Solicitation_FUSNA_Pier_Ramp.pdf

PDF 766 KB Posted

Attached to
FUSNA Pier and Ramp Construction Federal contract opportunity
Solicitation number
W912CL-17-R-0003
Issued by
Department of the Army Cyber Command

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to FUSNA Pier and Ramp Construction, newest first.
File Type Posted
Technical_Exhibit_1_Ramp_Pier_Location.pdf PDF
Materials_List.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair existing boat ramp and construction of a new finger pier/moorning area at Cuerpo de Fusileros Navales (FUSNA) El Cerro Uruguay

Navy Base.

In Accordance w ith FAR 36.204 (C) Disclosure of the Magnitude of Construction Projections: The estimate price rance of this project is betw een $100,000 and $250,000.

FITHO SIMPLICE 210-295-7158

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

22-Dec-2016

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________52.212-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________03 Feb 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

410TH CONTRACTING SUPPORT BRIGADE

REGIONAL CONTRACTING CENTER AMERICAS

CCEC-AMF-4130 STANLEY RD STE 320

JBSA FORT SAM HOUSTON TX 78234-2726

W912CL

PAGE OF PAGES

1 OF

CODE W912CL

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

410TH CONTRACTING SUPPORT BRIGADE

REGIONAL CONTRACTING CENTER AMERICAS

4075 GORGAS CIRCLE

FORT SAM HOUSTON TX 78234-2726

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

210-808-9473/9474FAX:TEL: 210-295-XXXX TEL: (210) 295-5719 FAX:

W912CL-17-R-0003 56

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912CL-17-R-0003

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Site Preparation

FFP

The work shall include but not be limited to leveling of the existing site where the new ramp and mooring pier will be located as stated in paragraph 5.2, other applicable paragraphs of the Statement of Work, and applicable Technical

Exhibit(s). The cost for this item shall include all related costs, i.e. profit, wages, visa card fee, transportation, insurance etc.

FOB: Destination

NET AMT

0002 1 Job Soil Study

FFP

The foundation and structure of the ramp and pier shall be bulit based on the soil study. The Contractor shall be responsible for conducting the soil studies and providing information of how the soil studies analysis will be conducted as stated in paragraph 5.3, other applicable paragraphs of the Statement of Work, and applicable Technical Exhibit(s). The cost for this item shall include all related costs, i.e. profit, wages, visa card fee, transportation, insurance etc.

0003 1 Job Ramp Repair

FFP

Contractor is required to repair existing ramp. Improvement to the ramp includes leveling, sloping, and improving edges as stated in paragraph 5.4, other applicable paragraphs of the Statement of Work, and applicable Technical Exhibit(s). The cost for this item shall include all related costs, i.e. profit, wages, visa card fee, transportation, insurance etc.

0004 1 Job Mooring Pier

FFP

Contractor shall construct a fixed mooring pier as stated in paragraph 5.5 through

5.5.2, other applicable paragraphs of the Statement of Work, and applicable

Technical Exhibit(s). The cost for this item shall include all related costs, i.e.

profit, wages, visa card fee, transportation, insurance etc.

0005 1 Job Paint

FFP

Contractor shall paint as stated in paragraph 5.6 and other applicable paragraphs of the Statement of Work. The cost for this item shall include all related costs, i.e.

profit, wages, visa card fee, transportation, insurance etc.

0006 1 Each Defense Base Act

COST

See paragraph 4.12 of the Statement of Work and FAR 52.228-3. This item applies to contractors from or outside Uruguay and it cannot be separated priced.

This cost will be excluded from price evaluation. The estimated amount will be adjusted throughout the contract period as necessary using projected and actual labor expenditures. The contractor shall be reimbursed for reasonable, allowable, and allocable DBA insurance costs upon submission of proof of payment of the insurance provider.

ESTIMATED COST

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

0006 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC

0001 210 dys. ADC 1 EL CERRO URUGUAY NAVY

JOSE M. BERMUDEZ

ESCUELA DE FUSILEROS NAVALES

(FUSNA) CALLE PUNTA DE LOBOS,

ESQUINA JOSE GURVICH, EL CERRO

MONTEVIDEO, URUGUAY

210-295-6045

W91LMH

0002 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0003 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0004 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0005 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0006 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

Section 00100 - Bidding Schedule/Instructions to Bidders

INSTRUCTIONS TO OFFERORS

1. GENERAL: This procurement will be awarded as a Lowest Price, Technically Acceptable

(LPTA) contract, considering past performance. The proposal will be evaluated in accordance with FAR 15.305. The Government intends to award a single contract without discussions with

Offerors (except for clarifications as described in FAR 15.306(a)). Therefore, the initial offer should contain the Offerors best terms from a price and technical standpoint. Offerors should not assume that they will be afforded the opportunity to clarify, discuss, or revise their response.

However, the Government reserves the right to request clarifications or request revised responses if later determined by the Contracting Officer to be necessary. The Government may reject any or all response if such action is in the public interest and/or waive informalities and minor irregularities in the submitted offers. The Government reserves the right to cancel this Request for Proposal (RFP) and make no award. By responding to this RFP and submitting a proposal in response to the RFP, the Contractor understands that the Government shall not be liable for any costs incurred by the Contractor in response to this RFP.

2. PROPOSAL SUBMISSION: The response to the RFP is to be submitted in the same currency that the offeror will use to invoice. The Offerors proposal shall be in the form prescribed by this solicitation and shall contain a response to each of the areas identified below in the. All responses shall be in English, legible and prepared in the following general format to be properly evaluated. Responses must be complete, self-sufficient, and respond directly to the requirements of this RFP..

a) Electronic Submission. The Offeror shall provide a copy of their proposal as an electronic file. The proposal shall be submitted via (email) to the Contract Specialist, SFC Simplice Fitho, at fitho.simplice.mil@mail.mil and the Contracting Officer, Mr.

Julio Cabrera, at julio.cabrera.civ@mail.mil before 3:00 PM USA Central Time

(CT) (6:00PM Uruguay Time) on 03 February 2017. The Offeror must ensure that its proposal submission is readable and in the format specified in the solicitation.

Any proposal received after the exact time specified for receipt will not be considered.

b) System for Award Management (SAM). All Offerors shall have an active registration in the System for Award Management (SAM’s) www.sam.gov to receive Award of this Contract.

3. QUESTIONS/AMENDMENTS/EXCEPTIONS

a) Solicitation Questions. Solicitation information and amendments will be posted to the

Federal Business Opportunities (FBO) website at www.fbo.gov and via email to all those interested parties contacted via email by the Government. Offerors may submit questions regarding this solicitation via email to the Contract Specialist; SFC Simplice Fitho, at fitho.simplice.mil@mail.mil and the Contracting Officer, Mr. Julio Cabrera at julio.cabrera.civ@mail.mil before 3:00 PM USA CT (6:00PM Uruguay Time) on 27 mailto:fitho.simplice.mil@mail.mil mailto:julio.cabrera.civ@mail.mil http://www.sam.gov/ http://www.fbo.gov/ mailto:julio.cabrera.civ@mail.mil

January 2017. All e-mailed questions shall be titled W912CL-17-R-0003 – Questions.

The Government reserves the right not to respond to any questions received concerning this solicitation after the question receipt date and time above. Offerors are encouraged to carefully review all solicitation requirements and submit questions to the Government early in the solicitation cycle.

b) Amendment. The Government reserves the right to revise or amend the specifications, drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such revisions, if any, will be announced by an amendment or amendments to this RFP. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposal will be posted to the FBO website at www.fbo.gov and sent out via email to all those interested parties contacted via email by the Government.

c) Exceptions. If the Offeror takes exception to any of the requirements specified in this solicitation, the Offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit it provides to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00600) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the

Offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an Offeror takes no exceptions to any solicitation requirement if the Offeror does not submit an

Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an Offeror's proposal unacceptable and ineligible for award.

4. FORMAT AND CONTENT OF PROPOSAL Each Offeror’s proposal shall be submitted as set forth below and all information shall be confined to the appropriate part to facilitate independent evaluation. Proposals, which do not include the requested minimum information, may be eliminated from further consideration at the Government’s discretion. Proposal Sections shall be labeled by section (i.e., Section I - Price, Section II-Technical and Section III-Past

Performance). If the proposal is not broken down in sections as described, the proposal may be removed from further consideration as non-compliant.

Section I

Price/Cost Information and required documents. Offerors shall provide all price/cost information necessary to provide a meaningful basis for Government's analysis and evaluation of price/cost for the project set forth in Section 00010 of this solicitation. The Government is not, and does not intend on, requesting certified cost or pricing data. Offeror’s may be required during the evaluation process to provide sufficient price/cost information that will enable the

Government to perform a meaningful evaluation. If an Offeror proposes an unusually low price, the Offeror should also provide rationale to justify the price.

http://www.fbo.gov/

A complete response shall consist of a price response, and a cover sheet. The Offeror shall provide its response with a cover sheet that contains the company’s name, address and telephone number, name and title of the person authorized to sign the offer, offer validation period of 90 days.

To be considered responsible, an Offeror must be in compliance with FAR 9.104-1(a).

To demonstrate this aspect of Responsibility, Offeror’s shall provide a bank reference from its bank with information of the Offeror’s financial standing (i.e., satisfactory accounts, outstanding loans, and line of credit.). Also, include a detailed plan of how the project will be financed, and a list of company owned equipment.

Offer and Section 00010 – Complete in its entirety the “Offeror” portion of the Standard

Form (SF) 1442, blocks 14 through 20c on page 2 and contract line items 0001 through 0006 on pages 3 through 5.

Amendment(s) – Acknowledge by signing any amendments issued out during this solicitation. Amendments may also be acknowledged in block 19 of the SF 1442.

Section 00600 - Representations and Certifications- Insert the required certifications and representations and return only those shown in section 00600.

Section II Materials List - Complete this attachment and when applicable, provide a detailed description of all primary components, infrastructure materials and products to be used for this project.

Section III Project Schedule - Offerors shall include in their technical quote a complete project management schedule utilizing the Critical Path Method (CPM), Program Evaluation & Review

Technique (PERT) or Gantt chart showing the major construction phases stated in the Statement of Work. The project schedule shall include float time within the 180-day maximum to account for down days due to inclement weather or other potential non-work situations. The proposed schedule shall include the critical milestones of the project including site preparation, construction/installation work, and any separately identified unique repair efforts. The project schedule shall have expected completion dates, execution time of each phase, and a mid-point completion of project.

Section IV Key Personnel Qualifications and Experience. As stated in Section 1.5.12 of the

Statement of Work, the Government has identified the following positions as key personnel:

Project Engineer/Architect

Field Engineer/Architect

Project superintendent/Foreman

Quality Control Representative

Qualifications:

Minimum qualifications for all key personnel are listed below: The project engineer/architect and the field and design engineers/architects shall have a valid professional registration that is accepted by the Government of Uruguay, and at least five (5) years of experience with projects of a similar type and magnitude. The project superintendent/foreman shall have at least three (3) years or three (3) projects of experience with projects of a similar type and magnitude. The

Contractor’s quality control representative shall have at least three (3) years as a quality control inspector in the construction field.

The Offeror shall submit resumes for Key Personnel. Offeror’s shall support key personnel with resumes that demonstrate depth and quality of relevant experience. Resumes should be current and updated within the past year. Each resume shall be limited to 4 pages and may be submitted in Spanish.

Resumes shall be marked as Personally Identifiable Information (PII) in accordance with the

Privacy Act requirements.

Resumes shall include the relevant qualifications, background, experience, and accomplishments for all key personnel in sufficient detail to demonstrate the capability of such personnel to meet the qualification requirements identified in the Statement of Work, paragraph 1.5.12. The work history of each key person should contain experience directly related to construction work he/she is intended to perform under the proposed contract.

Resumes shall also include the labor position for which the individual is being proposed.

The Offeror shall provide copies of the professional registration required by the Government of

Uruguay issued by a university in Uruguay for the Project Engineer/Architect and the Field

Engineer/Architect. All of the requirements of this section shall apply to the use of subcontractor personnel, as well as the prime contractor’s personnel.

Section V Past Performance History. Offeror shall submit at a minimum two (2) similar projects' past performance history relative in size and type to the work to be performed under this contract.

Provide any information currently available (letters, customer surveys) which demonstrate customer satisfaction with overall job performance and quality of completed services. Past performance history submission shall not exceed 10 pages and may be submitted in Spanish.

5. RESPONSIBILITY OF OFFERORS:

Offerors must be financially responsible to perform the work described in this solicitation.

At a minimum, each Offeror must meet the following requirements:

a) Have the necessary personnel, equipment and financial resources available to perform the work;

b) Have all licenses and permits required by local law. The Offeror shall determine whether performance requires registration with Uruguayan authorities or authorization to do business in Uruguay and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the Offeror also shall determine what documents or authorization its employees and any subcontractor employees must possess to work in Uruguay;

c) Meet all local insurance requirements;

d) Have no adverse criminal record;

e) Have no political or business affiliation which could be considered contrary to the interests of the United States;

f) Be able to read, speak and understand English;

g) The Offeror has been duly authorized to operate and to do business in Uruguay.

BASIS FOR AWARD

1. BASIS OF AWARD. The Government intends to award a contract resulting from this solicitation using the evaluation method “Lowest Price Technically Acceptable.” This method is appropriate when best value is expected to result from selection of the technically acceptable offer with the lowest evaluated cost/price. Offers will be evaluated for acceptability but not ranked using the non-cost/price factors. Evaluation factors and that establish the requirements of acceptability are set forth below. Award will be made on the basis of the lowest evaluated price

(excluding DBA) of quotes meeting or exceeding the acceptability standards for non-cost factors

(FAR 15.101-2).

2. Evaluation Process. The evaluation process consists of three parts; 1) Technical, 2) Past

Performance; and, 3) Price (price will be evaluated separately from technical evaluations). The

Government will evaluate proposals as follows. First, the Government price evaluators will conduct a price reasonableness of overall prices. Second, the Government price evaluators will determine which of the Offers meeting the price reasonableness and align them by total offer price. Third, the Government will select the three (3) lowest priced Offers meeting the price reasonableness and send those three (3) complete offers without price to the technical evaluator(s). The technical (non-pricing) volume(s) of each of these three Offers will be given to the Technical Evaluators for review, without identification of the prices or any rank order of prices. The Technical Evaluation Team will review these three Offers for technical acceptability. If any Offerors are determined to be technically acceptable from this group, the

Offeror with the lowest price technically acceptable offer will be awarded the contract. If, on the other hand, no Offers are found to be technically acceptable within this first group of three (3) offers, then the process described above will be conducted again, as many times as necessary, until such time as the Government identifies a technically acceptable offer.

3. Technical Evaluation. The technical evaluation portion shall consist of Factors 1, Technical, and 2, Past Performance. Technical Acceptability will include a review of each element in Factor

1 – Technical (Specifications) and Factor 2 - Past Performance. Each Offeror’s response will be evaluated and rated on each criteria element. The technical evaluation will evaluate whether the

Offeror has proposed on all requirements outlined in the Statement of Work, Instruction to

Offerors, and attached Materials List identified within this solicitation.

FACTOR 1 – Technical. Technical criteria consist of the following sub-factors:

1) Primary Component - Material List

2) Project Schedule – Project Schedule will be evaluated for construction phases and completion dates.

3) Key Personnel. Key personnel will be evaluated through information contained in the written proposals and resumes. The key personnel include those defined in the Statement of Work section 1.5.12. The information presented in the Offeror’s resume will provide the input for evaluation of this factor. The

Government will evaluate the following elements when evaluating the Offeror’s

Key Personnel:

a) Experience - The Government will evaluate the years of experience and appropriateness of the skill sets of each proposed personnel to successfully perform in this contract and the relevancy of the proposed personnel experiences to the requirements for this contract. As required by the Government, project engineer/architect shall have at least five (5) years of experience. Field and design engineers/architects shall have at least five (5) years of experience with projects of a similar type and magnitude. The project superintendent/foreman shall have at least three

(3) years of experience in the construction field. The Contractor’s quality control representative shall have at least three (3) years as a quality control inspector in the construction field.

b) Professional Registration – The project engineer/architect and the field and design engineers/architects shall have a valid Uruguayan professional registration issued by a university in Uruguay.

In order for Factor 1-Technical to be rated acceptable, sub-factors 1, 2 and 3 must be rated acceptable.

FACTOR 2 - Past Performance: - The Government will evaluate the construction projects or contracts submitted in order to evaluate past performance. Past performance relates to how well a Contractor has performed on previous contracts. The Government may contact references to verify past performance. In order to be considered for award, the offeror’s past performance rating must be evaluated as acceptable. Offeror shall present evidence of the offeror’s and/or their sub-contractors past performance on at least two (2) similar projects and may be submitted in Spanish. Past Performance from any of the sources listed under FAR

13.106-2(b)(3)(ii) may be used to evaluate past performance of prospective offerors.

Past Performance Evaluation Rating

Acceptable Rating - Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.

Unacceptable Rating - Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

Note - In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror shall not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance and will be considered “acceptable.”

4. PRICE EVALUATION PROCESS. The low Offeror and the items to be awarded shall be determined as the offeror that provides the lowest overall cost, excluding DBA Insurance. Price analysis will be performed IAW FAR15.404-1(b)(2) to make a fair and reasonable price determination. Pricing shall be evaluated for the entire amount of requested items. The contracting officer is responsible for the determination of price reasonableness. Price reasonableness is a judgment of the proposed price as compared to competitive prices received, current market conditions, Independent Government Cost Estimates (IGCE) historical prices, or information other than certified cost or pricing data or other relevant measures. The Government may utilize any one or a combination of these techniques to determine that prices are fair and reasonable.

5. TECHNICAL MERIT ADJECTIVAL RATING SCHEME. Any factor or sub-factor rated as “unacceptable” will result in an overall factor rating of “unacceptable”. The following is the Technical Merit Adjectival Rating Scheme for evaluation of Technical Proposal:

Acceptable – Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable – Proposal does not clearly meet the minimum requirements of the solicitation.

STATEMENT OF WORK

Uruguay Navy Peace Keeping Operation Ramp

Project Montevideo, Uruguay

PART1

1. GENERAL: Under this contract, the Contractor shall furnish all labor, transportation, equipment, materials, and any other items necessary to renovate existing restrooms in accordance with (IAW) the Statement of Work (SOW). The United States Government (USG) shall not exercise any supervision or control over the contractor performing the tasks herein.

Any tasks provided under this contract are considered non-personal in nature.

1.1 Scope of Work: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the terms of this SOW. The Contractor shall provide soil study, specifications, and labor required for the repair of the existing boat ramp and construction of a new finger pier/mooring area at “Cuerpo de Fusileros Navales” (FUSNA) at

El Cerro Uruguay Navy Base. At this military installation, power, sewer and water utilities are available but not at the ramp/pier site. It is the contractor’s responsibility to request and pay for these utilities during construction. Contractor needs to coordinate with FUSNA facility engineer to arrange for the connections if needed. Work executed by the contractor shall include but is not limited to:

- Site preparation and soil study;

- Repair ramp and construction of pier

- Construction of ramp and pier;

- Provision and installation of cleat, ladder, corner and edge straight bumpers, handrail, and solar dock lights;

- Paint, provision and installation of buoy with label and related signs; and

- Any other related works for the ramp and pier construction.

Note: The Contractor shall verify all dimensions and/or quantities on site before providing proposal and commencing works. Provided quantities are approximated and it is the Contractor’s responsibility to verify these dimensions during the site visit.

If discrepancies are found, contractor shall immediately notify the KO. Structural license engineers shall approve the final project designs prior construction start based on soil study.

1.2 Background: The project is part of Global Peace Operations Initiatives (GPOI) Program in support to the U.S Security Cooperation Office in Uruguay.

1.3 Objectives: The objective of this project is to repair existing ramp and add a finger/mooring pier at FUSNA. The completion of this project will improve peace operation training and increase their training capacity.

1.4 Required Delivery: The work shall begin within ten (10) days after the Contractor receives the Notice to Proceed (NTP) contract award, and the project shall be completed in

180 days or less from receipt of the NTP. This delivery time includes clean-up of the site area.

1.5 General Information:

1.5.1 Quality Control (QC): The Contractor shall develop and maintain an effective

Quality Control Program (QCP to ensure services are performed in accordance with this

SOW and applicable regulations. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which the contractor assures that the work complies with the requirement of the contract. Contractor shall deliver the QCP to the KO and Contracting

Officer’s Representative (COR) for approval within 30 days of contract award. The

Contractor shall have five (5) working days to submit any changes for COR and KO acceptance.

1.5.2 Quality Assurance (QA): The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan

(QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.5.3 Hours of Operation: The Contractor shall execute work within the FUSNA normal hours of operation. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.5.4 Place of Performance: The work to be performed under this contract will be performed at the FUSNA, Montevideo, Uruguay. Coordinates for this site are S34 o 37’40.1” and

W55 o 22’22.3”. Prior to the commencement of work, access to the installation shall be coordinated with FUSNA officials.

1.5.5 Security Requirements: The Contractor and/or associated subcontractor employees shall comply with applicable site access and local security policies and procedures.

1.5.5.1. Physical Security: The contractor shall be responsible for safeguarding all construction materials and equipment.

1.5.5.2 Background Checks. At the time of award of the contract or when hiring new contract workers, the Contractor shall ensure contractor employees and subcontractor employees performing services under this contract have passed a security check done by the Host Nation Police Department of their residence or the State Police Department of their U.S. residence. Security checks that have been completed as part of a security clearance background investigation, or a previous background check that was a condition of employment, meet this requirement. Documentation of these checks shall be made available to the KO upon request. The USG retains the right to exclude any employee from performance of duties under this contract if a security check reveals information an employee is a security risk. The exclusion of an employee for security reasons will not relieve the Contractor from performance required under this contract. If the USG determines additional background checks are required, at a minimum, and upon request from the USG, the Contractor shall provide to the KO, the following information on any contractor or subcontractor employee performing services under this contract:

Full birth name

Married name (if applicable)

SSN or local equivalent (ID card number)

Date of birth

Place of birth (city, country)

1.5.5.2.1 If a background check on any employee performing under this contract, whether the check was conducted as a condition of employment or as part of the contract with the

USG, reveals any information from any source (including host country law enforcement) of criminal activity by Contractor employees, subcontractors, or subcontractor employees, the

Contractor shall immediately:

Notify the KO of that information; and

Any actions taken against Contractor employees, subcontractors, or subcontractor employees pursuant to this clause.

1.5.5.2.2 The Contractor shall also immediately-

Notify the KO of any suspicious activity by Contractor employees, subcontractors, or subcontractor employees the Contractor believes may pose a risk to U.S. or host nation national security or imminent risk of deadly bodily harm to any person;

Notify the KO of any actions taken against Contractor employees, subcontractors, or subcontractor employees pursuant to this clause.

1.5.5.2.3 Remedies. In addition to other remedies available to the USG, the Contractor's failure to comply with the requirements of this paragraph may result in-

Requiring the Contractor to remove a Contractor employee or employees from the performance of the contract;

Requiring the Contractor to terminate a subcontract;

Suspension of contract payments;

Termination of the contract for default, in accordance with the termination clause of this contract; or

Suspension or debarment.

1.5.5.2.4 Subcontracts. The Contractor shall include the substance of this paragraph in all subcontracts.

1.5.5.3 Installation Access. Contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures. The employee performing services under this contract shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of

Emergency Services, Security Office or the host nation equivalent.

1.5.5.4 Vetting. The Contractor and all associated sub-contractor companies, must have been vetted by the US Embassy in the country which the contract will be performed. For the purposes of this contract, the company is considered vetted if the company is located in the country which the contract will be performed unless the company has been previously barred from performing services for the USG. If during a previous vetting process the company was barred from performing service for the USG, then that is grounds for termination of the contract. If the company is located outside of the country which the contract will be performed, the company must be vetted by the US Embassy in the country of performance.

Vetting will coordinated through the US Embassy's DOD Security Cooperation Office in the country of performance. If during any previous vetting process in other countries, the company was barred from performing services for the USG; that is grounds for termination of the contract.

1.5.5.5 Operations Security (OPSEC) Awareness. Not Applicable.

1.5.5.5.1 Advertisement and Social Media. Not Applicable.

1.5.5.6 Medical Requirements. Not Applicable.

1.5.5.7 Security Clearance. A security clearance for contracting personnel is not required for this project. Contractor personnel will not be accessing any restricted areas to accomplish this task.

1.5.6 Travel Requirements. No travel is authorized or required under this contract.

1.5.7 Training Requirements. All U.S. citizen or resident, and TCN contractor personnel must comply with the training requirements listed in the FCG. Verification of the training will be made available to the Government Representative upon request. Additionally, they must receive personal security training that includes at a minimum:

Safety and security issues facing employees within the USSOUTHCOM AOR.

Identifies safety and security contingency planning activities.

Identifies ways to utilize safety and security personnel and other resources appropriately.

1.5.8 Medical Travel Requirements. All U.S. citizen and third country national (TCN) contractor and sub-contractor personnel traveling into the USSOUTHCOM AOR from outside the USSOUTHCOM AOR must meet the medical screening requirements established by the

USSOUTHCOM Commander in the Medical Suitability Screening Regulation (SC Reg 40-

501), as well as the requirements identified in FORCE HEALTH PROTECTION (FHP)

GUIDANCE FOR DEPLOYMENT in the USSOUTHCOM AOR or their successors and follow immunization and health protection guidelines outlined therein. All immunizations must be obtained prior to traveling to the USSOUTHCOM AOR. U.S. citizen and TCN contractor and sub-contractor personnel traveling from a country outside of the

USSOUTHCOM AOR must travel into the USSOUTHCOM AOR with a current copy of the

Public Health Service Form 791, “International Certificate of Vaccination”. In addition, U.S.

citizen and TCN contractor and sub-contractor personnel traveling to the USSOUTHCOM

AOR are required to be beneficiaries of a medical evacuation plan and service through an insurance plan provided by their employer or paid for individually.

1.5.8.1 DNA Samples. The Contractor shall collect a DNA record for all U.S. citizen contractor and sub-contractor personnel traveling to the USSOUTHCOM AOR and shall have arrangements for storage of the DNA referenced specimen through a private facility or arrange for the storage of the specimen by contacting the Armed Forces Repository of

Specimen Samples for the Identification of Remains (AFRSSIR) at http://www.afmes.mil/index.cfm?pageid=afdil.afrssir.overview or phone: (302) 346-8800. In addition, U.S. citizen contractor and sub-contractor personnel shall comply with the requirements of DoDI 3020.41, Enclosure 3, para 8.b., or its successor.

1.5.8.2 Synchronized Predeployment and Operational Tracker (SPOT). Upon award of this contract, or employment of new personnel, the Contractor will enter contractor employees and sub-contractor employees performing services under this contract into the SPOT database who meet one of the following conditions:

All U.S. citizen and resident, and third country national (TCN) personnel who travel into the USSOUTHCOM AOR for periods of performance anticipated to exceed 30 consecutive days.

TCN, host nation (HN), or local national (LN) personnel who reside with or work in the immediate vicinity of U.S. Armed Forces and/or DOD Civilian personnel for periods of performance anticipated to exceed 30 consecutive days.

Private security contractors and contingency contractor personnel authorized to carry weapons regardless of proximity to U.S. Armed Forces or DOD Civilian personnel and regardless of the length of the anticipated period of performance.

Contractor and sub-contractor personnel with a place of performance in the continental United States, including the USSOUTHCOM Headquarters and Joint

Interagency Task Force-South (JIATF-S) Headquarters, that may, within the terms of the contract, deploy to the USSOUTHCOM AOR for periods anticipated to exceed

30 consecutive days.

The Government Representative will approve all employees in the SPOT database and a

Letter of Authorization (LOA) is generated to the Contractor on each employee. The signed

LOA is required prior to travel to, from, or within the USSOUTHCOM AOR. The LOA also will identify any additional authorizations, privileges, or Government support to which

Contractor personnel are entitled under this contract. The LOA will be regenerated by the

Contractor upon expiration of the LOA. Changes to the status of individual personnel relating to their in-theater arrival date and their duty location, to include closing out the trip with their proper status (e.g., mission complete, wounded, etc.) shall be annotated within the

SPOT database in accordance with the timeliness established in the SPOT business rules.

Information and standards for the SPOT system is posted on the U.S. Government Foreign

Clearance Guide website at https://www.fcg.pentagon.mil/fcg.cfm for the country of employment. Access to SPOT is https://spot.dmdc.mil.

1.5.9 Physical Security. Not Applicable.

http://www.afmes.mil/index.cfm?pageid=afdil.afrssir.overview http://www.fcg.pentagon.mil/fcg.cfm http://www.fcg.pentagon.mil/fcg.cfm https://spot.dmdc.mil/

1.5.10 Post Award Conference/Periodic Progress Meetings. The Contractor shall attend the pre-construction conference and any post award conferences convened by the KO IAW

Federal Acquisition Regulation (FAR) Subpart 42.5. The KO and COR, with other USG personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the contractor of how the

USG views the contractor's performance and the contractor shall apprise the USG of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the USG.

1.5.10.1 The Project Engineer/Architect may be required to meet at least weekly with the KO and/or the COR during the first month of construction and then as required throughout the period of performance. The Contractor shall be responsible for keeping minutes of these meetings. The written minutes of these meetings shall be signed by the Project

Engineer/Architect and any other individuals in attendance, and be submitted to the KO for approval. Minutes are due ten (10) days after meeting concluded.

1.5.11 Contracting Officer Representative (COR). The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and approves progress payments on a monthly basis and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the

Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.5.12 Key Personnel. The following personnel are considered key personnel by the USG:

The project engineer/architect, field engineer/architect, project superintendent/foreman, any other engineers leading the design (plans or calculations) efforts related to the project and the quality control representative. In the event the Contractor removes key employees, replacement personnel must be equally or better qualified.

Minimum qualifications for all key personnel are listed below: The project engineer/architect shall have a valid Uruguayan professional registration issued by a university in Uruguay, and at least five (5) years of experience. Field and design engineers/architects shall have a valid

Uruguayan professional registration issued by a university in Uruguay and at least five (5) years of experience with projects of a similar type and magnitude. The project superintendent/foreman shall have at least three (3) years of experience in the construction field.. The Contractor’s quality control representative shall have at least three (3) years as a quality control inspector in the construction field.

The Contractor shall provide sufficient number of personnel, properly trained and qualified

(i.e. civil engineer, architect, geotechnical engineer, electrical engineer, certified electricians and foremen), to perform the requirements of this contract at the worksite location. All non-laborer Contractor employees on this project shall maintain a proficiency license as required by University.

The Contractor shall provide to the KO and COR the phone numbers of the Project

Engineer/Architect and alternate(s), Field Engineer/Architect and Superintendent/Foreman to be available during duty and non-duty hours (to include evenings, holidays, and weekends) within fifteen (15) days of contract award.

1.5.12.1 Project Engineer/Architect Superintendent/Foreman.

1.5.12.1.1 The Contractor shall provide a Project Engineer/Architect who shall be a licensed engineer or architect and responsible for the performance of all work. The name of this person and an alternate(s), who shall act on behalf of the Contractor when the Project

Engineer/Architect is absent, shall be designated in writing to the KO no later than ten (10) days after contract award. The project engineer/architect shall have full authority to act for the

Contractor on all contract matters relating to daily operation of this contract. The project engineer/architect or alternate shall be available during the regular workday.

The Project Engineer/Architect shall be responsible for overall management and coordination of this contract; directing the onsite work; acquiring materials; resolving construction issues;

and providing information about work progress to the KO and COR. The Project

Engineer/Architect shall be highly knowledgeable of the project progress and have a good working knowledge of Spanish to be able to communicate effectively. By Good Working

Knowledge the employee should be able to read/speak Spanish and understand agency regulations, operating instructions, memoranda, and related material concerning the field of work, to prepare correspondence and standardized reports, and to communicate effectively with Spanish speaking staff members and the general public, including both Spanish speaking and non-Spanish speaking persons, to include English.

1.5.12.1.2 The Field Engineer/Architect and Superintendent/Foreman shall be designated in writing to the KO no later than ten (10) days after contract award. These key personnel shall be physically present at the worksite when work is being performed at the site.

1.5.12.2 Personnel Listing.

1.5.12.2.1 After NTP, the Contractor shall have five (5) days to submit to the KO a list of workers and Project Managers assigned to work at FUSNA (Biographic Data on

Personnel). Required information for each individual on the personnel list for FUSNA shall include:

Full Name

Place and Date of Birth

Current Address

Identification number

1.5.12.2.2 Failure to provide any of the above information may be considered grounds for rejection and/or re-submittal of the application(s).

1.5.13 Identification of Contractor Employees: Contractor’s personnel attending meetings, answering Government telephones, and working in other situations where their

Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are

Government officials. They must also ensure that all documents or reports produced by

Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.5.14 Contractor Travel. Contractor Travel is not required nor authorized for the performance of this contract.

1.5.15 Other Direct Costs.

This is the start of the file's text. The full file is on GovTribe.