This is a solicitation (W912CH-24-R-0168) for a five-year sole-source contract to RENK America LLC for System Technical Support (STS) services supporting the Transmission Hydro-Mechanically Propelled Transmission (HMPT) Operational Reliability (THOR) program. The services will support multiple vehicle platforms including the Armored Multi-Purpose Vehicle System, Bradley Fighting Vehicle System, Multiple Launch Rocket System, and Paladin Integrated Management Vehicle platform.
The Department of the Army Material Command TACOM Life Cycle Management Command intends to award one Cost-Plus-Fixed-Fee (CPFF) contract for up to 387,059 hours over the five-year term. Work will be awarded through Work Directives via contract modifications and may be either Level-of-Effort or Completion type efforts. Services include engineering and technical services, program management, and worldwide transmission Field Service Representative support. The solicitation closes on January 27, 2025. Proposals must include certified cost and pricing data and a completed Proposal Adequacy Checklist. The contractor must have a current DD 2345 certification to access export-controlled technical data.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912CH-24-R-0168 0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W912CH-24-R-0168
X
2024NOV27
2025JAN27
DOA4
2024NOV27 SEE SCHEDULE
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
DANE HANSEN
(571)588-9123
CCTA-AMO-B
DANE.J.HANSEN2.CIV@ARMY.MIL
X 1 25
1 111
X 1
X 5 X 7
X 34 X 35
X 36
X 38
X 41
X 81
X 82
X 97
X 109
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DANE HANSEN
Buyer Office Symbol/Telephone Number: CCTA-AMO-B/(571)588-9123
Type of Contract 1: Cost Plus Fixed Fee
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
EXECUTIVE SUMMARY
Solicitation W912CH-24-R-0168 is for a new five-year sole-source contract to RENK America LLC, for the acquisition of System Technical
Support (STS) services for the Transmission Hydro-Mechanically Propelled Transmission [HMPT] Operational Reliability (THOR) program in support of the Armored Multi-Purpose Vehicle (AMPV) System, Bradley Fighting Vehicle System (BFVS), Multiple Launch Rocket System
(MLRS), and Paladin Integrated Management (PIM) Vehicle platform.
The Government intends to award one contract on a Cost-Plus Fixed-Fee (CPFF) basis, which will provide for the exercise of STS hours to execute Work Directive(s) that are within the general scope of the contract. This includes up to 387,059 hours over the five-year contract term. Hours will be awarded under Work Directive(s) via contract modification(s), and may be either Level-of-Effort (LOE) or
Completion type efforts. STS efforts will include engineering and technical services, program management and worldwide transmission
Field Service Representative (FSR) support for the aforementioned programs.
The Government requests proposal delivery for the entire effort in accordance with Statement of Work Sections C.1.0-C.12.8.2 and associated Attachments and CDRLs, no later than the date specified on Page 1, Block 9 of the solicitation. Proposal delivery instructions are referenced in Section L of the solicitation.
*** END OF NARRATIVE A0001 ***
A.01 Electronic Contracting
(a) All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) Unless directed to do otherwise in Section L of this solicitation, offerors shall follow the instructions in paragraph (c) below.
(c) With the recent transition from www.FBO.gov to www.beta.sam.gov and then to www.sam.gov , the www.sam.gov site has been experiencing a number of issues. Interested Offerors shall submit a proposal via email to the Contract Specialist
(dane.j.hansen2.civ@army.mil) and CC the corresponding Contracting Officer (christina.a.schmidt.civ@army.mil) with the subject header:
Proposal Submission - W912CH-24-R-0168 (company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each bid/submission; however, you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.
Bids can be submitted can be submitted using any of the following electronic formats:
(2) Microsoft Office Products; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(3) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(4) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages.
All linked information must be contained within your electronic bid/offer and be accessible offline.
(5) Other electronic formats are not acceptable.
Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
2 111
W912CH-24-R-0168 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on www.sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.02 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.03 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/ombudsperson
. (Best viewed using Google Chrome or Microsoft Edge)
A.04 PROPOSAL ADEQUACY CHECKLIST REQUIRED
(a) Certified Cost and Pricing Data must be submitted by the offeror IAW FAR 15.403-5, including Table 15-2 of FAR 15.408. The offeror must also complete, and provide with the proposal, the "Proposal Adequacy Checklist" found in Section L (252.215-7009) of this solicitation.
(b) Failure to fully complete the checklist, may result in the return of the proposal and the offeror will be allowed five (5) business days from the date of return notification to fully complete and submit the checklist.
A.05 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This solicitation and resulting contract contain technical data whose export is restricted by the Arms Export Control Act (Section
2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States
Code). This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily
3 111
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's
Section C Technical Data Package instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
A.06 ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
*** END OF NARRATIVE A0002 ***
4 111
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 SERVICES, PRICED 1 LO $ ________________ __________________
SERVICE REQUESTED: THOR IV STS SERVICES, PRICED
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
PROGRAM YEAR: 1
ESTIMATED COST: $ TBD ___________
FIXED FEE: $ TBD ___________
TOTAL ESTIMATED CPFF: $ TBD ___________
(This is intended to be a starting point for CLINS to be awarded, please provide proposal information in the in the five-year schedule in Section H.3 and complete the Pricing Matrix - Attachment 0011).
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0001
0002 DATA ITEM _________
Technical Data as set forth in Contract Data
Requirements List (DD Form 1423) referred to as
Exhibit A.
(End of narrative B001)
5 111
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
B.1 SYSTEM TECHNICAL SUPPORT (STS)
B.1.1 ESTIMATED COST AND PAYMENT
Each funded Contract Line-Item Number (CLIN) shall be defined as a Level-Of-Effort (LOE) or a Completion Work Directive (WD). All terms laid out in Section B.1 apply to both LOE and Completion WDs.
Please provide proposal rates in the five-year schedule in Section H.3 and complete the Pricing Matrix Attachment 0011.
B.1.1.1 The estimated cost for the performance of work under this contract is established in Section B at the four-digit CLIN level. The contract clause entitled; LIMITATION OF COST applies to each CLIN separately.
Allowable costs shall be determined, and payment thereof, shall be IAW ALLOWABLE COST AND PAYMENT clause, FAR 52.216-7. No work is authorized outside the period of performance stated in the inidividual WDs, and any work performed outside of the period of performance is at the contractor's risk, for which the Government has no obligation to reimburse cost.
B.2 FIXED FEE
The fixed fee together with the reimbursement of cost shall constitute full and complete consideration for the contractor services in connection with the work required and performed under this contract. The contractor will be paid the total fixed fee for the performance of work IAW the contract clause entitled FIXED FEE, FAR 52.216-8, as set forth in Section B.2.1 and B.2.2 below.
B.2.1 LEVEL-OF-EFFORT CLIN(s) / WORK DIRECTIVE(s)
B.2.1.1 The fixed fee is payable based on satisfactory performance of the specified level of effort. For each request for payment, the contractor shall invoice fee as follows (subject to any applicable withholdings): Invoice Fee = Total WD Fixed Fee amount times the hours performed for the invoice period divided by total WD hours, subject to any applicable withholdings.
(Total Fixed Fee / Total Estimated Hours) x Actual Hours Worked = Fixed Fee Billed/Invoiced (subject to any withholds)
B.2.1.2 Pursuant to contract clause LIMITATION OF COST and FAR 16.306(d), in the event the contractor cannot perform LOE hour(s) within the estimated cost set forth in the CLIN, the Government may increase the estimated cost of the hour(s) but will not increase the fixed fee for the hours. In addition to the LIMITATION OF COST, the contractor shall be subject to the limitation of hours as specified on each WD.
B.2.2 COMPLETION CLIN(s) / WORK DIRECTIVE(s)
B.2.2.1 The fixed fee is directly expressed within respective Completion WDs. Fixed fee is payable based on satisfactory delivery and acceptance of respective WDs completion criteria. For each request for payment, the contractor shall invoice fee as follows: Invoice Fee
= Total WD Fixed Fee amount times the costs for the invoice period divided by total WD estimated cost, subject to any applicable withholdings.
(Actual Cost Worked / Total Estimated Cost) x Total Fixed Fee = Fixed Fee Billed/Invoiced (subject to any withholds). The maximum fixed fee is identified on the WD.
B.2.2.2 The fixed fee is based upon satisfactory completion of the scope within the period of performance. Pursuant to contract clause
LIMITATION OF COST and FAR 16.306(d), in the event the contractor cannot complete the scope within the estimated cost, the Government may require more effort without increase in fixed fee, provided the Government increases the estimated cost.
*** END OF NARRATIVE B0001 ***
6 111
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1.0 SCOPE
C.1.1 General System Technical Support (STS) Work Statements
The contractor shall support the following work statements as required by Work Directives (WD) as incorporated into the contract via modification.
C.1.2 Work Directives (WD)
C.1.2.1 All work under this contract section shall be performed only to the extent authorized by WDs incorporated into the contract through a modification issued by the Procuring Contracting Officer (PCO). The Government is under no obligation to pay for work performed outside the scope of a given WD, nor shall the Government be under obligation to pay for the expenditure of hours in excess of the hours listed on a given WD.
C.1.2.1.2 If the contractor has been tasked to perform any effort, which it thinks is beyond the scope of the contract, it shall immediately notify the Contracting Officer in writing. The Contracting Officer will issue a determination on the action within ten business (10) days.
Any such work performed, which is not covered by an approved WD, relieves the Government of all liability for claims of reimbursement for those efforts.
C.1.2.1.3 In accomplishing the effort under this contract, the contractor agrees that it shall not duplicate or otherwise provide efforts, present or future, required to be performed under any current or past contracts.
C.1.2.1.4 The contractor shall provide input for scope and storybooks required by the Government to create WDs, schedules, hours, and cost projections.
C.2 Systems Engineering
C.2.1 The contractor shall be responsible for Systems Engineering, to include design, redesign, development, integration, validation, and testing for all systems, subsystems, hardware, and software reflected by the technical activities conducted under this contract. The contractor is responsible for ensuring that optimum solutions are introduced into the transmission design without sacrifice in areas of total system performance, reliability, durability, safety, cost, maintainability, and quality. The contractor may be required to conduct design studies, feasibility and trade-off studies, safety and human factors analysis, perform market surveys, fabricate hardware, prepare test plans, and perform testing. These efforts would be required in order to correct known or potential deficiencies, improve performance, accomplish cost reductions, or analyze program alternatives. The contractor may be required to prepare engineering hardware cost and schedule estimates based on the production quantities. In addition, the contractor may be required to prepare cost and schedule estimating for the application of such hardware at a specific maintenance level, such as depot. The contractor may be required to resolve field problems and secondary item procurement problems and develop solutions for such problems as they arise. The contractor shall maintain facility vehicles in accordance with (IAW) established maintenance procedures found in vehicle technical manuals.
Maintenance shall include those design enhancements required by WDs. The contractor shall design for commonality between the Bradley
Fighting Vehicle (BFV), Paladin Integrated Management (PIM), Multiple Launch Rocket System (MLRS), and Armored Multi-Purpose Vehicle
(AMPV) platforms.
C.2.2 The contractor shall provide a detailed review for all proposed work under this contract. This review shall identify the need for specialty engineering involvement in support of design effort. The specialty engineering disciplines shall consist of Systems
Engineering, Quality, Product Support, Training and Maintenance Engineering, System Test Integration, System Safety, Human Factors, Reliability and Maintainability (RAM), System Analysis, System Validation, and Human Systems Integration (HSI).
C.2.3 The contractor shall be responsible for participation in all design review meetings, review of design parameter documents for appropriate load conditions and safety factors, assistance in selection of safety critical items, and participation in safety review and failure analysis board meetings.
C.2.4 When potential improvements or cost reduction areas are identified, the contractor shall conduct cost effectiveness studies and submit recommendations for each prospective improvement or cost reduction project as required by WD(s).
C.2.5 The contractor shall conduct technical/design analysis to confirm adequacy of component design and document the results.
C.2.6 The contractor shall conduct producibility analysis in the development of changes to Government-controlled items performed under this contract to assure the systems, subsystems, and components are producible in the most effective manner consistent with quality, reliability, and design requirements.
C.3 Human Systems Integration (HSI)
7 111
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The contractor shall provide Human Engineering Progress Reports (HEPR) for all approved ECPs that affect the soldier machine interface.
C.4 Environmental, Safety, and Occupational Health (ESOH)
C.4.1 System Safety Program Requirements
The contractors system safety program shall identify, assess, mitigate, and continuously track, control, and document environmental, safety, and occupational health (ESOH) mishap risks encountered in performing the tasks needed to execute the contract. The system safety program is responsible for the implementation and monitoring of engineering and management principles, criteria, and techniques to achieve acceptable mishap risk, within the constraints of operational effectiveness, time, and cost, throughout the contract. A safe design is a prerequisite for safe operations, with the goal being to produce an inherently safe product that will have the minimum safety-imposed operational restrictions IAW MIL-STD-882E. The contractor shall prepare and deliver a System Safety Program Plan (SSPP) that describes the planned safety tasks and activities necessary to execute a comprehensive and effective System Safety Program, IAW
CDRL A001.
C.4.2 Health Hazard Assessment Report (HHAR)
The contractor shall develop a HHAR to identify health hazards and recommend engineering controls, equipment, and protective procedures, to reduce the associated acceptable risk. The HHAR shall be delivered to the Government in contractor format IAW CDRL A002.
Issues to be addressed within the report shall include:
- Noise
- Toxic gases
- Carbon Monoxide
- Ammonia
- Oxides of nitrogen and sulfur
- Toxic chemicals
- Ionizing and non-ionizing radiation
- Heat and cold (to include heat stress)
- Shock and Whole Body Vibration to crew members
- Address the chemicals identified in the Material Safety Data Sheets to be provided IAW SAE-AMS2825.
C.4.3 Safety Assessment Report (SAR)
The contractor shall develop a SAR IAW MIL-STD-882E (Task 301) and deliver it IAW CDRL A003. The SAR shall include the Software System
Safety Assessment and the Software System Safety specific test results.
C.4.4 Hazard Tracking System (HTS)
The contractor shall prepare a HTS IAW MIL-STD-882E, Task 106 (Hazard Tracking System). The HTS shall include the findings from MIL-STD-
882E Task 205 (System Hazard Analysis), Task 208 (Functional Hazard Analysis), and Task 210 (Environmental Hazard Analysis). The contractor shall document and track all hazards from identification until the hazard is eliminated or the associated risk is reduced to a level acceptable to the Government. The HTS shall be delivered IAW CDRL A032. In the event design changes impact hazards, the contractor shall notify the COR within two calendar days. All hazards shall remain documented in the HTS.
C.4.5 Critical Safety Program (CSP)
The CSP described herein is applicable to any items for which drawings will be delivered to the Government.
C.4.5.1 CSP Definitions. The following definitions apply:
C.4.5.1.1 Critical Safety Items (CSI)
A part, assembly, installation, or production system with one or more critical characteristics that, if not conforming to the design data or quality requirements, would likely result in an unsafe condition. Unsafe conditions include conditions which would cause loss or damage to the end item or major component, or loss of control of the vehicle, or serious injury to personnel. Unsafe conditions are those in hazard severity categories IA-D, II A-C, and III A-B of the risk acceptance level definitions, IAW MIL-STD-882E.
C.4.5.1.2 Critical Safety Characteristics (CSC)
A CSC is any feature (i.e. tolerance, finish, material composition, manufacturing, assembly, or inspection process) of a product, material, or process, which, if nonconforming or missing would cause the failure or malfunction of the critical safety item.
8 111
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.4.5.2 Identification of CSIs
The contractor shall clearly identify each CSI and assembly process associated with design changes to the current product baseline. The contractor shall clearly identify the CSCs for each CSI on the engineering parts, engineering top drawings, part drawings, assembly drawings, and process documentation. The contractor shall ensure that all designated or identified CSCs shall have an associated control method. The control method, as a minimum, shall be either a Statistical Process Control (SPC) at a process capability index greater than or equal to 1.66, or a 100% inspection. The contractor shall annotate the control method in the drawing notes for all designated or identified CSCs. The specific method for marking drawings shall be as delineated in MIL-STD-31000 and ASME Y14.100.
C.4.5.3 Data Sources
Identification of CSIs shall be based on the following data sources:
- Engineering analysis
- Failure modes and effects, criticality analysis (MIL-STD-1629)
- Safety assessment / safety hazard analysis (MIL-STD-882E)
- Development testing / operational testing results
- RAM engineering assessments
- Previous experience using like items or designs
- Logistics Support Analysis (LSA) data
- Component qualification test results
C.4.5.4 The contractor shall validate the CSI requirements expressed herein to ensure that all critical safety aspects of the design are accurately depicted on deliverable drawings, and parts or materials operate below fatigue limits or stress levels. The contractor shall ensure that the Government can verify these requirements without the use of destructive inspection equipment. The contractors validation shall be based on engineering analyses of the CSI characteristics, and the validation shall consider design changes, and deterioration through time from use, fatigue life, and operating conditions.
C.4.5.5 CSI Master List
The contractor shall prepare and deliver a master list of CSIs and associated critical characteristics, including nomenclatures and Part
Numbers IAW Critical Safety Item(s)/Characteristics Report (CDRL A004). The contractor shall maintain and update the CSI list throughout the life of the contract. The contractor shall also reference the CSIs on vehicle class and division drawings. This list shall be dynamic in nature, with changes taking place as experience and knowledge are obtained, and as design changes are incorporated into the system.
C.4.6 Safety Control Board
The contractor shall establish a safety control board consisting of representatives from the contractors design, quality, manufacturing, field service, engineering, safety, and other appropriate departments for the purpose of reviewing and formalizing all CSIs delivered to the Government IAW CDRL A004.
C.4.7 Environmental, Safety, and Occupational Health (ESOH) Working Group (WG) Support
The contractor shall participate as an advisory member of the Bradley Fighting Vehicle Systems (BFVS) ESOH WG, as detailed in the WD(s).
This participation shall include, at a minimum: 1) attending the ESOH WG meetings on an as needed basis based on program ESOH efforts and concerns, and 2) providing input to action items resulting from the ESOH WG meetings.
C.4.8 ESOH Review Board
The contractor shall participate as an advisory member for the Governments BFVS ESOH Review Board, as detailed in the WD(s). This participation shall include: 1) attending the ESOH Review Board meetings on an as needed basis based on program ESOH efforts and concerns, and 2) providing input to action items resulting from the ESOH Review Board meetings.
C.4.9 Environmental Compliance and Hazardous Materials Management
C.4.9.1 Environmental Compliance
The contractor shall ensure that all aspects of contract execution in this agreement are in compliance with applicable International, United States Federal, State, interstate and/or local environmental regulations and requirements. Such regulations, conditions, or instructions in effect or prescribed by any International, Federal, State, interstate or local governmental agency are hereby made a condition of this Agreement. The contractor shall immediately notify the COR if the Government gives any instruction or direction the contractor believes may result in violation of applicable law(s) and or regulation(s). For contractor activities conducted at a
Government facility or installation, the contractor shall immediately notify the Government of any nonconformance and/or noncompliance related to this Statement of Work (SOW).
9 111
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.4.9.2 Hazardous Materials Management
For the purposes of this contract, hazardous materials shall be defined by FED-STD-313. A Radioactive material is defined as any source material, as defined by Title 10, Code of Federal Regulations, Part 40, Domestic Licensing of Source Material, in excess of 0.05 percent by weight. Specific prohibited hazardous materials for the contract are identified in section C.4.9.3. Prohibited materials requirements shall apply to all components, parts, and materials provided under this contract, including items purchased through a subcontractor or supplier, COTS components, OEM parts, and manufactured parts.
C.4.9.3 Prohibited Materials
The system shall not have any prohibited materials (including alloys containing prohibited materials) present in or on any delivered systems or support equipment, required for operation and sustainment of the system, or used in final manufacture and assembly processes.
The following are prohibited materials: asbestos, beryllium, Class I and Class II Ozone Depleting Substances (ODS), hydrofluorocarbons
(HFCS), hexavalent chromium, cadmium, mercury, lead, radioactive materials, and other Group 1 Agents classified as "carcinogenic to humans" by the International Agency for Research on Cancer (IARC) Monographs.
The following exceptions are allowed without prior approval from the Government:
- Cadmium and hexavalent chromium on electrical connectors and back shells used to mate with cadmium electrical connectors on Government
Furnished Equipment (GFE) or used in an Automatic Fire Extinguishing System (AFES)
- Products listed under "Priming" and "Topcoating" in MIL-DTL-53072, Table I
- Lead-acid batteries
- Lead solder
- Leaded battery terminal adaptors/clamps
- Silica used in adhesives and sealants
- Fuels specified for use in the requirements of this contract
- Steel containing up to 0.35 % lead by weight
- Aluminum containing up to 0.4 % lead by weight
- Copper and Brass alloys containing up to 4 % lead by weight
- Beryllium and Beryllium alloys used in electrical components
- Mercury containing components compliant with European Union (EU) Directive 2011/65/EU (RoHS 2)
- Trace amounts of identified restricted materials contained in base materials and/or alloys. For the purposes of this contract trace amounts are defined as <0.1% by weight for carcinogens and <1% by weight for all other materials
- HFCs in fire extinguishing systems in crew-occupied spaces
- R134a in ground vehicle air conditioning systems
C.4.9.4 Prohibited Materials Waivers
Waivers from the prohibited materials requirements shall not be permissible except where a suitable alternative does not exist. The contractor shall submit waiver requests to the COR no later than 90 days after contract award using the Request for Use of Prohibited
Materials (Attachment 0001). Waiver requests shall include detailed technical justification for use of prohibited hazardous materials.
The Government will make the final determination on whether sufficient justification has been provided to support approval of any waiver requests. Government response will be provided to the contractor within 30 days of receiving sufficient justification for the waiver request. The contractor shall not deliver any items containing prohibited materials without Government approval of the waiver request.
This includes purchased parts of components such as fasteners, electrical connectors, and lubrication fittings.
C.4.10 Hazardous Materials Management Report (HMMR)
The contractor shall prepare and deliver a Hazardous Materials Management Report (HMMR) IAW CDRL A005 and IAW National Aerospace
Standard (NAS) 411 REV 2 (dated April 29, 1994), section 4.4. (Exception to NAS 411 REV 2 section 4.4.1: In addition to those hazardous materials delivered on the system and required for operation and maintenance, the HMMR shall identify: all hazardous materials used in final system manufacture and assembly, specifying the process(es) utilizing the materials; any hazardous materials created by the system; and any anticipated hazardous wastes created during operation and maintenance of the system.) The HMMR shall specify which phase
(manufacture, operation, and sustainment) that each material is required for or created in.
For the life of the contract, the contractor shall discuss status, changes or issues with the HMMR as part of all technical reviews, ESOH WG meetings, and each Program Management Review.
C.4.11 Use of Government Owned or Furnished Property
C.4.11.1 The contractor is authorized to utilize Government-owned or Furnished Property provided under this contract for any task or purpose required to support STS activities or work directives. Use shall include shipment of Government property to contractor, subcontractor, Aberdeen Test Center (ATC), Yuma Test Center (YTC), or Camp Roberts, or other sites as indicated in WDs, required by the
Government. Use of Government property shall be on a non-interference basis and shall be at no additional cost to the Government.
10 111
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.4.11.2 Government assets intended for the production build shall not be redirected or loaned to STS activities without written concurrence from the PCO. Authorized use shall include the shipment of Government property to contractor, subcontractor, ATC, YTC, Camp
Roberts, or other locations.
C.4.11.3 Contractor Requisitions and Reporting Requirements for Government Furnished Material/Government Furnished Equipment (GFM/GFE)
C.4.11.3.1 All contractor requisitions must be processed through the Material Control Authority (MCA) office and shall include the NSNs and total quantities for each part listed in attachments to the contract. The contractor shall submit acknowledgement of receipt of material received, via e-mail message, to the supporting MCA office (TACOMMCA@conus.army.mil) on a monthly basis. The notification shall include the following information: NSN; unit of issue; quantity received; document number received; date material received.
C.4.12 Program Management
C.4.12.1 The contractor shall manage and report progress on assigned task orders under the STS Work Directives.
C.4.12.1.1 The contractor shall furnish supplies and services necessary to accomplish the effort described in this contract for modifications, changes, and/or improvements to the transmission system. Efforts shall include program management, logistics support, engineering, product assurance and field service support for the transmission.
C.4.12.1.2 Contract Status Report
The Contract Status Report (to be delivered IAW CDRL A006) shall provide monthly and cumulative to date Budget, Performance, and
Expenditure by WD. The report shall contain the following monthly cost and performance data per STS WBS and/or WD structure: Funding
PRON, CLIN, WD/WBS Description, WD Revision, contract Funding Amount, Actual Labor with Fee, Actual Material/ODC with Fee, Total Actual
Cost with billable actuals with fee, Percent spent, Future Purchase Order (PO) commitments, Open PO commitments, Estimate to Completion
(ETC), Estimate at Completion (EAC), Variance at Completion (VAC), Budgeted Hours, Actual Hours, and Period of Performance.
C.4.12.1.3 Service Contract Reporting (SCR)
Service contractor reporting of information is required in the SCR section in the System for Award Management (SAM) by 31 October, when a contract or task order has a total estimated value, including options, that exceeds $3 million; and is for services in the following acquisition portfolio groups.
1) Logistics management services
2) Equipment related services
3) Knowledge based services
4) Electronics and communications services
C.4.12.1.4 Engineering Management
The contractor shall provide engineering support to program management for STS-related activities including work directive management, planning, reporting, estimate and proposal preparation, attendance at meetings, and conducting STS Reviews.
C.4.12.1.5 Meetings
The contractor shall host, coordinate, and/or attend meetings as required by the Government. The contractor shall deliver minutes of meetings to all Government attendees providing an electronic address IAW CDRL A007.
C.4.12.1.6 Contract Performance Management
If any discrete Work Directive exceeds $20 million, the contractor shall establish, maintain and use an Earned Value Management System
(EVMS) in the performance of Work Directives and CDRL A008. If the $20 million threshold is not exceeded, the contractor shall provide a monthly Integrated Master Schedule (IMS) IAW awarded Work Directives, and CDRL A009.
C.4.12.1.6.1 Integrated Master Schedule (IMS)
The contractor shall prepare and deliver a THOR STS Integrated Master Schedule (IMS) for all WDs awarded under this contract IAW CDRL
A009. The contractor shall prepare the IMS IAW Integrated Master Schedule Preparation and Use Guide. The Integrated Master Schedule shall be structured IAW MIL-STD-881F.
All monthly submissions will include a written schedule analysis to identify, document and communicate changes of one (1) working day or greater to: the Project Critical Path, the next major milestone, and/or the Near Critical Path task/activity actual start and/or actual finish date variances from submission to submission. Work around and/or recovery schedules/plans, and associated impacts due to program changes shall also be provided. The schedule narrative shall address progress to date and discuss any significant schedule changes
11 111
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(i.e., add/deleted tasks, any significant logic revisions, and any/all programmatic schedule assumption changes.).
C.4.12.1.6.2 Integrated Performance Management
When an Integrated Performance Management Data Report (IPMDAR) is required, the contractor shall develop and deliver a monthly
IPMDAR/Integrated Master Plan (IMP) IAW CDRL A008, the DoD Integrated Master Plan and Integrated Master Schedule Preparation and Use
Guide, and MIL-STD-881F Work Breakdown Structures for Defense Material Items. The contractor shall utilize an Earned Value Management
System (EVMS) as a project management tool to effectively integrate the project scope of work with cost, schedule, and performance elements for optimum project planning and control. To establish the integrated performance management system, the contractor shall ensure the EVMS is linked to, and supported by, the contractors management processes and systems to include the resource-loaded
Integrated Master Schedule (IMS), Contract Work Breakdown Structure (CWBS), change management, material management, procurement, cost estimating, and accounting. The contractor shall correlate and integrate these systems and processes to provide for early indication of cost and schedule problems, and their relation to technical achievement.
C.4.12.1.6.3 Integrated Program Management Data Analysis Report (IPMDAR)/Integrated Master Plan (IMP)
The contractor shall develop and deliver an IPMDAR IAW CDRL A008. The IPMDAR shall be delivered monthly containing the original baseline, performance data earned value, and actual costs IAW CDRL A008. The contractor shall use COBRA as a reporting tool. The contractor shall deliver electronic backup files of the IMS and Performance Measurement Baseline (PMB) on a monthly basis, in Microsoft
Project scheduling format and Deltek Cobra EVM format, including all auxiliary files (e.g., breakdown structures, code files, calendars, etc.) along with the IPMDAR/IMP IAW CDRL A008.
C.4.12.1.6.4 The IPMDAR shall be updated and delivered at the Control Account IAW CDRL A008. The IMS shall be updated and maintained in an IMP. The IMP is an event-based plan consisting of a hierarchy of program events, with each event being support by specific accomplishments, and each accomplishment reinforced by specific criteria that must be satisfied.
The IMS shall be coded with IMP activity codes. The contractor shall update and maintain an IMS by logically networking detailed program activities. The schedule shall be consistent with the Contract Work Breakdown Structure (CWBS) and contain the planned events and milestones, accomplishments, exit criteria, and activities from work directive award to completion of the work directive. The IMS and time-phasing of the PMB shall be consistent. The IMS shall be resource-loaded and clearly identify critical path activities. All IMS monthly submissions shall include written schedule analysis.
C.4.12.1.6.5 Earned Value Management System (EVMS)
The contractor shall use an EVMS that complies with the EVMS guidelines in DoD 5000.02, Defense Acquisition Guidebook, the ANSI/EIA-748, and the contractors own documented System Description. EVM shall be used as a tool to identify and track program risks, manage cost, schedule, and technical performance.
C.4.12.1.6.6 Application to Subcontractors
The contractor shall flow-down EVMS requirements to subcontractors exceeding $20 million. Flow-down of the requirements to subcontractors of less than $20 million then-year dollars is a risk-based decision and will be as mutually agreed upon between the contractor and the Government. The performance information reported by the subcontractors shall be incorporated and integrated in the contractors management system. The contractor shall be responsible for reviewing and assuring the validity of all subcontractors reporting through surveillance and other means.
C.4.12.1.6.7 Over-Target Baseline (OTB) or Over-Target Schedule (OTS)
In exceptional circumstances indicated by contract performance (per the contractors EVMS System Description), the contractor shall submit a request for approval to initiate an over-target baseline or over-target schedule to the PCO. The request shall include a top-level projection of cost and schedule growth, a recommendation of whether or not performance variances shall be retained on record, and a schedule for implementing a new baseline. The contractor shall not implement the OTB or OTS restructuring prior to receiving written approval from the PCO.
C.4.12.1.6.7.1 Incorporation of Baseline Changes
The PMB shall be updated with any required work packages upon receipt of the modification implementing the change. Changes shall be incorporated IAW the contractors EVMS System Description.
C.4.12.1.6.7.2 Current Period and Retroactive Changes
The contractor shall use American National Standards Institute/Electronic Industries Alliance Standard (ANSI/EIA) 748 and the approved
System Description in complying with changes. Current period or retroactive changes will be approved by the COR.
C.4.12.1.6.7.3 Baseline Changes
12 111
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The contractor shall identify, with supporting rationale, any deviations or changes to the program baseline, and review all program plans, activities, and work products for consistency with the baseline requirements and any approved changes made to them. The contractor shall document all changes, including those to be made to the plans and work products resulting from changes to the requirements baseline. The contractor shall initiate and complete corrective action for all inconsistencies reported on the IPMDAR (CDRL
A008).
C.4.12.1.6.8 Integrated Baseline Review (IBR)
The contractor shall conduct a joint assessment with the Government of the Performance Measurement Baseline (PMB) to verify the baselines realism, accuracy, and technical content. The IBR shall take place at the contractors facility within 180 calendar days of applicable WD award with a Period of Performance longer than 180 calendar days. The contractor shall provide access to all pertinent records and data requested by the PCO, or other authorized Government representative to adequately prepare for the IBR (to include the detailed time-phased PMB, Responsibility Assignment Matrix, Earned Value Criteria, Control Account Authorizations, and Work Package
Authorizations) and permit Government surveillance to ensure EVMS compliance. The contractor shall detail-plan the PMB to MIL-STD-881F, Work Breakdown Structure (WBS) Level III. Two weeks prior to the IBR, the contractor shall provide the Government Control Account
Managers (CAM) with a read-ahead copy of the topics it will cover at the IBR, focusing on its assigned WBS elements. The contractor shall deliver and present a 12-month rolling wave detailed IMS plan, IAW CDRL A009, at the IBR. The Government has the right to accept or reject the detailed IMS and PMB plan. In the event that the Government rejects the detailed IMS and PMB plan, it will work with the contractor to adjust the plan.
C.4.13 Integrated Logistics Support (ILS)
C.4.13.1 ILS Program
The contractor shall plan, manage, and execute an ILS Program IAW AR 700-127 Chapter 5, Section 3.
C.4.13.1.1 ILS Program Objectives
The contractor shall conduct an effective LSA program that:
1. Ensures the supportability characteristics for the transmission identified under THOR are satisfied and demonstrated.
2. Effectively translates the design of the transmission into validated logistics support package products.
3. Focuses on the development of a validated logistics support package that maintains currency with the transmission configuration.
4. Provides effective test support by developing and managing system support packages for testing under this contract.
5. Maintains facility vehicles to ensure they are available and in the current configuration and condition to support the logistics activities required for their use under this contract.
C.5 ILS Program Management
The contractor shall establish and maintain the management processes and controls for the ILS program. A joint Government/contractor
Product Support Integrated Product Team (PS-IPT) shall be established to oversee the THOR ILS program.
C.5.1 ILS Master Schedule
The contractor shall develop and maintain an ILS Schedule to manage the ILS program through completion of this contract, delivered IAW
CDRL A009. The ILS schedule shall reflect the details of the ILS work contents per WD requirements and incorporate the schedule into the
THOR program IMS. The schedule shall be agreed upon and updated with the Government during PS-IPTs.
C.5.2 Logistics Support Analysis (LSA)/Logistics Management Information (LMI) Objectives
The contractor shall perform LSA of the transmission to ensure it meets or exceeds the supportability requirements of the current transmission configuration.