AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this amendment is to:
- Update the PWS to include an increase in the PoP and remove the w iper seal requirement.
- Remove CLIN 0002, Wiper Seal Replacment Facility.
- Extend the proposal due date from 14 Mar 2023 to 22 Mar 2022, 2pm CST.
All other terms and conditions remain unchanged
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Mar-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F23Q0038
X 9B. DATED (SEE ITEM 11)
23-Feb-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Mar-2023
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F23Q0038
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 14-Mar-2023 02:00 PM to 22-Mar-2023 02:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The CLIN description has changed from Wiper Seal Replacment Facility -1340 to AMENDMENT 0001 has deleted this CLIN.
The CLIN extended description has changed from:
(Tank 3) All work to replace wiper seal and pan penetration seals accordance with the PWS.
To:
AMENDMENT 0001 has deleted this CLIN
The following have been modified:
PERFORMANCE WORK STATEMEENT
SP-POL-CMP-INSPECT-PWS-LRG
Little Rock AFB, AR
Part 1 General Information
1. GENERAL:
1.1. Scope: This is a non-personnel services contract to perform inspections on
Department of Defense fuel tanks. This service entails disposal of remaining fuel, tank cleaning, replacing wiper seals, and providing an above-ground storage tank (AST) Inspection on tank(s) listed in Attachment B. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.2. Background: See attachment J for previous inspection report(s).
1.3. Objectives: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the fuel disposal of remaining fuel, clean the tank, wiper seal replacement, and perform an AST Internal inspection on the tank(s) as applicable at the location and tanks specified in attachment B as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.4. Period of Performance: The period of performance shall be for 365 calendar days starting at the date of contract award. Earlier completion of required services is encouraged and acceptable.
1.5. General Information
1.5.1. Quality Assurance: The government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5.2. Recognized Holidays:
New Year’s Day Martin Luther King Birthday President’s Day Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Christmas
1.5.3. Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730-1630 Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Other than normal duty hours must be coordinated with the KO or his/her designated representative. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall maintain stability and continuity of the workforce.
1.5.4. Place of Performance: The work to be performed under this contract will be performed at the installation and facilities identified in Attachment B.
1.5.5. Type of Contract: The government will award a Firm Fixed Price Contract
1.5.6. Security Requirements: Reference Attachment A – General Installation Security Requirements
1.5.7. Site Access: Contractor shall coordinate with Installation personnel for access to the site. Points of contact for the installation will be provided upon award.
1.5.8. Meetings/Kick-Off Meetings: The Contractor shall coordinate with USACE
PM and conduct a kickoff meeting prior to field activities. This can be accomplished either prior to mobilization and inspection activities or onsite prior to commencement of inspection activities. The Work Plan shall be discussed, and further coordination and scheduling accomplished at this meeting. These meetings shall be at no additional cost to the government.
1.5.8.1. The Contractor shall call the installation 72 hours prior to mobilization to verify tank fuel quantities are at the quoted/verified amount as stated in Attachment B as the contractor is not authorized to remove/transfer or dispose of more fuel than what is stated in the contract per Attachment B.
1.5.8.2. The Contractor shall be responsible to establish a report of findings and coordinate a teleconference after the inspection is complete and at least 24 hours prior to placing tank back into service. This teleconference will review deficiencies found during the inspection with the Government making the final decision on whether or not to place this tank back into service. The Contractor can use Attachment E - API INTERNAL INSPECTION TELECON BRIEFING TEMPLATE or their own format however this document shall include the next recommended inspection intervals for both External and Internal Inspection, and State regulated inspection intervals, if applicable. Also, when listing the findings, they shall be categorized as either “Mandatory”, “Recommended”. Coordinate with POC’s from Service Control Point (SCP), DLA, and USACE. Individuals to be identified after project award.
1.5.9. Contracting Officer Representative (COR): The (COR) will be identified by separate letter.
1.5.9.1. The COR is authorized to perform the following functions:
assure that the Contractor performs the technical requirements of the contract perform inspections necessary in connection with contract performance maintain written and oral communications with the Contractor concerning technical aspects of the contract issue written interpretations of technical requirements, including Government drawings, designs, specification monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies assist in coordinating availability of government furnished property
A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regards to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.5.10. Key Personnel: Certified API 653 Inspector and Project Manager.
1.5.11. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI.
The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as they deem necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.5.12. Suitability For Service: Evaluate inspection data to determine suitability for continued use. Identify conditions which pose a risk to integrity. Determine a metal loss threshold for mandatory repairs. In the determination of mandatory repairs:
Use a "first, do no harm" approach to classifying tank repairs.
Use Desired Service Interval as the time to next inspection unless notified otherwise by the Contracting Officer.
Use minimum remaining thickness (MRT) no less than 100 mils at the next inspection.
Do not classify as mandatory repair of conditions which are noncompliant with current standards but are un-related to structural or hydraulic integrity (e.g., gouge, improper weld spacing, weld profile).
Apply repair determination to individual indications. Do not average across an entire plate or course.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. MANDATORY REPAIR. Action necessary to preserve or restore the structural and hydraulic integrity of the tank or piping, or to mitigate a safety hazard.
Includes any condition which has or may breach the hydraulic or structural integrity of the tank prior to the next integrity inspection.
2.1.8. PHYSICAL SECURITY. Actions that prevent the loss or damage of
Government property.
2.1.9. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.10. QUALITY ASSURANCE SURVEILANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.11. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.12. RECOMMENDED REPAIR. Action intended to extend the service life of the tank or piping and to address conditions that currently, or within the next service interval, will not have an adverse effect on tank operability or integrity.
Applicability is limited to exclude soft or elastomeric parts for any pressure containing system. Categorize in either Long Term or Short Term repairs.
2.1.13. SUBCONTRACTOR. One that enters into a contract with a prime contractor.
The Government does not have privity of contract with the subcontractor.
2.1.14. TANK INSPECTION. A multi-disciplinary engineering assessment of al petroleum, oil, and lubricant storage tank systems within or connected to the tank hydraulic boundary. Systems include nozzles, appurtenances, and conveyance systems such as piping, stilling well, valve, flow control, cathodic protection, overfill protection, spill prevention, containment, leak detection, fire suppression, gauging, ventilation, lighting, and other electrical systems.
Inspection includes a review of cathodic protection reports and relevant as-built records when available. Unless stated otherwise, the limits are the boundary of secondary containment.
2.1.15. TANK INSPECTOR. An individual certified as a fuel storage tank inspector.
The recognized certification is API Std 653.
2.1.16. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.17. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement ANG Army National Guard AR Army Regulation AST Aboveground Storage Tank API American Petroleum Institute ATG Automatic Tank Gauging AWWA American Water Works Association CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DAF Department of the Air Force DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense EPA Environmental Protection Agency FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 IAP International Airport KO Contracting Officer MOGAS Motor Gasoline NFPA National Fire Protection Association OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RTO Returned to Operator STI Steel Tank Institute SCP Service Control Point TE Technical Exhibit UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specification
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND
SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: No Government furnished items or services are required.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Equipment: The Contractor shall provide all tools and inspection equipment needed to perform the inspection and other services to be performed under the PWS.
4.2.1. Precision Equipment: Contractor is responsible to ensure all equipment to be used is certified and calibrated to the parameters and tolerances of the required equipment.
4.2.2. Gaskets: Composition ring, one piece factory cut, compliant with ASME
B16.21, Buna-N. Gaskets must be composed of either graphite or synthetic fibers in a nitrile binder and must be resistant to the effects of aviation hydrocarbon fuels and manufactured of fire-resistant materials. Use full-faced gaskets for flat-face flanged joints. Buna-N material must conform to SAE
AMS3275.
4.2.3. Flange Bolts, Nuts, and Washers: Bolts for manway covers must conform to
ASME B18.2.1. Bolts must be of sufficient length to obtain full bearing on the nuts and must project no more than three full threads beyond the nuts with the bolts tightened to the required torque. Bolts must be regular hexagonal bolts conforming to ASME B18.2.1 with material conforming to ASTM A193/A193M, Class 2, Grade B8. Bolts must be threaded in accordance with ASME B1.1, Class 2A fit, Coarse Thread Series, for sizes one inch and smaller and Eight-Pitch Thread Series for sizes larger than one inch. Use stainless steel washers dimensioned in accordance with ASTM F436 flat circular and fabricated from the same grade of stainless steel as the bolt.
4.3. Project Inspection Management Plan (PMP): As part of the initial PMP, the
Contractor shall prepare and include a brief (< 10 pages) Work Plan, as an attachment, which will include proposed schedule, inspection activities, personnel performing inspection, required training certificates, and additional data or support requests.
4.4. Health and Safety Plan (HSP) and Accident Prevention Plan (APP): The
Contractor will prepare a Health and Safety Plan (HSP) to comply with 29 Code of Federal Regulations (CFR) 1910 and 1926 as well as applicable Military Service (Army, Air Force, or Navy), OSHA, state, host nation, and local and installation health and safety regulations regarding the proposed work effort. Qualifications for individuals who will be on-site for safety shall be submitted in the HSP.
4.4.1. The Accident Prevention Plan (APP) is required by FAR clause 52.236-13.
The APP describes the methods by which the contractor or USACE personnel will meet the safety and health requirements listed in EM 385-1-1. Entry into Confined Spaces shall comply with the requirements of 29 CFR 1910.146.
Provide additional monitoring for toxic (petroleum) vapors in addition to normal air monitoring requirements.
4.4.2. Abbreviated Accident Prevention Plans may be developed and submitted per
Form A-01 Abbreviated Accident Prevention Plan Checklist page A-13 of the EM 385-1-1. This may be submitted in order to develop a plan more specific to the work performed under this PWS but shall still comply as indicated above.
PART 5
SPECIFIC TASKS
5. Specific Tasks: Per each tank as identified in attachment B
5.1. Basic Services.
5.1.1. Perform a Tel-con kick-off meeting either prior to mobilization or the morning of the commencement of work on-site.
5.1.2. Remove and dispose of remaining fuel quantities as stated in Attachment B.
The contractor will be responsible to coordinate with environmental and safety authorities having jurisdiction to obtain and execute required permits, manifests, etc. Tank cleaning shall be done in accordance with UFGS 33 01 50.55.
5.1.3. The tank Inspection shall be in conformance with applicable industry standards API 653, API RP 575, NFPA 30, NFPA 326, UFGS 33 01 50.65, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local and service requirements. Scan 100 percent of the tank bottom, as interior appurtenances allow, for indications such as metal loss, pits, cracks, gouges, and general corrosion. Distinguish between product and backside indications. Measure metal thickness with an ultrasonic method. Procedures must be compliant with ASME BPVC SEC V.
Record measurements, exclusive of coating, for all tank bottom plates.
Provide UT thickness measurement on no less than five locations per bottom plate and at indications from the screening technologies determined to be relevant. Mark relevant indications on tank surfaces in a neat and professional manner adjacent to the indication. Collect data to be used in the assessment of corrosion growth, structural integrity, brittle fracture, and hydraulic integrity. Complete the API Std 653 checklist and provide them with the DRAFT and FINAL reports. Utilize UFC 3-460-01 Table 8-1 and indicate appurtenances that are not present. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.
5.1.4. The contractor shall visually inspect containment for ability to contain the entire contents of the tank in the event of catastrophic failure including required freeboard, assessing for cracks, settlement, and deterioration.
Record dimensions of cracks and provide photographic evidence of each deficiency. Visually assess the liner integrity and impermeability where applicable. Containment drain system shall be tested as follows.
5.1.5. Drain Line and Release Valve. The Contractor shall perform a hydrostatic test to ensure the drainpipe and release valve do not leak. Test in accordance with applicable requirements of AWWA C600 for hydrostatic testing. Ensure the release valve is closed and pressurize the end of the pipe within the containment basin sump. Test for leakage by filling the pipe with water and pressurizing to 10 psi using a suitable pump connected to the pipeline. The test pressure shall not vary by more than ±1 psi for the duration of the test. Hold this pressure for not less than 2 hours. If the system does not hold pressure, check the outfall point to see if water is bypassing the valve. Test pressure shall be maintained during the test by adding makeup water through the pressure test pump into the pipeline. Accurately note the amount of makeup water required to maintain pressure during the test.
5.1.6. Containment Drain Inlet. The Contractor shall perform a hydrostatic test to ensure the integrity of the inlet sump. Test for leakage by filling the inlet with water to a level at least 1-2 inches above the top of the inlet structure. The inlet shall hold this water for not less than 2 hours with no measurable change in the water level.
5.1.7. Coverage of the UT scan shall include 5 points per shell plate on the first shell course. Spot UT scans shall be made once every foot along the circumference of the tank shell within the critical zone and along the tank chime as accessible. 5 points per shell plate shall also be taken along the spiral staircase for each shell course as accessible. Provide UT scans of tank shell nozzles on the first shell course and their respective reinforcement plates as applicable. Include all findings in the inspection report.
5.1.8. Upon completion of the internal inspection the contractor shall provide a legible tank stencil or decal, consisting of black letters at least 1” in height, stating the date cleaned and inspected, the contractor’s name and the name of the contractor’s personnel supervising the work. Remove any existing stencils displaying previous inspection information. New information shall be provided in the following format:
Date Cleaned and Inspected: Day-Month-Year ABC Contracting
Supervisor: John Doe
5.1.9. Provide Tel-con out briefing prior to closing up the tank.
5.1.10. When the tank is ready to be closed and RTO, the Contractor is responsible to provide new stainless-steel bolts and manway gasket and ensure there are no leaks at the manway by filling the tank to at least the first shell course.
5.1.11. Provide photographic documentation of the following: PLC make and model, Input/Output Alarm Modules including directories, Level Alarm Panel, Annunciator Panel, and any As-Builts that are in the alarm panel. Coordinate with the installation as needed to obtain this information.
5.1.12. Provide DRAFT and FINAL inspection reports per the attached templates.
The report(s) must include a record of NDE findings with drawings depicting plate layout and thickness measurement locations. Incorporate engineering analysis, suitability for service analysis, corrosion rate determinations, and remaining service life calculations. Provide separate report for each tank inspected. Specify the due date for the next inspection. Include the API Std 653 inspector of record certificate number and signature.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
Steel Tank Institute (STI) SP001 Standard for the Inspection of Aboveground Storage Tanks
American Petroleum Institute (API) 653 Standard for the Tank Inspection, Repair, Alteration, and Reconstruction 650 Welded Tanks for Oil Storage RP 575 Inspection Practices for Atmospheric and Low-pressure Storage Tanks Std 2015 Requirements for Safe Entry and Cleaning of Petroleum Storage Tanks
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 30 Flammable and Combustible Liquids Code NFPA 70 National Electrical Code (NEC) NFPA 326 Standard for Safeguarding of Tanks and Containers for Entry, Cleaning, or Repairs
UNIFIED FACILITIES CRITERIA (UFC)
UFC 3-460-01 Design: Petroleum Fuel Facilities UFC 3-460-03 Petroleum Fuel Systems Maintenance
UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)
UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 112 EPA: Oil Pollution Prevention
PART 7
ATTACHMENT
7. Attachment/Technical Exhibit List:
7.1. Attachment A – General Installation Security Requirements
7.2. Attachment B – Fuel Storage Tank List
7.3. Attachment C – Fuel Storage Tank Data Sheet
7.4. Attachment D – Monthly Contractors Progress, Management and Status Report
7.5. Attachment E – API Internal Inspection Telecon Briefing Template
7.6. Attachment F – API Internal Inspection Report Template
7.7. Attachment G – Return to Service Letter
7.8. Attachment H – Not Applicable
7.9. Attachment I – Not Applicable
7.10. Attachment J.1 – Fac 1340 Final 2017
7.11. Attachment J.2 - Fac 1340 OOS 2012
7.12. Attachment J.3 – Fac 1344 – Final 2018
7.13. Attachment J.4 – Fac 1344 – OOS 2013
7.14. Attachment J.5 – Fac 1348 – Final 2017
7.15. Attachment J.6 – Fac 1348 – OOS 2012
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Standard Performance Threshold
Method of Surveillance
PRS # 1.
Kick-Off Meeting with USACE and Stakeholders
Para. 1.5.8.
State, local, and federal requirements regulating fuel storage tanks
100% The contractor will schedule this Meeting either on-site prior to commencement of work or via tel-con prior to being onsite. Submit agenda and meeting minutes to stakeholders.
PRS # 2.
Clean and provide API 653 Internal Inspection and visual inspection of the containment area
Para. 5.1.3 & 5.1.4.
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection
DELIVERABLES SCHEDULE
DELIVERABLE SCOPE OF
WORK
PARAGRAPH
DUE DATE
Project Inspection Management Plan/Work Plan, Accident Prevention Plan & Health and Safety Plan (Draft)
4.3 & 4.4. 15 days after award
Project Inspection Management Plan/Work Plan, Accident Prevention Plan & Health and Safety Plan (Final)
4.3 & 4.4. 5 days after receipt of comments
Inspection and Evaluation Report – (Draft) 5.1.13.
28 days after Field Inspection
Inspection and Evaluation Report – to include populated Attachment C Excel Sheet for each base (Final)
5.1.13.
7 days after receipt of comments
(End of Summary of Changes)
PRS # 3.
Provide API 653 Internal Inspection reports
Para 5.1.13.
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection.
The contractor is to provide a DRAFT and FINAL report for MCX review and comment
PRS # 5.
Out-Brief Meeting with USACE and Stakeholders
Para 5.1.10.
State, local, and federal requirements regulating fuel storage tanks
100% Contractor will coordinate a Tel-con and distribute the report of findings 24 hrs prior to the scheduled conference
PRS #6
Fuel removal and disposal Para. 5.1.2.
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection
PRS # 3.
Provide a UT Inspection.
Para. 5.1.8.
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection.