G24_Bid_Abstract_.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
JJRTC Paving Repair Federal contract opportunity
Solicitation number
W912DR-16-B-0023
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

View the file

Other files for this federal contract opportunity

Other files attached to JJRTC Paving Repair, newest first.
File Type Posted
W912DR-16-B-0025-0005.pdf PDF
W912DR-16-B-0023-0004.pdf PDF
W912DR-16-B-0023-0003.pdf PDF
W912DR-16-B-0023-0002.pdf PDF
W912DR-16-B-0023-0001.pdf PDF
A2_Plans_and_Specs.pdf PDF
W912DR-16-B-0023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chart1

SERVICEAll costs in connection with the Mill and Overlay (2”)Removal at Merletti
Parking Lot completAll costs in connection with the Mill and Overlay (2”)Removal at other areas complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth at Merletti Parking Lot and other areas complete as shown and specified.All costs in connection with the stabilization with full stone base reconstruction where required complete as shown on drawings and specified.All costs in connection with the Sidewalk and Curb Reconstruction at Merletti Lot complete as shown on drawings and specified.All costs in connection with Protective Operations Driving Course (PODC) striping complete as shown and specifiedAll costs in connection with the PODC sealing complete as shown and specifiedAll costs in connection with the new concrete pavement behind the Wilson Bldg. complete as shown and specifiedAll costs in connection with the Mill and Overlay (2”)Removal complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth complete as shown and specified.All costs in connection with the stabilization with full stone base in place where required complete as shown on drawings and specifiedAll costs in connection with the Sidewalk and Curb Reconstruction complete as shown on drawings and specified.TOTAL =PERCENT ABOVE/BELOW IGE =AMOUNT OVER IGE =BID ABSTRACT FOR W912DR-16-B-0023 JJRTC Paving RepairLOCATION: Laurel, MDLINECLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006CLIN 0007CLIN 0008CLIN 0009CLIN 0010CLIN 0011CLIN 001203855715825844205321790034072552412479943059862416778607325968340723615104SERVICEAll costs in connection with the Mill and Overlay (2”)Removal at Merletti
Parking Lot completAll costs in connection with the Mill and Overlay (2”)Removal at other areas complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth at Merletti Parking Lot and other areas complete as shown and specified.All costs in connection with the stabilization with full stone base reconstruction where required complete as shown on drawings and specified.All costs in connection with the Sidewalk and Curb Reconstruction at Merletti Lot complete as shown on drawings and specified.All costs in connection with Protective Operations Driving Course (PODC) striping complete as shown and specifiedAll costs in connection with the PODC sealing complete as shown and specifiedAll costs in connection with the new concrete pavement behind the Wilson Bldg. complete as shown and specifiedAll costs in connection with the Mill and Overlay (2”)Removal complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth complete as shown and specified.All costs in connection with the stabilization with full stone base in place where required complete as shown on drawings and specifiedAll costs in connection with the Sidewalk and Curb Reconstruction complete as shown on drawings and specified.TOTAL =PERCENT ABOVE/BELOW IGE =AMOUNT OVER IGE =BID ABSTRACT FOR W912DR-16-B-0023 JJRTC Paving RepairLOCATION: Laurel, MDLINECLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006CLIN 0007CLIN 0008CLIN 0009CLIN 0010CLIN 0011CLIN 00120254444.85385052.25367953.3462153800037505142024000553052.5657828.6654563380003074279.50.14960136693162907-540824.5SERVICEAll costs in connection with the Mill and Overlay (2”)Removal at Merletti
Parking Lot completAll costs in connection with the Mill and Overlay (2”)Removal at other areas complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth at Merletti Parking Lot and other areas complete as shown and specified.All costs in connection with the stabilization with full stone base reconstruction where required complete as shown on drawings and specified.All costs in connection with the Sidewalk and Curb Reconstruction at Merletti Lot complete as shown on drawings and specified.All costs in connection with Protective Operations Driving Course (PODC) striping complete as shown and specifiedAll costs in connection with the PODC sealing complete as shown and specifiedAll costs in connection with the new concrete pavement behind the Wilson Bldg. complete as shown and specifiedAll costs in connection with the Mill and Overlay (2”)Removal complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth complete as shown and specified.All costs in connection with the stabilization with full stone base in place where required complete as shown on drawings and specifiedAll costs in connection with the Sidewalk and Curb Reconstruction complete as shown on drawings and specified.TOTAL =PERCENT ABOVE/BELOW IGE =AMOUNT OVER IGE =BID ABSTRACT FOR W912DR-16-B-0023 JJRTC Paving RepairLOCATION: Laurel, MDLINECLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006CLIN 0007CLIN 0008CLIN 0009CLIN 0010CLIN 0011CLIN 00120157200027500017700028000280001300002210000-5.9952038369304558E-2-125000SERVICEAll costs in connection with the Mill and Overlay (2”)Removal at Merletti
Parking Lot completAll costs in connection with the Mill and Overlay (2”)Removal at other areas complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth at Merletti Parking Lot and other areas complete as shown and specified.All costs in connection with the stabilization with full stone base reconstruction where required complete as shown on drawings and specified.All costs in connection with the Sidewalk and Curb Reconstruction at Merletti Lot complete as shown on drawings and specified.All costs in connection with Protective Operations Driving Course (PODC) striping complete as shown and specifiedAll costs in connection with the PODC sealing complete as shown and specifiedAll costs in connection with the new concrete pavement behind the Wilson Bldg. complete as shown and specifiedAll costs in connection with the Mill and Overlay (2”)Removal complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth complete as shown and specified.All costs in connection with the stabilization with full stone base in place where required complete as shown on drawings and specifiedAll costs in connection with the Sidewalk and Curb Reconstruction complete as shown on drawings and specified.TOTAL =PERCENT ABOVE/BELOW IGE =AMOUNT OVER IGE =BID ABSTRACT FOR W912DR-16-B-0023 JJRTC Paving RepairLOCATION: Laurel, MDLINECLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006CLIN 0007CLIN 0008CLIN 0009CLIN 0010CLIN 0011CLIN 0012SERVICEAll costs in connection with the Mill and Overlay (2”)Removal at Merletti
Parking Lot completAll costs in connection with the Mill and Overlay (2”)Removal at other areas complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth at Merletti Parking Lot and other areas complete as shown and specified.All costs in connection with the stabilization with full stone base reconstruction where required complete as shown on drawings and specified.All costs in connection with the Sidewalk and Curb Reconstruction at Merletti Lot complete as shown on drawings and specified.All costs in connection with Protective Operations Driving Course (PODC) striping complete as shown and specifiedAll costs in connection with the PODC sealing complete as shown and specifiedAll costs in connection with the new concrete pavement behind the Wilson Bldg. complete as shown and specifiedAll costs in connection with the Mill and Overlay (2”)Removal complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth complete as shown and specified.All costs in connection with the stabilization with full stone base in place where required complete as shown on drawings and specifiedAll costs in connection with the Sidewalk and Curb Reconstruction complete as shown on drawings and specified.TOTAL =PERCENT ABOVE/BELOW IGE =AMOUNT OVER IGE =BID ABSTRACT FOR W912DR-16-B-0023 JJRTC Paving RepairLOCATION: Laurel, MDLINECLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006CLIN 0007CLIN 0008CLIN 0009CLIN 0010CLIN 0011CLIN 0012SERVICEAll costs in connection with the Mill and Overlay (2”)Removal at Merletti
Parking Lot completAll costs in connection with the Mill and Overlay (2”)Removal at other areas complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth at Merletti Parking Lot and other areas complete as shown and specified.All costs in connection with the stabilization with full stone base reconstruction where required complete as shown on drawings and specified.All costs in connection with the Sidewalk and Curb Reconstruction at Merletti Lot complete as shown on drawings and specified.All costs in connection with Protective Operations Driving Course (PODC) striping complete as shown and specifiedAll costs in connection with the PODC sealing complete as shown and specifiedAll costs in connection with the new concrete pavement behind the Wilson Bldg. complete as shown and specifiedAll costs in connection with the Mill and Overlay (2”)Removal complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth complete as shown and specified.All costs in connection with the stabilization with full stone base in place where required complete as shown on drawings and specifiedAll costs in connection with the Sidewalk and Curb Reconstruction complete as shown on drawings and specified.TOTAL =PERCENT ABOVE/BELOW IGE =AMOUNT OVER IGE =BID ABSTRACT FOR W912DR-16-B-0023 JJRTC Paving RepairLOCATION: Laurel, MDLINECLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006CLIN 0007CLIN 0008CLIN 0009CLIN 0010CLIN 0011CLIN 00121SERVICEAll costs in connection with the Mill and Overlay (2”)Removal at Merletti
Parking Lot completAll costs in connection with the Mill and Overlay (2”)Removal at other areas complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth at Merletti Parking Lot and other areas complete as shown and specified.All costs in connection with the stabilization with full stone base reconstruction where required complete as shown on drawings and specified.All costs in connection with the Sidewalk and Curb Reconstruction at Merletti Lot complete as shown on drawings and specified.All costs in connection with Protective Operations Driving Course (PODC) striping complete as shown and specifiedAll costs in connection with the PODC sealing complete as shown and specifiedAll costs in connection with the new concrete pavement behind the Wilson Bldg. complete as shown and specifiedAll costs in connection with the Mill and Overlay (2”)Removal complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth complete as shown and specified.All costs in connection with the stabilization with full stone base in place where required complete as shown on drawings and specifiedAll costs in connection with the Sidewalk and Curb Reconstruction complete as shown on drawings and specified.TOTAL =PERCENT ABOVE/BELOW IGE =AMOUNT OVER IGE =BID ABSTRACT FOR W912DR-16-B-0023 JJRTC Paving RepairLOCATION: Laurel, MDLINECLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006CLIN 0007CLIN 0008CLIN 0009CLIN 0010CLIN 0011CLIN 00121SERVICEAll costs in connection with the Mill and Overlay (2”)Removal at Merletti
Parking Lot completAll costs in connection with the Mill and Overlay (2”)Removal at other areas complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth at Merletti Parking Lot and other areas complete as shown and specified.All costs in connection with the stabilization with full stone base reconstruction where required complete as shown on drawings and specified.All costs in connection with the Sidewalk and Curb Reconstruction at Merletti Lot complete as shown on drawings and specified.All costs in connection with Protective Operations Driving Course (PODC) striping complete as shown and specifiedAll costs in connection with the PODC sealing complete as shown and specifiedAll costs in connection with the new concrete pavement behind the Wilson Bldg. complete as shown and specifiedAll costs in connection with the Mill and Overlay (2”)Removal complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth complete as shown and specified.All costs in connection with the stabilization with full stone base in place where required complete as shown on drawings and specifiedAll costs in connection with the Sidewalk and Curb Reconstruction complete as shown on drawings and specified.TOTAL =PERCENT ABOVE/BELOW IGE =AMOUNT OVER IGE =BID ABSTRACT FOR W912DR-16-B-0023 JJRTC Paving RepairLOCATION: Laurel, MDLINECLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006CLIN 0007CLIN 0008CLIN 0009CLIN 0010CLIN 0011CLIN 0012SERVICEAll costs in connection with the Mill and Overlay (2”)Removal at Merletti
Parking Lot completAll costs in connection with the Mill and Overlay (2”)Removal at other areas complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth at Merletti Parking Lot and other areas complete as shown and specified.All costs in connection with the stabilization with full stone base reconstruction where required complete as shown on drawings and specified.All costs in connection with the Sidewalk and Curb Reconstruction at Merletti Lot complete as shown on drawings and specified.All costs in connection with Protective Operations Driving Course (PODC) striping complete as shown and specifiedAll costs in connection with the PODC sealing complete as shown and specifiedAll costs in connection with the new concrete pavement behind the Wilson Bldg. complete as shown and specifiedAll costs in connection with the Mill and Overlay (2”)Removal complete as shown and specifiedAll costs in connection with the Mill and replace full pavement depth complete as shown and specified.All costs in connection with the stabilization with full stone base in place where required complete as shown on drawings and specifiedAll costs in connection with the Sidewalk and Curb Reconstruction complete as shown on drawings and specified.TOTAL =PERCENT ABOVE/BELOW IGE =AMOUNT OVER IGE =BID ABSTRACT FOR W912DR-16-B-0023 JJRTC Paving RepairLOCATION: Laurel, MDLINECLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005CLIN 0006CLIN 0007CLIN 0008CLIN 0009CLIN 0010CLIN 0011CLIN 0012

Sheet1 BID ABSTRACT FOR W912DR-16-B-0023 JJRTC Paving Repair

LOCATION: Laurel, MD
LINESERVICEIGERibeiroBlanchard
CLIN 0001All costs in connection with the Mill and Overlay (2”)Removal at Merletti
Parking Lot complet$385,571.00$254,444.85$269,470.00
CLIN 0002All costs in connection with the Mill and Overlay (2”)Removal at other areas complete as shown and specified$582,584.00$385,052.25$388,377.00
CLIN 0003All costs in connection with the Mill and replace full pavement depth at Merletti Parking Lot and other areas complete as shown and specified.$420,532.00$367,953.30$408,057.00
CLIN 0004All costs in connection with the stabilization with full stone base reconstruction where required complete as shown on drawings and specified.$17,900.00$46,215.00$94,967.00
CLIN 0005All costs in connection with the Sidewalk and Curb Reconstruction at Merletti Lot complete as shown on drawings and specified.$34,072.00$38,000.00$53,489.00
CLIN 0006All costs in connection with Protective Operations Driving Course (PODC) striping complete as shown and specified$5,524.00$3,750.00$27,562.00
CLIN 0007All costs in connection with the PODC sealing complete as shown and specified$124,799.00$51,420.00$84,070.00
CLIN 0008All costs in connection with the new concrete pavement behind the Wilson Bldg. complete as shown and specified$43,059.00$24,000.00$66,326.00
CLIN 0009All costs in connection with the Mill and Overlay (2”)Removal complete as shown and specified$862,416.00$553,052.50$539,049.00
CLIN 0010All costs in connection with the Mill and replace full pavement depth complete as shown and specified.$778,607.00$657,828.60$735,161.00
CLIN 0011All costs in connection with the stabilization with full stone base in place where required complete as shown on drawings and specified$325,968.00$654,563.00$677,016.00
CLIN 0012All costs in connection with the Sidewalk and Curb Reconstruction complete as shown on drawings and specified.$34,072.00$38,000.00$477,992.00
TOTAL =$3,615,104.00$3,074,279.50$3,821,536.00
PERCENT ABOVE/BELOW IGE =14.96%-5.71%
AMOUNT OVER IGE =-$540,824.50$206,432.00