Region_2_Grounds_Maint_ELINS_221018.xlsx

XLSX spreadsheet 123 KB Posted

Attached to
Municipal Services (Janitorial & Grounds Maint. ) Region 2 for the 63d Readiness Division Federal contract opportunity
Solicitation number
W9127S19Q0004
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

R2 Grounds Maint. - ELINS

View the file

Other files for this federal contract opportunity

Other files attached to Municipal Services (Janitorial & Grounds Maint. ) Region 2 for the 63d Readiness Division, newest first.
File Type Posted
SF30_W9127S19Q0004_Amendment_1.pdf PDF
Projnet_Report_Region2.pdf PDF
Combined_Synopsis-Solicitation-W9127S19Q0004_Rev.1_19Dec2018.pdf PDF
63RD_REGION2MS_FINAL_PWS_020518.pdf PDF
Region_2_Janitorial_ELINS_140918.xlsx XLSX spreadsheet
63d_RD_DPW_Operations_Area_Map_FY18_2018.pdf PDF
Combined_Synopsis_-_Solicitation-W9127S19Q0004.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINS Summary

Grounds Maintenance Services Summary
Service Code: 404
This sheet is filled out automatically as other sheets are completed
CLINTOTAL
0003Base Period Firm Fixed-Price$27,236.00
0004Base Period Indefinite Quantity$70,000.00
0005Base Period Contractor Manpower Reporting$0.00
0006Contractor Submittals$0.00
1003First Option Period Firm Fixed-Price$29,712.00
1004First Option Period Indefinite Quantity$70,000.00
1005First Option Contractor Manpower Reporting$0.00
2003Second Option Period Firm Fixed-Price$29,712.00
2004Second Option Period Indefinite Quantity$70,000.00
2005Second Option Contractor Manpower Reporting$0.00

$296,660.00

&F

&A &P of &N

Site Summary Sheet

GROUNDS MAINTENANCE (1503050)

This sheet is filled out automatically as other sheets are completed
CLIN / SUBCLINFAC IDELINSTotal Price
0003Base Period Firm Fixed-Price
0003AATX056(Items A001 Through A004)$0.00
0003ABTX058(Items A005 Through A008)$0.00
0003ACTX068(Items A009 Through A013)$0.00
0003ADTX114(Items A014 Through A017)$0.00
0003AETX122(Items A018 Through A020)$0.00
0003AFTX184(Items A021 Through A025)$0.00
0003AGTX187(Items A026 Through A030)$0.00
0003AHTX189(Items A031 Through A034)$0.00
0003AJTX190(Items A035 Through A037)$0.00
0003AKTX195(Items A038 Through A042)$27,236.00
0003ALTX196(Items A043 Through A047)$0.00
0003AMTX209(Items A048 Through A052)$0.00
0003ANTX213(Items A053 Through A056)$0.00
$27,236.00
0004Base Period Indefinite Quantity
TOTAL IQ LINE ITEMS - A701 THROUGH A740$70,000.00
0005Base Period Contractor Manpower Reporting$0.00
0006Contractor Submittals$0.00
1003First Option Period Firm Fixed-Price
1003AATX056(Items B001 Through B004)$0.00
1003ABTX058(Items B005 Through B008)$0.00
1003ACTX068(Items B009 Through B013)$0.00
1003ADTX114(Items B014 Through B017)$0.00
1003AETX122(Items B018 Through B020)$0.00
1003AFTX184(Items B021 Through B025)$0.00
1003AGTX187(Items B026 Through B030)$0.00
1003AHTX189(Items B031 Through B034)$0.00
1003AJTX190(Items B035 Through B037)$0.00
1003AKTX195(Items B038 Through B042)$29,712.00
1003ALTX196(Items B043 Through B047)$0.00
1003AMTX209(Items B048 Through B052)$0.00
1003ANTX213(Items B053 Through B056)$0.00
$29,712.00
1004First Option Period Indefinite Quantity
TOTAL IQ LINE ITEMS - B701 THROUGH B740$70,000.00

1005 First Option Period Contractor Manpower Reporting $0.00

2003Second Option Period Firm Fixed-Price
2003AATX056(Items C001 Through C004)$0.00
2003ABTX058(Items C005 Through C008)$0.00
2003ACTX068(Items C009 Through C013)$0.00
2003ADTX114(Items C014 Through C017)$0.00
2003AETX122(Items C018 Through C020)$0.00
2003AFTX184(Items C021 Through C025)$0.00
2003AGTX187(Items C026 Through C030)$0.00
2003AHTX189(Items C031 Through C034)$0.00
2003AJTX190(Items C035 Through C037)$0.00
2003AKTX195(Items C038 Through C042)$29,712.00
2003ALTX196(Items C043 Through C047)$0.00
2003AMTX209(Items C048 Through C052)$0.00
2003ANTX213(Items C053 Through C056)$0.00
$29,712.00
2004Second Option Period Indefinite Quantity
TOTAL IQ LINE ITEMS - C701 THROUGH C740$70,000.00

2005 Second Option Period Contractor Manpower Reporting $0.00

&F

&P of &N

ELINS BASE PERIOD FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE INFORMATION IN SHADED CELLS, PRICES ($) IN "UNIT PRICE" COLUMN & PERCENTAGES (%) IN "ADMIN FEE-SOURCE AMERICA (%)" COLUMN, TO PROVIDE GROUNDS MAINTENANCE SERVICES-FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 THROUGH A056. MANDATORY SOURCE AMERICA SITES WILL REQUIRE AN ADMIN FEE(%) ONLY, AS MONTHLY PRICING SET BY U.S. ABILITYONE COMMISION IS ALREADY PROVIDED.
CLIN 0003 - Base Period - Firm Fixed-Price Work
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICEAdmin Fee Source America (%)TOTAL
TX056Midland USARC48793
Firm Fixed-Price Work
A001Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A002Semi-Improved Grounds (Spec Item C 3.2)11.0Month$ - 0$ - 0
A003Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A004Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AA (Items A001 Through A004)$0.00
TX058Boyle Memorial USARC48795
Firm Fixed-Price Work
A005Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A006Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A007Un-Paved Areas (Spect Item C 3.5)11.0Month$ - 0$ - 0
A008Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AB (Items A005 Through A008)$0.00
TX068Seagoville USARC48837
Firm Fixed-Price Work
A009Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A010Semi-Improved Grounds (Spec Item C, 3.2)11.0Month$ - 0$ - 0
A011Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A012Un-Paved Areas (Spect Item C 3.5)11.0Month$ - 0$ - 0
A013Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AC (Items A009 Through A013)$0.00
TX114Grand Prairie Reserve Complex48491
Firm Fixed-Price Work
A014Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A015Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A016Un-Paved Areas (Spect Item C 3.5)11.0Month$ - 0$ - 0
A017Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AD (Items A014 Through A017)$0.00
TX122Waco USARC48875
Firm Fixed-Price Work
A018Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A019Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A020Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AE (Items A018 Through A020)$0.00
TX184Fort Worth AFRC/OMS/Storage48878
Firm Fixed-Price Work
A021Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A022Semi-Improved Grounds (Spec Item C, 3.2)11.0Month$ - 0$ - 0
A023Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A024Un-Paved Areas (Spect Item C 3.5)11.0Month$ - 0$ - 0
A025Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AF (Items A021 Through A025)$0.00
TX187Amarillo AFRC48277
Firm Fixed-Price Work
A026Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A027Semi-Improved Grounds (Spec Item C, 3.2)11.0Month$ - 0$ - 0
A028Xeriscape Grounds (Spec Item C 3.3)11.0Month$ - 0$ - 0
A029Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A030Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AG (Items A026 Through A030)$0.00
TX189Lewisville AFRC48622
Firm Fixed-Price Work
A031Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A032Xeriscape Grounds (Spec Item C 3.3)11.0Month$ - 0$ - 0
A033Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A034Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AH (Items A031 Through A034)$0.00
TX190Denton USARC48797
Firm Fixed-Price Work
A035Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A036Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A037Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AJ (Items A035 Through A037)$0.00
TX195Huntsville AFRC484370.00%
Firm Fixed-Price Work
A038Improved Grounds (Spec Item C 3.1)11.0Month$ 1,361.800.00%$ 14,979.80
A039Semi-Improved Grounds (Spec Item C, 3.2)11.0Month$ 247.600.00%$ 2,723.60
A040Xeriscape Grounds (Spec Item C 3.3)11.0Month$ 123.800.00%$ 1,361.80
A041Paved Areas (Spec Item C 3.4)11.0Month$ 371.400.00%$ 4,085.40
A042Storm Drainage Systems (Spec Item C 3.6)11.0Month$ 371.400.00%$ 4,085.40
Total CLIN 0003AK (Items A038 Through A042)$27,236.00
TX196Tyler AFRC48057
Firm Fixed-Price Work
A043Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A044Semi-Improved Grounds (Spec Item C, 3.2)11.0Month$ - 0$ - 0
A045Xeriscape Grounds (Spec Item C 3.3)11.0Month$ - 0$ - 0
A046Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A047Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AL (Items A043 Through A047)$0.00
TX209LUFKIN AFRC48763
Firm Fixed-Price Work
A048Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A049Semi-Improved Grounds (Spec Item C, 3.2)11.0Month$ - 0$ - 0
A050Xeriscape Grounds (Spec Item C 3.3)11.0Month$ - 0$ - 0
A051Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A052Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AM (Items A048 Through A052)$0.00
TX213Bryan USARC/OMS/Storage48275
Firm Fixed-Price Work
A053Improved Grounds (Spec Item C 3.1)11.0Month$ - 0$ - 0
A054Semi-Improved Grounds (Spec Item C, 3.2)11.0Month$ - 0$ - 0
A055Paved Areas (Spec Item C 3.4)11.0Month$ - 0$ - 0
A056Storm Drainage Systems (Spec Item C 3.6)11.0Month$ - 0$ - 0
Total CLIN 0003AN (Items A053 Through A056)$0.00

TOTAL FFP LINE ITEMS - A001 THROUGH A056 $27,236.00

0005Contractor Manpower Reporting Base Year Section C 0200000 Mgmt & Admin Spec 2.151Each$ - 0$0.00
0006Contractor Pre-Work Submittals; Section F Submittals1Each$ - 0$0.00

&F

&P of &N

ELINS BASE PERIOD IQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A740
CLIN 0004 - Base Period - Indefinite Quantity Work
UNITUNIT OFMIN. ORDER
ELINSHORT DESCRIPTIONFULL DESCRIPTIONPRICEISSUEQTY
A701Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.$ - 0Each1
A702Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.$ - 0Each1
A703Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A704Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A705Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A706Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.$ - 0Each1
A707Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.$ - 0Each1
A708Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.$ - 0Each1
A709Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.$ - 0Each1
A710GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.$ - 0SF50
A711Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A712Shrub Planting (1-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A713Shrub Planting (5-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A714Bedding/Ornamental Plants (4" pot size)All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each10
A715SoddingSod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
A716SpriggingSprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
A717FertilizeVegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days.$ - 0SF100
A718Dethatch & AerateServices shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance.
Work shall be completed within 14 calendar days.$ - 0SF100
A719AerateGrass shall be aerated to promote health and growth.
Work shall be completed within 10 calendar days.$ - 0SF100
A720Shrub Pruning (Stand-alone plants)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0Each5
A721Hedge Pruning (Continuous Hedging)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0L.F.100
A722Erosion ControlSoil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days.$ - 0SF50
A723UnderbrushingAll brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days.$ - 0SF100
A724Field MowingVegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days.$ - 0SF5,000
A725Control Undesired VegetationRemove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work shall be completed within 10 calendar days.$ - 0LF100
A726Debris RemovalRemove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris.
Work shall be completed within 10 calendar days.$ - 0SF50
Special Event Grass Cutting at the following sites:Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site.$ - 0
A727TX056$ - 0Each1
A728TX058$ - 0Each1
A729TX068$ - 0Each1
A730TX114$ - 0Each1
A731TX122$ - 0Each1
A732TX184$ - 0Each1
A733TX187$ - 0Each1
A734TX189$ - 0Each1
A735TX190$ - 0Each1
A736TX195$ - 0Each1
A737TX196$ - 0Each1
A738TX209$ - 0Each1
A739TX213$ - 0Each1
A740Plant Native VegetationAll native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape.

Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. $ - 0 Each 10

TOTAL IQ CAPACITY FOR LINE ITEMS - A701 THROUGH A740 $70,000.00

&F

&P of &N

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ELINS FIRST PERIOD FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE INFORMATION IN SHADED CELLS, PRICES ($) IN "UNIT PRICE" COLUMN & PERCENTAGES (%) IN "ADMIN FEE-SOURCE AMERICA (%)" COLUMN, TO PROVIDE GROUNDS MAINTENANCE SERVICES-FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 THROUGH B056. MANDATORY SOURCE AMERICA SITES WILL REQUIRE AN ADMIN FEE(%) ONLY, AS MONTHLY PRICING SET BY U.S. ABILITYONE COMMISION IS ALREADY PROVIDED.
CLIN 1003 - First Option Period - Firm Fixed-Price Work
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICEAdmin Fee Source America (%)TOTAL
TX056Midland USARC48793
Firm Fixed-Price Work
B001Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B002Semi-Improved Grounds (Spec Item C 3.2)12.0Month$ - 0$ - 0
B003Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B004Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AA (Items B001 Through B004)$0.00
TX058Boyle Memorial USARC48795
Firm Fixed-Price Work
B005Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B006Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B007Un-Paved Areas (Spect Item C 3.5)12.0Month$ - 0$ - 0
B008Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AB (Items B005 Through B008)$0.00
TX068Seagoville USARC48837
Firm Fixed-Price Work
B009Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B010Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B011Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B012Un-Paved Areas (Spect Item C 3.5)12.0Month$ - 0$ - 0
B013Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AC (Items B009 Through B013)$0.00
TX114Grand Prairie Reserve Complex48491
Firm Fixed-Price Work
B014Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B015Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B016Un-Paved Areas (Spect Item C 3.5)12.0Month$ - 0$ - 0
B017Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AD (Items B014 Through B017)$0.00
TX122Waco USARC48875
Firm Fixed-Price Work
B018Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B019Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B020Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AE (Items B018 Through B020)$0.00
TX184Fort Worth AFRC/OMS/Storage48878
Firm Fixed-Price Work
B021Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B022Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B023Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B024Un-Paved Areas (Spect Item C 3.5)12.0Month$ - 0$ - 0
B025Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AF (Items B021 Through B025)$0.00
TX187Amarillo AFRC48277
Firm Fixed-Price Work
B026Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B027Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B028Xeriscape Grounds (Spec Item C 3.3)12.0Month$ - 0$ - 0
B029Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B030Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AG (Items B026 Through B030)$0.00
TX189Lewisville AFRC48622
Firm Fixed-Price Work
B031Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B032Xeriscape Grounds (Spec Item C 3.3)12.0Month$ - 0$ - 0
B033Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B034Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AH (Items B031 Through B034)$0.00
TX190Denton USARC48797
Firm Fixed-Price Work
B035Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B036Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B037Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AJ (Items B035 Through B037)$0.00
TX195Huntsville AFRC484370.00%
Firm Fixed-Price Work
B038Improved Grounds (Spec Item C 3.1)12.0Month$ 1,361.800.00%$ 16,341.60
B039Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ 247.600.00%$ 2,971.20
B040Xeriscape Grounds (Spec Item C 3.3)12.0Month$ 123.800.00%$ 1,485.60
B041Paved Areas (Spec Item C 3.4)12.0Month$ 371.400.00%$ 4,456.80
B042Storm Drainage Systems (Spec Item C 3.6)12.0Month$ 371.400.00%$ 4,456.80
Total CLIN 1003AK (Items B038 Through B042)$29,712.00
TX196Tyler AFRC48057
Firm Fixed-Price Work
B043Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B044Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B045Xeriscape Grounds (Spec Item C 3.3)12.0Month$ - 0$ - 0
B046Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B047Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AL (Items B043 Through B047)$0.00
TX209LUFKIN AFRC48763
Firm Fixed-Price Work
B048Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B049Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B050Xeriscape Grounds (Spec Item C 3.3)12.0Month$ - 0$ - 0
B051Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B052Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AM (Items B048 Through B052)$0.00
TX213Bryan USARC/OMS/Storage48275
Firm Fixed-Price Work
B053Improved Grounds (Spec Item C 3.1)12.0Month$ - 0$ - 0
B054Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B055Paved Areas (Spec Item C 3.4)12.0Month$ - 0$ - 0
B056Storm Drainage Systems (Spec Item C 3.6)12.0Month$ - 0$ - 0
Total CLIN 1003AN (Items B053 Through B056)$0.00

TOTAL FFP LINE ITEMS - B001 THROUGH B056 $29,712.00

1005 Contractor Manpower Reporting First Option Period Section C 0200000 Mgmt & Admin Spec 2.15 1 Each $ - 0 $0.00

&F

&P of &N

ELINS FIRST PERIOD IQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS B701 - B740
CLIN 1004 - First Option Period - Indefinite Quantity Work
UNITUNIT OFMIN. ORDER
ELINSHORT DESCRIPTIONFULL DESCRIPTIONPRICEISSUEQTY
B701Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.$ - 0Each1
B702Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.$ - 0Each1
B703Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B704Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B705Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B706Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.$ - 0Each1
B707Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.$ - 0Each1
B708Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.$ - 0Each1
B709Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.$ - 0Each1
B710GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.$ - 0SF50
B711Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
B712Shrub Planting (1-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
B713Shrub Planting (5-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
B714Bedding/Ornamental Plants (4" pot size)All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each10
B715SoddingSod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
B716SpriggingSprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
B717FertilizeVegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days.$ - 0SF100
B718Dethatch & AerateServices shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance.
Work shall be completed within 14 calendar days.$ - 0SF100
B719AerateGrass shall be aerated to promote health and growth.
Work shall be completed within 10 calendar days.$ - 0SF100
B720Shrub Pruning (Stand-alone plants)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0Each5
B721Hedge Pruning (Continuous Hedging)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0L.F.100
B722Erosion ControlSoil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days.$ - 0SF50
B723UnderbrushingAll brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days.$ - 0SF100