W912BV-16-T-0128-0001.pdf

PDF 64 KB Posted

Attached to
Mowing Services Eufaula Lake Federal contract opportunity
Solicitation number
W912BV-16-T-0128
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Mowing Services Eufaula Lake, newest first.
File Type Posted
EUF_EM_MWG_MAPS.pdf PDF
W912BV-16-T-0128.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the scope of w ork to allow side discharge mow ers and to include the mow ing maps that w ere inadvertenly ommited from the solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 24

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-16-T-0128

X 9B. DATED (SEE ITEM 11)

25-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-May-2016

CODE

CONTRACTING DIV

USACE, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BV-16-T-0128

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

REVISED SCOPE OF WORK

S P E C I F I C A T I O N S

EUFAULA LAKE

OKLAHOMA

MAINTENANCE CONTRACT

FOR

ONE-TIME MOWING SERVICES

ORGANIZATION OF SPECIFICATIONS

This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following page.

The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.

Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.

TABLE OF CONTENTS

Para.

No. Paragraph Title

1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Performance Requirements 8 Contractor Quality Control 9 Deductions for Deficient Work 10 Safety 11 Reporting Defective Facilities 12 Required Insurance And Insurance Certificate 13 Prework Conference 14 Contractor Submittals 15 Billing 16 Work Schedules 17 Materials and Supplies

EXHIBITS

No. TITLE

1 Performance Requirements Table 2 Quality Assurance Report 3 Quality Control Inspection Log 4 Example of Job Hazard Analysis 5 Invoice Format

APPENDICES

Appendix Title

A Mowing – Corps Directed Mowing – Improved Areas B Mowing – Corps Directed Mowing – Herbicide & Dam Embankment

Facilities Inventory & Mowing Maps

1. SCOPE OF WORK. The work required under this specification provides for the two mowings, trimming, and edging of public use areas and other project lands at Eufaula Lake, Oklahoma.

2. DEFINITIONS.

2.1. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.

2.2. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 1.

2.3. Government. The term "Government" as used herein means the United States of America.

2.4. Performance Requirement (PR). The Government's requirement for each service provided under the contract. The requirements are stated as Performance Standards (PStd), and specify the minimum standard (quality) for each service provided under the contract.

2.5. Project. The term "project" as used herein means all Government property and easements at Eufaula Lake.

2.6. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.

2.7. Quality. Conformance with the contract specification.

2.8. Quality Assurance (QA). The procedure by which the Government determines CQC is functioning effectively.

2.9. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.

2.10. Workday. Any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.

3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, current version) is hereby incorporated into this specification. The Contracting Officer or their designee will furnish EM 385-1-1 to the contractor after contract award. EM 385-1-1 is also available on-line at http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.

aspx.

4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.

4.1. CORPS DIRECTED MOWING.

4.2.1. All mowing shall start upon contract award and be completed by 3:00 PM on 26 May 2016.

4.2.2. Acceptance of work. When work is completed, the contractor will notify the COR. The COR will accept work unless services are found to be deficient.

4.2.2.1. If the COR notifies the contractor of deficient work the contractor shall initiate action to accomplish corrective work. Reperformance of work to correct deficiencies must be completed within the original CDM response time.

4.2.2.2. The contractor shall notify the COR when corrective work is completed.

When work has been corrected, the COR will provide an email notification to the contractor and copy the Tulsa District Office.

5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.

5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.

5.2. Supervision.

5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during his absence, shall be designated in writing.

5.2.2. The contractor shall provide the COR and Contracting Officer a telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.

6. EQUIPMENT. The contractor shall furnish all equipment necessary to accomplish the various types of work specified. Equipment breakdowns do not relieve the contractor of the responsibility to complete work properly and on time.

6.1. Equipment Inspections. Upon request, the contractor shall present equipment to the COR for inspection. The contractor shall not use equipment until it has passed inspection by the COR.

The COR shall establish the time and location for these inspections.

6.2. Equipment Requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and shall comply with EM 385-1-1.

6.2.1. Tractors shall be equipped and operated in accordance with the following:

6.2.1.1. Power take offs on tractors shall operate at a minimum of 540 rpm during mowing operations.

6.2.1.2. Seat belts shall be worn at all times by equipment operators. Refer to subparagraph 16.B.08. of EM 385-1-1.

6.2.1.3. A substantial guard or shield shall be installed on the tractor to protect the operator from flying objects during mowing. The guard or shield shall be covered with not less than 1/4-inch woven wire mesh or expanded metal with openings no greater than one inch. Refer to subparagraph 16.B.03.a. and 16.B.11.a of EM 385-1-1.

6.2.1.4. Rollover protection shall be provided. If the structure is not designed and installed by the manufacturer of the tractor, the contractor shall furnish a certificate from a registered professional engineer that the rollover protection is structurally safe for its intended purpose. Refer to subparagraph 16.B.12. of EM 385-1-1.

6.2.2. Mowers shall be rotary-type or flail-type and shall meet the following requirements:

6.2.2.1. Mowers shall be rear and/or side discharge and equipped with safety chains or other protective devices to prevent flying objects from injuring people or damaging property.

6.2.2.2. Mowers shall be equipped with slides and wheels.

6.2.2.3. Brush hogs shall not be used on the slopes of dikes around oxidation ponds.

6.2.2.4. Mulching mowers shall not be used.

6.2.2.5. Brush hogs shall not be used within improved areas.

6.2.2.6. All safety devices provided by the manufacturers of push and riding mowers shall function as designed.

6.2.3. Edgers shall be equipped with a rotary blade in an upright position. A protective guard for the blade shall be provided.

6.2.4. Signs located on each side of the vehicles shall mark all sedans and trucks used by the contractor to perform work under this specification. Signs may be painted on the doors or magnetic signs may be attached to the doors. Magnetic signs shall not be removed at any time vehicles are at the project. Lettering shall be at least 2 inches high. Each sign shall contain the following:

EUFAULA LAKE

MOWING SERVICES

PROVIDED BY

(Contractor's Name)

6.3. Equipment Operation.

6.3.1. Mowing equipment shall be operated in a manner that will allow for discharge of grass clippings away from roads, ponds, facilities, etc., and prevent damage to turf.

6.3.2. Power operated trimming equipment shall not be used around any shrubs or trees with a diameter less than 3 inches at breast height.

6.4. Vehicle Operation and Parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the Contracting Officer or the COR and the Lake Manager approves use of other areas. All vehicles shall be properly licensed and maintained in a safe, clean condition. All contractor/sub contractor drivers shall maintain a valid state driver’s license.

7. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 1. The contractor's performance will be evaluated using these PRs as follows:

7.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the Contracting Officer's Representative.

7.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory reperformance.

7.3. Whenever QA inspections indicate the contractor’s performance is marginal or unsatisfactory; the contractor shall furnish the COR a written plan for correcting his/her CQC program within two (2) workdays. In addition, the contractor shall also furnish written status reports on the implementation of this plan weekly until the COR determines that performance is satisfactory. The COR will inform the contractor of the criteria to be used in determining marginal and unsatisfactory performance at the Pre-work Conference. The contractor will also be advised of any changes to these criteria prior to being used for evaluation.

8. CONTRACTOR QUALITY CONTROL. The contractor shall maintain control of their personnel and ensure all work is accomplished to meet the standards provided in the statement of work.

9. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 1. Deductions for documented defects will be made in accordance with the following procedures:

9.1. Each service found deficient and reperformed by the contractor: No deduction.

9.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.

9.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.

9.4. Each service found deficient and not reperformed by anyone, or work not performed at all:

Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.

10. SAFETY.

10.1. Safety Plan. The contractor shall furnish the COR a safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:

10.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.

10.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.

10.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.

10.1.4. Procedures for treating and transporting injured persons to medical facilities.

10.1.5. Fire prevention plans.

10.1.6. Job hazard analyses shall include an evaluation of hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner. Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job. Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below. However, the contractor shall prepare additional analyses as the need arises and/or the Contracting Officer directs. Job hazard analysis directed by the Contracting Officer shall be submitted for approval within one (1) week. An example of a job hazard analysis is given in Exhibit 6.

10.1.6.1. Loading and unloading of equipment (analysis for each type of equipment to be used to perform services required by this specification).

10.1.6.2. Equipment operation and maintenance (for each type of equipment).

10.1.6.3. Vehicle operation and maintenance.

10.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the request of the Contracting Officer.

10.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385-1-1.

10.4. Accident Reports.

10.4.1. The contractor shall immediately notify the Contracting Officer and COR of all known accidents that occur at the project and result in death or serious injury.

10.4.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the Contracting Officer and COR immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.

10.5. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man-hours worked) and submit the figure in writing to the COR when billing.

11. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the Contracting Officer each workday.

12. REQUIRED INSURANCE AND INSURANCE CERTIFICATE. Pursuant to FAR 28.301(b) for the protection of the Government, and FAR 28.306(b) and 52.228-5, Work on a Government Installation, the Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:

12.1. Worker’s Compensation and Employer’s Liability: Workers' compensation and employers' liability insurance in compliance with applicable state statutes, with a minimum liability coverage of $100,000.

12.2. General Liability: Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. Property damage liability insurance shall be required in an amount of at least $100,000.

12.3. Automobile liability: Liability insurance shall be written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

13. PREWORK CONFERENCE. The COR shall conduct a Prework Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 13 below. As a minimum, the officer of the company that signed the contract and the on-site supervisor shall represent the contractor. The Contracting Officer Representative shall establish the location, date, and time of the Prework Conference after consultation with the contractor.

14. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer Representative prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished the Contracting Officer Representative. If the Contracting Officer Representative determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.

14.1. Names and phone numbers of on-site supervisor and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1. and 5.2.2.).

14.2. Safety Plan (subparagraph 10.1.).

14.3. Job Hazard Analysis (subparagraph 10.1.6.)

14.4. Exposure reports (subparagraph 10.5.).

14.5. Required certificates of insurance (paragraph 11.)

14.6. Work schedules as applicable (section 17.)

15. BILLING.

15.1. The contractor shall submit an original and two copies of invoices on completed work only.

15.2. Invoices shall be prepared in the format shown at Exhibit 7.

15.3. All exposure reports and requested documents shall be submitted before an invoice will be accepted.

15.4. Invoices and supporting documents shall be delivered or mailed to the Lake Manager, Route 4, Box 5500 Eufaula Lake Office, Stigler, OK 74462.

16. WORK SCHEDULES. The contractor is responsible for managing all work performed under this specification, including written work schedules as prescribed below. The COR’s authority in reviewing these schedules is limited to assuring compliance with this specification.

If the COR determines the schedules do not comply with this specification, the contractor shall revise his schedules and resubmit them.

17. MATERIALS AND SUPPLIES.

17.1. Contractor furnished. The contractor shall furnish all materials and supplies necessary to accomplish all work required by this specification within the specified time limits.

17.2. Government Furnished. The Government will furnish potable water for workers and equipment. The contractor shall be responsible for transporting water needed to work sites that lack potable water.

EXHIBIT 1

PERFORMANCE REQUIREMENTS

PERFORMANCE REQUIREMENTS

SERVICE REQUIREMENT PR NO. PERFORMANCE STANDARDS

APPENDIX A

Improved areas 1 Smooth cut. 1Height of cut grass does not exceed 1/2 inch from that specified. No uncut vegetation.

Edging 3 Edge of grass is a uniform vertical cut with no runners extending beyond vertical face.

APPENDIX B

Embankment area 5 Smooth cut. 1Height of cut grass does not exceed 1 inch from that specified. 2No uncut vegetation.

APPENDICES A & B

Trimming 6 Uniform cut with no scalping of grass. No damage to trees or shrubs.

Clean designated areas after mowing

7 No vegetation or debris left on paved surfaces.

1. Conformance with height requirement shall be determined by measuring the height of cut grass on smooth ground.

2. The Contracting Officer will relax this requirement to a degree when the height of grass prior to mowing is excessive. The Contracting Officer shall make the determination of excessive grass height unilaterally.

EXHIBIT 2

QUALITY ASSURANCE REPORT

The Quality Assurance Report (SWT Form 982) is provided at SECTION J as Attachment 1.

EXHIBIT 3

QUALITY CONTROL INSPECTION LOG

The Quality Control Inspection Log (SWT Form 990) is provided at SECTION J as Attachment 2.

EXHIBIT 4

EXAMPLE OF JOB HAZARD INSPECTION LOG

The Example of Job Hazard Analysis is provided at SECTION J as Attachment 3.

EXHIBIT 5

INVOICE FORMAT

BILLING FOR

MAINTENANCE CONTRACT

PROJECT: ________________________________ SHEET ___ OF ___

CONTRACTOR: _____________________________ DATE: ___________

ADDRESS: ________________________________ CONTRACT NO: W912BV-__-_-____

BILLING PERIOD: ________ THRU __________ INVOICE NO: __________

PAYMENT TERMS: ____________________________

(Payment Discount or N/A)

CDM OR

BID ITEM

NO. DEDUCTION AMOUNT TOTAL

PAYMENT REQUESTED: ______________

CONTRACTOR (Signature/Date)

APPENDIX A

CORPS DIRECTED MOWING – IMPROVED AREA’S

1. FACILITIES TO BE SERVICED. Public use areas and Lake Office complex. An inventory of mowing areas bid by the "mowing" is given in Table A. All mowing maps are at the end of Appendix B.

2. FREQUENCIES AND TIMES OF SERVICE.

2.1. Work shall be performed between 7:00 a.m. and 8:00 p.m., from date of contract until 26 May 2016.

2.2. Mowing of PUAs shall not be accomplished on Saturdays, Sundays, Federal holidays, or one workday before Federal holidays.

3. DESCRIPTION OF WORK. The contractor shall perform the following work:

3.1. Improved areas are highly developed areas, normally located in PUA’s. These area’s shall be mowed to a height of 1 ½ inches. In addition, mow the areas described below and around facilities shown on the drawings

3.2. Areas adjacent to all roads and parking areas shall be mowed to the top of the back slope of ditches. If ditches do not exist, mowing shall be accomplished for a distance of 15 feet from each edge of the road or parking area or to the tree line, whichever is closer. The limits of mowing at intersections shall be determined by the Contracting Officer to provide a safe viewing distance for vehicles approaching the intersections.

3.3. Areas around park and lake entrance signs. Park entrance signs are located beside roads shown on the attached maps. The area to be mowed around these park signs shall follow the mow line of the previous mowing. If there needs to be any changes, the Contracting Officer will determine the length of the new area to be mowed in front of these signs.

3.4. Areas around oxidation ponds shall be mowed from the edge of the water to a point 10 feet outside of fences. The oxidation pond shall be mowed every time the park is mowed.

3.5. Trimming shall be performed around all vertical objects protruding from the ground, including under guardrails, trees, reservation bollard signposts, and fence posts which exist within the limits of improved areas. This includes trimming along railroad ties delineating pullouts.

3.6. Edging shall be accomplished along all concrete walkways and curbs that are flush with the ground each time areas are mowed.

3.7. Cleanup. Prior to mowing, the contractor shall remove rocks and debris that are likely to damage equipment or be thrown by the mower. After mowing is accomplished, the contractor shall remove vegetation and debris from parking lots, paved walkways and pullouts, and table and picnic shelter slabs.

4. RESTRICTIONS ON WORKING. The contractor shall not start work unless the grass and ground are dry enough for smooth cutting and equipment will not cause rutting of the ground.

The contractor shall use good judgment in determining whether conditions are suitable for mowing operations. In cases where the contractor and the Contracting Officer disagree about the suitability of conditions for mowing operations, the Contracting Officer will determine whether work shall progress or stop. Areas excluded by these conditions will also be excluded in the inspections.

TABLE A

INVENTORY OF CORPS DIRECTED MOWING AREAS – IMPROVED AREAS

IMPROVED

AREAS PLAYGROUNDS TOILETS SHELTERS

LOCATION (AC) (NO) (NO) (NO)

Belle Starr South 54.41 2 5 2

Brooken Cove North 45.63 1 7 2

Lady Bird Landing & South Overlook 41.60 1 6 2

Elm Point 14.48 0 1 1

Gentry Creek 26.76 1 4 0

Highway 9 Landing (East/North/South) 41.8 1 5 1

Mill Creek Bay 17.33 0 1 1

Oak Ridge 7.4 0 2 0

Porum Landing 27.63 1 4 2

Project Office East Storage Yard 10.25 0 0 0

Damsite East & Fishing Areas 14.67 0 3 1

TOTAL 301.96 7 38 12

The following have been deleted:

SCOPE OF WORK

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The below Table of Contents has been added

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Eufaula Mowing Maps 15 26-MAY-2016

(End of Summary of Changes)