Materials_List.xls
XLS spreadsheet 84 KB Posted
- Attached to
- ENOPU Bathrooms Renovation Federal contract opportunity
- Solicitation number
- W912CL-17-R-0004
- Issued by
- Department of the Army Cyber Command
About this file
Materials List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ENOPU_answers_questions_from_industry.docx | DOCX document | |
| Technical_Exhibit_1_Renovation_Sketches.pdf | ||
| Solicitation_ENOPU_Bathrooms_Renovation_Uruguay.doc | DOC document | |
| Technical_Exhibit_2_Bathroom_Perimeter_Location.pptx | PPTX presentation |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENOPU projects
| MATERIALS LIST | |||||
| ENOPU Projects | |||||
| Item | Description | Unit | Quantity | Unit Cost | Partial Cost |
| 01 | DORM RESTROOM | LS | 1.00 | $ - 0 | |
| 02 | HANDICAP RESTROOM (OPTION 1) | LS | 1.00 | $ - 0 | $ - 0 |
| 03 | PUBLIC RESTROOM (OPTION 2) | LS | 1.00 | $ - 0 | |
| TOTAL PROJECT COST | $ - 0 | ||||
| Notes: | |||||
| 1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final. | |||||
| Prepared by: | Reviewed by: | ||||
| Jose M. Bermudez | Rosa L. Santoni | ||||
| US Army South-ACSENG | US Army South-ACSENG | ||||
| CW3/EN, Engineering Technician | Deputy Director | ||||
| jose.m.bermudez2.mil@mail.mil | rosa.l.santoni.civ@mail.mil | ||||
| 295-6045 | 295-6665 | ||||
| Prepared on: 08 DEC 2016 | Date: 08 DEC 2016 |
ENOPU dorms
| MATERIALS LIST | |||||
| DORMITORIES | |||||
| Item | Description | Unit | Quantity | Unit Cost | Partial Cost |
| 01 | DEMOLITION | $ - 0 | |||
| 01.01 | Removal and disposal of exiting restroom fixtures, tiles, drop ceiling, particion walls, plumbing lines, and electrical items. Doors and frames will be reused. | sm | 24.00 | $ - 0 | |
| 02 | PARTITION WALL | $ - 0 | |||
| 02.01 | 5/8 or 1/2 inch fire rated green gypsum board | sf | 400.00 | $ - 0 | |
| 02.02 | 10ft metal knockout C-channel stud framing 16 O.C. (2-1/2 inches x 10ft, 20 gauge) | lf | 200.00 | $ - 0 | |
| 02.03 | 10ft metal C-channel track bottom (2-1/2" x 10ft, 20 gauge) | lf | 20.00 | $ - 0 | |
| 02.04 | 10ft metal C-channel track top (2-1/2" x 10ft, 20 gauge) | lf | 20.00 | $ - 0 | |
| 02.05 | Trim (3 or 4 inches) Drywall Corner Bead (1-1/4" x 1-1/4" x 10 ft) | lf | 160.00 | $ - 0 | |
| 02.06 | Metal stud screws 1/2 Inch No. 8 pan head to fasten studs to tracks (Box of 100) | Box | 1.00 | $ - 0 | |
| 02.07 | Joint mesh tape (roll 2 inch x 300 ft) | ea | 1.00 | $ - 0 | |
| 02.08 | Joint compound to seal joints (5GALs) | ea | 1.00 | $ - 0 | |
| 02.09 | Tapcon screws 1/4 Inch x 1-1/4 Inch hex head to hold bottom track to slab (Box of 100) | Box | 1.00 | $ - 0 | |
| 02.10 | Self-tapping drywall screws 1-1/4 inch (Box of 100). | Box | 1.00 | $ - 0 | |
| 02.11 | Dual grit sanding sponge | ea | 1.00 | $ - 0 | |
| 02.12 | Insulation R-value of 15 | sf | 200.00 | $ - 0 | |
| 03 | FLOORS | $ - 0 | |||
| 03.01 | CONCRETE FOR FLOOR LEVELING E=40 MM | sm | 24.00 | $ - 0 | |
| 03.02 | CERAMIC TILING FLOOR 50X50 | sm | 24.00 | $ - 0 | |
| 03.03 | CONCRETE FOR TILING WALL E=40 MM | sm | 36.00 | $ - 0 | |
| 03.04 | CERAMIC TILING WALL 20X50 | sm | 36.00 | $ - 0 | |
| 04 | ZOCALOS Y CONTRAZOCALOS | $ - 0 | |||
| 04.01 | CERAMIC ZOCALO 15 X 50 | sm | 4.20 | $ - 0 | |
| 05 | WOODEN CARPENTRY | $ - 0 | |||
| 05.01 | WOODEN DOOR IMPROVEMENT | ea | 8.00 | $ - 0 | |
| 06 | DOOR ACCESSORIES | $ - 0 | |||
| 06.01 | HINGE 3 1/2" X 3 1/2" | Ea | 24.00 | $ - 0 | |
| 06.02 | DOOR LOCK | Ea | 8.00 | $ - 0 | |
| 07 | GLASS, CRYSTALS & OTHERS | $ - 0 | |||
| 07.01 | TEMPERED GLASS 10MM FOR SHOWER | sm | 116.00 | $ - 0 | |
| 06.02 | MIRROR (0.75 m X 0.9 m) | Ea | 8.00 | $ - 0 | |
| 08 | PAINT | $ - 0 | |||
| 08.01 | PAINT FOR CEILING (2 COATS) | sm | 48.00 | $ - 0 | |
| 08.02 | PAINT FOR EXTERIOR & INTERIOR WALLS (2 COATS) | sm | 32.00 | $ - 0 | |
| 08.03 | PAINT FOR DOORS C/VARNIZ (2 COATS) | sm | 13.36 | ||
| 09 | SANITARY ITEMS | $ - 0 | |||
| 09.01 | WHITE LOW TANK TOILET WITH SEAT AND LID (WATER SAVER) | Ea | 8.00 | $ - 0 | |
| 09.02 | SINK | Ea | 8.00 | $ - 0 | |
| 09.03 | PAPER TOILET HOLDER | Ea | 8.00 | $ - 0 | |
| 09.04 | HIGENIC SHOWER AT TOILET (BIDET) | Ea | 8.00 | $ - 0 | |
| 09.05 | SHOWER | Ea | 8.00 | $ - 0 | |
| 09.06 | SOAP HOLDER | Ea | 8.00 | $ - 0 | |
| 09.07 | TOWEL HOLDER BAR | Ea | 8.00 | $ - 0 | |
| 09.08 | SMALL TOWEL HOLDER BAR AT SINK | Ea | 8.00 | $ - 0 | |
| 09.09 | HOOK AT SHOWER AND SINK | Ea | 16.00 | $ - 0 | |
| 09.10 | FAUCETS (FOR HOT AND COLD WATER) | Ea | 5.00 | $ - 0 | |
| 10 | DRAIN SYSTEM | $ - 0 | |||
| 10.01 | DRAIN POINT WITH PVC PIPE | Ea | 8.00 | $ - 0 | |
| 10.02 | VENT WITH PVC 2 INCHES PIPE | Ea | 4.00 | $ - 0 | |
| 10.03 | 4 INCHES PVC PIPE | m | 20.00 | $ - 0 | |
| 10.04 | 2 INCHES PVC PIPE | m | 10.00 | $ - 0 | |
| 10.05 | BRONZE THREADED CLEAN OUT ø4 INCHES | Ea | 8.00 | $ - 0 | |
| 10.06 | DRAIN FOR SINKS ø 2 INCHES | Ea | 8.00 | $ - 0 | |
| 11 | COLD AND HOT WATER SYSTEM | $ - 0 | |||
| 11.01 | COLD WATER POINT WITH PVC PIPE | Ea | 8.00 | $ - 0 | |
| 11.02 | HOT WATER POINT WITH PVC PIPE | Ea | 8.00 | $ - 0 | |
| 11.03 | DISTRIBUTION NETWORK 1/2 INCH PVC PIPE | m | 20.00 | $ - 0 | |
| 11.04 | DISTRIBUITION NETWORK 3/4 INCH PVC PIPE | m | 10.00 | $ - 0 | |
| 11.05 | POTABLE PVC 2 INCHES PIPE | m | 10.00 | $ - 0 | |
| 12 | INTERIOR ELECTRICAL INSTALATIONS | $ - 0 | |||
| 12.01 | OUTLET FOR ROOF LIGHTING | Ea | 8.00 | $ - 0 | |
| 12.02 | SWITCH WITH PLATE | Ea | 3.00 | $ - 0 | |
| 12.03 | RECEPTACLE Ground Fault Circuit Interrupter (GFCI) | Ea | 8.00 | $ - 0 | |
| 12.04 | Light Emitting Diode (LED) electrical directional lamp | Ea | 8.00 | $ - 0 | |
| 12.05 | CONDUITS | lm | 20.00 | $ - 0 | |
| 12.06 | ELECTRICAL WIRE, BREAKER, LOAD CENTER | LS | 1.00 | $ - 0 | |
| 13 | CABINET AND COUNTERTOP | $ - 0 | |||
| 13.01 | VANITY FOR SINK | Ea | 2.00 | $ - 0 | |
| 13.02 | MABLE/GRANITE COUNTERTOP WITH SPLASH (15 MM) | sm | 3.60 | $ - 0 | |
| 14 | VENTS AND WATER HEATER UNITS | $ - 0 | |||
| 14.01 | VENT UNIT | Ea | 8.00 | $ - 0 | |
| 14.02 | WATER HEATER UNIT | Ea | 2.00 | $ - 0 | |
| 14.03 | CIRCUIT & ACCESSORIES | LS | 1.00 | $ - 0 | |
| 15 | SPECIAL ITEMS | $ - 0 | |||
| 15.01 | DROP CEILING | sm | 48.00 | $ - 0 | |
| 15.02 | FINAL CLEAN UP | sm | 48.00 | $ - 0 | |
| DIRECT COST | $ - 0 | ||||
| 16 | OTHER | $ - 0 | |||
| 16.01 | LABOR | LS | 1.00 | $ - 0 | $ - 0 |
| 16.02 | UTILITIES | LS | 1.00 | $ - 0 | $ - 0 |
| 16.03 | TAXES | LS | 1.00 | $ - 0 | $ - 0 |
| 16.04 | TRANSPORTATION | LS | 1.00 | $ - 0 | $ - 0 |
| 16.05 | CONTINGENCY AND PROFIT | LS | 1.00 | $ - 0 | $ - 0 |
| TOTAL PROJECT COST | $ - 0 | ||||
| Notes: | |||||
| 1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final. |
ENOPU Handicap Restroom
| MATERIALS LIST | |||||
| HANDICAP RESTROOM | |||||
| Item | Description | Unit | Quantity | Unit Cost | Partial Cost |
| 01 | DEMOLITION | $ - 0 | |||
| 01.01 | Removal and disposal of exiting restroom fixtures, tiles, drop ceiling, particion walls, plumbing lines, and electrical items. Doors and frames will be reused. | sm | 12.00 | $ - 0 | |
| 02 | PARTITION WALL | $ - 0 | |||
| 02.01 | 5/8 or 1/2 inch fire rated green gypsum board | sf | 189.12 | $ - 0 | |
| 02.02 | 10ft metal knockout C-channel stud framing 16 O.C. (2-1/2 inches x 10ft, 20 gauge) | lf | 110.00 | $ - 0 | |
| 02.03 | 10ft metal C-channel track bottom (2-1/2" x 10ft, 20 gauge) | lf | 15.00 | $ - 0 | |
| 02.04 | 10ft metal C-channel track top (2-1/2" x 10ft, 20 gauge) | lf | 15.00 | $ - 0 | |
| 02.05 | Trim (3 or 4 inches) Drywall Corner Bead (1-1/4" x 1-1/4" x 10 ft) | lf | 120.00 | $ - 0 | |
| 02.06 | Metal stud screws 1/2 Inch No. 8 pan head to fasten studs to tracks (Box of 100) | Box | 1.00 | $ - 0 | |
| 02.07 | Joint mesh tape (roll 2 inch x 300 ft) | ea | 1.00 | $ - 0 | |
| 02.08 | Joint compound to seal joints (5GALs) | ea | 1.00 | $ - 0 | |
| 02.09 | Tapcon screws 1/4 Inch x 1-1/4 Inch hex head to hold bottom track to slab (Box of 100) | Box | 1.00 | $ - 0 | |
| 02.10 | Self-tapping drywall screws 1-1/4 inch (Box of 100). | Box | 1.00 | $ - 0 | |
| 02.11 | Dual grit sanding sponge | ea | 1.00 | ||
| 03 | FLOORS | $ - 0 | |||
| 03.01 | CONCRETE FOR FLOOR LEVELING E=40 MM | sm | 14.00 | $ - 0 | |
| 03.02 | CERAMIC TILING FLOOR 50X50 | sm | 14.00 | $ - 0 | |
| 03.03 | CONCRETE FOR TILING WALL E=40 MM | sm | 36.00 | $ - 0 | |
| 03.04 | CERAMIC TILING WALL 20X50 | sm | 36.00 | ||
| 04 | ZOCALOS Y CONTRAZOCALOS | $ - 0 | |||
| 04.01 | CERAMIC ZOCALO 15 X 50 | sm | 2.25 | ||
| 05 | WOODEN CARPENTRY | ||||
| 05.01 | WOODEN DOOR IMPROVEMENT AND INSTALLATION | ea | 3.00 | $ - 0 | |
| 06 | DOOR ACCESSORIES | $ - 0 | |||
| 06.01 | HINGE 3 1/2" X 3 1/2" | Ea | 12.00 | $ - 0 | |
| 06.02 | DOOR LOCK | Ea | 3.00 | ||
| 07 | GLASS, CRYSTALS & OTHERS | ||||
| 07.01 | MIRROR (0.75 m X 0.9 m) | Ea | 1.00 | $ - 0 | |
| 06.02 | MIRROR (1.7 m X 0.9 m) | Ea | 2.00 | $ - 0 | |
| 08 | PAINT | $ - 0 | |||
| 08.01 | PAINT FOR CEILING (2 COATS) | sm | 14.00 | $ - 0 | |
| 08.02 | PAINT FOR EXTERIOR & INTERIOR WALLS (2 COATS) | sm | 48.00 | $ - 0 | |
| 08.03 | PAINT FOR DOORS C/VARNIZ (2 COATS) | sm | 5.86 | ||
| 09 | SANITARY ITEMS | $ - 0 | |||
| 09.01 | WHITE LOW TANK TOILET WITH SEAT AND LID (WATER SAVER) FOR HANDICAP | Ea | 1.00 | $ - 0 | |
| 09.02 | WHITE LOW TANK TOILET WITH SEAT AND LID (WATER SAVER) | Ea | 2.00 | $ - 0 | |
| 09.03 | SINK FOR HANDICAP (WALL MOUNTED) | Ea | 2.00 | $ - 0 | |
| 09.04 | SINK | Ea | 3.00 | $ - 0 | |
| 09.05 | PAPER TOILET HOLDER | Ea | 3.00 | $ - 0 | |
| 09.06 | HIGENIC SHOWER AT TOILET (BIDET) | Ea | 3.00 | $ - 0 | |
| 09.07 | SOAP HOLDER | Ea | 4.00 | $ - 0 | |
| 09.08 | SMALL TOWEL HOLDER BAR AT SINK | Ea | 3.00 | $ - 0 | |
| 09.09 | HOOK AT SINK AND TOILET STALL | Ea | 6.00 | $ - 0 | |
| 09.10 | FAUCETS (FOR HOT AND COLD WATER) | Ea | 5.00 | ||
| 10 | DRAIN SYSTEM | $ - 0 | |||
| 10.01 | DRAIN POINT WITH PVC PIPE | Ea | 1.00 | $ - 0 | |
| 10.02 | VENT WITH PVC 2 INCHES PIPE | Ea | 1.00 | $ - 0 | |
| 10.03 | 4 INCHES PVC PIPE | m | 20.00 | $ - 0 | |
| 10.04 | 2 INCHES PVC PIPE | m | 10.00 | $ - 0 | |
| 10.05 | BRONZE THREADED CLEAN OUT ø4 INCHES | Ea | 2.00 | $ - 0 | |
| 10.06 | DRAIN FOR SINKS ø 2 INCHES | Ea | 4.00 | $ - 0 | |
| 11 | COLD AND HOT WATER SYSTEM | $ - 0 | |||
| 11.01 | COLD WATER POINT WITH PVC PIPE | Ea | 2.00 | $ - 0 | |
| 11.02 | HOT WATER POINT WITH PVC PIPE | Ea | 2.00 | $ - 0 | |
| 11.03 | DISTRIBUTION NETWORK 1/2 INCH PVC PIPE | m | 20.00 | $ - 0 | |
| 11.04 | DISTRIBUITION NETWORK 3/4 INCH PVC PIPE | m | 10.00 | $ - 0 | |
| 11.05 | POTABLE PVC 2 INCHES PIPE | m | 10.00 | $ - 0 | |
| 12 | INTERIOR ELECTRICAL INSTALATIONS | $ - 0 | |||
| 12.01 | OUTLET FOR ROOF LIGHTING | Ea | 4.00 | $ - 0 | |
| 12.02 | SWITCH WITH PLATE | Ea | 3.00 | $ - 0 | |
| 12.03 | RECEPTACLE Ground Fault Circuit Interrupter (GFCI) | Ea | 2.00 | $ - 0 | |
| 12.04 | Light Emitting Diode (LED) electrical directional lamp | Ea | 4.00 | $ - 0 | |
| 12.05 | CONDUITS | lm | 20.00 | $ - 0 | |
| 12.06 | ELECTRICAL WIRE, BREAKER, LOAD CENTER | LS | 1.00 | $ - 0 | |
| 13 | CABINET AND COUNTERTOP | $ - 0 | |||
| 13.01 | VANITY FOR SINK | Ea | 1.00 | $ - 0 | |
| 13.02 | MABLE/GRANITE COUNTERTOP WITH SPLASH (15 MM) | sm | 0.94 | $ - 0 | |
| 14 | VENTS AND WATER HEATER UNITS | $ - 0 | |||
| 14.01 | VENT UNIT | Ea | 2.00 | $ - 0 | |
| 14.02 | WATER HEATER UNIT | Ea | 1.00 | $ - 0 | |
| 14.03 | CIRCUIT & ACCESSORIES | LS | 1.00 | $ - 0 | |
| 15 | SPECIAL ITEMS | $ - 0 | |||
| 15.01 | HANDICAP SIGN AND LABEL | Ea | 2.00 | $ - 0 | |
| 15.03 | HANDICAP RAMP | m3 | 4.56 | $ - 0 | |
| 15.04 | DROP CEILING | sm | 14.00 | $ - 0 | |
| 15.05 | STALL PARTITIONS | LS | 1.00 | $ - 0 | |
| 15.06 | FINAL CLEAN UP | sm | 14.00 | $ - 0 | |
| DIRECT COST | $ - 0 | ||||
| 16 | OTHER | $ - 0 | |||
| 16.01 | LABOR | LS | 1.00 | $ - 0 | $ - 0 |
| 16.02 | UTILITIES | LS | 1.00 | $ - 0 | $ - 0 |
| 16.03 | TAXES | LS | 1.00 | $ - 0 | $ - 0 |
| 16.04 | TRANSPORTATION | LS | 1.00 | $ - 0 | $ - 0 |
| 16.05 | CONTINGENCY AND PROFIT | LS | 1.00 | $ - 0 | $ - 0 |
| TOTAL PROJECT COST | $ - 0 | ||||
| Notes: | |||||
| 1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final. |
ENOPU Public Restroom
| MATERIALS LIST | |||||
| PUBLIC RESTROOM | |||||
| Item | Description | Unit | Quantity | Unit Cost | Partial Cost |
| 01 | DEMOLITION | $ - 0 | |||
| 01.01 | Removal and disposal of exiting restroom fixtures, tiles, drop ceiling, particion walls, plumbing lines, and electrical items. Doors and frames will be reused. | sm | 21.00 | $ - 0 | |
| 02 | PARTITION WALL | $ - 0 | |||
| 02.01 | 5/8 or 1/2 inch fire rated green gypsum board | sm | 21.60 | $ - 0 | |
| 02.02 | 10ft metal knockout C-channel stud framing 16 O.C. (2-1/2 inches x 10ft, 20 gauge) | lm | 100.00 | $ - 0 | |
| 02.03 | 10ft metal C-channel track bottom (2-1/2" x 10ft, 20 gauge) | lm | 9.90 | $ - 0 | |
| 02.04 | 10ft metal C-channel track top (2-1/2" x 10ft, 20 gauge) | lm | 9.90 | $ - 0 | |
| 02.05 | Trim (3 or 4 inches) Drywall Corner Bead (1-1/4" x 1-1/4" x 10 ft) | lm | 24.33 | $ - 0 | |
| 02.06 | Metal stud screws 1/2 Inch No. 8 pan head to fasten studs to tracks (Box of 100) | Box | 1.00 | $ - 0 | |
| 02.07 | Joint mesh tape (roll 2 inch x 300 ft) | ea | 1.00 | $ - 0 | |
| 02.08 | Joint compound to seal joints (5GALs) | ea | 1.00 | $ - 0 | |
| 02.09 | Tapcon screws 1/4 Inch x 1-1/4 Inch hex head to hold bottom track to slab (Box of 100) | Box | 1.00 | $ - 0 | |
| 02.10 | Self-tapping drywall screws 1-1/4 inch (Box of 100). | Box | 1.00 | $ - 0 | |
| 02.11 | Dual grit sanding sponge | ea | 1.00 | $ - 0 | |
| 03 | FLOORS | $ - 0 | |||
| 03.01 | CONCRETE FOR FLOOR LEVELING E=40 MM | sm | 21.00 | $ - 0 | |
| 03.02 | CERAMIC TILING FLOOR 50X50 | sm | 21.00 | $ - 0 | |
| 03.03 | CONCRETE FOR TILING WALL E=40 MM | sm | 54.79 | $ - 0 | |
| 03.04 | CERAMIC TILING WALL 20X50 | sm | 54.79 | $ - 0 | |
| 04 | ZOCALOS Y CONTRAZOCALOS | $ - 0 | |||
| 04.01 | CERAMIC ZOCALO 15 X 50 | sm | 3.64 | $ - 0 | |
| 05 | WOODEN CARPENTRY | $ - 0 | |||
| 05.01 | WOODEN DOOR IMPROVEMENT AND INSTALLATION | ea | 2.00 | $ - 0 | |
| 06 | DOOR ACCESSORIES | $ - 0 | |||
| 06.01 | HINGE 3 1/2" X 3 1/2" | Ea | 6.00 | $ - 0 | |
| 06.02 | DOOR LOCK | Ea | 2.00 | $ - 0 | |
| 07 | GLASS, CRYSTALS & OTHERS | $ - 0 | |||
| 07.01 | MIRROR (0.75 m X 0.9 m) | Ea | 1.00 | $ - 0 | |
| 06.02 | MIRROR (1.7 m X 0.9 m) | Ea | 2.00 | $ - 0 | |
| 08 | PAINT | $ - 0 | |||
| 08.01 | PAINT FOR CEILING (2 COATS) | sm | 21.00 | $ - 0 | |
| 08.02 | PAINT FOR EXTERIOR & INTERIOR WALLS (2 COATS) | sm | 14.55 | $ - 0 | |
| 08.03 | PAINT FOR DOORS C/VARNIZ (2 COATS) | sm | 3.60 | $ - 0 | |
| 09 | SANITARY ITEMS | $ - 0 | |||
| 09.01 | WHITE LOW TANK TOILET WITH SEAT AND LID (WATER SAVER) | Ea | 5.00 | $ - 0 | |
| 09.02 | SINK | Ea | 5.00 | $ - 0 | |
| 09.03 | PAPER TOILET HOLDER | Ea | 5.00 | $ - 0 | |
| 09.04 | HIGENIC SHOWER AT TOILET (BIDET) | Ea | 5.00 | $ - 0 | |
| 09.05 | SOAP HOLDER | Ea | 5.00 | $ - 0 | |
| 09.06 | SMALL TOWEL HOLDER BAR AT SINK | Ea | 2.00 | $ - 0 | |
| 09.07 | HOOK AT SINK AND TOILET STALL | Ea | 7.00 | $ - 0 | |
| 09.08 | FAUCETS (FOR HOT AND COLD WATER) | Ea | 5.00 | $ - 0 | |
| 10 | DRAIN SYSTEM | $ - 0 | |||
| 10.01 | DRAIN POINT WITH PVC PIPE | Ea | 1.00 | $ - 0 | |
| 10.02 | VENT WITH PVC 2 INCHES PIPE | Ea | 1.00 | $ - 0 | |
| 10.03 | 4 INCHES PVC PIPE | m | 20.00 | $ - 0 | |
| 10.04 | 2 INCHES PVC PIPE | m | 10.00 | $ - 0 | |
| 10.05 | BRONZE THREADED CLEAN OUT ø4 INCHES | Ea | 2.00 | $ - 0 | |
| 10.06 | DRAIN FOR SINKS ø 2 INCHES | Ea | 5.00 | $ - 0 | |
| 11 | COLD AND HOT WATER SYSTEM | $ - 0 | |||
| 11.01 | COLD WATER POINT WITH PVC PIPE | Ea | 2.00 | $ - 0 | |
| 11.02 | HOT WATER POINT WITH PVC PIPE | Ea | 2.00 | $ - 0 | |
| 11.03 | DISTRIBUTION NETWORK 1/2 INCH PVC PIPE | m | 20.00 | $ - 0 | |
| 11.04 | DISTRIBUITION NETWORK 3/4 INCH PVC PIPE | m | 10.00 | $ - 0 | |
| 11.05 | POTABLE PVC 2 INCHES PIPE | m | 10.00 | $ - 0 | |
| 12 | INTERIOR ELECTRICAL INSTALATIONS | $ - 0 | |||
| 12.01 | OUTLET FOR ROOF LIGHTING | Ea | 3.00 | $ - 0 | |
| 12.02 | SWITCH WITH PLATE | Ea | 3.00 | $ - 0 | |
| 12.03 | RECEPTACLE Ground Fault Circuit Interrupter (GFCI) | Ea | 2.00 | $ - 0 | |
| 12.04 | Light Emitting Diode (LED) electrical directional lamp | Ea | 3.00 | $ - 0 | |
| 12.05 | CONDUITS | lm | 20.00 | $ - 0 | |
| 12.06 | ELECTRICAL WIRE, BREAKER, LOAD CENTER | LS | 1.00 | $ - 0 | |
| 13 | CABINET AND COUNTERTOP | $ - 0 | |||
| 13.01 | VANITY FOR SINK | Ea | 2.00 | $ - 0 | |
| 13.02 | MABLE/GRANITE COUNTERTOP WITH SPLASH (15 MM) | sm | 1.93 | $ - 0 | |
| 14 | VENTS AND WATER HEATER UNITS | $ - 0 | |||
| 14.01 | VENT UNIT | Ea | 2.00 | $ - 0 | |
| 14.02 | WATER HEATER UNIT | Ea | 1.00 | $ - 0 | |
| 14.03 | CIRCUIT & ACCESSORIES | LS | 1.00 | $ - 0 | |
| 15 | SPECIAL ITEMS | $ - 0 | |||
| 15.01 | UTILITY CABINET | Ea | 1.00 | $ - 0 | |
| 15.03 | DROP CEILING | sm | 21.00 | $ - 0 | |
| 15.04 | STALL PARTITIONS | LS | 1.00 | $ - 0 | |
| 15.06 | FINAL CLEAN UP | sm | 21.00 | $ - 0 | |
| DIRECT COST | $ - 0 | ||||
| 16 | OTHER | $ - 0 | |||
| 16.01 | LABOR | LS | 1.00 | $ - 0 | |
| 16.02 | UTILITIES | LS | 1.00 | $ - 0 | $ - 0 |
| 16.03 | TAXES | LS | 1.00 | $ - 0 | $ - 0 |
| 16.04 | TRANSPORTATION | LS | 1.00 | $ - 0 | $ - 0 |
| 16.05 | CONTINGENCY AND PROFIT | LS | 1.00 | $ - 0 | $ - 0 |
| TOTAL PROJECT COST | $ - 0 | ||||
| Notes: | |||||
| 1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final. |