Materials_List.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- FUSNA Pier and Ramp Construction Federal contract opportunity
- Solicitation number
- W912CL-17-R-0003
- Issued by
- Department of the Army Cyber Command
About this file
Materials List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Technical_Exhibit_1_Ramp_Pier_Location.pdf | ||
| Solicitation_FUSNA_Pier_Ramp.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FUSNA Ramp-Pier
| Materials List | ||||
| FUSNA RAMP-PIER | ||||
| DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL UNIT COST |
| PRELIMINARY | ||||
| Cleaning and clearing | m2 | 93.00 | ||
| Survey | m2 | 93.00 | ||
| Soil study | EA | 1.00 | ||
| Temporary facilities | EA | 1.00 |
| SITE PREPARATION (RAMP, SIDEWALK AND PIER) | ||
| Site leveling | m3 | 28.35 |
| Footing excavation | m3 | 43.89 |
| Footing concrete | m3 | 43.89 |
| Footing reinforcement | KG | 200.00 |
| Concrete strength testing | EA | 2.00 |
| RAMP | ||
| Reinforcement (grade 60) | KG | 1,000.00 |
| Ramp floor/platform (4000 psi) | m3 | 4.88 |
| Concrete strength testing | EA | 2.00 |
| Paint | Quartz | 1.00 |
| SIDEWALK | ||
| Reinforcement (grade 60) | KG | 300.00 |
| Sidewalk (3500 psi) | m3 | 1.37 |
| Concrete strength testing | EA | 1.00 |
| Handrail | LS | 1.00 |
| Paint | LS | 1.00 |
| MOORING PIER | ||
| Reinforcement (grade 60) | KG | 2,000.00 |
| Pier floor/platform (4000 psi) | m3 | 12.19 |
| Concrete strength testing | EA | 2.00 |
| Cleats | EA | 4.00 |
| Ladder | EA | 1.00 |
| Corner bumper | EA | 2.00 |
| Edge straight bumper | LM | 20.00 |
| Handrail | LS | 1.00 |
| Solar dock lights | EA | 10.00 |
| Buoy with label | EA | 2.00 |
| Related sign | EA | 2.00 |
| Paint | LS | 2.00 |
Total Material Cost 0.00
Additional Costs
Total Cost 0.00
| Estimated execution time (working days) | 180.0 | |
| Notes: | ||
| 1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final. |