816-B598-03 CRANE LOADING RAMP CONCEPTS.PDF
PDF 131 KB Posted
- Attached to
- One (1) Steel Deck Barge Federal contract opportunity
- Solicitation number
- W912BU-16-B-0010
About this file
Drawings
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DETAIL 11-A
STBD SIDEPORT SIDE
DUNNAGE LIFTING PAD EYE
CRANE CURBCL
DATE
APRD FOR THE DIRECTOR - CHR DES BR
RECOMMENDED - SECT CH
SUBMITTED - PROJ ENG
CHK'D BYDES. BYDR. BY
MARINE DESIGN CENTER
PHILADELPHIA, PA
CRANE RAMP - ELEVATION
CURBS, LIFT PADEYES AND DUNNAGE
SHOWN ON DRAWING 623-D317-01
7'-8"
10'-3"
7'-8"
10'-3"
5'-0"
5'-0"
RAMP WIDTH
21'-5"
7"
3" CURB START LINE
14'-1"
3'-8" LINKBELT-238
3'-8" LINKBELT-238
11-A
11-A
CL BARGE
CRAWLER CRANE RAMPS - PLAN VIEW
2 RAMPS FOR EACH CRANE,REQ'D
CAN BE USED FOR LINKBELT-238 HSL OR MANITOWOC MLC-165
PORT SIDE LIMIT
STBD SIDE LIMIT
2 PINS TO REMOVE
3 PINS TO REMOVE
OFF CL
OFF CL
CL BARGE
4'-1"
3'-5"
1'-8"
3'-5"
1'-8"
9'-5"
RAMP WIDTH
10"
7'-9"
1'-10" LINKBELT HTC-8640 SL
1'-10" LINKBELT HTC-8640 SL
CL BARGE
PORT SIDE LIMIT
STBD SIDE LIMIT
5 PINS TO REMOVE
MOBILE CRANE RAMP - PLAN VIEW
USED FOR LINKBELT HTC-8640 SL ONLY
OFF CL
OFF CL
OFF CL
OFF CL
SECTION 11-A
SCALE 1 : 32
OFF CL
OFF CL
REVISIONS
REV DESCRIPTION DATE APPROVED
REFERENCES
7 BOW RECESS PADEYE DETAILS 816-B598-02
6 LONGITUDINAL STRUCTURE 816-B311-01
5 TRANSVERSE STRUCTURE 816-B309-01
4 SIDE PLATING 816-B307-02
3 DECK & BOTTOM STRUCTURE 816-B307-01
2 WELDING SCHEDULE 816-B305-01
1 GENERAL ARRANGEMENTS 816-B215-01
NO. TITLE DWG. NO.
F
E
F
E
12345678
8 7 6 5 4 3 2
D
C
B
A A
B
C
D
816-B598-03 SCALE: AS SHOWN SHEET: 1 of 2
SIZE PROJECT NO. DWG. NO. REV
D 2920 -
DEPARTMENT OF THE ARMY
MARINE DESIGN CENTER
CORPS OF ENGINEERS
CESAJ SPUD BARGE
120' x 45' x 10'
LOADING RAMP DETAILS
ONB MDC RNS
DAN TO
/s/ TIMOTHY KEYSER
/s/ GREG LEE
08-APRIL-2016
1'-0" DUNNAGE 6" RAMP DUNNAGE
NOT TO EXCEED 2'-3 5
16 "
2'-3"
16°
3" PIPE
1" RAMP DECK
2'-6 1 4 "
30'-0" 7 1
4 " GAP
1" MIN. CLEARANCE
CRANE RAMP ELEVATION - LEVEL
5° 1'-0" DUNNAGE
6" RAMP DUNNAGE
1" MIN. CLEARANCE
CRANE RAMP ELEVATION - CRANE TRAVEL DOWNHILL
15°
1'-0" DUNNAGE
6" RAMP DUNNAGE
1'-7 11 16 "
1'-1 1
4 " GAP
3 5
8 " GAP
1" MIN. CLEARANCE
CRANE RAMP ELEVATION - CRANE TRAVEL UPHILL
F
E
F
E
1718192021222324
24 23 22 21 20 19 18
D
C
B
A A
B
C
D
816-B598-03 SCALE: AS SHOWN SHEET: 2 of 2
SIZE PROJECT NO. DWG. NO. REV
D 2920 -
| Sheet1X |
| Drawing View20 |
| Drawing View22 |
| Drawing View23 |
| Section View 11-A - 11-A |
| Sheet2X |
| Drawing View12 |
| Drawing View13 |
| Drawing View14 |