- Construct Foreign Military Sales Facility Eglin, Air Force Base, Florida Federal contract opportunity
- Solicitation number
- W91278-18-R-0008
About this file
W9127818R0008 AM02
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AM02-DRAWINGS.pdf | ||
| W9127818R0008_Sign_In_Sheet.PDF | ||
| W9127818R0008_AM01_Drawings.pdf | ||
| W9127818R0008_AM01.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)
W9127818R0008-0002 11 JAN 2018 M015FR84
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W9127818R0008
9B. DATED (SEE ITEM 11)
29 NOV 2017
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: CONSTRUCT FOREIGN MILITARY SALES FACILITY, EGLIN AIR FORCE BASE, FL
Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS/DRAWING REVISIONS FOR AMENDMENT NO. 0002 NOTE: THE RECEIPT OF PROPOSAL DATE IS HEREBY REVISED BY THIS AMENDMENT. REFER TO THE ENCLOSED SF1442, SOLICITATION, OFFER & AWARD FORM.
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
CONSTRUCT FOREIGN MILITARY SALES FACILITY W9127818R0008
EGLIN AIR FORCE BASE, FLORIDA M015FR84
SF 30 Page 2 W9127818R0008-0002
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph SECTION Page, and/or Section
Table of Contents Revised as indicated herein.
SF1442, Solicitation, Offer & Award Form Revised as indicated herein.
Bidding Schedule Revised as indicated herein.
Explanation of Bid Items Revised as indicated herein.
SF24, Bid Bond Replaced in its entirety.
00800 Revised Section 00800 Index
01 00 00 Revised Paragraph 1.19
01 33 00 Revised Paragraph 1.11.1
Replaced Submittal Register associated with Section 07 15 00
Added Submittal Register associated with Section 07 27 26
02 41 00 Revised Paragraph 1.8
07 15 00 Revised Paragraphs 1.2 and 2.2
07 27 26 Added in its entirety.
21 30 00 Revised Paragraphs 2.15 and 2.15.2
23 52 00 Revised Paragraphs 2.5.17.1 and 3.3.15
Deleted Paragraphs 2.9.2, 2.9.2.1, 2.9.2.2, 2.9.2.3,
2.9.2.4 and 2.9.2.5
Appendix D Revised Section 8, Order Data Sheets A-1A, A-1B, A-2A, A-2B, A-6, A-9, A-10 AND A-12
Revised Section 10, Order Data Sheets C-1, C-3 and C-4A
Revised Section 11, Order Data Sheet D-5
SF 30 Page 3
Appendix D Revised Section 12, Order Data Sheets S-1, S-2, S-6 and S-12
Revised Section 13, Order Data Sheet WB-1
PART II - REVISIONS MADE BY DELETED PAGES/SECTIONS
The pages and/or sections listed below are to be deleted from the specifications by the bidders and marked "DELETED":
Page/Section
00800 Deleted Clause UAI 5152.236-9009
PART III - NOTE: Revised drawings are listed below. These revised drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised by this amendment shall be deleted from the folio.
SHT
REF. TITLE OF DRAWINGS
COVER SHEET
CS101 SITE PLAN
CS500 CIVIL DETAILS
S-102 FIRST FLOOR SLAB PLAN
S-104 SECOND FLOOR SLAB PLAN
S-106 ROOF SLAB PLAN
S-302 FOUNDATIONS SECTIONS
S-303 FOUNDATION SECTIONS
S-501 TYPICAL STRUCTURAL SLAB DETAILS
A-002 AIR BARRIER PLANS AND SECTIONS
A-101 COMPOSITE PLAN FIRST FLOOR
A-102 FIRST FLOOR PLAN WEST
A-103 FIRST FLOOR PLAN EAST
A-104 COMPOSITE PLAN SECOND FLOOR
A-105 SECOND FLOOR PLAN
A-120 ROOF PLAN
A-201 OVERALL BUILDING ELEVATIONS
A-202 ENLARGED NORTH ELEVATION
A-203 ENLARGED SOUTH ELEVATION
A-204 ENLARGED EAST AND WEST ELEVATIONS
A-310 WALL SECTIONS
A-311 WALL SECTIONS
A-312 WALL SECTIONS
A-320 WALL DETAILS
SF 30 Page 4
A-411 ENLARGED SECOND FLOOR RESTROOM
A-412 ENLARGED 2ND FLOOR RESTROOM ELEVATIONS AND DETAILS
A-510 ROOF DETAILS
A-601 WALL TYPES
A-611 DOOR SCHEDULE AND DETAILS
A-622 WINDOW DETAILS
FA101 FIRST FLOOR WEST FIRE ALARM & MASS NOTIFICATION PLAN
FA102 FIRST FLOOR EAST FIRE ALARM AND MASS NOTIFICATION PLAN
M-103 HVAC WEST FIRST FLOOR PLAN
M-104 HVAC EAST FIRST FLOOR PLAN
M-105 HVAC WEST SECOND FLOOR PLAN
M-106 HVAC EAST SECOND FLOOR PLAN
M-503 HVAC DETAILS
M-504 HVAC DETAILS
EL102 FIRST FLOOR EAST LIGHTING PLAN
EP001 POWER LEGEND
EP102 FIRST FLOOR EAST POWER PLAN
EY102 FIRST FLOOR EAST ELECTRONIC SYSTEMS PLAN
EY502 INTRUSION DETECTION SYSTEM DETAILS & RISERS
TN102 FIRST FLOOR EAST TELECOMMUNICATION PLAN
TN501 TELECOMMUNICATION DETAILS
TN601 TELECOMMUNICATION RISER DIAGRAMS
TN602 TELECOMMUNICATION RISER DIAGRAMS
TN603 TELECOMMUNICATION RISER DIAGRAMS
TN604 TELECOMMUNICATION RISER DIAGRAMS
TN605 TELECOMMUNICATION RISER DIAGRAMS
Encl as stated:
Revised pages of the specifications as indicated in Part I.
50 Revised drawings as indicated in Part III.
Table of Contents Page 1 Amendment No. W9127818R0008-0002
TABLE OF CONTENTS
VOLUME 1 OF 4
CHECKLIST FOR PREPARATION OF OFFERS
BIDDING REQUIREMENTS
Contract Clauses
STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD
BIDDING SCHEDULE
EXPLANATION OF BID ITEMS
STANDARD FORM 24 - BID BOND
STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY
STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES
00100 INSTRUCTIONS TO BIDDERS
00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD
00600 REPRESENTATIONS & CERTIFICATIONS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
CESAM FORM 1151, PROMPT PAYMENT CERTIFICATION
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
PROJECT SIGNS
DD FORM 1354
DD FORM 1354 CHECKLIST
WAGE RATES
01 00 01 GENERAL CONTRACT REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
FORM 4025
01 33 29 SUSTAINABILITY REPORTING
AIR FORCE SUSTAINABILITY REQUIREMENTS SCORESHEET
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
SAM FORM 696
01 45 35 SPECIAL INSPECTIONS
STATEMENT OF SPECIAL INSPECTIONS
SCHEDULE OF SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
Table of Contents Page 2 Amendment No. W9127818R0008-0002
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY
04 20 00 UNIT MASONRY
VOLUME 2 OF 4
DIVISION 05 - METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 15 00 WALL AIR AND VAPOR BARRIERS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 23 LOOSE FILL THERMAL INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 60 00 FLASHING AND SHEET METAL
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 06 00 SCHEDULE FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
Table of Contents Page 3 Amendment No. W9127818R0008-0002
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 – SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 19 DEMOUNTABLE MOVABLE PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 11 – EQUIPMENT
11 31 13 ELECTRIC KITCHEN EQUIPMENT
DIVISION 12 – FURNISHINGS
12 21 00 WINDOW BLINDS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 14 – CONVEYING EQUIPMENT
14 24 00 HYDRAULIC ELEVATORS
DIVISION 21 – FIRE SUPPRESSION
21 13 13.00 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 18.00 PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 – PLUMBING
22 00 00.00 PLUMBING, GENERAL PURPOSE
VOLUME 3 OF 4
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00.00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING OF HVAC SYSTEMS
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00 COMMISSIONING OF HVAC SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
Table of Contents Page 4 Amendment No. W9127818R0008-0002
23 11 25 FACILITY GAS PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 13.10 30 ELECTRIC METERS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 15.00 10 NATURAL GAS-GENERATOR SET STATIONARY 100-2500 KW, WITH
AUXILIARIES
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET COMMUNICATION
SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 40 00 AUDIO-VISUAL SYSTEMS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
VOLUME 4 OF 4
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 17 HOT MIX BITUMINOUS PAVEMENT FOR ROADS AND PARKING
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
Table of Contents Page 5 Amendment No. W9127818R0008-0002
DIVISION 33 - UTILITIES
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
APPENDICES
APPENDIX A SOIL BORING LAYOUT, LOGS AND LAB TEST DATA
APPENDIX B DOD MANUAL 5205.07 VOLUME 3 AND AFMAN 16-703 VOLUME 3 SPECIAL
ACCESS PROGRAM SECURITY MANUAL
APPENDIX C IDC 705 TECHNICAL SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED INFORMATION FACILITIES
VERSION 1.4
APPENDIX D FURNITURE, FIXTURE AND EQUIPMENT SPECIFICATION FORMS
--End of Project Table of Contents--
This page was intentionally left blank for duplex printing.
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9127818R0008
2. TYPE OF
SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
29 NOVEMBER
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
72646684
6. PROJECT NO.
M015FR84
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S. ARMY ENGINEER DISTRICT, MOBILE
CONTRACTING DIVISION (CESAM-CT)
(109 ST. JOSEPH ST. 36602) P.O. BOX 2288
MOBILE, AL 36628-0001
SAME AS BLOCK 7
IF HAND CARRIED, DELIVER TO
ROOM 1009
9. FOR INFORMATION
CALL :
A. NAME
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Construct Foreign Military Sales, Eglin AFB, FL
* Block 11. – Refer to Section 01 00 00 for the number of calendar days after receiving the notice to proceed to begin performance and to complete the entire work.
** Block 13A. – Refer to Section 00 11 00 for the number of copies to submit with the original offer.
11. The Contractor shall begin performance within _*_________ calendar days and complete it within ____*_____ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _ __.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and ___**____ copies to perform the work required are due at the place specified in Item 8 by__1400___ (hour) local time 17 24 JANUARY 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than ____120_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101
STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(e)
Revised by Amendment No. W9127818R0008-0002
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation – give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304© ( ) 41 U.S.C. 253© ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award con-summates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
STANDARD FORM 1442 BACK (REV. 4-85)
Reissued by Amendment No. W9127818R0008-0002
Bid Schedule page - 1 Amendment No. W9127818R0008-0002
BIDDING SCHEDULE
BIDDER'S NAME:_______________________________________________________________
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount___
Base Bid:
1. Construction of New
Building 1 Job XXX ___________
2. Construction of Associated Site Work and Utilities 1 Job XXX ___________
3. Natural Gas Connection with Okaloosa Gas District 1 Job $5,000 $ 5,000.00
Total Base Bid ___________
Bid Option No. 1
4. Comprehensive Interior Design (CID) Package 1 Job XXX ___________
Bid Option No. 2
5. AV Equipment and Cabling, VTC System (Recording Equipment, Cameras, and Cabling) Package 1 Job XXX ___________
Bid Option No. 3
6. Exterior Pavilion 1 Job XXX ___________
Bid Option No. 4
7. Backup Generator 1 Job XXX ___________
Total Base Bid Plus All Bid Options ___________
Bid Schedule page - 2
NOTES FOR BIDDING SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest bid schedules as published in the solicitation or the latest amendment thereto.
In lieu of indicating additions/deductions to contract line items, bidder should state the revised prices for each item. The company name should be indicated on the face of the bidding schedule to preclude being misplaced.
NOTE NO. 2. Bidders must insert a price on all numbered items of the Bidding Schedule. Failure to do so will disqualify the bid.
NOTE NO. 3. If a modification to a bid is submitted and provides for a job adjustment to the total estimated cost, the application of the job adjustment to each unit price and/or job price, in the bid schedule must be stated or, if it is not stated, the bidder agrees that the job adjustment shall be applied on a pro rata basis to every bid item in the bid schedule.
NOTE NO. 4. CONDITIONS GOVERNING EVALUATION OF BIDS AND AWARD OF CONTRACTS.
In accordance with the source selection criteria established in this solicitation, only one contract will be awarded on the bid schedule and award will be made on the Base Bid and selected Options. Evaluation of Base Bid and all Options shall be in accordance with Section 00 12 00 and the following clause:
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of clause)
The Government may require the delivery of the numbered line items, identified in the schedule as option items, in the quantity and at the price stated in the schedule. Subject to the availability of funds, the Contracting Officer may exercise Bid Option Nos. 1 and 2 by written notice to the Contractor within 365 calendar days of Notice to Proceed. Subject to the availability of funds, the Contracting Officer may exercise the option(s) Bid Option Nos. 3 and 4 by written notice to the Contractor within 180 calendar days of Notice to Proceed.
NOTE NO. 5. CHECKLIST FOR THE BIDDING SCHEDULE:
a. Is it completely filled out? Y__ NA__
b. It may not be altered either as to quantities or as to items offered. Y__
NA__
c. There can be no language of limitation either as to quantities or as to items offered. Y__ NA__
d. If you corrected your numbers, have you initialed these corrections? Y__
NA__
Bid Schedule page - 3
e. If the bidding schedule has been changed by Amendment, is the bidding schedule that you are submitting from the most recent amendment ? Y__ NA__
f. Do prices for each bid item include all costs, mark-ups and taxes (if any taxes are imposed)? Y__ NA__
g. Is the cost of obtaining your performance and payment bond included in the total bid price specified on the bid schedule? Y__ NA__
h. In preparing your bid, remember the Corps does not make advanced payments on its contracts Y__ NA__
NOTE NO. 6. ADDITIONAL SUBMISSION REQUIREMENTS:
a. Upon the Government’s request, the offeror shall submit a price breakdown of the bid items directly to the Mobile District Office. Details on where and how to send the breakdown will be provided by the requesting official making the request on behalf of the Government. The format of the breakdown will be left up to the offeror. However, as a minimum, the offeror shall provide pricing for the major categories of work under each bid item, for example: site improvements, landscaping, electrical, mechanical, etc. This information will not be needed sooner than three (3) working days after the proposal submission due date.
b. This information may required for the initial and, if requested, for any revised proposals.
NOTE NO. 7. The programmed amount (PA) for this project is $13,600,000.00.
Please note that the PA is subject to costs for Government supervision and overhead and amounts set aside by the Government for contingencies.
END OF BIDDING SCHEDULE
Explanation of Bid Items page - 1
EXPLANATION OF BID ITEMS
GENERAL:
This section comprises an explanation of the bid items identified in the Bidding Schedule. This section is a general scope of work for the bid items described in the Bidding Schedule and is not intended to be all encompassing in the description. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the plans/details as shown on the contract drawings. The contractor shall bid each type of work under the applicable bid item.
Measurement for payment will not be made. Payment described for the various bid items will be full compensation for all labor, materials, and equipment required to complete the work. Compensation for any item of work described in the contract but not listed in the bid schedule shall be included in the payment for the item of work to which it is made subsidiary.
BASE BID
Bid Item No. 1 – Construction of New Building
Payment under Bid Item No. 1 "Construction of New Building" will constitute full compensation for furnishing all materials, plant, tools, labor costs, special inspection services, and other associated incidentals necessary to complete the construction of the new building as required by the contract document drawings and specifications to a point 5 feet outside the building lines.
Bid Item No. 2 – Construction of Associated Site Work and Utilities
Payment under Bid Item No. 2 "Construction of Associated Site Work and Utilities" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the work beyond the 5 foot building lines of the Facility. Work includes, but not limited to, as required by the contract document drawings and specifications: clearing, grubbing, grading the site, hauling fill material, all exterior utilities, pavements, landscaping, site improvements, equipment enclosure, and demolition of existing site improvements. Includes the complete cost to construct the site work required to support the primary facility.
Bid Item No. 3 – Natural Gas Connection with Okaloosa Gas District
Payment under Bid Item No. 3 “Natural Gas Connection with Okaloosa Gas District” will constitute full compensation for the Contractor’s reimbursement to Okaloosa Gas District to complete the natural gas connection from the Okaloosa Gas existing main to Nomad Way to construct the distribution line within the site including service lines to the building. The Contractor shall coordinate with Mr. Mark Clark of Okaloosa Gas District to schedule this work.
Mr. Mark Clark can be contacted at 850-729-470 –cell 850-974-7019. The Contractor shall obtain certified receipts from Okaloosa Gas District for payments and the final fee for the design and installation work, and submit the receipts to the Contracting Officer’s Representative. Any change in the fee of $5,000 shall be reflected on the receipt and such change shall be administered in accordance with the Changes clause of Section 00700.
Explanation of Bid Items page - 2
BID OPTION NO. 1
Bid Item No. 4 – Comprehensive Interior Design (CID) Package
Payment under Bid Item No. 4 "Comprehensive Interior Design (CID) Package” will be at the contract job price and will constitute full compensation for the work associated with the CID Package, in accordance with requirements of the CID Package included as an Appendix of the contract document specifications, furniture drawings and Order Data Sheets.
BID OPTION NO. 2
Bid Item No. 5 – AV Equipment and Cabling, VTC System (Recording Equipment, Cameras, and Cabling) Package
Payment under Bid Item No. 5 "AV Equipment and Cabling, VTC System (Recording Equipment, Cameras, and Cabling) Package“ will be at the contract job price and will constitute full compensation for the work associated with the AV package included in contract document “TA” drawings and specification Section 27 40 00 AUDIO-VISUAL SYSTEMS. Provide the necessary equipment and components to provide complete and operational systems including all cabling, wiring, miscellaneous materials, installation and training. All costs for material, tools and labor for the AV rough-in infrastructure (including, but not limited to power, pathway conduits and boxes) as identified on the contract document “EY” drawings shall be in the Bid Item No. 1 Base Bid scope of work.
BID OPTION NO. 3
Bid Item No. 6 – Exterior Pavilion
Payment under Bid Item No. 6 "Exterior Pavilion“ will be at the contract job price and will constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary as shown on the drawings and specifications. All costs for material, tools and labor for the exterior power system rough-in infrastructure shall be in the Bid Item No. 2 Base Bid scope of work.
BID OPTION NO. 4
Bid Item No. 7 – Backup Generator
Payment under Bid Item No. 7 "Backup Generator“ will be at the contract job price and will constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary as shown on the drawings and specifications. This bid item will also constitute compensation of $20,500 for the reimbursement to Okaloosa Gas District to provide additional distribution line and service to the backup generator. This compensation is in addition to the $5,000 from Bid Item No. 3. All costs for material, tools and labor for supporting infrastructure such as conduits for feeders, remote alarm panel, and peripheral circuits shall be in the Bid Item No. 2 Base Bid scope of work.
END OF BID SCHEDULE
BID BOND
(See instructions on reverse)
OMB Control Number: 9000-0045 Expiration Date: 7/31/2019
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PERCENT
OF BID
PRICE
PENAL SUM OF BOND
AMOUNT NOT TO EXCEED
MILLION(S) THOUSAND(S) HUNDRED(S) CENTS
BID IDENTIFICATION
BID DATE INVITATION NUMBER
PRINCIPAL
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1. 2.
2.
3.
3.
(Seal) (Seal) (Seal) Corporate Seal
INDIVIDUAL SURETY(IES)
SIGNATURE(S)
NAME(S)
(Typed)
1.
1.
2.
2.
(Seal) (Seal)
CORPORATE SURETY(IES)
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2. Corporate Seal
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is NOT usable
STANDARD FORM 24 (REV. 8/2016)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
FOR (Construction, Supplies or Services)
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.
Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
DATE BOND EXECUTED (Must not be later than bid opening date)
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
JOINT VENTURE
OTHER (Specify)
PARTNERSHIPINDIVIDUAL
CORPORATION
Replaced in its entirety by Amendment No. W9127818R0008-0002
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.
(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.
(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.
The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2. Corporate Seal
Corporate Seal
LIABILITY LIMIT ($)STATE OF INCORPORATION
2.
2.
1.
1.NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
STANDARD FORM 24 (REV. 8/2016) BACK
Replaced in its entirety by Amendment No. W9127818R0008-0002
00800 - PAGE - 1
REVISED BY AMENDMENT NO. W9127818R0008-0002
Section 00800 – Special Contract Requirements
UAI 5152.231-9000 Equipment Ownership and Operating Expense Schedule………………2
UAI 5152.232-9000 Payment for Materials Delivered Off-Site……………………………...3
UAI 5152.236-9001 Personnel, Subcontractors, and Outside Associates or Consultants…….3
UAI 5152.236-9009 Partnering…………………………….………………….….…….…….5
UAI 5152.249-9000 Basis for Settlement of Proposals……….………………….…….…….5
01 00 00
AMENDMENT NO. W9127818R0008-0002
01 00 00
1.19 SCHEDULE OF AVAILABLE UTILITIES
Existing utilities are available in the project area. The Contractor is responsible for providing all temporary utilities until permanent utility connections are made. The Contractor is responsible for providing all connections to existing utilities and metering. Contractor will coordinate with Eglin Air Force Base Civil Engineering Group for utilities.
Once utility connections are made, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government, as indicated herein or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia. The utilities are privatized at Eglin AFB. For water, sewer, and power, the Contractor shall provide temporary service back to the connection to the water and sewer, or transformer for power, and the privatization Contractor will connect and later disconnect the temporary utility to the existing system. If medium voltage line extension is required, the Privatization Contractor will perform at a cost to the Contractor. The Privatization Contractor would later retire any pole or transformer that was just for temporary use. As such, the Contractor is responsible for formally requesting temporary service connection 30 days in advance from the privatization contractors through the COR to obtain these temporary utility connections until permanent utility connections are made. The Contractor is required to provide certified backflow preventers for the water and meters for all utilities, as well as pay all connection charges for temporary utilities and notify each utility provider through the COR when the Contractor is ready to remove the temporary connections distribution lines, meters, and associated paraphernalia. The contact information for connection pricing from these utility providers is as follows:
a. Water/Sewer: ASUS - POC: Joe Margio; Telephone: (850) 389-8773, ext.
103; Email: joe.margio@ecus.asusinc.com.
b. Electric: CHELCO - POC: Chris Eddy; Telephone: (850) 307-1229;
Email: ceddy@chelco.com.
Once utility connections are made, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government, as indicated herein or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The current utility rates are as follows:
Electric: $0.091 per KWh Natural Gas: $11.85 per Dekatherms Sewer: $2.42 per kilo gallons Water: $1.75 per kilo gallons
(NOTE: The remainder of the section is unchanged by the amendment.)
01 33 00
01 33 00
1.11.1 Review Notations
Contracting Officer review will be completed within 30 calendar days after date of submission. Submittals will be returned to the Contractor with the following notations:
(NOTE: The remainder of paragraph 1.11.1 is unchanged by the amendment.)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
CONSTRUCT FOREIGN MILITARY SALES FACILITY, EGLIN AFB, FL
07 15 00 SD-02 Shop Drawings
2.1 GShop Drawings
SD-03 Product Data
2.3 G DOClosed-cell sprayed polyurethane
foam barrier
3.4.2 G DOClosed-cell sprayed polyurethane
foam barrier 2.4Accessory materials
SD-04 Samples
1.7.3 G ROMock-Up
SD-05 Design Data
2.1 GDesign Data
SD-06 Test Reports
1.7.4.5 GTest Reports
1.7.4.5 G ROTest Reports
1.7.4.3 G ROWhole Building Air Leakage Test
1.7.4.5 G ROWhole Building Air Leakage Test
3.8.1 G ROWhole Building Air Leakage Test
1.7.4.3 G ROThermography Test
1.7.4.5 G ROThermography Test
3.8.2 G ROThermography Test
SD-07 Certificates
2.1 G ROManufacturer's certification of
materials compatibility
1.7.2.1 G ROInspector Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
REPLACED BY AMENDMENT NO. W9127818R0008-0002
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
07 15 00 1.7.4.1 G ROWhole Building Air Leakage Test Technician Qualifications
1.7.4.2 G ROThermography Technician
Qualifications
1.7.4.3 G ROTest Procedures
1.7.4.3 G ROTest Procedures
1.7.4.3 G ROTest Procedures
1.7.4.3 G ROTest Procedures
SD-08 Manufacturer’s Instructions
2.1 GManufacturer's instructions
2.1Material safety data sheets
(MSDS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
REPLACED BY AMENDMENT NO. W9127818R0008-0002
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
07 27 26 SD-01 Preconstruction Submittals
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.4 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
2.7 GReinforcement
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.4 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections
SD-07 Certificates
1.4 GFluid-Applied Membrane Air
Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
Added by Amendment No. W9127818R0008-0002
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
07 27 26 2.4 GTransition Membrane
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-08 Manufacturer’s Instructions
1.4 GFluid-Applied Membrane Air
Barrier
2.4 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1 SVolatile Organic Compound
(VOC) Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
Added by Amendment No. W9127818R0008-0002
02 41 00
02 41 00
1.8 FOREIGN OBJECT DAMAGE (FOD) NOT USED
Aircraft and aircraft engines are subject to FOD from debris and waste material lying on airfield pavements. Remove all such materials that may appear on operational aircraft pavements due to the Contractor's operations.
If necessary, the Contracting Officer may require the Contractor to install a temporary barricade at the Contractor's expense to control the spread of FOD potential debris. The barricade shall include a fence covered with a fabric designed to stop the spread of debris. Anchor the fence and fabric to prevent displacement by winds or jet/prop blasts. Remove barricade when no longer required.
07 15 00
07 15 00
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-04 Samples
Mock-Up G, RO
Composite, self-adhering membrane barrier sheeting
(NOTE: The remainder of paragraph 1.2 is unchanged by the amendment.)
2.2 COMPOSITE, SELF-ADHERING MEMBRANE BARRIER SHEETING FLUID-APPLIED
MEMBRANE AIR BARRIERS
Self-adhering membrane composed of flexible facing material coated completely and uniformly on one side with adhesive material, formed into uniform flexible sheets, and with disposable release liner that is removed prior to application or membrane that adheres upon application of heat to the membrane surface. Provide sample of composite, self-adhering membrane barrier sheeting to Contracting Officer for approval. Materials shall meet the requirements indicated:
a. Thickness, ASTM D 3767, 40 mils minimum;
b. Tensile Strength, ASTM D 412, Die C: 250 psi minimum;
c. Ultimate Elongation, ASTM D 412, Die C: 200 percent minimum;
d. Puncture Resistance, ASTM E 154: 40 lb. minimum;
e. Lap Adhesion at Minimum Application Temperature, ASTM D 1876 Modified:
4.0 lbs/in. width.
Fluid applied membrane air barrier in accordance with Section 07 27 26.
SECTION 07 27 26
FLUID-APPLIED MEMBRANE AIR BARRIERS
05/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR BARRIER ASSOCIATION OF AMERICA (ABAA)
ABAA Accreditation Accreditation
ABAA QAP Quality Assurance Program
ASTM INTERNATIONAL (ASTM)
ASTM C836/C836M (2015) High Solids Content, Cold Liquid-Applied Elastomeric Waterproofing Membrane for Use With Separate Wearing Course
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D4263 (1983; R 2012) Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM D4541 (2009; E 2010) Pull-Off Strength of Coatings Using Portable Adhesion Testers
ASTM D5590 (2000; R 2010; E 2012) Standard Test Method for Determining the Resistance of Paint Films and Related Coatings to Fungal Defacement by Accelerated Four-Week Agar Plate Assay
ASTM E2178 (2013) Standard Test Method for Air Permeance of Building Materials
ASTM E331 (2000; R 2016) Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference
ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
SECTION 07 27 26 Page 1 Added in its entirety by Amendment No. W9127818R0008-0002
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 285 (2012) Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components
1.2 RELATED REQUIREMENTS
Coordinate the requirements of Section 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM SECTION 07 15 00 WALL AIR AND VAPOR BARRIERS and other building enclosure sections to provide a complete building air barrier system.
Submit all materials, components and assemblies of the air barrier system together as one complete submittal package.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Qualifications of Manufacturer; G
Qualifications of Installer; G
SD-02 Shop Drawings
Fluid-Applied Membrane Air Barrier; G
SD-03 Product Data
Fluid-Applied Membrane Air Barrier; G
Transition Membrane; G
Primers, Adhesives, and Mastics; G
Reinforcement; G
Safety Data Sheets; G
SD-04 Samples
Fluid-Applied Membrane Air Barrier…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.