Amendment 0002 to change completion date from 60 days to 150 days, excluding dates for winter.

View the file

Other files for this federal contract opportunity

Other files attached to BB Replace Doors and Windows, newest first.
File Type Posted
AMD_0006_Drawings.pdf PDF
W9128F19Q0110_AMD0006.pdf PDF
W9128F19Q0110_AMD0005.pdf PDF
Windows-Doors_AM_0004_drawings.pdf PDF
W9128F19Q0110_AMD0004.pdf PDF
W9128F19Q0110_AMD0003.pdf PDF
Site_Visit_Questions_and_Answers.pdf PDF
Pre-Bid_Site_Visit_Sign_In_Sheet.pdf PDF
W9128F19Q0110_AMD0001.pdf PDF
Amd_0001.pdf PDF
W9128F19Q0110.pdf PDF
Door_and_Window_Big_Bend_Specs.pdf PDF
BB_Admin-OM_Doors-Windows_drawing_AdvSet_July_2019.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W59XQG91362270

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Big Bend Dam, Ft. Thompson, SD

The purpose of this amendment is to update the follow ing information in the Specifications Package 00 73 00 Section 1.2 & FAR Clause 52.211-10 to reflect:

Work shall begin no later than 10 days after NTP is issued and shall commence w ithin 150 days of NTP. A w inter exclusion period shall be applied from January 1 to March 1 due to anticipated cold w eather conditions and w ill not count tow ards the 150 days. The sealant for the w indow s cannot be installed if the outside air temperature is not 40F and rising. All other conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F19Q0110

X 9B. DATED (SEE ITEM 11)

26-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Sep-2019

CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

David.W.Neal@usace.army.milEMAIL:402-995-2988TEL:

DAVID W NEAL / CONTRACTING OFFICER

W9128F19Q0110

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises. A winter exclusion period shall be applied from January 1 to March 1 due to anticipated cold weather conditions and will not count towards the 150 days. The sealant for the windows cannot be installed if the outside air temperature is not 40F and rising.

(End of clause)