A.01.13_TR_SS_Fault_Current_AMD0002.pdf
PDF 32 KB Posted
- Attached to
- 125 VDC Replacement, Essential Battery, Table Rock Federal contract opportunity
- Solicitation number
- W9127S-17-R-0003
About this file
Drawing for Solicitation Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_Solicitation_Amendment_0003.pdf | ||
| A.01.13_Drawing_TR-6490-142-29271_AMD0002.pdf | ||
| A.07.24_Solicitation_Amendment_0002.pdf | ||
| A.01.13_Drawing_TR-6490-142-2864_AMD0002.pdf | ||
| A.01.13_Drawing_TR-6490-142-2861_AMD0002.pdf | ||
| A.01.13_Drawing_TR-6490-142-2927_AMD0002.pdf | ||
| A.07.24_Solicitation_Amendment_0001.pdf | ||
| A.01.29_Specs_AMD0001.pdf | ||
| A.07.24_Solicitation_Amendment_1.pdf | ||
| A.01.13_Plans,_17R0003.pdf | ||
| A.01.29_Specs,_17R0003.pdf | ||
| A.07.23_Solicitation.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table Rock MG Control Center Fault Current Calculation jfm 9-6-17
Notes & Assumptions
1) Both 480V feeders to the MG Control Center will have the same available fault current.
2) Worst case fault current will occur when both station service generators and the station service transformer are connected to the 480V system with the bus tie breaker closed.
3) The station service transformer is assumed to be connected to an infinite bus on the primary side.
4) There are no induction motor loads to contribute significant fault current.
5) Feeder impedence is assumed to be zero to give the most conservative results.
6) Station service transformer hi-side voltage is assumed to be 14.4KV as set by generator operating limits.
7) Station service generator voltage is assumed to be 528VAC (110%).
Figure 1 - MG Control Center 480V Feeders
Station Service Transformer Fault Current (ISST)
Nameplate Data:
13,2000V delta to 480V delta
1000MVA
Z = 11.24% (0.1124pu)
Rated 480V Current = 1000/.48/1.732 = 1203A PU Voltage = 14.4/13.2 = 1.09pu PU Fault Current = 1.09/.1124 = 9.71pu = 11681A = ISST
Station Generator Fault Current (ISSG)
Nameplate Data:
875KVA, 480V, 1052A
D-Axis Saturated Transient Reactance = 0.27pu
PU Voltage = 528/480 = 1.1pu PU Fault Current = 1.1/0.27 = 4.07pu = 4286A = ISSG
Total Fault Current = ISST + 2 x ISSG = 11681 + 2 x 4286 = 20,253A