PROJECT_DRAWINGS.pdf
PDF 5 MB Posted
- Attached to
- Reclaim Barrier Pit Federal contract opportunity
- Solicitation number
- W9124V-19-R-5002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A3-Combined_Specs_Revised.pdf | ||
| Combined_Specs.pdf | ||
| A2-SOW_3_28_19.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE
S O
U T
H
E
A S
T
B
A R
R I E
R
P
I T
D
E M
O
3/30/2019
J K
M O
N T
A N
A
A
R
N
A T
I O
N A
L
G
U A
R D
R
P O
V
B
G R
E A
T
F
A L
L S
M
T
SHEET
OF
1 5
SCALE
NO SCALE
TITLE
DRAWN BY
TSGT MIKE GORECKI
PLAN VIEW
120 AW CES
APPROVAL/REVISION
NUM DATEAPPROVED BY
PROJECT LOCATION
REMOVED FALL 2017
PAPI LIGHTS
GREAT FALLS IAP
RUNWAY 21
RUNWAY 03
RECLAIM BARRIER PIT
JKSE 182403
MT AIR NATIONAL GUARD
GREAT FALLS, MT
SHEET INDEX
1. TITLE PAGE
2. PROJECT OVERVIEW
3. SW BARRIER REMOVAL PLAN VIEW
4. BARRIER REMOVAL DETAIL
5. ASPHALT MILLING AND PATCHING DETAILS
AR-1 RNWY 3 SOUTH A/C ARRESTING SYSTEM PLAN,
SECTION AND DETAILS
AR-2 RNWY 21 NORTH A/C ARRESTING SYSTEM PLAN,
SECTION AND DETAILS
AR-3 A/C ARRESTING SYSTEM PIT PLAN AND SECTION
AR-4 A/C ARRESTING SYSTEM FOUNDATION PLAN AND SECTION
AR-5 A/C ARRESTING SYSTEM TROUGH END BOX SECTION AND DETAILS
AR-6 A/C ARRESTING SYSTEM FAIRLEAD BEAM AND SPACER BEAM PLAN,
SECTIONS AND DETAILS
AR-7 A/C ARRESTING SYSTEM FAIRLEAD BEAM FOUNDATION PLANS
AND SECTIONS
AR-8 A/C ARRESTING SYSTEM FAIRLEAD TUBE SUPPORT DETAILS
AR-9 A/C ARRESTING SYSTEM ENGINE PIT PLAN, SECTIONS AND DETAILS
AR-10 A/C SYSTEM PIT PLAN AND SECTION
AR-11 ARRESTOR BARRIER ENGINE PIT TOP PLAN SECTION AND DETAILS
AR-12 ARRESTOR BARRIER ELECTRICAL VAULT PLAN SECTION AND DETAILS
AR-13 ARRESTOR BARRIER ELECTRICAL VAULT SECTION AND DETAILS
AR-14 ARRESTOR BARRIER HATCH PLAN, SECTIONS AND DETAILS
AR-15 RNWY 3/21 PITS, MECHANICAL AND ELECTRICAL PLAN, SECTIONS
AND PARTS LIST
AR-16 ARRESTOR BARRIER MISCELLANEOUS DETAILS
AR-17 ARRESTOR BARRIER MARKER LIGHT DETAILS AND EXHAUST
FAN ADN LIGHTING CONTROL SCHEMATIC
AR-18 ARRESTOR BARRIER ENGINE EXHAUST DUCT, DUCT BANK
AND SNOW MELT HEATING CABLE DETAILS
AR-19 ARRESTOR BARRIER ELECTRICAL ONE-LINE DIAGRAMS
DATE
O
U T
H
E
A S
T
B
A R
R I E
R
P
M
O
4/3/2019
J K
M O
N T
A N
A
A
T
I O
N A
L
G
U A
R D
R
P O
R
E A
T
F
A L
L S
M
T
SHEET
OF
2 5
SCALE
1"=100'
TITLE
DRAWN BY
TSGT MIKE GORECKI
PROJECT OVERVIEW
120 AW CES
APPROVAL/REVISION
NUM DATEAPPROVED BY
PAPI LIGHTS
CONTRACTOR STAGING AND
EQUIPMENT PARKING AREA
CONTRACTOR AIRFIELD
ACCESS GATE
CONTRACTOR EMPLOYEE
PARKING AREA
SW BARRIER REMOVAL AREA
A
I
R
C
R
A
F
T
E
N
F
E
L
D
O
O
P
P
I
O
P
R
K
I
N
G
H
E
A
PROJECT SITE ACCES AND STAGING AREA
SW ARRESTING BARRIER
SEE PAGE 3 FOR DETAILS
PROJECT NOTES:
1. CONTRACTORS WILL BE ESCORTED BY
AIRPORT PERSONAL ON AIRFIELD.
2. RUNWAY CLOSURE HOURS - 12AM- 5 AM M- F
3. ANTICIPATED PROJECT START DATE JULY 22,
GENERAL NOTES
1. GENERAL CONTRACTOR SHALL VERIFY DIMENSIONS AND CONDITIONS OF ALL WORK AREAS.
2. THE TERM "CONTRACTOR" REFERS TO THE GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.
3. ALL FINAL RESPONSIBILITY FOR ON-SITE COORDINATION IS WITH THE GENERAL CONTRACTOR
4. ALL SHOP DRAWING DIMENSIONS TO BE CHECKED AND VERIFIED IN THE FIELD BY THE CONTRACTOR WHO WILL BE RESPONSIBLE FOR SAME.
5. GENERAL CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO AREAS OUTSIDE THE WORK ZONES DONE BY HIMSELF OR ANY OTHER TRADE
OR CONTRACTOR
6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE REPAIR AND REFINISHING OF ALL WORK TO MATCH EXISTING CONDITIONS AS A
RESULT OF NECESSARY CUTTING, PATCHING, OR DEMOLITION BY ALL TRADES WHILE PERFORMING WORK.
7. CONSTRUCTION LIMIT LINE IS APPROXIMATE, ACCESS TO OTHER AREAS AS REQUIRED BY WORK IS ACCEPTABLE BY APPROVAL OF GOVERNMENT
REPRESENTATIVE.
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
B
P
0+00
1+00
1+55
B
E
0+95.15
3679.181
3680.258
0+35.05
0+64.95
1+25.22
1+50.00
0+01.08
EL:3679.43
3678.24
3678.271
3680.936
REMOVE CONCRETE AND REPLACE WITH TWO 3"
ASPHALT LIFTS OVER COMPACTED ENGINEERED FILL
WATER FLOW PATH
REMOVE TAPE TUBE AND
SUPPORTS SEE SECTION 1 PAGE4
PLUG PENATRATIONS
NOTE:
1. ALL WORK TO BE COMPLETED FROM 12AM TO 5AM
2. A 3" MAXIMUM DEVIATION CAN REMAIN AT THE END OF
EACH SHIFT. ALL SOILS MUST COMPACTED OR OTHER
SURFACES STRONG ENOUGH TO SUPPORT A 365,000LB
AIRBUS A-300 AIRCRAFT.
3. MAX SLOPE FOR ALL DIRT WORK IS 1.5%
4. SURVEY WATER FLOW PATHS TO ENSURE DRAINAGE.
5. PROTECT RUNWAY EDGE LIGHTS
6. NO VEHICLE TRAFFIC IS ALLOWED ON RNWY 03/21.
PROTECT RUNWAY EDGE DRAIN
PAPI LIGHTS
PROTECT FROM DAMAGE
PAPI LIGHTS
PROTECT FROM DAMAGE
TAPE TUBE(REMOVE)
RESHAPE SOIL IN THIS AREA TO DRAIN
WATER AWAY FROM THE RUNWAY
WATER FLOW PATH
SEE NOTE 2
EXISTING GRADE
PROPOSED GRADE
MAX 1.5% SLOPE
LHA #1LHA #3
LHA #4
LHA #2
RUNWAY 03/21
RUNWAY 03/21 EDGE
EDGE OF RUNWAY SAFETY ZONE
3'-0"
GRADE TO MATCH RUNWAY
DATE
S O
U T
H
E
A S
T
B
A R
R I E
R
P
M
O
3/30/2019
J K
M O
N T
A N
A
A
T
I O
N A
L
G
U A
R D
R
P O
R
E A
T
F
A L
L S
M
T
SHEET
OF
3 5
SCALE
NO SCALE
TITLE
DRAWN BY
TSGT MIKE GORECKI
PLAN VIEW
120 AW CES
APPROVAL/REVISION
NUM DATEAPPROVED BY
PAPI LIGHTS
Scale: 1:75
PAPI SECTION
A
A
A
EXISTING TAPE TUBEBarrier demo work will encompass:
1. Weld existing trough end box lids in place
2. Demo of fairlead beam concrete and paving at runway edge
3. Removal of arresting barrier system sign bases
4. Excavating/Removing tape tubes and supports
5. Clearing vegetation, stripping topsoil
6. Grading raised area to match surrounding area
7. Replacing topsoil
8. Reseed disturbed areas by drill seeding or broadcasting seed and rolling, a tackifier is required on all seeded areas.
9. Capping barrier pit penetrations at roof top and sealing precast roof slab joints.
10. Asphalt repair work at the 3 previously removed barrier locations SEE PAGE 5
4" TRENCH DRAIN FAIRLEAD BEAM
TROUGH END BOX
CABLE TROUGH
FAIRLEAD TUBE
ENGINE PIT
FAIRLEAD TUBE SUPPORTS (11)
INTAKE AND EXAHUST
TAPE TUBE HOLE
(DEMO)
(DEMO)
(RETAIN)
(RETAIN AND WELD LID)
(DEMO)
(REMOVE AND CAP WITH METAL)
(SEAL PRECAST LID)
(DEMO 6" BELOW RWY EDGE MIN.)
(FILL WITH NON-SHRINK GROUT)
138'
Slope 1.25%
Slope 3%
FAIRLEAD TUBE
4" TRENCH DRAIN
RUNWAY CENTERLINE
CONTROL PIT
FAIRLEAD BEAM
(DEMO)
(RETAIN)
(SEAL PRECAST LID)
(DEMO 6" BELOW RWY EDGE MIN.)
DATE
S O
U T
H
E
A S
T
B
A R
R I E
R
P
M
O
3/13/2019
J K
M O
N T
A N
A
A
T
I O
N A
L
G
U A
R D
R
P O
R
E A
T
F
A L
L S
M
T
SHEET
OF
4 5
SCALE
1"=100'
TITLE
DRAWN BY
TSGT MIKE GORECKI
120 AW CES
APPROVAL/REVISION
NUM DATEAPPROVED BY
BARRIER PIT SECTION VIEW
DEMOLITION PLAN
FINISH PLAN
BARRIER
REMOVAL DETAILS
Varies
SW BARRIER
SE BARRIER
NW BARRIER
NE BARRIER
RNWY 03/21
THIS SIDE
RNWY 03/21
THIS SIDE
RNWY 03/21 SIDE
NE BARRIER SIDE
NE BARRIER SIDE
THIS SIDE
SW BARRIER SIDE
SE BARRIER SIDE
THIS SIDE
7'-0" 4'-0"
24'-0"
26'-0"
25'-0"
24'-0"
5'-0" 6'-0"
5'-0"
10'-0"
13'-0"
5'-0"
NOTE: ALL AREAS WILL BE MILLED 2"
AREAS TO BE PATCHED
24'
2'-0"
6'-0"
7'-0"
10'-0"
29'-0"
PATCHING QTY = 115 SQ FT PATCHING QTY = 278 SQ FT
PATCHING QTY = 269 SQ FT PATCHING QTY = 470 SQ FT
RNWY 03/21 SIDE
EXISTING
TRENCH
DRAIN
EXISTING
TRENCH
DRAIN
EXISTING
TRENCH
DRAIN
EXISTING
TRENCH
DRAIN
DATE
S O
U T
H
E
A S
T
B
A R
R I E
R
P
M
O
4/5/2019
J K
M O
N T
A N
A
A
T
I O
N A
L
G
U A
R D
R
P O
R
E A
T
F
A L
L S
M
T
SHEET
OF
5 5
SCALE
VARIES
TITLE
DRAWN BY
CAPT AARON JEWETT
SECTION
120 AW CES
APPROVAL/REVISION
NUM DATEAPPROVED BY
Runway 03/21
SOUTH BARRIERS ASPHALT PATCHING AREA
NORTH BARRIERS ASPHALT PATCHING AREA
SCALE 1/8" = 1'
BARRIER ASPHALT MILLING AND PATCHING DETAILS
SCALE 1" = 50'
SOUTH BARRIER OVERVIEW
SCALE 1" = 50'
NORTH BARRIER OVERVIEW
DavidG Text Box
FAIRLEAD TUBE CUT 18" FROM WALL - TYPICAL ALL 3 LOCATIONS
| RECLAIM SOUTH EAST BARRIER PIT_4_6_19 |
| Sheets and Views |
| RECLAIM SOUTH EAST BARRIER PIT_4_4_19-COVER PAGE |
| RECLAIM SOUTH EAST BARRIER PIT_4_4_19-PG 2 |
| RECLAIM SOUTH EAST BARRIER PIT_4_4_19-SITE PLAN PG 3 |
| RECLAIM SOUTH EAST BARRIER PIT_4_4_19-SECTIONS PG 4 |
| RECLAIM SOUTH EAST BARRIER PIT_4_4_19-ASPHALT MILLIING PG 5 |
GTF-Issued For Construction(As Builts)
File details come from the government source that posted it.