A.07.23_RFQ_Amendment_2.pdf
PDF 993 KB Posted
- Attached to
- NERC Security System Installations (Software House) Federal contract opportunity
- Solicitation number
- W9127S19Q0018
About this file
Amendment 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SITE_VISIT_INFORMATION-Amendment_4.pdf | ||
| A.01.30-Updated-2018_Security_System_Upgrades_PWS_2-19-2019.pdf | ||
| A.01.23-Amendment_No.3.pdf | ||
| A.07.23_Conformed_RFQ_Amendment_2.pdf | ||
| A.01.30_Updated_PWS_17_Jan_19.pdf | ||
| A.02.01_FBO_Posting_QAs.pdf | ||
| A.04.36_Wage_Rates.pdf | ||
| A.01.30_PWS.pdf | ||
| A.07.23_RFQ_W9127S19Q0018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W41XDE82262457
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise the evaluation criteria to reflect the requirement to provide a current Softw are House certification.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S19Q0018
X 9B. DATED (SEE ITEM 11)
18-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jan-2019
CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127S19Q0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 18-Jan-2019 12:00 PM to 07-Feb-2019 12:00 PM.
The following have been modified:
QUOTATION EVALUATION SUMMARY
(1) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
Any award recommendation resulting from offer(s) received in response to this solicitation shall be based upon Lowest Priced Technically Acceptable (LPTA) evaluation factors. Concerning the technical evaluation only past performance shall be evaluated on an ‘Acceptable’ or ‘Unacceptable’ basis. In order to be considered for award a rating of ‘Acceptable’ must be received concerning evaluated past performance. The following factors shall be used to evaluate offers:
A. Offerors submitting a quotation in response to this Request For Quotation (RFQ) shall only submit the following in order to be considered responsive to this RFQ:
- Volume 1, Past Performance Information
- Volume 2, Price Schedule
- Representations & Certifications*
* Representations and Certifications need NOT be submitted by vendors who are SAM (www.sam.gov) registered.
This information shall be pulled directly from the SAM website.
B. Quotations shall be submitted utilizing the templates provided in this RFQ. The past performance questionnaire and pricing schedule included in this RFQ must be utilized to compile Volumes 1 & 2 in each quotation response.
C. Quotations shall be submitted in Times New Roman 12-size font with 1" margins intended to be printed on standard letter sized paper.
D. Quotations shall be submitted in electronic format only. All Quotations must be emailed to Joseph.D.Sherwood@usace.army.mil prior to the closing date/time of the RFQ. Only electronic submissions will be considered acceptable. Electronic file submissions must be submitted in Microsoft Office Suite or Adobe format (*.doc, *.docx, *.xls, *.pdf). It is preferable offers be submitted in Adobe Acrobat format (*.pdf).
E. Volume 1 – Past Performance Instructions. Each offeror shall submit a minimum of three (3) Past Performance Questionnaires (PPQ) and no more than five (5) PPQ in repsonse to this RFQ. The format below shall be utilized for each PPQ reference and the PPQ document must be completely filled out and signed by the PPQ reference. Each reference must have accurate contact information for the issuing office to verify PPQ accuracy. Any PPQ unable to be verified by the RFQ issuing office will not be considered as part of the final evaluation for technical acceptance.
Part 1 of 2
USACE PAST PERFORMANCE QUESTIONNAIRE
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact:
Contact Phone Number:
2. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
3. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. CLIENT'S OVERALL RATING BASED UPON FOLLOWING RATING SYSTEM:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
**Must be signed by Client to be considered complete**
Part 2 of 2
RATING DEFINITION NOTE
(A) Acceptable
Performance meets minimum contractual requirements. The contractual performance of the element or sub- element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
An 'Acceptable' rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified.
(U) Unacceptable
Performance does not meet some or most contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
An 'Unacceptable' rating is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
F. Volume 2 – Price Schedule Instructions. Offerors shall utilize the price schedule included in the RFQ as the Volume 2 Price Schedule submission.
G. Weight of Evaluations. This RFQ is being evaluated under Lowest Price Technically Acceptable (LPTA) evaluation criteria. Due to the commercial nature of this requirement no technical proposals are required in this RFQ. Instead, past performance shall be evaluated based upon the criteria below. In order for a quotation to be considered 'Technically Acceptable' the past performance rating below must be rated 'Acceptable'.
H. Volume 1 Past Performance Information. The Past Performance of the Prime Contractor (Offeror) consists of (a) Relevant Company Effort and (b) Quality of Past Performance. The Government will review recent, relevant company efforts and quality i n f o r ma t i o n provided by the owners of those efforts to assess the Offeror’s past experience and probability of successfully performing the work described in this solicitation. A recent, relevant project is:
(a) Performed under a contract or task order, as those terms are defined in FAR 2.101, for Federal projects, or similar contractual agreements for State or Local Governments, or the commercial or private sector. (Multiple projects under a single contract or task order are considered one project.
However, do not combine multiple projects under separate contracts or task orders to create a single project.);
(b) That is “recent”; one that has been completed within five (5) years of the solicitation issue date, or on-going project at least 50% complete (measured by end user approved progress report) as of the solicitation issue date. (Offerors are responsible for providing start and completion dates for each completed project, or the start and scheduled completion dates for projects currently being performed);
(c) That is “relevant”; one that is similar in scope (type, size, complexity and dollar value) to the project types described in Section 01 00 02, in particular paragraph 2.0 OBJECTIVE. (In terms of dollar value, a relevant project is one ranging from $100k to $1M. For a project to be assessed any degree of “relevancy” it must clearly demonstrate installation references of Software House integrated systems. Additionally, the contractor is required to provide a current Software House certification in order to be considered technically acceptable.
Every recent and relevant PPQ reference shall contribute toward an overall Volume 1 Past Performance evaluation rating based upon the following rating scale. Any rating of 'Acceptable' shall demonstrate the quotation is considered 'Technically Acceptable'.
RATING DEFINITION NOTE
(A) Acceptable
Performance meets minimum contractual requirements. The contractual performance of the element or sub- element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
An 'Acceptable' rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified.
(U) Unacceptable
Performance does not meet some or most contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
An 'Unacceptable' rating is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
I. Volume 2 Price Schedule. The price schedule will be evaluated based upon the lowest priced offeror being considered most advantageous to the government. The price schedule shall be submitted in Firm Fixed Price values.
J. Award Recommendation. Award recommendation should it be accomplished shall be issued to the LPTA offeror. There is no preference given for vendors with higher past performance evaluation ratings.
(2) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(3) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
(End of Summary of Changes)
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
File details come from the government source that posted it.