AMENDMENT_0001_VA_LOCATIONS.pdf

PDF 330 KB Posted

Attached to
VIDEO INTERCOM SYSTEM(S), VA AREA Federal contract opportunity
Solicitation number
W912DR-16-T-0061
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

About this file

AMENDMENT 0001 TO SOLICITATION

View the file

Other files for this federal contract opportunity

Other files attached to VIDEO INTERCOM SYSTEM(S), VA AREA, newest first.
File Type Posted
FILE_COPY_OF_BASIC_RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is for the offerors to replace the follow ing sections in the solicitation package w ith the attached -

A. REV 07 21-2016 INSTRUCTIONS TO OFFERORS

B. REV 07-21-2016 FLOOR PLAN, ALEXANDRIA, VA (PART OF ATTACHMENT NO. 2 OF PERFORMANCE WORK STATEMENT) C. REV 07-21-2016 FLOOR PLAN, MANASSAS, VA (PART OF ATTACHMENT NO. 2 OF PERFORMANCE WORK STATEMENT) D. REV 07-21-2016 - SPEC FOR GT SERIES (2ND PAGE OF ATTACHMENT NO. 4 OF THE PERFORMANCE WORK STATEMENT) NOTE: POTENTIAL OFFERORS ARE REQUIRED TO NOTIFY Gloria.s.haw kins@usace.army.mil (410)962-2003 TO SCHEDULE A SITE VISIT.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-16-T-0061

X 9B. DATED (SEE ITEM 11)

30-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jul-2016

CODE

U.S. ARMY CORPS OF ENGINEERS, BALTIMORE

10 S. HOWARD STREET

ROOM 7000

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR-16-T-0061

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

TABLE OF CONTENTS

The below Table of Contents has been added

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit 1 REV 07-21-2016

INSTRUCTIONS TO

OFFERORS

21-JUL-2016

Exhibit 2 REVISED 07-21-2016

ATTCH 2 FLOOR PLAN

ALEXANDRIA, VA

21-JUL-2016

Exhibit 3 REV 07-21-2016

ATTACH 2 FLOOR

PLAN FOR

MANASSAS,VA

21-JUL-2016

Exhibit 4 REVISED 07-21-2016

SECOND PAGE TO

ATTACHMENT NO. 4

21-JUL-2016

(End of Summary of Changes)

INSTRUCTIONS TO OFFERORS

SUBMISSION OF QUOTES: REVISED 21-JULY-2016

Quotations shall be submitted electronically by e-mail to Josephine.E.Baran@usace.army.mil or by U.S. mail/hand delivered to U.S. Army Corps of Engineers, Contracting Division, Simplified Acquisition Team, ATTN: Josephine Baran, 10 South Howard Street, 7th floor, Room 7000, Baltimore, MD 21201-2530. Quotations received after the required date and time may be rejected and may not be considered.

Offeror is not required to quote on all locations. However, offeror is required to quote on all the line items associated with any individual location (e.g. video intercom system; frosted film;

peephole; motorized shades).

General questions about a solicitation may be answered via telephone, Josephine Baran (410)962-0972. Any questions (e.g. that may affect the item description, price, quantity, quality, or delivery schedule) of any item needs to be sent in writing to Josephine.E.Baran@usace.army.mil).

Quotes submitted shall incorporate the following:

QUOTATION FORMAT

A. The quote shall be logically assembled.

CONTENT REQUIREMENTS

A.Theofferorshallconfinesubmissionstoessentialmatters,sufficienttodefinetheoffer
details,inaconcisemanner,topermitacompleteandaccurateevaluationofthequote.
B.Theofferorshallsubmitthequotealongwithacapabilitystatementtoperformthiswork
thatdemonstratestheofferor’stechnicalability.
C.Additionally,describehowtheprojectteamwillbestructured;theprinciplefirms,
responsibilities,relationships,interactions,andqualifications.Theofferorshallsubmitalist
ofkeypersonnelthatindicateseachindividual’scurrentassignmentandtheofferor’splan
toensurethatthenamedpersonnelshallbeusedonthisproject.Theprojectteammembers
mayinclude,butnotbelimitedtothefollowingmembers.

Project Manager Laborer Electrician

D. PROVIDE SCHEDULE: Discuss the sequence of the project, including ordering, delivery and

installationofequipmentandaccessories.Theanticipatedawarddateisnotlaterthan05
August2016.DiscusshowtheofferorwillcoordinatewiththeGovernment’s
representatives.DiscusshowtheofferorshallmaintaintheGovernment’sschedule.
Elaborateonareasofworkwherehighdegreesofriskareinvolvedthatmayadversely
affecttheplannedperformanceperiodandtheofferor’splantomitigatethoserisks..
Provideanitemizedschedulefromstarttofinishwithnecessarytasksandduration
addressed.GanttorMilestonechartwouldbeacceptableandshalldiscussinstallation,
inspection,punch‐listandfinalacceptancebytheGovernment.
E. Offerorshallprovidethenameandphonenumberforthethreereferencesthattheofferor
providedtheenclosedFormPPQ‐0)NAVFAC/USACEPASTPERFORMANCE
QUESTIONNAIREto.
F.OfferorshallprovidedescriptiveliteratureinaccordancewiththeprovisionatFAR52.214‐
21ifquotingonotherthanthebrandname(s)specifiedinthesolicitationtobeusedinthe
technicalevaluation.SeetheprovisionatFAR52.211‐6,BrandNameorEqual.
BASIS FOR AWARD
A. TheGovernmentisusingFARPart12andwillawardacontractresultingfromthis

solicitation to the responsible offeror whose offer conforms to the solicitation.

B. Foreachlocation,theGovernmentanticipatesawardofaFirm‐Fixed‐Price(FFP)Lowest
PriceTechnicallyAcceptable(LPTA)quote,(i.e.totheofferorwiththelowestevaluated
realisticpricequotemeetingtheacceptabilitystandardsfornon‐costfactors).Theofferoris
notrequiredtoquoteonallindividuallocations.However,theyarerequiredtoquoteonall
thelineitemsassociatedwithanindividuallocation(e.g.videointercomsystem;frosted
film;motorizedshades;peephole).Forexample,ifanindividuallocationrequiresthevideo
intercomsystem;thefrostedfilm;andmotorizedshades,acontractorwillbefoundnon‐
responsiveiftheyquoteonjustthevideointercomsystemandnothingelseassociatedwith
thatlocation.Forawardpurposes,itispossiblethatmorethanoneawardwouldbemade
tothesamecontractor,providedthatcontractoristhelowestpricetechnicallyacceptable
quote.Toreceiveconsiderationforaward,aratingofnolessthan“Acceptable”mustbe
achievedfortheTechnicalfactor.Awardwillbemadewithappropriateconsiderationgiven
tothetwoevaluationfactors.
C. TheGovernmentintendstoevaluatequotesandmakeawardwithoutquestionstoofferors.
Therefore,theOfferor'sinitialquoteshouldcontaintheOfferor'sbesttermsfroma
TechnicalandCoststandpoint.
D. Unclearquotesmaynotresultinquestionsforclarifications.Offerswithanomissionor
unclearquotemaybejudgedtomeanthecontractordoesnotfullyunderstandthe
requirementsorunderstandwhatittakestomeettherequirements,regardlessofthe
proposedcost/priceandwillberatedunacceptable.Inthatcase,theOfferormaybefound
unacceptable,andineligibleforaward.TheGovernmentreservestherighttoaskquestions
ofofferorsiftheContractingOfficerdeterminesthemtobenecessary.

EVALUATION CRITERIA

Thefollowingevaluationfactorswillbeused.Awardwillbemadewithappropriate
considerationbasedupontheevaluationfactorsdescribedbelow:

Factor 1‐Technical.

Thequotewillbeevaluatedtoensurealltheitemsbelowwereprovided:
A.Theofferorconfinedsubmissionstoessentialmatters,sufficienttodefinetheofferdetails,
inaconcisemanner,topermitacompleteandaccurateevaluationofthequote.
B.Theofferorsubmittedthequotealongwithacapabilitystatementtoperformthiswork
thatdemonstratestheofferor’stechnicalability.
C.Theofferordescribedhowtheprojectteamwillbestructured;theprinciplefirms,
responsibilities,relationships,interactions,andqualifications.Theofferorsubmittedalist
ofkeypersonnelthatindicateseachindividual’scurrentassignmentandtheofferor’splan
toensurethatthenamedpersonnelshallbeusedonthisproject.
D. Theofferorprovidedaschedulediscussingthesequenceoftheproject,includingordering,
deliveryandinstallationofequipmentandaccessories.Anticipatedawarddateisnotlater
than05August2016.Theofferordiscussedhowtheofferorwillcoordinatewiththe
Government’srepresentatives.Theofferordiscussedhowtheofferorshallmaintainthe
Government’sschedule.Theofferorelaboratedonareasofworkwherehighdegreesofrisk
areinvolvedthatmayadverselyaffecttheplannedperformanceperiodandtheofferor’s
plantomitigatethoserisks..Theofferorprovidedanitemizedschedulefromstarttofinish
withnecessarytasksanddurationaddressed.GanttorMilestonechartwasprovidedand
discussed,installation,inspection,punch‐listandfinalacceptancebytheGovernment.
E.Offerorprovidedthenameandphonenumberforthreereferencesthattheofferor
providedtheFormPPQ‐0)NAVFAC/USACEPASTPERFORMANCEQUESTIONNAIREto.
F.OfferorprovideddescriptiveliteratureinaccordancewiththeprovisionatFAR52.214‐21
ifofferorquotedonotherthanthebrandname(s)specifiedinthesolicitationtobeusedin
thetechnicalevaluation.SeetheprovisionatFAR52.211‐6,BrandNameorEqual.

A. Technical Ratings:

a. The following adjectival ratings will be assigned to the technical factor.

Ratings Definitions:

ADJECTIVALRATINGS
ACCEPTABLEOfferclearlymeetstheminimumrequirements
ofthesolicitation.
UNACCEPTABLEOfferdoes notclearlymeettheminimum

requirements of the solicitation

FACTOR 2 – COST/PRICE

A. TheGovernmentwillevaluatequotesforeachlocationforawardpurposesbyaddingthe
totalofallCLINpricesthatareassociatedforeachlocationtoensurethatpricingisrealistic
andisnotunbalanced.Priceswillbeevaluatedforfairnessandreasonablenessusingthe
techniquesinFAR15.404‐1(b)(2).

B. The following will be evaluated:

Fair and Reasonableness

Completeness, Accuracy, and Balance.

A. For each location, the total price shall be equal to the sum of the total of all of the cost

elements(Labor,andMaterials).TheGovernmentwillverifytheOfferorscalculationofthe
totalquotedpriceforeachlocation.

REVISED

07-21-2016

REVISED 07-21-2016

THIS PAGE REVISED 07-21-2016 (SECOND PAGE OF ATTACHMENT #4 OF PWS - GT SERIES)

File details come from the government source that posted it. Updated .