16B0010-0002_Amendment.pdf
PDF 22 KB Posted
- Attached to
- One (1) Steel Deck Barge Federal contract opportunity
- Solicitation number
- W912BU-16-B-0010
About this file
Amendment 0002 to the solicitation. Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by signing block 15 below by acknowledging receipt of this amendment on each copy of the offer submitted or by separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR QUOTE. All other terms and conditions remain the same.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions presented to the Government.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-16-B-0010
X 9B. DATED (SEE ITEM 11)
12-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Apr-2016
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: JUSTIN CHUNG
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU-16-B-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The Government has received questions concerning the solicitation and hereby provides answers to these questions.
Questions may be of general interest of all Offerors/Government. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s).
Questions and answers are issued to the Offerors for information purposes only.
Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by signing block 15 below, by acknowledging receipt of this amendment on each copy of the offer submitted or by separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE TO
ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION
OF YOUR QUOTE. All other terms and conditions remain the same.
Answers to Questions Question 1: As discussed, I would like to know if a barge with dimensions 402’09” x 100’ x depth 21’06’, with load line draft of 10’07” might be considered. We have barges in the Jacksonville, FL area that we could make available for your engineers to check out. Please see the attached General Arrangement plans.
Answer 1: The contract requires a new barge specifically designed per our spec. The barges being proposed are too large to support the mission for Jacksonville District and will not physically fit at the service base. In addition, the Jacksonville District does not have a towboat with enough horsepower to push a 400' barge.
Question 2: Engineering "as-built" drawings - will the Corps furnish the project CADD drawings for use.
This will be needed for the as-builts.
Answer 2: Yes, CADD drawings will be provided to the successful bidder.
Question 3: The drawings posted with the solicitation do not form the complete list as delineated on dwg 816- B000-02-. Will the complete set of drawings be provided to the Contractor on award? Further to question above, it would be very helpful to the bidders for the Corps to post dwg. 816-B115-01, Weight Estimate with the solicitation. Specifically, we are interested in the steel weight. Can this be accomplished?
Answer 3: All Contract Drawings as listed in Section J01 have been provided. The drawings listed on the 816- B000-02 Drawing Index that were not provided are drawings/calculations that are the responsibility of the Government not the Contractor. A detailed weight estimate has not been done, only a model with overall estimate for steel weight which has not been verified and is not recommended for use with bidding.
Question 4: Please advise what size materials are to be used to properly price the cargo loading ramps. The drawings have little information.
Answer 4: See Contract Section C598-03. The 816-B598-03 is a concept drawing. The ramps have not been designed. The Contractor is responsible for designing and constructing the ramps in accordance with the contract requirements.
W912BU-16-B-0010
(End of Summary of Changes)
File details come from the government source that posted it. Updated .