About this file

Solicitation No. W9127S-16-R-6000

View the file

Other files for this federal contract opportunity

Other files attached to Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC) for Design-Build (DB) Construction, newest first.
File Type Posted
Down_Select.docx DOCX document
W9127S-16-R-6000-02.pdf PDF
W9127S-16-R-6000-01.pdf PDF
Div_01_Attachments_-_Phase_1_.pdf PDF
Div_01_Gen_Req.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This acquisition w ill be a firm-fixed price (FFP), indefinite delivery/indefinite quantity (ID/IQ), multiple aw ard task order (MATOC), for design-build (DB) construction services. It w ill be procured using the tw o phase design-build selection procedures in accordance w ith FAR Part 36.3. The acquisition is unrestricted w ith a small business reserve. A combined pool of three (3) or more small businesses and three (3) or more firms comprising the unrestricted pool w ill be established w ith a shared capacity of $900M.

The NAICS code is 236220 and the small business size standard is $36.5 million.

Additional Phase II information:

**Funds are not presently available for the minimum guarantees or the seed project. See Section 00 22 20** Please read the dow nload instructions to access the specif ications, draw ings and any amendments.

BETTYE L MAHONEY 501.340.1056

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

06-Jul-2016

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________7 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________16 Aug 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE, LITTLE ROCK (W9127S)

700 W. CAPITOL AVE, RM 7315

LITTLE ROCK AR 72201-3225

W9127S

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(501) 324-5196FAX:TEL: (501) 340-5720 TEL: FAX:

W9127S-16-R-6000 171

TBD

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9127S-16-R-6000

Section 00 01 10 - Table of Contents

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00 Solicitation, Offer & Award 00 21 00 Instructions, Conditions and Notices to Offerors 00 22 10 Phase 1-Submission Requirements, Evaluation Criteria & Selection Criteria 00 22 20 Phase 2-Submission Requirements, Evaluation Criteria & Selection Criteria 00 44 00 Procurement Forms and Supplements 00 45 00 Representations and Certifications 00 72 00 Contract Clauses 00 73 00 Special Contract Clauses 00 73 05 Design-Build Selection Procedures and Basis of Award

DIVISION 01 - GENERAL REQUIREMENTS

01 10 10 Statement of Work (background, cost, schedule, scope and project team) 01 10 11 Criteria 01 10 12 Administrative 01 10 13 Design After Award 01 10 14 Construction 01 10 15 Commissioning 01 10 16 Closeout & Warranty 01 10 17 Schedule 01 10 18 Quality Control 01 10 19 Safety 01 10 20 Environmental Protection 01 10 21 Temporary Construction Facilities Acronyms

Division 01: Attachments:

A. Concept of Operations B. Program for Design C. Drawings

--- End of Project Table of Contents ---

Section 00 21 00 - Instructions, Conditions & Notices to Offerors

NOTICES TO OFFERORS

SECTION 00 21 00

INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS

1.0 CONTRACT DESCRIPTION

2.0 GENERAL PROCEDURES/REQUIREMENTS

3.0 INTRODUCTION NOTICE TO OFFERORS

4.0 PREPARING PROPOSALS

5.0 GENERAL INSTRUCTIONS

6.0 SUMMARY

1.0 CONTRACT DESCRIPTION

This acquisition will be a firm-fixed price (FFP), indefinite delivery/indefinite quantity (ID/IQ), multiple award task order (MATOC), for design-build (DB) construction services. It will be procured using the two phase design-build selection procedures in accordance with FAR Part 36.3. The acquisition is unrestricted with a small business reserve. A combined pool of three (3) or more small business Offerors and three (3) or more Offerors comprising the unrestricted pool will be established with a shared capacity of $900M. A small business reserve will be utilized in which all projects valued at $12 million and below will be a small business set aside within the MATOC. Projects valued at over $12 million will be competed among all MATOC holders. If there is no competition on a project valued at $12 million and below from small business, then the project will be competed among all MATOC holders.

The contract duration will be five (5) years from date of award.

The total value of all task orders awarded under this MATOC will not exceed $900 million. The minimum guarantee amount for each contract not awarded the seed task order will be $10,000.00. Task orders will be firm-fixed price (FFP).

The NAICS code is 236220 and the small business size standard is $36.5 million.

2.0 GENERAL PROCEDURES/REQUIREMENTS

PRELIMINARY REVIEW

Proposals shall describe the capability of the Offeror to perform the requirements of the Solicitation. Proposals should be specific and complete in every detail; and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. Proposals should be practical, legible, clear, and coherent.

In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. The price proposals will be separated from the technical proposals. Technical proposals will be provided to the designated Technical Evaluation Team and Price Proposals will be provided to the designated Price Evaluation Advisors, with both teams under the direct guidance and oversight of Contracting Officer. Proposal clarity, organization, and cross-referencing are mandatory.

Failure to submit and organize proposals as requested may adversely affect an Offeror's evaluation.

3.0 INTRODUCTION NOTICE TO OFFERORS

This section is designed to provide the Offeror with instructions to complete and deliver a complete competitive proposal in response to this request for proposals (RFP). Oral proposals are not solicited for Phase one (I). The selection procedures to be used will be a two-phase approached IAW FAR Subpart 36.3. The two-phase selection procedure authorized under 10 U.S.C. 2305a allows Offerors to submit information related to specialized experience, technical competence, capability to perform, past performance, teaming arrangements and/or other information requested in Phase I. In Phase I, price is not a submission requirement. In Phase I, the Government reserves the right to reject any and/all offers.

Based on information submitted in Phase I, the Source Selection Authority (SSA) will select from the most qualified Offerors, no more than five (5) small businesses and no more than five (5) firms from the unrestricted pool, to advance onto Phase two (II) in the competition and are subsequently invited to submit price proposals and technical design products as part of the technical proposals for evaluation during Phase II. The price proposal will include the bid schedule for the initial seed project pricing. Only one (1) Offeror awarded an IDIQ MATOC contract will be eligible for award of the seed project. The Government is not obligated to award an IDIQ MATOC contract to all offerors competing in Phase II. The Government reserves the right to reject any and/all offers in Phase II.

In accordance with FAR 36.303-1(a)(4), approval has been received to select a number greater than five offerors to advance onto Phase II of the acquisition.

All proposals must be complete and timely to be considered.

3.1 Acquisition Method:

The method of acquisition for this procurement considers the Best Value continuum, wherein a Best Value source selection process will be utilized in accordance with the Federal Acquisition Regulation (FAR) Subpart 15.101.

Award will be made to the proposal that represents the best value to the Government as determined by the Source Selection Official. The proposal determined to be the Best Value may not be the lowest price or the highest technically rated proposal. The decision will involve a comparison and trade-off analysis of the combination of non-cost strengths, weaknesses, and risks, the evaluated cost/price offered in each proposal, and judgment as to which proposal provides the best combination. As a result Offerors must provide their best proposal with all required information in the required format. Information provided must be complete, clear and legible to obtain the best evaluation rating possible.

3.2. Contract Cost Ceiling Limitation for Design and Construction Costs:

The design and construction costs will be subject to the funds available for each Task Order. The current capacity for the design and construction cost for the five (5) year MATOCs is $900M. The total MATOC awards shall not exceed the anticipated capacity amount of $900M for this contract. Offerors are notified that they are under no obligation to approach this ceiling. The Government will track capacity availability in order not to exceed the $900M.

3.3. The solicitation process is known as the “Request for Proposals” or the acronym: “RFP”. Interested firms or joint venture entities (referred to as “Offerors”) may submit certain specified performance capability proposals, demonstrating their capability to successfully execute the contract resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described herein.

3.4. The Government will evaluate the proposals, in accordance with the criteria described in Sections 00 22 10 and 00 22 20 in the solicitation and award a firm-fixed-price design-build construction contract to the responsible Offerors whose proposals conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government considering all factors, sub-factors, and price. Price will not be rated, but will be evaluated for fairness and reasonableness.

3.5. The proposals must describe the capability of the Offerors to perform the work, describe the Offerors’ understanding of the requirements contained in the solicitation and set forth full, accurate, and complete information as required by the Request for Proposals (RFP). The proposal should be prepared simply and economically in the prescribed format and be complete, legible, clear and coherent.

3.6. The Government included Federal Acquisition Regulation (FAR) clause 52.215-1, Instructions to Offerors, in this RFP. This clause states that the Government intends to make award based on initial offers, without discussions, but reserves the right to conduct discussions with all Offerors determined to be part of the competitive range or those being selected to continue to Phase II, should the Source Selection Authority deem discussions necessary.

3.7. Oral Presentations: The Government may conduct oral presentations after selection of Phase II Offerors.

Location, assigned dates and times for each potential Offeror will be provided at a later date if it is determined oral presentations are necessary.

3.8. Offerors will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this Request for Proposal does not constitute an award commitment on the part of the Government.

3.9 Contract Type: Multiple firm-fixed-price design-build construction contracts requiring delivery and installation are contemplated for this Acquisition.

4.0 PREPARING PROPOSALS

Proposal submittal information is located in each phase section (00 22 10 & 00 22 20).

5.0 GENERAL INSTRUCTIONS

Proposal Compliance Review: This is an initial check by Contracting Division on the basis of RFP requirements.

This review may eliminate those proposals which fail to provide all required information and documents in the formal and detail specified. This review is to ensure that all required forms are complete.

Submit proposals initially on the most favorable terms from a price and technical standpoint. Do not assume that firms will be contacted or afforded an opportunity to clarify, discuss or revise their proposals. Submit proposals in tabbed, three-ring binders. Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.

6.0 SUMMARY

6.1 Project Title: Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOC) for Design-Build (DB) Construction in Support of U. S. Air Force Medical Services Agency (AFMSA), U. S. Army Corps of Engineers (USACE), Little Rock District (CESWL)

6.2 Location: Continental United States (CONUS), Alaska (AK) and Hawaii (HI)

6.3 Proposed Contract Type: Firm-Fixed Price (FFP), Multiple Award Task Order Contract (MATOC).

6.4 Design-Build: Yes

6.5 Source Selection Process: Best Value, Trade-Off, IAW FAR 15.101-1

6.6 Who May Submit Proposals: This requirement is unrestricted with a small business reserve. The NAICS for this project is 236220, with a size standard of $36.5 Million, as determined by the U.S. Small Business Administration.

END OF SECTION 00 21 00

CLAUSES INCORPORATED BY REFERENCE

52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.222-33 Alt II Notice of Requirement for Project Labor Agreement (MAy

2010) Alternate I

MAY 2010

52.236-28 Preparation of Proposals--Construction OCT 1997

CLAUSES INCORPORATED BY FULL TEXT

52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM DESCRIPTIONS

LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION INFORMATION SYSTEM

(ASSIST) (APR 2014)

(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(1) ASSIST (https://assist.dla.mil/online/start/);

(2) Quick Search (http://quicksearch.dla.mil/);

(3) ASSISTdocs.com (http://assistdocs.com).

(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--

(1) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);

(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone

(215) 697-2667/2179, Facsimile (215) 697-1462.

(End of provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of three (3) or more firms comprising the unrestricted pool and three (3) or more small business Indefinite Delivery-Indefinite Quantity (IDIQ) firm-fixed price contracts resulting from this solicitation.

52.216-27 SINGLE OR MULTIPLE AWARDS. (OCT 1995)

The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to a combined pool of three (3) or more small business and three (3) or more firms comprising the unrestricted pool under this solicitation.

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause

52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from US Army Corps of Engineers, Contracting Division, Little Rock District, 700 West Capitol Avenue, Room 7315, Little Rock, AR 72201-3225.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

Information pertaining to the site visit for the seed project will be provided to the Offerors selected for consideration in Phase II.

Information pertaining to future site visits will be provided to MATOC holders in the solicitation for each task order.

(c) Participants will meet at--

TBD

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

252.211-7001 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM DESCRIPTIONS

NOT LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION INFORMATION

SYSTEM (ASSIST), AND PLANS, DRAWINGS, AND OTHER PERTINENT DOCUMENTS (MAY 2006)

Offerors may obtain the specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation by submitting a request to:

US Army Corps of Engineers

Little Rock District

700 West Capitol Avenue

Room 7315

Little Rock, AR 72201

Include the number of the solicitation and the title and number of the specification, standard, plan, drawing, or other pertinent document.

(End of Provision)

252.228-7004 BONDS OR OTHER SECURITY (DEC 1991)

(a) Offerors shall furnish a bid guarantee in the amount of 20% of bid price or $3 Million, whichever is less, with their bids. The Offeror receiving notice of award shall furnish--

(1) A performance bond in the penal amount of 100% of the task order price (for seed project and subsequent task orders issued to MATOC holders) ; and

(2) Payment in full of any sum due the Government.

(b) The Contractor shall furnish the performance bond to the Contracting Officer within 10 days after receipt of the notice of award. The Contracting Officer will not issue the notice to proceed until receipt of an acceptable performance bond and payment of any sum due the Government.

(c) Bonds supported by sureties whose names appear on the list contained in Treasury Department Circular 570 are acceptable. Performance bonds from individual sureties are acceptable if each person acting as a surety provides a SF 28, Affidavit of Individual Surety, and a pledge of assets acceptable to the Contracting Officer.

(End of clause)

252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)

(a) The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for --

(1) Furnishing all plant, labor, equipment, appliances, and materials; and

(2) Performing all operations required to complete the work in conformity with the drawings and specifications.

(b) The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule.

NON-GOVERNMENT ADVISORS

TECHNICAL ADVISORS: The Government reserves the right to allow technical advisors to review all proposals.

Technical advisors may be Government contract employees or third party consultants. Technical Advisors are prohibited from voting.

(1) Offerors are advised that employees of the firms identified below may serve as non-government advisors in the source selection process. These individuals will be authorized access only to those portions of the proposal data and discussions that are necessary to enable them to perform their respective duties. Such firms are expressly prohibited from competing on the subject acquisition.

Don J. Napierela, CACI-ISS, Inc. - Contractor for AFMSA (Healthcare Medical Equipment Planner) Cynthia Jones Miller, Health Facility Solutions (HFS) - Contractor for AFMSA (Healthcare Interior

Designer)

Sharon Y. Roberts, CACI-ISS, Inc. - Contractor for AFMSA (Healthcare Commissioning and Mechanical Electrical Plumbing (MEP)

B. Allison. Keck, Polu Kai Services, Inc. - Contractor for AFMSA (Healthcare Design-Build-Initial Outfitting Integrated Project Delivery (IPD) Methodology and Transition Planning

(2) In accomplishing their duties related to the source selection process, the aforementioned individuals may require access to proprietary information contained in the Offerors’ proposals. Therefore, pursuant to FAR 9.505-4, these individuals must execute an agreement with each Offeror that states that they will (1) protect the Offerors’ information from unauthorized use or disclosure for as long as it remains proprietary and (2) refrain from using the information for any purpose other than that for which it was furnished.

NOTE: This requirement shall flow down to all subcontractors.

DFARS 252.203-7996

PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS- REPRESENTATION (DEVIATION 2016-00003)(0CT 2015)

(a) In accordance with section lOl(a) of the Continuing Appropriations Act, 2016 (Pub. L. 114-53) and any subsequent FY 2016 appropriations act that extends to FY 2016 funds the same restrictions as are contained in section 743 of division E, title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), none of the funds appropriated (or otherwise made available) by this or any other Act may be used for a contract with an entity that requires employees or subcontractors of such entity seeking to report fraud, waste, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or contactors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency aut horized to receive such informa tion.

(b) The prohibition in paragraph (a) of t his provision does not contravene req uireme nts applica ble to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(c) Representation. By submission of its offer. t he Offeror represents th at it does not req uire employees or subcont ractors of such en tity seeking to report fra ud, waste , or abuse to sign or comply with in ternal confidentiality ag reements or statements prohibiting or otherwise restricting such employees or contractors from lawfully reporting such waste, fraud or abuse t o a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

( End of p rovision )

Section 00 22 10 - Phase 1 of a 2 Phase Design Build Selection Process

PHASE I INFORMATION

SECTION 00 22 10

PHASE I PROPOSAL SUBMISSION REQUIREMENTS AND EVALUATION CRITERIA

PHASE I – GENERAL REQUIREMENTS

1. INQUIRIES

OFFEROR'S QUESTIONS AND COMMENTS:

Questions and/or comments relative to these documents should be submitted via e-mail to:

U.S. Army Corps of Engineers, Little Rock District ATTN: Bettye Lou Mahoney 700 W. Capitol Ave, Rm 3410 Little Rock, AR 72201

Phone: 501-340-1056 Email: bettye.l.mahoney@usace.army.mil

BIDDER INQUIRY:

Technical inquiries and questions relating to proposal procedures and bonds are to be submitted via:

Bidder Inquiry in ProjNet at http://www.projnet.org/projnet

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.

To self-register go to web page identified above, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: W9127S-16-R-6000

The Bidder Inquiry Key is: 7PXPCK-ET7MGY

The Phase I Review is open from July 7, 2016 through July 22, 2016

The Bidder Inquiry System will be unavailable for new inquires ten (10) calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

Oral explanations or instructions are not binding. Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

As this is a competitive negotiation acquisition, there is no public bid opening and no information will be given out as to the number of Offerors or the results of the competition until all awards are made.

2. DIRECTIONS FOR SUBMITTING PROPOSALS:

Submit proposals to:

CONTRACTING DIVISION

USACE, LITTLE ROCK (W9127S)

700 W. CAPITOL AVE, ROOM 7315

LITTLE ROCK, AR 72201-3225

Facsimile (fax) proposals will not be accepted.

The Packaging:

The Proposals shall be marked:

“Proposals for Solicitation Number: W9127S-16-R-6000-PHASE I- AFMSA, MATOC DBIO CONSTRUCTION

SERVICES “DO NOT OPEN”

Submission Deadline:

Offer Closing Date: August 16, 2016, Offer Closing Time: 2:00PM CT Proposals shall be received by the Corps of Engineers no later than the time and date specified.

Submission Format:

Cover Sheet & Table of Contents. Phase I Proposals shall consist of one volume. A cover sheet identifying the Offeror (name, address, point of contact) and solicitation number shall be provided. The second sheet shall be a table of contents. The proposals shall contain a detailed table of contents. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. Neither the cover sheet nor the table of contents count toward the page limitations.

Tabs. Written proposal materials shall be submitted in standard three-ring loose‐leaf binders. Proposals shall be tabbed and labeled as specified in a manner to afford easy identification from a Table of Contents.

Font Size. Shall not be less than 10 point.

Sheet Size. Shall be 8‐1/2 inches x 11 inches; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches and folded to 8‐1/2 inches x 11 inches shall be used. Sheets that are 11 x 17 inch will be counted as two 8‐1/2 inch x 11‐inch sheets against the page limit. All sheets shall be dated and numbered.

Page Limits. Pages will be double‐sided and each page shall be identified with the appropriate page number centered at the bottom of the page. The proposal shall not exceed the page limits specified in the Submission Requirements of each technical factor. The Government will not review any information in excess of the page limits or information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.

Number of Copies. Offerors shall submit one (1) original and seven (7) hard copies of their proposal with seven (7) electronic copies (CDs).

PHASE I ‐ SUBMISSION REQUIREMENTS

GENERAL REQUIREMENTS:

The proposal shall describe the capability of the Offeror to perform the program requirements. The proposal should be specific and complete in every detail; and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.

In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affect an Offeror's evaluation.

Proposals shall not include any cost information and shall not exceed the page limits described. Provide all information in tabbed sections. Appendices and attachments are not permitted and will not be evaluated.

No technical designs, prices/costs or detailed technical illustrations are required or requested and will not be evaluated.

PHASE I – TECHNICAL PROPOSAL FACTORS

Volume 1, Tab A – Factor 1: Relevant Qualifications & Experience Volume 1, Tab B – Factor 2: Management Approach Volume 1, Tab C – Factor 3: Technical Approach Volume 1, Tab D – Factor 4: Past Performance Volume 1, Tab E Required Proposal Documents

Weight among technical factors for Phase I:

FACTOR LOCATION DESCRIPTION RELATIVE IMPORTANCE

Factor 1 Vol. 1, Tab A Relevant Qualifications & Experience

Factors 1 and 4 are of equal importance and are more important than Factors 2 and 3.

Factor 2 Vol. 1, Tab B Management Approach Factors 2 and 3 are of equal importance and are less important than Factors 1 and 4.

Factor 3 Vol. 1, Tab C Technical Approach Factors 2 and 3 are of equal importance and are less important than Factors 1 and 4.

Factor 4 Vol. 1, Tab D Past Performance Factors 1 and 4 are of equal importance and are more important than Factors 2 and 3.

Format and Content of Volume 1 and List of Tabs: Volume 1 shall be appropriately labeled as such and shall be organized as indicated in the following chart:

PHASE I – TECHNICAL PROPOSAL

VOLUME 1 – Submit an “Original” and seven (7) hard copies and seven (7) digital CD copies

TAB Contents of the Phase I – Technical Proposal

A Factor 1: Relevant Qualifications & Experience

B Factor 2: Management Approach

C Factor 3: Technical Approach

D Factor 4: Past Performance

E REQUIRED PROPOSAL DOCUMENTS

E1 SF 1442 and Acknowledgement of Amendments (SF30)

E2 Proposal Cover Sheet (Attachment 1)

E3 Agreement with Non-Government Advisors

FACTOR 1 – RELEVANT QUALIFICATIONS & EXPERIENCE (VOL 1, TAB A)

SUBMISSION REQUIREMENT: Page Limit: Five (5) Pages. Submit five (5) project examples that communicate recent and relevant experience completed by the proposed team members. Recent means projects completed, or in progress with at least 80% construction in place, within 5 years from the date of this solicitation.

Relevant means projects that are predominately self-performed on-site by the Prime Contractor and similar to the projects outlined in the following program description:

Most projects (task orders) range between $750K and $75M with an average performance period of 2-4 years. The scope of the work includes “cradle-to-grave” services such as design, construction, outfitting, excessing, moves (aka “transition”), and demolition and will be predominately healthcare facilities such as inpatient care, outpatient clinics, medical research and labs, outpatient rehabilitation, dental, veterinary, pharmacies, etc. Most projects will be required to meet a minimum of LEED Silver certification, range between 20,000-400,000 SF, and involve either multi-phased renovation projects all while maintaining on-going healthcare operations or new construction. It is estimated that approximately six (6) to twelve (12) task orders will be executed annually so contractors may be required to simultaneously delivery multiple projects at different locations. Projects will be mostly for Air Force clients, but other Federal/Department of Defense clients (such as Army) may also use the contract so familiarity with DOD criteria is required. Using integrated project delivery (IPD) principles and Lean processes, the contractors and their partners/subcontractors will be required to work closely with multiple stakeholders to include users, owner and installation representatives, government subject matter experts, architectural review boards, etc.

At a minimum, communicate relevant experience by outlining: the cost of the project (i.e. ><$12M small business, >$12M large), the date of project; performance period and percent complete (i.e. 2-4 years, 80% complete); scope to include facility type (hospital, clinic, dental, veterinary treatment, lab etc.), the work involved (design, construction, outfitting, etc.), and type of work (new construction, renovation, additions); project team to include client &/or agency (Kaiser, USACE, Air Force, VA, Sutter Health, etc.) and types of key subcontractors involved in the execution; and the project delivery method used (DBB, DB, DB via IPD (e.g. IDBIO), CM at Risk, etc.) and criteria used to design the facility.

Offerors representing the combining of two or more companies for the purpose of this RFP must describe the nature of the association; indicate whether the firms have experience working together in design-build-outfitting ventures, including how long and how many projects. If the Joint Venture (JV), or teaming arrangement, has little or no recent and/or relevant projects performed, then each member of the teaming arrangement and/or JV may provide a combined total of five projects. Experience by other corporate entities or JVs not named on the Standard Form (SF) 1442 is prohibited and will not be evaluated.

EVALUATION CRITERIA: The Government will use recent and relevant specialized experience to assess the Offeror’s probability of successfully performing the scope of work described in this RFP. For this solicitation, the government considers the more projects that align with the features outlined in the above program description, the more likely the contractor will successfully perform in this program. Healthcare facility renovation qualifications and experience is more relevant than new construction. Experience with DOD criteria is more relevant than experience with just private industry criteria, and IDBIO plus transition service experience is considered more relevant than experience with other project delivery methods.

FACTOR 2 – MANAGEMENT APPROACH (Volume 1, Tab B)

SUBMISSION REQUIREMENT: Page Limit: Eight (8) Pages. Describe (via illustration and narrative) how your company will manage multiple, concurrent task orders issued under the contract. Provide:

a. Program Management Plan. Provide an illustration of how you would resource the program detailed in the

RFP, who would fill the various roles, and how you would support multiple and simultaneous projects awarded against this contract.

Clearly illustrate the responsibilities and lines of communication and authority relative to your program management team. Describe your plan to interface with program leadership for informational, collaborative and historical purposes. Describe your process for optimizing communication and integration with government and key stakeholders at the Program level.

b. Project Management Plan. Provide a typical project staffing plan and what services the Offeror will self-perform. Include the title of their role and at what stages of the project they will be involved. Include all key personnel, subcontractors and/or consultants. Clearly illustrate the responsibilities and lines of communication and authority relative to your project management team. Describe your process for optimizing communication and integration with government and key stakeholders at the Project level. Describe how contractor key personnel will work with subcontractors to achieve results. Your project management plan should address the following:

1. Change Management Plan. Describe your approach to change management. Include your understanding of how funding, timing, project management tools & systems would be utilized to manage contract changes.

2. Risk Management Plan. Describe key tasks required to maximize integrated project delivery processes to proactively address risks. Describe how you will forecast, mitigate, and address risks as it relates to cost, schedule, scope, quality and safety during a project’s life cycle.

3. Quality Control Plan. Describe your formal process of control quality relative to your management approach.

EVALUATION CRITERIA The proposal will be evaluated to determine the extent to which the Program and Project Management Plans:

a. Program Management Plan demonstrates Offeror has applied the right skill sets at the right time during the course of a given program and identifies and meets the requirements outlined in the RFP. Demonstrates Offeror’s understanding of internal and external communication protocols, roles and responsibilities, and integrated design-build and outfitting.

b. Project Management Plan demonstrates Offeror has applied the right skill sets at the right time during the course of a project and identifies and meets the requirements outlined in the RFP. Demonstrates Offeror’s understanding of internal and external communication protocols, roles and responsibilities, and integrated design-build and outfitting.

1. Change Management Plan demonstrates Offeror’s understanding of how change management must be administered and the tools and protocols as they relate to the requirements of the RFP, including funding parameters, to manage the project.

2. Risk Management Plan demonstrates the Offeror’s understanding of the fundamental principles relative to the project delivery methodology to include resources required to proactively manage risk during the life cycle of the project.

3. Quality Control Plan demonstrates the Offeror has a formal process in place to control quality throughout the course of the project.

Factor 3 – Technical Approach (Volume 1, Tab C)

SUBMISSION REQUIREMENT: Page Limit: Ten (10) pages. Submit how you will technically approach the project described in the RFP. Include a narrative and supporting graphics and/or tables. Note: Do NOT show floor or departmental block plans or detailed technical designs; they will not be reviewed or accepted as part of your proposal.

a. Design Development. Describe your design development approach for the project outlined in the RFP to include the process by which you would provide physical space, systems, furniture, and equipment that promotes innovative and lean business practices, operational efficiencies, and patient well-being. Highlight who is involved, the submittal process, and the quality control measures implemented to ensure the project requirements are achieved.

b. Criteria &…