W912BV-16-R-0104_0001.pdf

PDF 171 KB Posted

Attached to
Park Cleaning SVS Federal contract opportunity
Solicitation number
W912BV-16-R-0104
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Park Cleaning SVS, newest first.
File Type Posted
W912BV-16-R-0104_0002.pdf PDF
W912BV-16-R-0104.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to:

1. This amendment is to add a Bid Schedule.

2. POC: Rudy Morales (918) 669-7275

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Mar-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-16-R-0104

X 9B. DATED (SEE ITEM 11)

25-Feb-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Mar-2016

CODE

CONTRACTING DIV

USACE, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BV-16-R-0104

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

BID SCHEDULE

SEE SECTION J FOR BID SCHEDULE

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Scope of Work 23-FEB-2016 Attachment 2 PRICING SCHEDULE 24-FEB-2016 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Scope of Work 23-FEB-2016 Attachment 2 PRICING SCHEDULE 24-FEB-2016 Attachment 3 BID Schedule 07-MAR-2016

(End of Summary of Changes)

BASE YEAR

BID SCHEDULE

Contractor: CONTRACT NO.:

CLIN SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

SCHEDULE I - TENKILLER LAKE

APPENDIX A - CLEANING

* SUMMER PERIOD - 01 April - 31 October 2016

0001 Carter's Landing (A) 7 MO

0002 Carter's Landing (B) 7 MO

0003 Sisemore Landing (A) 7 MO

0004 Sisemore Landing (B) 7 MO

0005 Trout Stream 7 MO

0006 Chicken Creek (A) 7 MO

0007 Chicken Creek (B) 7 MO

0008 Chicken Creek South (C) 7 MO

0009 Cookson Bend (A) 7 MO

0010 Cookson Bend (B) 7 MO

0011 Cookson Bend (C) 7 MO

0012 Elk Creek Landing 7 MO

0013 Overlook 7 MO

0014 Pettit Bay I (A) 7 MO

0015 Pettit Bay II (B) 7 MO

0016 Snake Creek (A) 7 MO

0017 Snake Creek (B) 7 MO

0018 Strayhorn Landing (A) 7 MO

0019 Strayhorn Landing (B) 7 MO

0020 Second Cleanings

Item 1. Chicken Creek (A) 26 Each

Item 2. Chicken Creek (B) 26 Each

Item 3. Chicken Creek South (C) 26 Each

Item 4. Cookson Bend (A) 26 Each

Item 5. Cookson Bend (B) 26 Each

Item 6. Cookson Bend (C) 26 Each

Item 7. Elk Creek Landing 26 Each

Item 8. Pettit Bay I (A) 26 Each

Item 9. Pettit Bay II (B) 26 Each

Item 10. Snake Creek (A) 26 Each

Item 11. Snake Creek (B) 26 Each

Item 12. Strayhorn Landing (A) 26 Each

Item 13. Strayhorn Landing (B) 26 Each

Total Tenkiller

PARK CLEANING, TENKILLER

& WEBBERS FALLS LAKES,OK

SCHEDULE II - WEBBERS FALLS LAKE

APPENDIX A - CLEANING

* SUMMER PERIOD - 01 April - 31 October 2016

0021 Brewer's Bend A 7 MO

0022 Brewer's Bend B 7 MO

0023 Spaniard Creek (A) 7 MO

0024 Spaniard Creek (B) 7 MO

0025 Bluff View, Powerhouse Access Road & P.O. Roadway 7 MO

0026 Highway 10 Landing 7 MO

0027 Lock View Landing & Lock Access Road 7 MO

0028 Overlook 7 MO

0029 Second Cleanings

Item 1. Brewer's Bend A 26 Each

Item 2. Brewer's Bend B 26 Each

Item 3. Spaniard Creek (A) 26 Each

Item 4. Spaniard Creek (B) 26 Each

WINTER PERIOD-01 November-30 March

0030 Winter Schedule Cleanings- Tennkiller Lake 5 MO

0031 Winter Schedule Cleanings- Webbers Falls Lake 5 MO

TOTAL SCHEDULEs I & II - Base Year $

OPTION YEAR 1

BID SCHEDULE 01 APR 2017 - 31 MAR 2018

Contractor: CONTRACT NO.:

CLIN SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

SCHEDULE I - TENKILLER LAKE

APPENDIX A - CLEANING

* SUMMER PERIOD - 01 April - 31 October

1001 Carter's Landing (A) 7 MO 1002 Carter's Landing (B) 7 MO 1003 Sisemore Landing (A) 7 MO 1004 Sisemore Landing (B) 7 MO 1005 Trout Stream 7 MO 1006 Chicken Creek (A) 7 MO 1007 Chicken Creek (B) 7 MO 1008 Chicken Creek South (C) 7 MO 1009 Cookson Bend (A) 7 MO 1010 Cookson Bend (B) 7 MO 1011 Cookson Bend (C) 7 MO 1012 Elk Creek Landing 7 MO 1013 Overlook 7 MO 1014 Pettit Bay I (A) 7 MO 1015 Pettit Bay II (B) 7 MO 1016 Snake Creek (A) 7 MO 1017 Snake Creek (B) 7 MO 1018 Strayhorn Landing (A) 7 MO 1019 Strayhorn Landing (B) 7 MO 1020 Second Cleanings

Item 1. Chicken Creek (A) 26 Each Item 2. Chicken Creek (B) 26 Each Item 3. Chicken Creek South (C) 26 Each Item 4. Cookson Bend (A) 26 Each Item 5. Cookson Bend (B) 26 Each Item 6. Cookson Bend (C) 26 Each Item 7. Elk Creek Landing 26 Each Item 8. Pettit Bay I (A) 26 Each Item 9. Pettit Bay II (B) 26 Each Item 10. Snake Creek (A) 26 Each Item 11. Snake Creek (B) 26 Each

Item 12. Strayhorn Landing (A) 26 Each

Item 13. Strayhorn Landing (B) 26 Each Total Tenkiller

SCHEDULE II - WEBBERS FALLS LAKE

APPENDIX A - CLEANING

* SUMMER PERIOD - 01 April - 31 October

1021 Brewer's Bend A 7 MO 1022 Brewer's Bend B 7 MO 1023 Spaniard Creek (A) 7 MO 1024 Spaniard Creek (B) 7 MO 1025 Bluff View, Powerhouse Access Road & P.O. Roadway 7 MO 1026 Highway 10 Landing 7 MO 1027 Lock View Landing & Lock Access Road 7 MO 1028 Overlook 7 MO 1029 Second Cleanings

Item 1. Brewer's Bend A 26 Each Item 2. Brewer's Bend B 26 Each

Item 3. Spaniard Creek (A) 26 Each

Item 4. Spaniard Creek (B) 26 Each

WINTER PERIOD-01 November-30 March

1030 Winter Schedule Cleanings- Tenkiller Lake 5 MO

1031 Winter Schedule Cleanings- Webbers Falls Lake 5 MO

TOTAL SCHEDULEs I & II - Option Year 1 $

OPTION YEAR 2

BID SCHEDULE 01 APR 2018 - 31 MAR 2019

Contractor: CONTRACT NO.:

CLIN SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

SCHEDULE I - TENKILLER LAKE

APPENDIX A - CLEANING

* SUMMER PERIOD - 01 April - 31 October

2001 Carter's Landing (A) 7 MO 2002 Carter's Landing (B) 7 MO 2003 Sisemore Landing (A) 7 MO 2004 Sisemore Landing (B) 7 MO 2005 Trout Stream 7 MO 2006 Chicken Creek (A) 7 MO 2007 Chicken Creek (B) 7 MO 2008 Chicken Creek South (C) 7 MO 2009 Cookson Bend (A) 7 MO 2010 Cookson Bend (B) 7 MO 2011 Cookson Bend (C) 7 MO 2012 Elk Creek Landing 7 MO 2013 Overlook 7 MO 2014 Pettit Bay I (A) 7 MO 2015 Pettit Bay II (B) 7 MO 2016 Snake Creek (A) 7 MO 2017 Snake Creek (B) 7 MO 2018 Strayhorn Landing (A) 7 MO 2019 Strayhorn Landing (B) 7 MO 2020 Second Cleanings

Item 1. Chicken Creek (A) 26 Each Item 2. Chicken Creek (B) 26 Each Item 3. Chicken Creek South (C) 26 Each Item 4. Cookson Bend (A) 26 Each Item 5. Cookson Bend (B) 26 Each Item 6. Cookson Bend (C) 26 Each Item 7. Elk Creek Landing 26 Each Item 8. Pettit Bay I (A) 26 Each

Item 9. Pettit Bay II (B) 26 Each

Item 10. Snake Creek (A) 26 Each Item 11. Snake Creek (B) 26 Each Item 12. Strayhorn Landing (A) 26 Each Item 13. Strayhorn Landing (B) 26 Each

Total Tenkiller

SCHEDULE II - WEBBERS FALLS LAKE

APPENDIX A - CLEANING

* SUMMER PERIOD - 01 April - 31 October

2021 Brewer's Bend A 7 MO 2022 Brewer's Bend B 7 MO 2023 Spaniard Creek (A) 7 MO 2024 Spaniard Creek (B) 7 MO 2025 Bluff View, Powerhouse Access Road & P.O. Roadway 7 MO 2026 Highway 10 Landing 7 MO 2027 Lock View Landing & Lock Access Road 7 MO 2028 Overlook 7 MO

2029 Second Cleanings

Item 1. Brewer's Bend A 26 Each Item 2. Brewer's Bend B 26 Each Item 3. Spaniard Creek (A) 26 Each Item 4. Spaniard Creek (B) 26 Each WINTER PERIOD-01 November-30 March

2030 Winter Schedule Cleanings- Tennkiller Lake 5 MO

2031 Winter Schedule Cleanings- Webbers Falls Lake 5 MO

TOTAL SCHEDULEs I & II - Option Year 2 $

OPTION YEAR 3

BID SCHEDULE 01 APR 2019 - 31 MAR 2020

Contractor: CONTRACT NO.:

CLIN SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

SCHEDULE I - TENKILLER LAKE

APPENDIX A - CLEANING

* SUMMER PERIOD - 01 April - 31 October

3001 Carter's Landing (A) 7 MO 3002 Carter's Landing (B) 7 MO 3003 Sisemore Landing (A) 7 MO 3004 Sisemore Landing (B) 7 MO 3005 Trout Stream 7 MO 3006 Chicken Creek (A) 7 MO 3007 Chicken Creek (B) 7 MO 3008 Chicken Creek South (C) 7 MO 3009 Cookson Bend (A) 7 MO 3010 Cookson Bend (B) 7 MO 3011 Cookson Bend (C) 7 MO 3012 Elk Creek Landing 7 MO 3013 Overlook 7 MO

3014 Pettit Bay I (A) 7 MO 3015 Pettit Bay II (B) 7 MO 3016 Snake Creek (A) 7 MO 3017 Snake Creek (B) 7 MO 3018 Strayhorn Landing (A) 7 MO 3019 Strayhorn Landing (B) 7 MO 3020 Second Cleanings

Item 1. Chicken Creek (A) 26 Each Item 2. Chicken Creek (B) 26 Each Item 3. Chicken Creek South (C) 26 Each Item 4. Cookson Bend (A) 26 Each Item 5. Cookson Bend (B) 26 Each Item 6. Cookson Bend (C) 26 Each Item 7. Elk Creek Landing 26 Each Item 8. Pettit Bay I (A) 26 Each Item 9. Pettit Bay II (B) 26 Each Item 10. Snake Creek (A) 26 Each Item 11. Snake Creek (B) 26 Each Item 12. Strayhorn Landing (A) 26 Each Item 13. Strayhorn Landing (B) 26 Each

Total Tenkiller

SCHEDULE II - WEBBERS FALLS LAKE

APPENDIX A - CLEANING

* SUMMER PERIOD - 01 April - 31 October

3021 Brewer's Bend A 7 MO 3022 Brewer's Bend B 7 MO 3023 Spaniard Creek (A) 7 MO 3024 Spaniard Creek (B) 7 MO 3025 Bluff View, Powerhouse Access Road & P.O. Roadway 7 MO 3026 Highway 10 Landing 7 MO 3027 Lock View Landing & Lock Access Road 7 MO 3028 Overlook 7 MO 3029 Second Cleanings

Item 1. Brewer's Bend A 26 Each Item 2. Brewer's Bend B 26 Each

Item 3. Spaniard Creek (A) 26 Each Item 4. Spaniard Creek (B) 26 Each WINTER PERIOD-01 November-30 March

3030 Winter Schedule Cleanings- Tenkiller Lake 5 MO

3031 Winter Schedule Cleanings- Webbers Fall Lake 5 MO

TOTAL SCHEDULEs I & II - Option Year 3 $

OPTION YEAR 4

BID SCHEDULE 01 APR 2020 - 31 MAR 2021

Contractor: CONTRACT NO.:

CLIN SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

SCHEDULE I - TENKILLER LAKE

APPENDIX A - CLEANING

* SUMMER PERIOD - 01 April - 31 October

4001 Carter's Landing (A) 7 MO 4002 Carter's Landing (B) 7 MO 4003 Sisemore Landing (A) 7 MO 4004 Sisemore Landing (B) 7 MO 4005 Trout Stream 7 MO 4006 Chicken Creek (A) 7 MO 4007 Chicken Creek (B) 7 MO 4008 Chicken Creek South (C) 7 MO 4009 Cookson Bend (A) 7 MO 4010 Cookson Bend (B) 7 MO 4011 Cookson Bend (C) 7 MO 4012 Elk Creek Landing 7 MO 4013 Overlook 7 MO 4014 Pettit Bay I (A) 7 MO 4015 Pettit Bay II (B) 7 MO 4016 Snake Creek (A) 7 MO 4017 Snake Creek (B) 7 MO 4018 Strayhorn Landing (A) 7 MO 4019 Strayhorn Landing (B) 7 MO 4020 Second Cleanings

Item 1. Chicken Creek (A) 26 Each Item 2. Chicken Creek (B) 26 Each Item 3. Chicken Creek South (C) 26 Each Item 4. Cookson Bend (A) 26 Each Item 5. Cookson Bend (B) 26 Each Item 6. Cookson Bend (C) 26 Each Item 7. Elk Creek Landing 26 Each Item 8. Pettit Bay I (A) 26 Each Item 9. Pettit Bay II (B) 26 Each Item 10. Snake Creek (A) 26 Each Item 11. Snake Creek (B) 26 Each Item 12. Strayhorn Landing (A) 26 Each Item 13. Strayhorn Landing (B) 26 Each

Total Tenkiller

SCHEDULE II - WEBBERS FALLS LAKE

APPENDIX A - CLEANING

* SUMMER PERIOD - 01 April - 31 October

4021 Brewer's Bend A 7 MO 4022 Brewer's Bend B 7 MO 4023 Spaniard Creek (A) 7 MO 4024 Spaniard Creek (B) 7 MO 4025 Bluff View, Powerhouse Access Road & P.O. Roadway 7 MO 4026 Highway 10 Landing 7 MO 4027 Lock View Landing & Lock Access Road 7 MO 4028 Overlook 7 MO

4029 Second Cleanings Item 1. Brewer's Bend A 26 Each Item 2. Brewer's Bend B 26 Each Item 3. Spaniard Creek (A) 26 Each Item 4. Spaniard Creek (B) 26 Each

WINTER PERIOD-01 November-30 March 4030 Winter Schedule Cleanings- Tennkiller Lake 5 MO

4031 Winter Schedule Cleanings- Webbers Falls Lake 5 MO

TOTAL SCHEDULEs I & II - Option Year 4 $

TOTAL BID AMOUNTS OF BASE AND 4 OPTIONS YEARS

TOTAL

BASE YEAR TOTAL $____________

OPTION YEAR 1 TOTAL $____________

OPTION YEAR 2 TOTAL $____________

OPTION YEAR 3 TOTAL $____________

OPTION YEAR 4 TOTAL $____________

TOTAL AMOUNTS OF BASE AND 4 OPTIONS $____________

Bid Schedule.pdf
13-P-0085

File details come from the government source that posted it. Updated .