Materials_List.xls

XLS spreadsheet 84 KB Posted

Attached to
ENOPU Bathrooms Renovation Federal contract opportunity
Solicitation number
W912CL-17-R-0004
Issued by
Department of the Army Cyber Command

About this file

Materials List

View the file

Other files for this federal contract opportunity

Other files attached to ENOPU Bathrooms Renovation, newest first.
File Type Posted
ENOPU_answers_questions_from_industry.docx DOCX document
Technical_Exhibit_1_Renovation_Sketches.pdf PDF
Solicitation_ENOPU_Bathrooms_Renovation_Uruguay.doc DOC document
Technical_Exhibit_2_Bathroom_Perimeter_Location.pptx PPTX presentation

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENOPU projects

MATERIALS LIST
ENOPU Projects
ItemDescriptionUnitQuantityUnit CostPartial Cost
01DORM RESTROOMLS1.00$ - 0
02HANDICAP RESTROOM (OPTION 1)LS1.00$ - 0$ - 0
03PUBLIC RESTROOM (OPTION 2)LS1.00$ - 0
TOTAL PROJECT COST$ - 0
Notes:
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.
Prepared by:Reviewed by:
Jose M. BermudezRosa L. Santoni
US Army South-ACSENGUS Army South-ACSENG
CW3/EN, Engineering TechnicianDeputy Director
jose.m.bermudez2.mil@mail.milrosa.l.santoni.civ@mail.mil
295-6045295-6665
Prepared on: 08 DEC 2016Date: 08 DEC 2016

ENOPU dorms

MATERIALS LIST
DORMITORIES
ItemDescriptionUnitQuantityUnit CostPartial Cost
01DEMOLITION$ - 0
01.01Removal and disposal of exiting restroom fixtures, tiles, drop ceiling, particion walls, plumbing lines, and electrical items. Doors and frames will be reused.sm24.00$ - 0
02PARTITION WALL$ - 0
02.015/8 or 1/2 inch fire rated green gypsum boardsf400.00$ - 0
02.0210ft metal knockout C-channel stud framing 16 O.C. (2-1/2 inches x 10ft, 20 gauge)lf200.00$ - 0
02.0310ft metal C-channel track bottom (2-1/2" x 10ft, 20 gauge)lf20.00$ - 0
02.0410ft metal C-channel track top (2-1/2" x 10ft, 20 gauge)lf20.00$ - 0
02.05Trim (3 or 4 inches) Drywall Corner Bead (1-1/4" x 1-1/4" x 10 ft)lf160.00$ - 0
02.06Metal stud screws 1/2 Inch No. 8 pan head to fasten studs to tracks (Box of 100)Box1.00$ - 0
02.07Joint mesh tape (roll 2 inch x 300 ft)ea1.00$ - 0
02.08Joint compound to seal joints (5GALs)ea1.00$ - 0
02.09Tapcon screws 1/4 Inch x 1-1/4 Inch hex head to hold bottom track to slab (Box of 100)Box1.00$ - 0
02.10Self-tapping drywall screws 1-1/4 inch (Box of 100).Box1.00$ - 0
02.11Dual grit sanding spongeea1.00$ - 0
02.12Insulation R-value of 15sf200.00$ - 0
03FLOORS$ - 0
03.01CONCRETE FOR FLOOR LEVELING E=40 MMsm24.00$ - 0
03.02CERAMIC TILING FLOOR 50X50sm24.00$ - 0
03.03CONCRETE FOR TILING WALL E=40 MMsm36.00$ - 0
03.04CERAMIC TILING WALL 20X50sm36.00$ - 0
04ZOCALOS Y CONTRAZOCALOS$ - 0
04.01CERAMIC ZOCALO 15 X 50sm4.20$ - 0
05WOODEN CARPENTRY$ - 0
05.01WOODEN DOOR IMPROVEMENTea8.00$ - 0
06DOOR ACCESSORIES$ - 0
06.01HINGE 3 1/2" X 3 1/2"Ea24.00$ - 0
06.02DOOR LOCKEa8.00$ - 0
07GLASS, CRYSTALS & OTHERS$ - 0
07.01TEMPERED GLASS 10MM FOR SHOWERsm116.00$ - 0
06.02MIRROR (0.75 m X 0.9 m)Ea8.00$ - 0
08PAINT$ - 0
08.01PAINT FOR CEILING (2 COATS)sm48.00$ - 0
08.02PAINT FOR EXTERIOR & INTERIOR WALLS (2 COATS)sm32.00$ - 0
08.03PAINT FOR DOORS C/VARNIZ (2 COATS)sm13.36
09SANITARY ITEMS$ - 0
09.01WHITE LOW TANK TOILET WITH SEAT AND LID (WATER SAVER)Ea8.00$ - 0
09.02SINKEa8.00$ - 0
09.03PAPER TOILET HOLDEREa8.00$ - 0
09.04HIGENIC SHOWER AT TOILET (BIDET)Ea8.00$ - 0
09.05SHOWEREa8.00$ - 0
09.06SOAP HOLDEREa8.00$ - 0
09.07TOWEL HOLDER BAREa8.00$ - 0
09.08SMALL TOWEL HOLDER BAR AT SINKEa8.00$ - 0
09.09HOOK AT SHOWER AND SINKEa16.00$ - 0
09.10FAUCETS (FOR HOT AND COLD WATER)Ea5.00$ - 0
10DRAIN SYSTEM$ - 0
10.01DRAIN POINT WITH PVC PIPEEa8.00$ - 0
10.02VENT WITH PVC 2 INCHES PIPEEa4.00$ - 0
10.034 INCHES PVC PIPEm20.00$ - 0
10.042 INCHES PVC PIPEm10.00$ - 0
10.05BRONZE THREADED CLEAN OUT ø4 INCHESEa8.00$ - 0
10.06DRAIN FOR SINKS ø 2 INCHESEa8.00$ - 0
11COLD AND HOT WATER SYSTEM$ - 0
11.01COLD WATER POINT WITH PVC PIPEEa8.00$ - 0
11.02HOT WATER POINT WITH PVC PIPEEa8.00$ - 0
11.03DISTRIBUTION NETWORK 1/2 INCH PVC PIPEm20.00$ - 0
11.04DISTRIBUITION NETWORK 3/4 INCH PVC PIPEm10.00$ - 0
11.05POTABLE PVC 2 INCHES PIPEm10.00$ - 0
12INTERIOR ELECTRICAL INSTALATIONS$ - 0
12.01OUTLET FOR ROOF LIGHTINGEa8.00$ - 0
12.02SWITCH WITH PLATEEa3.00$ - 0
12.03RECEPTACLE Ground Fault Circuit Interrupter (GFCI)Ea8.00$ - 0
12.04Light Emitting Diode (LED) electrical directional lampEa8.00$ - 0
12.05CONDUITSlm20.00$ - 0
12.06ELECTRICAL WIRE, BREAKER, LOAD CENTERLS1.00$ - 0
13CABINET AND COUNTERTOP$ - 0
13.01VANITY FOR SINKEa2.00$ - 0
13.02MABLE/GRANITE COUNTERTOP WITH SPLASH (15 MM)sm3.60$ - 0
14VENTS AND WATER HEATER UNITS$ - 0
14.01VENT UNITEa8.00$ - 0
14.02WATER HEATER UNITEa2.00$ - 0
14.03CIRCUIT & ACCESSORIESLS1.00$ - 0
15SPECIAL ITEMS$ - 0
15.01DROP CEILINGsm48.00$ - 0
15.02FINAL CLEAN UPsm48.00$ - 0
DIRECT COST$ - 0
16OTHER$ - 0
16.01LABORLS1.00$ - 0$ - 0
16.02UTILITIESLS1.00$ - 0$ - 0
16.03TAXESLS1.00$ - 0$ - 0
16.04TRANSPORTATIONLS1.00$ - 0$ - 0
16.05CONTINGENCY AND PROFITLS1.00$ - 0$ - 0
TOTAL PROJECT COST$ - 0
Notes:
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.

ENOPU Handicap Restroom

MATERIALS LIST
HANDICAP RESTROOM
ItemDescriptionUnitQuantityUnit CostPartial Cost
01DEMOLITION$ - 0
01.01Removal and disposal of exiting restroom fixtures, tiles, drop ceiling, particion walls, plumbing lines, and electrical items. Doors and frames will be reused.sm12.00$ - 0
02PARTITION WALL$ - 0
02.015/8 or 1/2 inch fire rated green gypsum boardsf189.12$ - 0
02.0210ft metal knockout C-channel stud framing 16 O.C. (2-1/2 inches x 10ft, 20 gauge)lf110.00$ - 0
02.0310ft metal C-channel track bottom (2-1/2" x 10ft, 20 gauge)lf15.00$ - 0
02.0410ft metal C-channel track top (2-1/2" x 10ft, 20 gauge)lf15.00$ - 0
02.05Trim (3 or 4 inches) Drywall Corner Bead (1-1/4" x 1-1/4" x 10 ft)lf120.00$ - 0
02.06Metal stud screws 1/2 Inch No. 8 pan head to fasten studs to tracks (Box of 100)Box1.00$ - 0
02.07Joint mesh tape (roll 2 inch x 300 ft)ea1.00$ - 0
02.08Joint compound to seal joints (5GALs)ea1.00$ - 0
02.09Tapcon screws 1/4 Inch x 1-1/4 Inch hex head to hold bottom track to slab (Box of 100)Box1.00$ - 0
02.10Self-tapping drywall screws 1-1/4 inch (Box of 100).Box1.00$ - 0
02.11Dual grit sanding spongeea1.00
03FLOORS$ - 0
03.01CONCRETE FOR FLOOR LEVELING E=40 MMsm14.00$ - 0
03.02CERAMIC TILING FLOOR 50X50sm14.00$ - 0
03.03CONCRETE FOR TILING WALL E=40 MMsm36.00$ - 0
03.04CERAMIC TILING WALL 20X50sm36.00
04ZOCALOS Y CONTRAZOCALOS$ - 0
04.01CERAMIC ZOCALO 15 X 50sm2.25
05WOODEN CARPENTRY
05.01WOODEN DOOR IMPROVEMENT AND INSTALLATIONea3.00$ - 0
06DOOR ACCESSORIES$ - 0
06.01HINGE 3 1/2" X 3 1/2"Ea12.00$ - 0
06.02DOOR LOCKEa3.00
07GLASS, CRYSTALS & OTHERS
07.01MIRROR (0.75 m X 0.9 m)Ea1.00$ - 0
06.02MIRROR (1.7 m X 0.9 m)Ea2.00$ - 0
08PAINT$ - 0
08.01PAINT FOR CEILING (2 COATS)sm14.00$ - 0
08.02PAINT FOR EXTERIOR & INTERIOR WALLS (2 COATS)sm48.00$ - 0
08.03PAINT FOR DOORS C/VARNIZ (2 COATS)sm5.86
09SANITARY ITEMS$ - 0
09.01WHITE LOW TANK TOILET WITH SEAT AND LID (WATER SAVER) FOR HANDICAPEa1.00$ - 0
09.02WHITE LOW TANK TOILET WITH SEAT AND LID (WATER SAVER)Ea2.00$ - 0
09.03SINK FOR HANDICAP (WALL MOUNTED)Ea2.00$ - 0
09.04SINKEa3.00$ - 0
09.05PAPER TOILET HOLDEREa3.00$ - 0
09.06HIGENIC SHOWER AT TOILET (BIDET)Ea3.00$ - 0
09.07SOAP HOLDEREa4.00$ - 0
09.08SMALL TOWEL HOLDER BAR AT SINKEa3.00$ - 0
09.09HOOK AT SINK AND TOILET STALLEa6.00$ - 0
09.10FAUCETS (FOR HOT AND COLD WATER)Ea5.00
10DRAIN SYSTEM$ - 0
10.01DRAIN POINT WITH PVC PIPEEa1.00$ - 0
10.02VENT WITH PVC 2 INCHES PIPEEa1.00$ - 0
10.034 INCHES PVC PIPEm20.00$ - 0
10.042 INCHES PVC PIPEm10.00$ - 0
10.05BRONZE THREADED CLEAN OUT ø4 INCHESEa2.00$ - 0
10.06DRAIN FOR SINKS ø 2 INCHESEa4.00$ - 0
11COLD AND HOT WATER SYSTEM$ - 0
11.01COLD WATER POINT WITH PVC PIPEEa2.00$ - 0
11.02HOT WATER POINT WITH PVC PIPEEa2.00$ - 0
11.03DISTRIBUTION NETWORK 1/2 INCH PVC PIPEm20.00$ - 0
11.04DISTRIBUITION NETWORK 3/4 INCH PVC PIPEm10.00$ - 0
11.05POTABLE PVC 2 INCHES PIPEm10.00$ - 0
12INTERIOR ELECTRICAL INSTALATIONS$ - 0
12.01OUTLET FOR ROOF LIGHTINGEa4.00$ - 0
12.02SWITCH WITH PLATEEa3.00$ - 0
12.03RECEPTACLE Ground Fault Circuit Interrupter (GFCI)Ea2.00$ - 0
12.04Light Emitting Diode (LED) electrical directional lampEa4.00$ - 0
12.05CONDUITSlm20.00$ - 0
12.06ELECTRICAL WIRE, BREAKER, LOAD CENTERLS1.00$ - 0
13CABINET AND COUNTERTOP$ - 0
13.01VANITY FOR SINKEa1.00$ - 0
13.02MABLE/GRANITE COUNTERTOP WITH SPLASH (15 MM)sm0.94$ - 0
14VENTS AND WATER HEATER UNITS$ - 0
14.01VENT UNITEa2.00$ - 0
14.02WATER HEATER UNITEa1.00$ - 0
14.03CIRCUIT & ACCESSORIESLS1.00$ - 0
15SPECIAL ITEMS$ - 0
15.01HANDICAP SIGN AND LABELEa2.00$ - 0
15.03HANDICAP RAMPm34.56$ - 0
15.04DROP CEILINGsm14.00$ - 0
15.05STALL PARTITIONSLS1.00$ - 0
15.06FINAL CLEAN UPsm14.00$ - 0
DIRECT COST$ - 0
16OTHER$ - 0
16.01LABORLS1.00$ - 0$ - 0
16.02UTILITIESLS1.00$ - 0$ - 0
16.03TAXESLS1.00$ - 0$ - 0
16.04TRANSPORTATIONLS1.00$ - 0$ - 0
16.05CONTINGENCY AND PROFITLS1.00$ - 0$ - 0
TOTAL PROJECT COST$ - 0
Notes:
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.

ENOPU Public Restroom

MATERIALS LIST
PUBLIC RESTROOM
ItemDescriptionUnitQuantityUnit CostPartial Cost
01DEMOLITION$ - 0
01.01Removal and disposal of exiting restroom fixtures, tiles, drop ceiling, particion walls, plumbing lines, and electrical items. Doors and frames will be reused.sm21.00$ - 0
02PARTITION WALL$ - 0
02.015/8 or 1/2 inch fire rated green gypsum boardsm21.60$ - 0
02.0210ft metal knockout C-channel stud framing 16 O.C. (2-1/2 inches x 10ft, 20 gauge)lm100.00$ - 0
02.0310ft metal C-channel track bottom (2-1/2" x 10ft, 20 gauge)lm9.90$ - 0
02.0410ft metal C-channel track top (2-1/2" x 10ft, 20 gauge)lm9.90$ - 0
02.05Trim (3 or 4 inches) Drywall Corner Bead (1-1/4" x 1-1/4" x 10 ft)lm24.33$ - 0
02.06Metal stud screws 1/2 Inch No. 8 pan head to fasten studs to tracks (Box of 100)Box1.00$ - 0
02.07Joint mesh tape (roll 2 inch x 300 ft)ea1.00$ - 0
02.08Joint compound to seal joints (5GALs)ea1.00$ - 0
02.09Tapcon screws 1/4 Inch x 1-1/4 Inch hex head to hold bottom track to slab (Box of 100)Box1.00$ - 0
02.10Self-tapping drywall screws 1-1/4 inch (Box of 100).Box1.00$ - 0
02.11Dual grit sanding spongeea1.00$ - 0
03FLOORS$ - 0
03.01CONCRETE FOR FLOOR LEVELING E=40 MMsm21.00$ - 0
03.02CERAMIC TILING FLOOR 50X50sm21.00$ - 0
03.03CONCRETE FOR TILING WALL E=40 MMsm54.79$ - 0
03.04CERAMIC TILING WALL 20X50sm54.79$ - 0
04ZOCALOS Y CONTRAZOCALOS$ - 0
04.01CERAMIC ZOCALO 15 X 50sm3.64$ - 0
05WOODEN CARPENTRY$ - 0
05.01WOODEN DOOR IMPROVEMENT AND INSTALLATIONea2.00$ - 0
06DOOR ACCESSORIES$ - 0
06.01HINGE 3 1/2" X 3 1/2"Ea6.00$ - 0
06.02DOOR LOCKEa2.00$ - 0
07GLASS, CRYSTALS & OTHERS$ - 0
07.01MIRROR (0.75 m X 0.9 m)Ea1.00$ - 0
06.02MIRROR (1.7 m X 0.9 m)Ea2.00$ - 0
08PAINT$ - 0
08.01PAINT FOR CEILING (2 COATS)sm21.00$ - 0
08.02PAINT FOR EXTERIOR & INTERIOR WALLS (2 COATS)sm14.55$ - 0
08.03PAINT FOR DOORS C/VARNIZ (2 COATS)sm3.60$ - 0
09SANITARY ITEMS$ - 0
09.01WHITE LOW TANK TOILET WITH SEAT AND LID (WATER SAVER)Ea5.00$ - 0
09.02SINKEa5.00$ - 0
09.03PAPER TOILET HOLDEREa5.00$ - 0
09.04HIGENIC SHOWER AT TOILET (BIDET)Ea5.00$ - 0
09.05SOAP HOLDEREa5.00$ - 0
09.06SMALL TOWEL HOLDER BAR AT SINKEa2.00$ - 0
09.07HOOK AT SINK AND TOILET STALLEa7.00$ - 0
09.08FAUCETS (FOR HOT AND COLD WATER)Ea5.00$ - 0
10DRAIN SYSTEM$ - 0
10.01DRAIN POINT WITH PVC PIPEEa1.00$ - 0
10.02VENT WITH PVC 2 INCHES PIPEEa1.00$ - 0
10.034 INCHES PVC PIPEm20.00$ - 0
10.042 INCHES PVC PIPEm10.00$ - 0
10.05BRONZE THREADED CLEAN OUT ø4 INCHESEa2.00$ - 0
10.06DRAIN FOR SINKS ø 2 INCHESEa5.00$ - 0
11COLD AND HOT WATER SYSTEM$ - 0
11.01COLD WATER POINT WITH PVC PIPEEa2.00$ - 0
11.02HOT WATER POINT WITH PVC PIPEEa2.00$ - 0
11.03DISTRIBUTION NETWORK 1/2 INCH PVC PIPEm20.00$ - 0
11.04DISTRIBUITION NETWORK 3/4 INCH PVC PIPEm10.00$ - 0
11.05POTABLE PVC 2 INCHES PIPEm10.00$ - 0
12INTERIOR ELECTRICAL INSTALATIONS$ - 0
12.01OUTLET FOR ROOF LIGHTINGEa3.00$ - 0
12.02SWITCH WITH PLATEEa3.00$ - 0
12.03RECEPTACLE Ground Fault Circuit Interrupter (GFCI)Ea2.00$ - 0
12.04Light Emitting Diode (LED) electrical directional lampEa3.00$ - 0
12.05CONDUITSlm20.00$ - 0
12.06ELECTRICAL WIRE, BREAKER, LOAD CENTERLS1.00$ - 0
13CABINET AND COUNTERTOP$ - 0
13.01VANITY FOR SINKEa2.00$ - 0
13.02MABLE/GRANITE COUNTERTOP WITH SPLASH (15 MM)sm1.93$ - 0
14VENTS AND WATER HEATER UNITS$ - 0
14.01VENT UNITEa2.00$ - 0
14.02WATER HEATER UNITEa1.00$ - 0
14.03CIRCUIT & ACCESSORIESLS1.00$ - 0
15SPECIAL ITEMS$ - 0
15.01UTILITY CABINETEa1.00$ - 0
15.03DROP CEILINGsm21.00$ - 0
15.04STALL PARTITIONSLS1.00$ - 0
15.06FINAL CLEAN UPsm21.00$ - 0
DIRECT COST$ - 0
16OTHER$ - 0
16.01LABORLS1.00$ - 0
16.02UTILITIESLS1.00$ - 0$ - 0
16.03TAXESLS1.00$ - 0$ - 0
16.04TRANSPORTATIONLS1.00$ - 0$ - 0
16.05CONTINGENCY AND PROFITLS1.00$ - 0$ - 0
TOTAL PROJECT COST$ - 0
Notes:
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.

Sheet1

File details come from the government source that posted it. Updated .