A.07.24 Amendment 0003- SF30.pdf

PDF 2 MB Posted

Attached to
Power Plant Elevator Installation, Norfork Power Plant Federal contract opportunity
Solicitation number
W9127S20R0003
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

This solicitation is for the installation of a power plant elevator at the Norfork Powerhouse in Baxter County, Arkansas. The project scope includes design, manufacture, delivery, installation and commissioning of an electric traction freight elevator with a 4,000 pound capacity and 200 feet per minute speed. Additional work involves demolition, hoistway construction, machine room construction, installation of associated safety and notification systems, and training of personnel. The contract is valued between $1 million and $5 million. Small businesses are eligible for the set-aside. Proposals are due by June 26, 2020. A request for information period is open until May 15, 2020 to allow offerors to ask clarifying questions via an online platform. Due to COVID-19, an organized site visit is not scheduled but the agency will provide additional information as needed. The solicitation includes specifications, plans, drawings and wage determinations for Baxter County, Arkansas.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0003 provides government responses to Bidder Inquiries and related revised documents. Proposal due date is also extended, from June 12, 2020, to June 26, 2020 at 1:00 PM CDT.

1. CONTRACT ID CODE PAGE OF PAGES

1 38

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S20R0003

X 9B. DATED (SEE ITEM 11)

23-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Jun-2020

CODE

CONTRACTING DIVISION

USACE, LITTLE ROCK (W9127S)

700 W. CAPITOL AVE, RM 7315

LITTLE ROCK AR 72201-3225

W9127S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127S20R0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 12-Jun-2020 01:00 PM to 26-Jun-2020 01:00 PM.

The number of offeror copies required has decreased by 2 from 2 to 0.

CLIN 0004

The pricing detail quantity has increased by 49.00 from 1.00 to 50.00.

The unit of issue has changed from Job to Pound.

The cost constraint EST has been added.

The following Delivery Schedule item for CLIN 0004 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

240 dys. ADC 1 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

FOB: Destination

96721H

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

240 dys. ADC 50 NORFORK POWERHOUSE

1487 HIGHWAY 177

SALESVILLE AR 72653

FOB: Destination

96721H

REVISED PRICING SCHEDULE

Line Item No. Description Quantity Unit of

Measure Unit Price Amount

BASE BID

0001 Elevator Design 1 Job XXXX $_____________

0002 Elevator Installation 1 Job XXXX $_____________

0003 Asbestos Abatement Work XXXX XXXX XXXX XXXX

0003AA

Submittal Preparation for Asbestos Abatement Work 1 Job XXXX $_____________

0003AB

Sampling: Mobilization and Demobilization for Asbestos Bulk Sampling 2 EST Each $_____________ $_____________

0003AC

Sampling: Collecting and Analyzing Asbestos Bulk Samples 5 EST Each $_____________ $_____________

0003AD

Abatement: Mobilization and Demobilization for Asbestos Abatement 2 EST Each $_____________ $_____________

0003AE

Abatement: Services of a Certified Asbestos Abatement Worker 16 EST Man Hrs $_____________ $_____________

0003AF

Abatement: Services of a Certified Asbestos Abatement Supervisor 8 EST Man Hrs $_____________ $_____________

0003AG

Abatement: Services of an Air Monitoring Personnel 8 EST Man Hrs $_____________ $_____________

0003AH

Disposal: Transportation of Asbestos-Containing Materials, per trip 2 EST Each $_____________ $_____________

0003AJ Disposal: Asbestos-Containing Materials 500 EST Pound $_____________ $_____________

0004 On-Site Lead-Based Paint Removal 50 EST Pound $_____________ $_____________

TOTAL BASE BID

OPTION 1

0005 Assessment of Existing Dam Elevator 1 Job XXXX $_____________

TOTAL BASE BID PLUS OPTIONS

The following have been added by full text:

GOVERNMENT RESPONSE- RFIS

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: Norfork Major Replacement - Elevator Review: RFI Review (00001) (sorted by CommentID ) Displaying 96 inquiries.

Id Discipline Sheet Detail Spec 8543629 Contracting 1 1 1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The project is current classified to NAICS code 238290- Other Building Equipment Contractors. The scope of work is broader and the following NAICS codes may be better align more properly to the government's benefit. The scope of work to be performed is much more encompassing in nature with the elevator installation itself, a component of work.

Many general contracting trades will be required. More applicable NAICS codes for the government's consideration could include: 236210- Industrial Building Construction, 236220- Commercial and Institutional Construction, or 221111- Hydroelectric Power Generation. The current designation would prohibit our participation as an offeror due to the corresponding size standard of the current NAICS code. A revision to the NAICS would align and allow more offeror participation for the government's benefit while not precluding any current offerors. We hope you find this request to be to the benefit of the government.

On: Apr 28 2020.

Government Response. . The NAICS code determination was reviewed and NAICS 23290 remains appropriate for the acquisition and will not be changed. On: May 07 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8575175 Equipment architectual drawing

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

I wanted to confirm something. The arch drawings show 2 speed side opening doors and speaks of a passenger car.

But the specs show Bi-Parting Doors and speaks of a Freight car. Is this a passenger elevator or freight elevator?

Do you want the doors to open vertically (bi-parting) or horizontally (2 speed side open)?

On: May 13 2020.

Government Response. . Requirement is for a freight elevator(4000lb), 2 speed, side opening. Will issue revised spec section On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8576648 Construction Phasing SF1442

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Project duration is shown as 240 calendar days after notice to proceed on the SF 1442. The time required for elevator design, approval, fabrication, and installation particularly given current COVID-19 supply chain issues will likely result in a longer required project duration. Can project duration be adjusted to reflect what is required for the critical path through the elevator design and fabrication process?

Government Response. . Offeror may request time extensions for schedule impacts during contract performance for Government consideration. Period of performance is 240 calendar days. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8576650 Contracting SF1442

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 13A of the SF 1442 currently calls for physical delivery of the proposals to the Corps office in Little Rock.

Given current COVID-19 concerns impacting travel, will it be possible to submit this proposal electronically?

Government Response. . Solicitation will be amended to remove requirement for paper copies;

electronic copies in CD format will be authorized. On: Jun 05 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8576654 Construction Phasing 01 14 00.00 46

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 1.3.3 of section 01 14 00.00 46 states that work cannot commence on site until the elevator is onsite.

Given that abatement, demolition, and construction of the shaft including concrete cures needs to occur before the elevator can be installed, can that requirement be waived so that the project duration is not extended further?

Government Response. . This only means that one cannot install the elevator until it is on-site to be installed, so if steel workers were on site to install beams then steel should be on site to install On: Jun 08

Current Request Status: Request Closed Information for this report is procurement sensitive.

8576657 Construction Management 01 14 00.00 46 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 1.7.3.1 of section 01 14 00.00 46 states that the powerhouse crane will become unavailable for the contractor at some point. At what date should it be assumed to be no longer available for contractor use?

On: May 13 2020.

Government Response. . Offeror should assume crane will not be available for use. On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8576659 Security 01 15 10.10 46

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 01 15 10.10 46 states that this project is a multi level security project and that Level 2 or 3 clearance will typically require six or nine months. How does that six to nine month security processing requirement relate to the project duration of 240 calendar days from notice to proceed?

Government Response. . Security clearances may commence upon contract award and previous to

NTP. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8576664 Construction Management 01 35 26

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 01 35 26 paragraph 1.6.1.2 states that the Contractor Quality Control Manager cannot be the SSHO on the project.

Can the Contractor Quality Control Manager or the SSHO perform the duties of Superintendent or are three personnel required onsite fulltime?

On: May 13 2020.

Government Response. . Three individuals are required; refer to EM 385-1-1, USACE Safety and Health

Requirements Manual On: Jun 09 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8576670 Specifications 02 83 13.00 20

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 02 83 13.00 20 for Lead in Construction is provided, but the summary of work calls for Lead Abatement.

What is the scope and requirement for lead removal on this project?

Government Response. . See revised bid schedule for estimated quantity of lead based paint removal On: Jun 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8576675 Construction Management 01 14 00.00 46 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 01 14 00.00 46 paragraph 1.3.3.d states that work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations and other construction', but then no details are provided. What other construction contracts and owner activities does work under this solicitation need to be scheduled around? What are the specific restrictions on this contract within the work area?

Government Response. . Notice is provided that other work could be ongoing concurrently by the

Government or others. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8579401 Construction Management None but need one

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

No site location or access plans were provided. Can a siteplan be provided to indicate where equipment and materials can be stored, parking for vehicles, and access for equipment for installations?

On: May 14 2020.

Government Response. . Site plan for lay down area will be provided. On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8579403 Building Design & Engineering

Attachment 2 & Attachment

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Attachment 2 and attachment 3 seem to show the same plansets but possibly might have differences. Which planset takes precedence?

On: May 14 2020.

Government Response. . Attachment 3 will be rescinded; Attachment 2 is correct. On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8580758 Contracting SF1442

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Due to the COVID 19 situation, and with many suppliers and contractors working remotely it is taking additional time to respond to the requirements of the solicitation. Can the proposal due date be extended to a date later in June to allow for a more comprehensive proposal?

On: May 15 2020.

Government Response. . Due date will be extended. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8581657 Architectural S103 & A102

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

A1/S103 indicates that the roof deck between column lines 1 and 2 will need to be grouted level. This will require removal of the existing roof in between column lines 1 and 2 and placement of new insulation, coverboard, and roofing, however sheet A102 shows the existing roof to remain outside of the walls of the machine room. What is the scope of work regarding levelling and roof replacement between column lines 1 & 2?

Government Response. . S103 indicates a level work area to be grouted larger than the extents of the proposed mechanical room wall limits. Arch drawings show the level work area as only required to the back side of the new roof flashing. A practical area will be required to provide the appropriate slope and chamfer strip to maintain the existing roof warranty per the manufacturer's warranty. Roofing warranty requirements shall be maintained. Contractor to provide a pre-roof conference including roof manufacturer to confirm all requirements to maintain warranty are included. On: Jun 05 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8582052 Structural S301

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The elevator pit detail A7 on S-301 suggests that the pit is being cut into solid concrete full depth. Is this area concrete to full depth or is there aggregate fill between slabs?

Government Response. . Full Depth On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8582134 Architectural ALL ALL NA

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The specifications state that the scale may be off and that it is up to the contractor to field verify the measurements.

However, for estimating purposes we have tried using a variety of scales, both manually and electronically and across multiple platforms and nothing is getting us to the dimensions listed on the plans. Will the USACE please go back and identify and correct the issue in the scaling, then repost the plans as an amendment.

Government Response. . Do not Scale Scale Drawings for any purpose. Ref Gen Req #4 S-001. Please field verify dimensions and report any specific discrepancy for clarification. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8582190 Architectural ALL ALL NA

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

USACE states that the crane will be available for use during the course of the project. Will USACE identify the type and location of the crane and also all of the load capacities of the crane. This is important to identify how much material weight we can drop down and lift up.

Government Response. . Offeror will assume crane will not be available. On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8582202 Architectural ALL ALL NA

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The USACE stated that the crane would be available for use and that the Contractor needed to provide the rigger.

Can we assume that the crane and the operator will be available for use during the entire duration of the duty/work day? Will requesting the crane operator require any lead time notification and coordination?

Government Response. . Offeror will assume crane will not be available. On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8582244 Architectural ALL ALL NA

Will the USACE please hold the RFI window open until after the site visit on Wednesday 20 May?

Government Response. . Complete. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8582273 Architectural ALL ALL NA

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The specifications call for a SSHO, Site Superintendent, and Quality Control Manager. Can any combination of these three roles be served by one person? I.E. Site Super is also SSHO? SSHO is also QCQA?

Government Response. . Three individuals are required; refer to EM 385-1-1, USACE Safety and Health

Requirements Manual On: Jun 09 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8582278 Architectural ALL ALL NA

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Must the Quality Control Manager have taken the USACE QCQA course? Is the QCM required to be onsite every day and every hour during the duration of the project?

Government Response. . Yes, the USACE course is required per the specification; Yes, the individual must be onsite everyday. On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8582700 Architectural ALL ALL NA

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In reviewing the plans it's possible that they were photocopied or distorted and reprinted in a PDF at some time in the past. This may or may not be the case; however, if the USACE is willing to post the Auto-Cad file to BetaSam then we can use that to properly scale and run a material takeoff.

Government Response. . Drawings are available in PDF format. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8587445 Equipment 14 21 13

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The specifications (Section 14-21-13) refer to an electric traction freight elevator. Typically freight elevators do have vertical bi-parting manual or power operated doors. The spec also refers to a class A type freight elevator which I believe is general loading and not made for heavy impact or large one piece loads, like what would be moved by large fork lifts. On page 7, 2.1.1 item E, calls for power operated bi-parting freight doors. 4'6"w x 7". Sections 2.1.1 also calls for a power operated car gate. Page 15, item 2.8.4 then calls for a two section vertical rising gate with power operator. Consistent with a vertical bi-parting freight elevator door that Section 2.1.1 describes, again bi-parting doors. In 2.8.5 the spec mentions a one piece car entrance sill and doesn't state a freight elevator sill or a passenger type sill. Reading further into the spec in section 2.9.1 they talk about a 14 guage stainless steel hositway entrance frame which is somewhat more consistent with a passenger type frame but then say to provide door panels with truckable sill and vision panels, this again leads me back to a freight elevator vertical bi-parting door. 2.9.2 calls for heavy duty sill angles, but again doesn't state if it is for a freight elevator one piece loads, or just a heavy duty passenger type arrangement. The drawings show an off-set 4'6" wide door (A-501, detail E4) which looks more consistent with a two speed off-set passenger elevator door arrangement. I have seen some small vertical bi-parting freight doors before that are 7' tall, but typically not 4'6" in width. Freight elevators would typically be centered on the shaftway and as wide as the car platform. Freight elevators would also have c-channel type structural frames that are designed to carry and have vertical bi-parting freight door tracks attached to them. I have seen freight elevator structural frames wrapped with stainless steel. Typically the structural c-channels are painted and provided by the steel supplier because it is really not a typical passenger style elevator door frame or jamb.Typically freight elevators can only be used with a freight handler/operator, not for passenger usage. They can take more abuse then a passenger style door and sill. However, the code with quite a few modifications will allow passengers on a freight elevator with vertical bi-parting freight doors with quite a few other bells and whistles to make is compliant. The question, after reviewing all the above, is to clarify (I apologize if I am missing a detail somewhere) whether or not the owner wants a passenger style door and frame with a heavy duty (nickel, silver, or bronze) passenger style sill and a two speed 4'6" wide passenger door or do they really want an off-set vertical bi-parting freight elevator door?

On: May 19 2020.

Government Response. . Side Opening Two Speed 4'-6" Pass. Sill Bronze all other SS due to wet conditions On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8591890 Electrical E-501 & E-601 E1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

ON SHEET E-501 DETAIL E1 NOTES 5&6 CALL FOR NEMA3R ENCLOSURES FOR THE PANEL BOARDS. ON SHEET E-601 KEYNOTES 3 & 7 CALL FOR NEMA1 ENCLOSURES FOR THE SAME PANEL BOARDS. WHICH ENCLOSURE

IS REQUIRED?

On: May 21 2020.

Government Response. . ENCLOSURES SHOULD BE NEMA 3R. Amendment will be issued to remove

NEMA1 on E-601 Keynotes 3 & 7 On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8594667 Specifications 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 011100 paragraph 1.1.1 notes that existing steel doors and frames with lead paint are to be reinstalled. What is required with regard to the lead paint on the doors and frames, encapsulation or removal of the paint?

On: May 22 2020.

Government Response. . Encapsulation On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8594671 Cost Engineering Bid Form

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is the asbestos removal called out in section 028213.00 10 paragraph 1.4.1 to be considered part of CLIN 0002 or of the respective CLIN 0003 breakdowns in the bidding schedule?

On: May 22 2020.

Government Response. . Asbestos work should be priced in CLINS 0003AA-0003AJ On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8595061 Contracting 02 41 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 011100 paragraph 1.1.1, section 024100 paragraph 1.2.1, and section 028213.00 10 paragraph 1.4.1 identify that some vinyl asbestos floor tile is to be removed along with asbestos joints on roof drain pipe. What are the quantities to be assumed to require removal for this project in the base bid?

Government Response. . Note 1-A302 states VCT to remain and VCT placed over existing On: Jun 05 2020

Current Request Status: Request Closed

8596928 Construction Management 01 45 00.00 10

Paragraph 3.2.2 of section 01 45 00.00 10 calls for a design quality control manager for this 'design-build contract', however the solicitation does not call this a design-build contract. Is this a design-build contract?

Government Response. . This is not a design-build contract. Only design required to accommodate the proprietary equipment as compared to the basis of design drawings. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8597842 Architectural A302

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Sheet A302 has a room finish schedule that could be read as providing new flooring and wall finish in multiple rooms, such as Closet 1 or the Oil Storage. What items on the finish schedule are existing to remain, and what are to be provided under this contract?

Are finishes to only be provided where there is new work?

On: May 25 2020.

Government Response. . ALL EXISTING PLASTER WALL SURFACES IN RM A01, 102, 103, 104,105, 107 AND THE NORTH WALL IN RM A06 painted full height. All new work if painted to match existing adjacent.

If adjacent is damaged during construction it should be repaired and repainted On: Jun 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8597846 Architectural A102

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The new door, frame, and associated hardware for the door to the elevator machine room shown on sheet A102, is not called out. What is the door and hardware schedule for that opening?

On: May 25 2020.

Government Response. . Added Hardware to sheet A302 On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8597871 Contracting Wage Determination

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Elevator mechanic is not listed on the wage determination. What classification applies to elevator mechanic?

On: May 25 2020.

Government Response. . Successful offeror may submit a Request for Authorization of Additional Classification and Rate (SF 1444) after contract award for approval by the Department of Labor. On: Jun 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8597877 Contracting Bid Form Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The form has CLIN 0005 Assessment of existing elevator, but it does not appear that there is any other documentation in the solicitation about this elevator. Is there any as-built information regarding this elevator that can be provided?

On: May 25 2020.

Government Response. . There are no as-builts for distribution. On: Jun 08 2020 Current Request Status: Request Closed

8598423 Electrical E601

Note 2 on sheet E601 is incomplete. Can this note be revised for clarity?

On: May 26 2020.

Government Response. . Note is complete.

There are three phase conductors that have parallel #1/0 AWG) and the ground is #4 AWG (3 sets of 2 #1/0AWG and #4AWG ground) routed in 2 -2" GRS conduit On: Jun 05 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8598437 Electrical E107

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Sheet E107 has note 4 calling for a 100A panelboard in the machine room while sheet E601 note 7 calls for a 225A panelboard. Which note is correct?

On: May 26 2020.

Government Response. . 225A panelboard is correct.

Will issue Amendment to change E107 to 225AMP, and to change E-602 Panel Schedule LA to 225Amp Panel with 150 MCB. On: Jun 05 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8598723 Electrical 26 05 00.00 40 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraphs 2.1.1 and 3.2 of section 26 05 00.00 40 limit the type of conduits and raceways for electric work. Do these paragraphs also apply to section 28 31 64 for fire alarm cabling and to section 14 24 00 for elevator control wiring?

Government Response. . Yes specification 2605 00.00 40 applies to all conduits and raceways On: Jun

05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8600186 Mechanical 23 00 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference: Section 22 00 00, Part 2 Products, 2.1 Materials Reference: Section 23 00 00, Part 2 Products, 2.1 Standard Products Reference: Section 23 07 00, Part 2 Products, 2.1 Standard Products Please advise whether or not "Buy American" requirements apply to the purchase of Plumbing and HVAC Materials.

Please provide document clarifying any special requirements for material purchases.

Government Response. . Offerors should refer to clauses 52.225-9, 52.225-10, and 52.225-13. On: Jun

08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8600192 Mechanical M-101 A6

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference Dwg: M-101, Detail A6 Please provide rough isometric detail to clarify construction for the elevator pit drain.

Please provide floor drain schedule to assist in purchasing of new elevator pit drain.

Government Response. . Detail A6 on mechanical sheet M-101 has been revised to include a new floor drain and a new 4 inch drain pipe to be sloped and connected to an existing drain pipe. On: Jun 05 2020

8600196 Mechanical M-001, M-901 E8 & A8

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference Dwg: M-001, General Notes 17 Reference Dwg: M-901, Details E8 & A8 Photos show existing plumbing pipe and above ceiling duct to be uninsulated, please confirm new plumbing pipe and duct work shall be uninsulated to match existing.

Government Response. . Detail E8 on Sheet M-901 shows insulated ductwork (see same ductwork on Detail

A1 of Sheet M-903). New ductwork and insulation shall match existing (refer to Sheet M-101).

Detail A8 on Sheet M-901 shows uninsulated plumbing pipes inside pipe chase (see other plumbing pipes inside pipe chase on Detail A5 of Sheet M-902). New plumbing piping shall match existing (refer to Sheet M-101). On:

Jun 05 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8600206 Mechanical MD-101 & M-101 A2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

According to the onsite mechanical contractor, the new RW plumbing line in detail A2 may have already been removed and replaced and put into its new location as depicted in A2. Will USACE please confirm and verify this.

Government Response. . Concur. Detail A2 has been removed from mechanical sheets MD-101 and M-

101. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8600253 Architectural NA NA 01 0000

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

When does the USACE anticipate making an award to replace the old crane with a new crane? How long does the USACE anticipate the old crane taking to manufacture and build before the old one is replaced with the new one?

Government Response. . This schedule is unknown at this time. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8600382 Contracting NA NA NA

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Norfork response is asking for the Proposal Data Sheet to be submitted as Volume 1, Tab A (along with the 1442). We cannot find the specified Proposal Data Sheet anywhere in the solicitation.Please advise as to where we can locate this or if it is missing, please add it as an amendment.

Government Response. . Proposal Data Sheet will be provided. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8600450 Structural S-301 A1 NA

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The state elevator inspector informed us that the steel grate at the top of the shaft was a code violation. He stated that the air in the elevator control room and the hoistway must be isolated from each other. He referenced Arkansas Fire Prevention Code 3004.1, IBC 2012, NFPA 72, and ASME A17.1 section 2.1.4. He stated that the two must be vented to the outside separately and that they cannot share the same air. He stated that the minimum space requirement for the shaft duct must have at least 18" of clearance between the duct and any elevator equipment. He stated that the penthouse and the hoistway needed an independent electrically actuated vent louver that was triggered to open with a fire alarm activation. He recommended isolating the hoistway from the penthouse by separating it with fire rated plywood or pouring a concrete pad by placing B-deck over top of the W8s. He recommended not leaving the vent open at all times, that doing so would allow moisture and humidity to enter the chase. Please advise if the USACE wishes to deviate from these requirements of if USACE wants to align with the applicable codes.

On: May 26 2020.

Government Response. . Refer to A1/S-103 and A1/S-301. A1/S-103 floor span symbol indicates the bar grate is covered with ".063 ALUMINUM DIAMOND RAISED PATTERN PLATE". A1/S-301 indicates how to fasten the aluminum floor plate over the bar grate, and further indicates "BAR GRATE WITH RAISED

PATTERN PLATE ON TOP SEE PLAN".

With the exception of cable raceways bar grate floor is covered with aluminum plate. Successful Elevator installer will take necessary measures to meet the intent of the code by preventing air exchange between machine room and shaft. Contractor shall coordinate the Alu. Plate installation with elevator installation.

Submit plan for elevator machine room for approval as per specs.

2018 IBC does not appear to require venting of elevator control room or hoistway, neither does it appear to require that the elevator control room and hoistway be isolated from each other. On: Jun 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8600458 Architectural A-301 A1 & A5 NA Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Can the contractor core drill to a depth of 368' if it is necessary for the scope of work?

On: May 26 2020.

Government Response. . Offeror should assume a depth of elevation 369. Successful offeror may propose a deviation after award for Government consideration. On: Jun 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8600486 Architectural A-301 A5 NA Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Detail A5 calls out E4/A-303. Pg A-303 does not have an E4. Please provide this detail or clarify the call out.

On: May 26 2020.

Government Response. . A1/A-303 from A5/-301 will be clarified in Amendment. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8600614 Building Design &

Engineering

NA NA

14 21 13 Paragraph 1.3.5

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 1.3.5 states that the "Cabinet shalll be equipped with an enviroment control unit (HVAC) to be mounted on the side of the cabinet." This cabinet is 46" W X 16" D X 36" H. Does the USACE want a stand alone HVAC unit attached to the side of this little cabinet? If so, please provide a specification and drawing detail as to how this should be designed, integrated, powered, operated, controlled, etc..

On: May 26 2020.

Government Response. . Reference to cabinet will be removed. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8600642 Mechanical M-101 & A-501 A6 & A1

Note 6 on M-101 states that the drain shall not slope down towards the pit. Detail A1 on A-501 states that the pit floor shall be level throughout at 370'. Does the USACE want to have a slight slope towards the drain pipe to ensure that any liquid drains toward the pipe and doesn't stand at the bottom of the pit?

On: May 26 2020.

Government Response. . Mechanical sheet M-101 has been revised to include a new floor drain and a new

4 inch drain pipe to be sloped and connected to an existing drain pipe. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8602069 Contracting Wage Determination

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Will the KO please submit a request the Davis Bacon Wage Requirement from the DOL?

On: May 27 2020.

Government Response. . Cannot determine request. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8603592 Environmental 02 32 18

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Does the USACE want the contractor to do asbestos bulk samples on the drywall/joint compound/cove base & cove base adhesive that will be impacted by demolition in the offices of Level A (first floor)?

On: May 27 2020.

Government Response. . Asbestos survey will be provided. On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8603601 Contracting SF 1442

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Does the USACE want to add a CLIN for lead bulk sampling, lead bulk sampling mob & de-mob, lead on-site removal mob & de-mob, lead work plan, etc... or is the entire lead scope included in the only lead CLIN listed? (CLIN 0004 On-site Lead Removal) The Asbestos CLINs are broken out in more detail, so it was unclear if this was or was not the case for the lead. Please advise.

Government Response. . See revised bid schedule for estimated quantity of lead based paint removal

On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8603605 Construction Management 02 32 18

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Does the USACE want the contractor to abate roof drains before any demolition of the roof is to begin or can we use the new penetrations created by roof demo work to access roof drains? It is a very tight squeeze to get personnel, materials, etc...up to the attic to get access to the roof drains. Please advise.

Government Response. . Schedule and sequence of construction is up to each individual offeror. On:

Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8603614 Contracting Wage Requirement

There is no DOL wage requirement for Asbestos Abatement Worker, Asbestos Abatement Supervisor, and Air Monitor. Same applies for the lead abatement worker. Please contact the DOL and request that the current wage requirement be modified to include these wage rates.

On: May 27 2020.

Government Response. . Successful offeror may submit a Request for Authorization of Additional

Classification and Rate (SF 1444) after contract award for approval by the Department of Labor. On: Jun 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8603621 Contracting SF 1442 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is this project funded? If not currently funded, will it be funded using end of FY 20 fallout funds? How long does USACE anticipate taking to make an award?

Government Response. . Solicitation was not issued subject to availability of funds. See also Block

13.D. of the SF1442. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8603659 Contracting SF 1442

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

COVID-19 has created a significant supply chain disruption and the steel and general supply market is very volatile right now. We've been told by the elevator supplier, steel supplier, and metal panel supplier that the prices we get today will be obsolete and much higher in thirty days from now. Increases by as much as 15% were mentioned on the steel.

Their reasoning is that the market is expected to rebound and when it does the prices will rise again. If the contractor provides justification and documentation will the USACE consider allowing a post-award raw price only (no fee & no markup) inflation contingency to the awarded contractor to cover the unknown price increases that we might encounter?

Government Response. . The solicitation does not include a provision for any economic price adjustment; offerors will determine their own pricing strategy. On: Jun 10 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8603775 Building Design &

Engineering S-302 & S-301 A8 & E5

S-302 Detail A8 shows the penthouse HSS with a plate on top of it. S-301 detail E5 shows the same HSS without a plate on top of it. It is recommended to have a plate on top of the HSS at S-301 (levels A-D). Please advise if the USACE wants the ends of the HSS plated to eliminate moisture intrusion into the HSS.

On: May 27 2020.

Government Response. . The plate on top of the HSS at A8/S-302 is a bearing plate for the hoist beam (as shown in the detail). No cap plate is desired/required for the HSS condition shown at E5/S-301. Per 05 12 00

- 2.5 "All structural steel members and components shall be galvanized." On: Jun 05 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8603841 Architectural S-302 A5

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The L6x6x1/2"x0'9" appears to be a little short in length. Please confirm that the true intent of this drawing is for the angle to completely wrap the CMU wall.

In detail A5 there is a space between the CMU and the concrete deck above it. Please confirm if it is the USACE's intent to leave this gap or if there should be grout between the CMU and the deck.

Government Response. . For the 9" long angle, refer to A1/S-101 for locations. Intent of this angle is to brace the top of the CMU shaft into the structural diaphragm.

As shown at A5/S-302, a 1" minimum 2" maximum gap shall be located between the top of the CMU shaft and the soffit of the structural floor above to accommodate floor deflection without vertically loading the CMU shaft partition walls.

Fill the gap with compressible filler On: Jun 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8603849 Building Design &

ALL SHEETS

The solicitation package included two drawing files. One labeled drawings and the other labeled plans. The drawing file includes AD-101, the Plan file excludes the actual page AD-101 but lists AD-101 on the G-001 drawing index.

The last revised date on the Drawing file is 4/27/2018 and the revised date of the plan file is 3/25/2020. Other than the plan file, is there any other detail that is different that was modified during this two year gap?

On: May 27 2020.

Government Response. . Attachment 3 will be rescinded; Attachment 2 is correct. On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8603856 Building Design &

All SHEETS

The bottom right corner of each page in the Plan File states 100% design submittal. Regarding the structural steel, the specifications call for the contractor to submit and provide stamped shop drawings. The design is pretty basic and is not necessary, and the 100% design submittal mark leads us to believe that we can use those drawings for the field work. Does USACE want the contractor to supply engineered shop drawings for the structural steel or are the 100% design drawings sufficient?

Government Response. . Submit shop drawings for the structural steel in accordance with 05 12 00 -

1.3 (yes, erection and fabrication drawings are required). On: Jun 10 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8606798 Building Design &

14 21 13 1.2.1

Paragraph 1.2.1 calls for shop drawings for penthouse arrangement. Does the USACE want engineered drawings or can the drawings be coordinated by a designer and provided without an engineer's/architect's stamp?

On: May 28 2020.

Government Response. . 1.2.1 does not require seal. On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8606810 Building Design &

14 21 13 Page 5

Para 1.3.2 Last Sentence.. Elevator suppliers never publish their pricing lists for parts and components to the public or on their websites. Can the USACE please clarify their intent with this sentence?

On: May 28 2020.

Government Response. . 1.3.2 the intent is to have a price list after the installation. On: Jun 05 2020

8606815 Specifications 14 21 13 Page 7 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

2.1.1.e Hoistway Door - This hoistway door is indicative of a passenger elevator. Paragraph 2.9 calls for a freight elevator hoistway door. Please clarify if the USACE wants a Passenger elevator door, freight elevator door, or a service elevator door.

On: May 28 2020.

Government Response. . 4000lb capacity elevator with a 2 speed sliding offset door. as shown in plan

Will revise section 14 On: Jun 05 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8606825 Specifications 14 21 13 Page 7 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Para 2.1.2.c ....... ; Stainless Steel - This is indicative of a passenger elevator. If the USACE wants a freight elevator then there won't be any wall reveals, car door returns, and it won't come in stainless steel. Note that these will be different depending on type of elevator installed. If freight elevator the finish will not be stainless steel. Please clarify USACE's intent..

On: May 28 2020.

Government Response. . Spec section 14 21 13 will be revised; stainless steel is required. On: Jun 08

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8606829 Specifications 14 21 13 Page 8 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

2.3.3 Hoistway Access.... - Are NEMA 4 rated fixtures required for the hoistway access operation switches?

On: May 28 2020.

Government Response. . Refer to the NAVFAC Elevator Design Criteria (ITG 2013-01)The fixtures must have a one piece, molded, high-impact clear acrylic diffuser with a secure seal against dust and moisture. 6-3.3 NEMA 4 Electrical Equipment All electrical equipment located less than 4'-0" (1219 mm) above the pit floor shall be weatherproof (NEMA4) and wiring shall be identified for use in wet locations in accordance with the requirements in NFPA 70. On: Jun 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8606840 Specifications 14 21 13 Page 8 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Does the USACE want rigid conduit in the shaftway or will USACE allow flex conduit?

On: May 28 2020.

Government Response. . Conduit in the shaftway should be rigid conduit but flex conduit is allowed not to exceed 6ft per the National electrical code. On: Jun 05 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8606860 Specifications 14 21 13 Page 12 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

2.6.1.1 Hall Station Door..... - These type of buttons are indicative of a freight elevator, not a passenger elevator.

Please clarify USACE's intent..

Government Response. . Will revise section 14. 21. 13. 2.6.1.1 On: Jun 05 2020

Information for this report is procurement sensitive.

8606871 Specifications 14 21 13 Page 13

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

2.6.2.2 Service Controls - Will two, two position switches (in lieu of one three position switch) be suitable for this requirement? A single three position is not necessary and cost more than two, two positions switches. Keeping costs savings in mind, will the USACE please confirm if the substitution is allowable>

Government Response. . Substitution not allowed; refer to specifications. On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8606877 Specifications 14 21 13 Page 13

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

2.6.2.3 Certificate Window - The elevator inspector won't issue an elevator inspection report for this elevator or any elevator in a Federal facility. Does the USACE want to exclude this placard?

Government Response. . Yes, include the placard. On: Jun 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8606892 Specifications 14 21 13 Page 15

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

2.8.4 Car Door - A two section…