Abbreviated APP Checklist Form.pdf
PDF 479 KB Posted
- Attached to
- B-Wall Pump Replacement Federal contract opportunity
- Solicitation number
- W9128F22Q0011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Submitall Register.pdf | ||
| Pre-Bid MEETING MINUTES Jan 12 2022.pdf | ||
| Pre-Bid Meeting _ Sign In Roster.pdf | ||
| Eng_Form_4025.pdf | ||
| AMENDMENT 1.pdf | ||
| Photos and Drawings _ B Wall Pump Replacement_2.0.pdf | ||
| W9128F22Q0011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Description Yes No N/A
(Qualified person, corporate safety staff person, owner, company president, regional vice presiden
U.S.Army Corps of Engineers Safety Inspection Checklist
Abbreviated Accident Prevention Plan
Remarks (Any NO or N/A Item)
USACE Ft. Randall Project TBD
TBD B-Wall Pump Replacement
Already Included in Contract docs Already included in Contract docs of safety-toed footwear drilling cutting and drilling cutting, grinding, blowing, and other high noise activities rn working below other personnel.
rn
Equipment and tools
Safety Inspection Checklist
Abbreviated Accident Prevention Plan Remarks (Any NO or N/A item)
Required around equipment.
No chainsawing anticipated
May be required depending on means & methods.
m
Remarks (Any NO or N/A Item)
Safety Inspection Checklist
Abbreviated Accident Prevention Plan
Note, the remarks in this form do not alleviate the contractor from performing their own due diligence in identifying the hazards associated with the work being performed or the protective measures required for that work.
No traffic control anticipated slopes/boat work not anticipated
Not anticipated / to be monitored for means/methods that may require this.
Contractor shall provide a lock to lock onto the USACE lock-box.