00 06 for further technical specification preparation requirements. Comcast shall provide specification for the cable television system to each of the units and the multi-purpose space.
1.4 DESIGN QUALITY
The main objectives of this solicitation are to obtain a design for a Fire Station, including associated site development within funds and gross square footage available while maximizing design and material quality. Utility systems should be integrated within the building and on the site, and building systems should be selected for low-cost maintenance and operation. Therefore there should be an overall balance of aesthetics and functionality within the parameters provided in this RFP.
1.5 DESIGN FREEDOM
Requirements stated and illustrated in this RFP are minimums. Innovative, creative, or cost-saving proposals which meet or exceed these requirements are encouraged and will be considered during design submittal reviews. The drawings provided establish project floor area requirements and spatial relationships that have been reviewed for user function and preliminary code compliance. Floor and site plans may change with government approval to enhance design, comply with codes, incorporate options, include betterments, or support constructability.
1.6 ENERGY AND LEED COMPLIANCE
1.6.1 Energy Compliance
This project shall confirm to the requirements of the Energy Policy Act (EPAct-2005). The proposed project building shall be designed, built, and modeled to utilize 30% less energy than a baseline building in conformance with ASHRE 90.1 (Energy Efficient Design of New Buildings Except Low-Rise Residential Buildings), Appendix G. As a separate part or section of the Design Analysis demonstrate exceeding ASHRAE 90.1 with calculations, vendor literature, equipment catalog sheets, compliance forms, worksheets, and narrative descriptions of the building envelope, HVAC systems, service water heating, electrical power, lighting, and other equipment and systems.
1.6.2 LEED Compliance
Overall Project Design shall achieve, as a minimum, LEED “Silver” rating in accordance with USGBC and the USACE LEED Implementation Guide. The LEED checklist is provided in Appendix H. Offerors shall not assume sustainability category credit points for proposed strategies or decisions not within the control of the Design- Build Contractor. The intent of the Government is to certify the building using the USGBC certification process.
1.7 ACCESSIBILITY REQUIREMENTS
01 02 10.00 06 - 3
The Fire Station does not need to be fully accessible to physically disabled persons, however, there shall be (1) one handicapped accessible restroom. The ADA restroom shall achieve full compliance of Americans with Disabilities Act (ADA) as required by federal law. Compliance shall be in accordance with Americans with Disabilities Act Accessibility Guidelines (ADAAG), and/or Uniform Federal Accessibility Standards (UFAS) whichever is most stringent.
1.8 FORCE PROTECTION & ANTI-TERRORISM CONSIDERATIONS
Project design and construction shall comply with the Department of Defense Minimum Antiterrorism Standards for Buildings Unified Facilities Criteria Series (UFC) 4-010-01 - DoD Minimum Antiterrorism Standards for Buildings. Mass notification systems shall be in accordance with UFC 4-021-01 - Design and O&M: Mass Notification Systems.
1.9 PERMITS
The contractor shall be responsible for preparing, filing, and paying for any fees required to obtain all necessary permits for the construction of this project.
The project site is located in a New Jersey Pinelands Commission identified Pinelands area. The contractor shall be required to furnish and submit to any relevant agencies a Pinelands Application, Erosion Control Permit, and Request for Authorization and Storm Water Discharge General Permit. All applications and supporting documentation must be completed, signed and submitted by a registered New Jersey State Professional Engineer. Additionally, McGuire AFB 87th CES/CEAN must review and approve of all permits prior to submission by the contractor.
The site design for the project shall incorporate a Storm Water Pollution Prevention Plan (SPPP) in accordance with New Jersey Department of Environmental Protection (NJDEP), New Jersey Pinelands Commission, Burlington County Soil Conservation District, and McGuire AFB Facility Standards.
01 02 10.00 06 - 4
PART 2
ARCHITECTURAL
DESIGN
REQUIREMENTS
01 02 10.00 06 - 5
PART 2 DESIGN REQUIREMENTS
2.1 GENERAL DEFINITIONS AND REQUIREMENTS
2.1.1 Gross Area Definition
Gross building area is measured to the outside face of exterior enclosure walls. The Contractor's proposal shall meet all requirements including minimum net areas indicated in this RFP.
2.1.2 Net Area Definition
Net area is measured to the inside face of the room or partition walls.
2.1.3 Net Area Requirements
Minimum net area requirements for programmed spaces are included on the floor plans under the room names. Net areas indicated for building circulation and utility rooms are for guidance only. These spaces shall be sized to accommodate the required function and equipment, comply with code requirements, enhance constructability, and comply with other requirements of the RFP.
2.1.4 Finish Requirements
Room finishes stated in the following paragraphs are the minimum requirements and must be coordinated with the furniture specified in the Comprehensive Interior Design (CID) 1 submission to the USACE. The approved selection of interior finishes shall be submitted as a Structural Interior Design (SID) package.
See Part 2.3 Exterior and Interior Design and Section 01 03 00.00 06 Design and Submission Requirements after Award.
2.1.5 Furniture Requirements
Provide a CID package to include furniture selection and arrangement that complies with US Air Force Interior Design Standards. The furniture plans provided in this RFP shall be further developed with the user to accommodate the building occupants' needs. The Designer of Record shall consider code and security requirements. The material and color palette for the interior finishes (provided in the SID) and the furnishings (provided in the CID) shall be modern. Furnishings shall not be provided nor installed by the Contractor, however the Contractor shall assure coordination between the furnishings in the CID, finishes in the SID, government furnished/ installed (GFGI) equipment, building structure, and building utilities ( including location of light switches, electrical outlets, communications outlets, utility panels, and HVAC units within furnished areas).
2.1.6 Room Data Sheets
Refer to Room Data Sheets for additional documentation
1 AMC Supplement to AFCEE CID Guidance (Appendix J) & Interior Design Presentation Format (Appendix I)
01 02 10.00 06 - 6
2.2 FUNCTIONAL AREA REQUIREMENTS
2.2.1 Corridors, Vestibule, Kitchens, Bathrooms, Day Room2
Hard Surface Floor: ceramic tile vinyl composition tile Carpet: indoor/outdoor carpet Base: ceramic tile vinyl base Chair Rail: n/a Ceiling: gypsum board acoustical tile Window Covering: mini blinds roller shades Upholstery: vinyl fabric (100,000+ double rubs) Walls: paint wall protection stainless steel
2.2.2 Shared Common Rooms and Dorm Rooms
Floors: carpet (patterned cut or cut & loop) Base: wood rubber base Chair Rail: n/a Ceiling: gypsum board Lighting: fluorescent incandescent Window Covering: mini blinds lined draperies and/or roller shades Upholstery: vinyl fabric (100,000+ double rubs) Walls: paint
2 AFDG Interior Design Standards (Appendix E)
01 02 10.00 06 - 7
JB-MDL - SQUARE FOOTAGE FOR SATELLITE FIRE STATION
RM # Name Occ. Occ.
Class.
Group
Prog.
NET
Area
Concept Design
NET
Area
DELTA Ceiling Height
Comments
101 VEST. 1 B 56 SF 55 SF 1 SF 9' - 0"
102 CORRIDOR 3 B 328 SF 320 SF 8 SF 9' - 0"
103 STA.
OFFICER/WATCH
2 B 146 SF 143 SF 3 SF 9' - 0"
104 FITNESS RM 4 B 391 SF 382 SF 9 SF 12' - 0" Install ceil. Fans
105 TRAINING /
TESTING
3 B 256 SF 250 SF 6 SF 9' - 0"
106 TOILET 1 B 62 SF 60 SF 2 SF 9' - 0"
107 STORAGE 1 B 74 SF 73 SF 1 SF 9' - 0"
108 TELECOM. 2 B 97 SF 96 SF 3 SF 12' - 0" If gypsum ceiling is installed
109 JC 0 B 39 SF 38 SF 1 SF 9' - 0"
110 CORRIDOR 2 R 291 SF 284 SF 7 SF 9' - 0"
111 WMNS RM 1 R 82 SF 80 SF 2 SF 9' - 0"
112 MEN'S ROOM 1 R 166 SF 162 SF 4 SF 9' - 0"
113 DORM RM 1 R 102 SF 100 SF 2 SF 9' - 0"
114 DORM RM 1 R 102 SF 100 SF 2 SF 9' - 0"
115 DORM RM 1 R 102 SF 100 SF 2 SF 9' - 0"
116 DORM RM 1 R 102 SF 100 SF 2 SF 9' - 0"
117 DORM RM 1 R 102 SF 100 SF 2 SF 9' - 0"
118 DORM RM 1 R 102 SF 100 SF 2 SF 9' - 0"
119 CORRIDOR 3 B 247 SF 241 SF 6 SF 9' - 0"
120 KITCHEN /
LIVING / DINING
7 B 766 SF 747 SF 19 SF 9' - 0"
121 ELEC. RM. 2 B 178 SF 174 SF 4 SF 9' - 0"
122 MECH. RM 2 B 207 SF 202 SF 5 SF 9' - 0"
123 APPARATUS BAY 30 S-2 3021 SF 2947 SF 74 SF 14' - 0" Min. Ceiling elevation
124 PPE STOR 2 S-2 179 SF 175 SF 4 SF 9' - 0"
125 WORK RM / EQ
MAINT.
3 S-2 240 SF 234 SF 6 SF 9' - 0"
126 COMP. 1 S-2 84 SF 82 SF 2 SF 9' - 0"
127 LAUNDRY 3 S-2 216 SF 211 SF 5 SF 9' - 0"
128 EQ WASH 3 S-2 235 SF 229 SF 6 SF 9' - 0"
129 UPS ROOM 0 B 35 SF 34 SF 2 SF 12' - 0" If gypsum ceiling is installed Grand total: 29 8012 SF 7819 SF 194 SF
01 02 10.00 06 - 8
2.3 EXTERIOR & INTERIOR DESIGN
2.3.1 Design Goals
Provide a functional, low maintenance, visually appealing fire station building.
2.3.2 Exterior Design Objectives
The Contractor shall provide an exterior design with elements such as horizontal banding accents. The correct combination of materials, textures, color, detailing, and building form shall achieve a fire station in accordance with the Architectural Compatibility Guide, McGuire AFB. The use of exterior sunshades and light shelves is encouraged, refer to building elevations.
The elevations provided in the drawings in the attachments shall be considered the minimum in terms of the required articulation of exterior architectural elements. Further development of the building massing and elevations may be necessary requiring incorporation of additional architectural elements to fully achieve the optimal design. The Designer of Record shall confirm the necessity of additional architectural elements with the Contractor during the proposal stage.
2.3.3 Interior Design Objectives
Interior design for the project shall enhance the living environment, emphasizing durable materials and furnishings that can be easily maintained and replaced. The structural interior design (SID) for finishes shall be included in the construction contract. The comprehensive interior design (CID) is included in the construction contract; however, the furnishings shall be purchased and installed by the Government through a separate contract.
One palette shall be used throughout the facility. The Interior Designer of Record shall provide 2-3 modern, non-institutional color and material palettes to the user for discussion with the Base Architect and User’s Representative for final selection. In particular, the user shall be consulted by the Interior Designer of Record to determine appropriate color schemes, furniture styles, and furniture items. Finishes indicated under 2.2 Functional Area Requirements of this specification section shall determine the minimum types of finishes required for each space.
2.3.4 Applicable Codes and Standards
Except as specified otherwise in this RFP or in the Unified Facilities Criteria, design and construction of facilities shall comply with the latest editions (as of the issue date of this RFP). Major criteria references for architectural building design are listed below; additional requirements are included in each part of this document. Refer to http://www.wbdg.org/ for the complete list of UFCs applicable to this project.
• Air Force Handbook 32-1084 Facility Requirements
• McGuire AFB Design Standards (see Section 1.2 Design and Construction Criteria)
• ADA and ABA Accessibility Guidelines for Buildings and Facilities (only applicable for accessible toilet)
• UFC 1-200-01 General Building Requirements
• UFC 1-200-02 High Performance and Sustainable Building Requirements
• UFC 3-101-01 Architecture
• UFC 3-110-03 Roofing
01 02 10.00 06 - 9
• UFC 3-120-01 Design: Sign Standards
• UFC 3-120-10 Interior Design
• UFC 3-190-06 Protective Coatings and Paints
• UFC 3-600-01 Fire Protection Engineering for Facilities o National Fire Codes, published by the National Fire Protection Association (NFPA), including NFPA 101 Life Safety Code o International Building Code (IBC)
• UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings
• UFC 4-730-10 Fire Stations (USACE and Air Force only)
For USACE – Engineering Construction Bulletin (ECB)s refer to http://www.wbdg.org/ccb/ARMYCOE/COEECB/ecb_2015_6.pdf
• ECB 2015-7 Life-Cycle Cost Analysis Requirements for the Design Phase of USACE Buildings, Central Energy Systems and Associated Supporting Facilities
• ECB 2015-6 Total Building Commissioning Process for USACE Projects
2.3.5 ARCHITECTURAL REVIEW CHECKLIST
The contractor shall use the Architectural Review Checklist and include it as part of the design submissions for Government review.
2.4 IBC OCCUPANCY AND BUILDING TYPE CLASSIFICATIONS
Occupancy classification, construction type, allowable areas, maximum building height, and fire separation requirements shall comply with the requirements of the UFC 3-600-01 Design: Fire Protection Engineering for Facilities and the International Building Code (IBC).
2.5 ROOM NOISE CRITERIA AND SOUND ATTENUATION
Minimum STC 55 (Sound Transmission Class) for partitions, ceilings and openings inside the building.
Interior partitions and finishes (furring) along the exterior walls and shall comply with ASTM C919-12 - Standard Practice for Use of Sealants in Acoustical Applications. Partitions with openings, outlet boxes and other opening shall follow the recommendations shown in figures 1, 3, and 4. Provide sound attenuation sealant on each base and face layer of gypsum board partitions.
2.6 SOUND ATTENUATION
Mechanical sound attenuation as stipulated by ASHRAE target criteria. Minimum Outdoor-Indoor Transmission Coefficient (OITC) for installed door, windows and glazing assemblies shall be 36 with a Sound Transmission Criteria (STC) of no less than 40. Assemblies glazing shall be double laminated insulated. OITC for roofs and walls shall not be less than 44.
2.7 EXTERIOR DESIGN
2.7.1 Building Height
01 02 10.00 06 - 10
All elevations of the building shall be developed with materials matching those used in other buildings on Joint Base McGuire/Dix/Lakehurst (JB MDL). Building heights shown on the drawings are based on a 14 foot floor-to-ceiling distance which shall be considered the minimum requirement at the apparatus bay.
Height shall be increased if required to maintain minimum 14 foot ceiling height clearance at the apparatus bay while providing adequate space for utilities above. Verify bottom of structural members / ceiling height with pumper engine.
2.7.2 Exterior Walls
Provide eight (8) inch structural CMU backup wall. Cladding below eight (8) feet shall be Four-inch thick, sand-colored concrete masonry units (CMU). A contrasting color of CMU will wrap the building with a split face finish at the water table up to the window sill, and as a smooth finish to the head of the windows and the doors. The sand color CMU shall match that which is currently in use near this site. Above eight
(8) feet the cladding shall be metal panels finished to contrast the CMU color. Precast concrete shall be used for window sills and the transition between CMU and metal panel. Refer to the sound attenuation section for additional requirements.
2.7.3 Roofs
Structural standing seam metal roofing on metal deck with a minimum pitch of 3:12 shall be used. All roof mounted items such as plumbing vents and exhaust fans shall be finished to match dark bronze trim colors. Refer to the sound attenuation section for additional requirements.
2.7.3.1 Roof Warranty
Contractor shall provide Weather Tightness Warranty for a period of 25 years, with a notarized signature of an authorized representative of the firm. Guarantee shall provide for repair or replacement, without cost to the Government, in the event of failure caused by faulty workmanship or materials, and cover all standing seam roofing, metal flashings, fasteners and trim. Repairs to be made within 24 hours of notice.
In addition, the manufacturer shall provide a twenty-year warranty on the paint finish covering chalking, cracking, checking, chipping, blistering, peeling, flaking and fading. The manufacturer’s warranty shall have no dollar limit or prorating. The period of the guarantees shall commence upon completion and acceptance of the work involved as determined by the Contracting Officer.
2.7.3.2 Standing Seam Fence-Style Snow Guards
Snow guards shall be provided along all roof eaves using compatible metal construction. Snow guards shall be sized and spaced per snow guard manufacturer's design calculations and requirements to evenly distribute the snow and keep it in place to prevent sliding.
2.7.4 Trim and Flashing
All stepped wall flashing and trim such as soffits, fascia, gutters, downspouts, and eave trim shall be factory-finished aluminum to match metal roofing. Finishes shall have a 20-year manufacturer's warranty.
Through-wall flashing shall be electro-sheet copper, stainless steel, or copper sheet. Trim, flashings, gutters, and downspouts shall be sized and detailed per SMACNA Architectural Sheet Metal Manual.
Metal gauges shall be per UFGS Section 07 60 00 requirements. Downspouts shall drop into painted cast iron downspout boots with receiving bells sized to fit downspouts per UFGS Section 05 50 13. Use of downspouts and gutters shall be minimized to installation at exterior doors if necessary to divert water.
However, roof configurations that divert runoff away from doors are preferred. Roof diverters are acceptable.
2.7.5 Miscellaneous Exterior Elements
Exterior elements including louvers and exhaust fans shall be factory finished to match the trim color.
Use of exterior wood with painted finish is prohibited.
01 02 10.00 06 - 11
2.7.6 Exterior Signage
Exterior signage for the project shall be provided to include building number signs on the front and side elevations, building identification signage in front of the building, and handicap parking signage. Building identification signage shall match characteristics of those on adjacent buildings. Exterior signage shall be provided in accordance with the Sign Standard, UFC 3-120-01 - Design: Sign Standards.
2.7.6.1 Building Number
The building shall have exterior signage permanently attached on two faces of the building indicating the assigned building number or address.
2.7.7 Exterior Steel Doors and Frames
Exterior steel doors and frames shall be hollow metal, thermal insulated, maximum duty, level 3, physical performance Level A, Model 2, top edge closed flush, painted to match anodized bronze components.
Frames shall be Level 3 14 gauge, with continuously welded corners and seamless face joints. Frames in masonry shall have bituminous back-coating, plaster guards, and shall be grouted solid. Refer to the sound attenuation section for additional requirements.
2.7.8 Exterior Aluminum Storefront Doors and Frames
Exterior aluminum storefront doors and frames shall have a medium bronze AA-M10-C22-A42, Architectural Class I color-anodized finish. Refer to the sound attenuation section for additional requirements.
2.7.9 Exterior Door Hardware
Exterior door hardware shall include the following items. Items not specifically identified shall be provided based on suitability of use, durability, and aesthetic character. Finishes on exterior hardware shall match throughout facility and shall be US26D (brass or bronze base metal, satin chromium plated over nickel).
2.7.9.1 Hinges
Hinges shall comply with ANSI/BHMA A156.1; template, full mortise, heavy duty, ball bearing, minimum size 4-1/2" x 4-1/2", non-ferrous base metal, non-removable pins.
2.7.9.2 Locksets
Locksets shall comply with ANSI/BHMA A156.2; series 4000, Grade 1, non-ferrous base metal, 7-pin removable core compatible with the Base grand master keying system. Lever handles shall be provided per ADA and ABA Accessibility Guidelines for Buildings and Facilities.
2.7.9.3 Exit (Panic) Devices
Exit devices shall comply with ANSI/BHMA 156.3; heavy-duty touch-pad type, through-bolted mounting.
Listed and labeled for panic protection based on UL 305.
2.7.9.4 Closers
Closers shall comply with ANSI/BHMA A156.4; series C02000, Grade 1, hydraulic, factory-sized, adjustable (to meet field conditions), mounted on interior of doors. Include overhead hold-open capability on exterior door closers.
2.7.9.5 Auxiliary Hardware
01 02 10.00 06 - 12
Auxiliary hardware shall comply with ANSI/BHMA A156.16. Provide wall or floor stops for all exterior doors. Provide other hardware as necessary for a complete installation.
2.7.9.6 Kick Plates
Kick plates shall comply with ANSI/BHMA A156.6 and shall be non-ferrous metal.
2.7.9.7 Thresholds
Thresholds shall comply with ANSI/BHMA A156.21 and ADA and ABA Accessibility Guidelines for Buildings and Facilities. Thresholds shall be non-ferrous metal and shall be provided at all exterior doors.
2.7.9.8 Weather stripping
Weather stripping shall be provided at all exterior doors and comply with ANSI/BHMA A156.22.
2.7.10 Insulated sectional Apparatus Bay Doors
2.7.10.1 Apparatus Bay Doors
Provide sectional (minimum opening of 14 feet wide by 14 feet high) in the exterior wall at EXITING side of each vehicle(s)/structural bay for Fire Department apparatus ONLY. Provide electrically operated doors with provision for manual chain operation.
2.7.10.2 Locking
Provide overhead doors that are operable from the interior only. Provide doors with a positive locking mechanism that will allow the door to remain open at engine exhaust position approximately 1 ft above the floor. Coordinate door locking requirements with the Contracting Officer.
2.7.10.3 Serviceability
Design apparatus bay doors to meet heavy duty loads and high frequency of operation. Provide testing of deflection and operation of the doors prior to acceptance during construction. Doors shall be provided and installed by a commercial door company having not less than five years of experience in manufacturing, installing, and servicing the size and type of doors provided.
2.7.10.4 Insulated Doors
The preference is for insulated doors for thermal resistance and noise control.
2.7.11 Exterior Windows
Exterior windows shall comply with DOD Minimum Antiterrorism Standards for Buildings, paragraph B-
3.1.2 and shall be commercial heavy duty with color matching medium bronze, AA-M10-C22-A42, Architectural Class I color-anodized finish. Additional framing shall be designed and provided as required for items including but not limited to blast windows. All operable windows shall receive aluminum insect screens with frames to match window frames. Hardware shall be metal, finished to match window frames. Interior window sills shall be solid surfacing material. The windows shown on the preliminary elevations and described here are considered the minimum extent of window coverage required. Further development of the building elevations may require additional windows and window types. Refer to the sound attenuation section for additional requirements.
2.7.11.1 Exterior Openings Installation
01 02 10.00 06 - 13
Install windows, and doors in accordance with ASTM E 2112 - 07, Standard Practice For Installation Of Exterior Windows, Doors And Skylights. Provide the following:
A. One or multiple piece pan flashing with premolded corners (end dam) placed on top of sill and jamb flashing. Pan height (back dam) (H1) no less than 1 5/16 inch. All other sides to be 2 inches minimum as shown in figure A3.4 B. Flexible head, sill and jamb flashing. Extend sill flashing to overlap jamb flashing in full. Extend jamb flashing to 8 1/2 inches above rough opening at head and 8 1/2 inch below rough opening at sill. Extend flashing at head one inch beyond jamb flashing. Turn flashing into opening and extend to full wall depth C. Sealant at head, jambs and sill between flashing and mounting flange D. Apply sealant between sill and sill extender or sill angle E. Follow all other applicable recommendations on this publication for the installation of windows
2. Provide end dam at thru-wall flashings over lintels. Flashing should extend beyond the ends of the lintel and turn up to form end dams.
3. Place cavity seal between back of lintel and rigid insulation
4. Place a precompressed pad or sealant in the cavity at the perimeter of the opening and over the perimeter flashing
2.7.12 Exterior Glass
Exterior glass shall comply with DOD Minimum Antiterrorism Standards for Buildings, paragraph B-3.1.1.
All exterior glass units shall be minimum 3/4-inch insulating glass with 1/4-inch laminated glass inside pane and either 1/4-inch annealed or tempered glass on the outside pane. Tempered glass shall be used on all glass in doors and in windows below 30 inches from the finished floor per code. Bronze tinting and anti-reflective low-emissivity coating shall be provided on the outside panel. Glazing should have a minimum shading coefficient of 0.22 and U-value of 1.6. Refer to the sound attenuation section for additional requirements.
2.7.13 Thermal Performance
2.7.13.1 Standards And Codes: Building construction and thermal insulation for mechanical systems shall conform to APPLICABLE CRITERIA.
2.7.13.2 Building Envelope Sealing Performance Requirement
Design and construct the building envelope with a continuous air barrier to control air leakage into, or out of, the conditioned space. Clearly identify all air barrier components of each envelope assembly on construction documents and detail the joints, interconnections and penetrations of the air barrier components. Clearly identify the boundary limits of the building air barriers, and of the zone or zones to be tested for building air tightness on the drawings.
2.7.13.2.1 Trace a continuous plane of air-tightness throughout the building envelope and make flexible and seal all moving joints.
2.7.13.2.2 The air barrier material(s) must have an air permeance not to exceed 0.004 cfm / sf at 0.3” wg [0.02 L/s.m2 @ 75 Pa] when tested in accordance with ASTM E 2178
2.7.13.2.3 Join and seal the air barrier material of each assembly in a flexible manner to the air barrier material of adjacent assemblies, allowing for the relative movement of these assemblies and components.
2.7.13.2.4 Support the air barrier so as to withstand the maximum positive and negative air pressure to be placed on the building without displacement, or damage, and transfer the load to the structure.
01 02 10.00 06 - 14
2.7.13.2.5 Seal all penetrations of the air barrier. If any unavoidable penetrations of the air barrier by electrical boxes, plumbing fixture boxes, and other assemblies are not airtight, make them airtight by sealing the assembly and the interface between the assembly and the air barrier or by extending the air barrier over the assembly.
2.7.13.2.6 The air barrier must be durable to last the anticipated service life of the assembly.
2.7.13.2.7 Do not install lighting fixtures with ventilation holes through the air barrier.
2.7.13.2.8 Provide a motorized damper in the closed position and connected to the fire alarm system to open on call and fail in the open position for any fixed open louvers such as at elevator shafts.
2.7.13.2.9 Damper and control to close all ventilation or make-up air intakes and exhausts, atrium smoke exhausts and intakes, etc when leakage can occur during inactive periods
2.7.13.2.10 Compartmentalize garages under buildings by providing air-tight vestibules at building access points.
2.7.13.2.11 Compartmentalize spaces under negative pressure such as boiler rooms and provide make-up air for combustion.
2.7.13.2.12 Performance Criteria and Substantiation: Submit the qualifications and experience of the testing entity for approval. Demonstrate performance of the continuous air barrier for the opaque building envelope by the following tests:
2.7.13.2.12.1 Test the completed building and demonstrate that the air leakage rate of the building envelope does not exceed 0.25cfm/ft2 at a pressure differential of 0.3” w.g.(75 Pa) in accordance with ASTM’s E 779 (2003) or E-1827-96 (2002). Accomplish tests using either pressurization or depressurization or both. Divide the volume of air leakage in cfm @ 0.3” w.g. (L/s @ 75 Pa) by the area of the pressure boundary of the building, including roof or ceiling, walls and floor to produce the air leakage rate in cfm/ft2 @ 0.3” w.g. (L/s.m2 @ 75 Pa). Do not test the building until verifying that the continuous air barrier is in place and installed without failures in accordance with installation instructions so that repairs to the continuous air barrier, if needed to comply with the required air leakage rate, can be done in a timely manner.
2.7.13.2.12.2 Test the completed building using Infrared Thermography testing. Use infrared cameras with a resolution of 0.1deg C or better. Perform testing on the building envelope in accordance with ISO 6781:1983 and ASTM C1060-90(1997). Determine air leakage pathways using ASTM E 1186-03 Standard Practices for Air Leakage Site Detection in Building Envelopes and Air Barrier Systems, and perform corrective work as necessary to achieve the whole building air leakage rate specified in (a) above.
2.7.13.2.12.3 Notify the Government at least three working days prior to the tests to provide the Government the opportunity to witness the tests. Provide the Government written test results confirming the results of all tests.
2.8 STRUCTURAL INTERIOR DESIGN (SID)
Minimum interior finishes are indicated in Part 2.2 Functional Area Requirements for each space in the project. Items not specifically identified shall be coordinated in the SID package and provided based on suitability of use, durability, and aesthetic character. Corner guards shall be provided on all outside corners. Snap-on corner guards formed from high impact resistant resilient material, mounted on a continuous aluminum retainer, shall extend from floor to ceiling. The Contractor shall develop the SID binders in accordance with requirements from Air Force Interior Design Presentation Format (Appendix I).
The SID and the CID shall be coordinated.
01 02 10.00 06 - 15
2.8.1 Concrete Floors
The facility shall be concrete slab-on-grade. All exposed concrete floors indicating concrete hardener finish shall be sealed. The concrete floor sealer shall have a minimum 5-year warranty. Sealer must comply with ASTM C309.
2.8.2 Carpet Tile
Carpet tile and installation shall comply with ETL 03-3 Air Force Carpet Standard. The UFGS specification section 09 68 00 shall be edited to include the ETL 03-3 requirements.
2.8.2.1 6.9.18 Carpet Moldings
Install carpet moldings, either vinyl or aluminum, where floor covering material changes or carpet edge does not abut a vertical surface.
2.8.4 Ceramic Tile
Ceramic tile shall comply with ANSI A 137.1, Section 6.3. Installation shall follow the recommendations of Tile Council of America (TCA) Handbook For Ceramic Tile Installation. Ceramic tile material shall contain 70% recycled solid waste as defined by the EPA's Comprehensive Procurement Guideline (CPG) program and the EPA's RMAN's. Recycled material shall be a combination of post-consumer recycled glass, post-industrial grinding paste, and post-industrial mining waste. Mounting of 2-inch x 2-inch tiles shall require factory mounting. Grout release shall be used. Provide cultured marble thresholds under doors where a ceramic tile floor meets a different floor finish. Substrate for wall tile shall be mortar setting bed or cement backer board; gypsum board shall not be used as a substrate for wall tile. Wall tile wainscot shall be minimum 5'-0" high and shall be located on walls with fixtures and walls adjacent to fixtures.
2.8.5 Entrance Floor Mats
Vinyl Link Mats (Custom Logo Mats)
2.8.5.1 Provide vinyl Link mats made for high-traffic / heavy-duty material. Mats shall be provided with matching color nosing attached on all 4 sides. Provide 1-1/2” square nosing for recessed mats. Extruded vinyl shall be links woven on rust-resistant galvanized 13 gauge spring steel wire with tempered reinforcing metal bar on the front and back edges and with nosing on all 4 sides with mitered and sealed corners. Wires should run the short dimension of mat. Individual links shall have extra weight at stress points and extra strong ribs for cleaning action.
2.8.5.2 Weave Type
Close weave No. CW-16
2.8.5.3 Custom Logo
Logo on mat shall be identical as image provided by the contracting officer. Contracting officer will provide logo.
2.8.6 Interior Walls and Partitions
Comply with requirements of applicable codes. Non-combustible construction is preferable, even where combustible materials are allowed by code. Wall finish materials shall be as specified below. Refer to the Room Noise Criteria and Sound Attenuation section for additional requirements.
2.8.6.1 Metal Wall Support Systems
01 02 10.00 06 - 16
Non-load bearing metal studs and furring for interior walls shall comply with ASTM C 645; stud gauge shall be as required by height and loading, but 25 gauge stud thickness is minimum thickness permissible. Maximum stud spacing is 16 inches on center. Provide galvanized finish.
2.8.6.2 Gypsum Wallboard
Comply with ASTM C 36. Minimum panel thickness shall be 5/8-inch. Provide Type X panels in fire-rated assemblies. Provide moisture resistant panels in janitor closets, toilets and restrooms where ceramic tile is not used. Joint treatment shall be per ASTM C 475. Screws shall be per ASTM C 646. Drywall installation shall be per ASTM C 840.
2.8.6.2.1 Paints and Coatings
Paint gloss shall be satin, eggshell, or semi-gloss on walls, semi-gloss on trim, and eggshell or semi-gloss finish on ceilings as appropriate for the function of the space. Apply Paint, primer, stain, and other coatings while using proper ventilation provided in accordance with the manufacturer's installation instructions and warranty. Paint containing lead shall not be used. Use interior latex paints in toilet rooms or other areas subject to moisture. Use only one stain color throughout the facility for doors, trim, and other wood items to be stained. The use of Chromate containing primers is prohibited.
2.8.6.2.2 Wall Base
Conform to FS SS-W-40 for vinyl base. Provide minimum overall thickness of base not less than 0.125 inch, color as selected from manufacturer's full line. Straight or Cove style, 6 inch high. Furnish base in rolls not less than 96 feet long. Pre-mold corners with wings not less than 2 inch long.
2.8.7 Ceilings
Comply with requirements of applicable codes. Non-combustible construction is preferable, even where combustible materials are allowed by code. Ceiling finish materials shall be as specified in functional and area requirements listed in this specification section. Minimum ceiling height shall be (9) nine feet unless otherwise indicated or shown. Refer to the Room Noise Criteria and Sound Attenuation section for additional requirements.
2.8.7.1 Suspension System
Provide standard suspension system conforming to ASTM C 635/C 635M for heavy-duty systems.
Provide surfaces exposed to view of aluminum or steel with a factory-applied white color. Provide wall molding having a flange of not less than 15/16 inch. Provide standard corners. Suspended ceiling framing system must have the capability to support the finished ceiling, light fixtures, air diffusers, and accessories. Provide a suspension system with a maximum deflection of 1/360 of the span length.
Conform seismic details to the guidance in UFC 3-310-04 and ASTM E 580/E 580M
2.8.7.2 Acoustical Ceiling Tiles
Acoustical ceiling tiles conform with ASTM E 1264, Class A, and the following requirements:
Acoustical Ceiling Tiles (ACT) shall be Type III white, Minimum NRC of 0.75, Pattern “C” and “D”, Nominal Size of two feet by two feet, and Minimum LR-1 Coefficient greater than 0.75. Upon construction completion, Contractor shall provide Contracting Officer with two percent extra material of each color and type ACT used. Thermal insulation shall not be installed directly on top of suspended acoustical panel ceilings.
2.8.8 Interior Doors and Frames
01 02 10.00 06 - 17
Provide flush solid core wood doors with hollow metal door frames for all interior administrative areas.
Provided hollow metal doors and frames in interior industrial areas. Refer to the Room Noise Criteria and Sound Attenuation section for additional requirements.
2.8.8.1 Wood Doors
Provide flush wood solid core doors complying with National Wood Window and Door Association (NWWDA) I.S.-1A. Stile edges shall be non-finger jointed hardwood compatible with face veneer.
Provide American Woodwork Institute (AWI) Grade A hardwood face veneer for transparent finished doors. Coordinate transparent door stain with SID.
2.8.8.2 Hollow Metal Doors
Comply with ANSI A250.8/SDI 100. Doors shall be Level 2, physical performance Level B, Model 2;
factory primed. Anchors and accessories shall be zinc coated.
2.8.8.3 Hollow Metal Frames
Comply with ANSI A250.8/SDI 100. Frames shall be Level 2, 16 gauge, with continuously welded corners and seamless face joints; factory primed. Anchors and accessories shall be zinc coated. Frames in masonry shall have bituminous back-coating, plaster guards, and shall be grouted solid.
2.8.8.4 Fire-rated Doors and Frames
Comply with International Building Code (IBC), NFPA 80, and requirements of labeling authority. Doors and frames shall bear labels from IBC approved testing laboratory. Comply with positive pressure testing requirements of IBC.
2.8.8.5 Windows in Doors
Windows shall be provided in the indicated interior doors, 6" wide by 36" high, off-set to the latch side of the door. Windows in fire rated doors shall be of fire-rated glass (no wire glass permitted) as required by code.
2.8.9 Interior Door Hardware
Interior door hardware shall include the following items. Items not specifically identified shall be provided based on suitability of use, durability, aesthetic character, and cost efficiency. Finishes on hardware shall match throughout facility, shall be coordinated with SID, and shall not be a surface finish that shall rub off with extended use.
2.8.9.1 Hinges
Hinges shall comply with ANSI/BHMA A156.1; template, full mortise, heavy duty, ball bearing, minimum size 4-1/2" x 4-1/2", non-ferrous base metal, non-removable pins.
2.8.9.2 Locksets
Locksets shall comply with ANSI/BHMA A156.2; series 4000, Grade 1, non-ferrous base metal, removable core.