About this file

DRAWINGS REPLACE WINDOWS CDC

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE WINDOWS CDC, newest first.
File Type Posted
W9124M-16-B-0017_Replace_Windows_CDC_Bldg_403.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR CONSTRUCTION 3/18/2016

DESIGN BY: DATE SHEET OF

DRAWING NUMBER

GEORGIA

DRAWN BY: JMHSCALE:

FORT STEWART, GEORGIA

FT. STEWART

AS SHOWN

OFFICE OF THE ENGINEER

REVISION DATE BYDESCRIPTION

FS-3802

3 5A-2 ALETHIA CANADY 11/18/15

LIBERTY COUNTY

EQUIPMENT

ELECTRICAL

FENCED

X

IJO#SR-86-5J

BY OTHERS

BOLLARDS

XX

X X

3 5

X

X X X

X

X

X

X X

X

XX

X

X

X

X

X

X X X X X

X X

X

UNIT

NEW DUCTLESS MECH

WINDOW REPLACEMENT BLDG 403

NEW WORK

PLATE A-4

SEE DETAIL

A

3 5

IJO#SR-85-5J

3/10/16 ARCATFP WINDOW NOTES UPDATED

W-3 B3

W-3 B3

W-3 B4

W-5 A1

W-5 A1

W-6 D1

W-6 D2

W-6 D3

W-6 D4

W-6 B2

W-6 B2

W-5 B2

W-5 B2

W-5 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 B2

W-7 E3

W-7 A1

W-7 B2

W-7 C1

W-5 B5

W-5 E1

W-4 B6

W-4 B6

W-2 E2

W-1 B1

200FTW-7

100FTW-6

80FTW-5

60FTW-4

25FTW-3

13FTW-2

6FTW-1

BLAST HAZARD DISTANCES

JMH

ALETHIA CANADY 11/15

DRAWING NUMBER

OFFICE OF THE ENGINEER

GEORGIA

DESIGN BY: DATE

SCALE: DRAWN BY:

FORT STEWART, GEORGIA

FT. STEWART

FS-

SHEET OF

LIBERTY COUNTY

REVISION DATE DESCRIPTION BY

REPLACE WINDOWS BLDG 403

1" = 10'-0"

IJO# SR-86-5J

AND SPECIFICATIONS

TECHNICAL PROVISIONS GENERAL

A-3 54

IJO# SR-85-5J

SECTION 238127 DUCTLESS SPLIT-SYSTEM AIR-CONDITIONERS

SPECIFICATIONS:

SECTION 08510 STEEL WINDOWS

TO BEGINNING WORK AT THE WORK SITE.

WORK SCHEDULE TO THE COR FOR APPROVAL PRIOR

C.1.2 CONTRACTOR SHALL SUBMIT A SAFETY PLAN AND A

REQUIRED BY THIS CONTRACT.

SPECIFIC SCHEDULES FOR PERFORMING WORK AS

ADVANCE OF THE ANTICIPATED WORK DAY TO ARRANGE

OFFICER’S REPRESENTATIVE (COR) 10 DAYS IN

C.1 THE CONTRACTOR SHALL NOTIFY THE CONTRACTING

C. SCHEDULING OF WORK:

ARE PRESENT.

WORK SHALL OCCUR IN ROOMS WHERE CHILDREN

COORDINATED WITH FACILITY DIRECTOR AND NO

WORK SCHEDULE TO BE PHASED AND B.1.3

APPROVED SCHEDULES.

BE ACCOMPLISHED IN ACCORDANCE WITH PRIOR

OUTAGES OF UTILITIES OR BUILDING SYSTEMS WILL

B.1.2 WORK REQUIRING OUTAGES WORK REQUIRING

NOON ON THURSDAY.

A SATURDAY SHOULD BE MADE NO LATER THAN

ADVANCE. FOR EXAMPLE, A REQUEST TO WORK ON

BE MADE IN WRITING AT LEAST 36 HOURS IN

DURING OTHER THAN THESE NORMAL HOURS SHALL

THE CONTRACTING OFFICER. REQUESTS TO WORK

UNLESS OTHERWISE INDICATED OR APPROVED BY

AND 4:00 P.M. EXCLUDING OFFICIAL HOLIDAYS,

WORK SHALL BE PERFORMED BETWEEN 7:30 A.M.

ATTICS, CRAWL SPACES, ETC. AND ALL OTHER

ACCESS TO BUILDING INTERIORS EXCLUDING

B.1.1 ACCESS TO BUILDINGS ALL WORK REQUIRING

B.1. TIME OF PERFORMANCE

B. CONSTRUCTION CONSTRAINTS:

IS LOCATED.

DUCTLESS MECH. UNIT WHERE CURRENT WINDOW UNIT

ATFP UFC REQUIREMENTS. INSTALLATION OF

COMPLY WITH CDC UFC SPECIFICATIONS AS WELL AS

REPLACEMENT OF ALL EXTERIOR WINDOWS TO 1.1.1

NECESSARILY RESTRICTED TO, THE FOLLOWING ITEMS.

AND DRAWINGS. THE WORK INCLUDES, BUT IS NOT

COMPLETE IN STRICT ACCORDANCE WITH SPECIFICATIONS

REPLACE WINDOWS CDC 403 IN CONNECTION WITH

MATERIALS AND PERFORMING ALL OPERATIONS REQUIRED

CONTRACT CONSISTS OF FURNISHING ALL PLANT, LABOR,

A.1 WORK TO BE DONE: THE WORK COVERED BY THIS

A. DESCRIPTION OF WORK:

912-767-1581.

POC AND PROJECT MANAGER/COORDINATOR: ALETHIA CANADY.

COR AND THE POC FOR RESOLUTION.

THE SOW WILL BE BROUGHT TO THE ATTENTION OF THE

FOLLOWED. ANY DISCREPANCY BETWEEN THE DRAWING AND

DRAWINGS FOR THIS PROJECT. THE DRAWINGS ARE TO BE

THIS STATEMENT OF WORK IS INTENDED TO ENHANCE THE

OF THE DEVICES SHOWN ON THE CONTRACT DRAWINGS.

INTENDED TO COVER ALL THE NECESSARY ITEMS OR ALL

DRAWINGS. THIS SCOPE IS NARRATIVE IN NATURE AND IS NOT

INSTALLATION OF THE ITEMS AS INDICATED ON THE

MATERIALS, SUPERVISION AND SERVICES FOR THE

THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT,

FORT STEWART.

ACCORDANCE WITH ALL ENFORCEABLE CODES IN EFFECT ON

THAT IS READY FOR CONTINUOUS USE BY THE OWNER IN

CONTRACT IS TO PROVIDE A COMPLETE FINISHED PRODUCT

THIS SCOPE IS NARRATIVE IN NATURE. THE INTENT OF THIS

IJO SR-86-5J

REPLACE WINDOWS CDC 403

TECHNICAL PROVISIONS GENERAL

6.2.-PROTECTION OF EXISTING LANDSCAPING FROM DAMAGE.

6.1.-DISRUPTION OF SITE LANDSCAPING TO ACCESS BUILDING WINDOWS.

THE FOLLOWING TASKS:

6.-SITE WORK: SITE WORK ON THIS PROJECT CONSISTS PRIMARILY OF

NAMA, UL AND IEEE.

SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS OF

5.2.4.-ALL ELECTRICAL FIXTURES, EQUIPMENT, AND MATERIALS

VOLTAGE AND PHASING ON ALL PROJECTS.

5.2.3.-CONTRACTOR IS RESPONSIBLE FOR CHECKING FOR PROPER

AND THE NATIONAL FIRE PROTECTION CODE.(NFPA)

LATEST EDITION OF THE NATIONAL ELECTRICAL CODE (NEC)

5.2.2.-ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE

SPECIFYING THE EQUIPMENT.

CONTROL WIRING SHALL BE DONE UNDER THE SECTION

SHOWN OTHERWISE ON THE DRAWINGS. INTERCONNECT

SHALL BE PROVIDED WITH EQUIPMENT UNLESS SPECIFICALLY

IN OTHER DIVISIONS STARTERS AND RELATED CONTROLS

EQUIPMENT WITH OTHER TRADES. FOR EQUIPMENT FURNISHED

EQUIPMENT AND COORDINATE ALL CONNECTIONS OF

5.2.1.-PROVIDE ELECTRICAL CONNECTIONS COMPLETE TO ALL

5.2.-ELECTRICAL NOTES:

SPLIT SYSTEM AIR-CONDITIONING UNIT.

5.1.1.-PROVIDE AND INSTALL THE POWER SUPPLY FOR DUCTLESS

ROOM FOR THE FOLLOWING NEEDS:

EXISTING POWER SUPPLIED TO WINDOW UNIT IN MULTI-PURPOSE

5.1.-CONTRACTOR SHALL MODIFY AS SHOWN ON DRAWINGS THE

5.-ELECTRICAL

MANUFACTURER'S INSTALLATION INFORMATION.

4.1.-INSTALL DRAIN LINE FOR MECHANICAL UNIT AS REQUIRED BY

4.-PLUMBING

SHOWN ON PLAN.

WALK PATH AND REACH OF CHILDREN, GENERAL LOCATION

3.2.2.-INSTALL EXTERIOR UNIT ON WALL MOUNTED RACK OUT OF

3.2.1.1.-30700 BTU, 14.5 SEER, R410A, 208-230 V/1 PH/60HZ

3.2.1.-BASIS OF DESIGN MITSUBISHI MZ-D30NA

ROOM.

FOR THE COMPUTER RACKS THAT HAVE BEEN ADDED TO THIS

3.2.-INSTALL NEW DUCTLESS UNIT OF REQUIRED SIZE TO COMPENSATE

MULTI-PURPOSE ROOM.

3.1.-REMOVE EXISTING WINDOW MOUNTED HVAC UNIT IN THE

3.-HVAC

2.4.3.9.- ALUMINUM FINISH: BLACK ANODIZED ALUMINUM

2.4.3.8.4.- INTERIOR LAYER CLEAR GLASS

2.4.3.8.3.- OUTER LAYER TINTED GLASS

2.4.3.8.2.- LOW E

2.4.3.8.1.- INSULATED GLASS

2.4.3.8.- GLAZING:

END OF SECTION

FROM DAMAGE.

PROPER OPERATION. CLEAN AND PROTECT WORK

C.-RESTORE DAMAGED FINISHES AND TEST FOR

OTHER SECTIONS.

UNIFORM APPEARANCE. COORDINATE WITH WORK OF

RELATION WITH ADJACENT CONSTRUCTION AND WITH

B.-INSTALL MATERIALS AND SYSTEMS IN PROPER

SUBMITTALS.

WITH MANUFACTURER'S INSTRUCTIONS AND APPROVED

A.-INSTALL MATERIALS AND SYSTEMS IN ACCORDANCE

3.01-INSTALLATION:

PART 3 EXECUTION

2.-INSECT SCREENING.

1.-OPERATING HARDWARE.

C.-AUXILIARY MATERIALS:

B.-WINDOWS: SEE GENERAL INSTRUCTIONS

YKK, OR APPROVED EQUAL

A.-MANUFACTURERS: GRAHAM WINDOWS, KAWNEER &

2.01 MATERIALS:

PART 2 PRODUCTS

INSTRUCTIONS FOR GRADE OF WINDOW REQUIRED.

B.-PERFORMANCE: COMPLY WITH GENERAL

WITH MANUFACTURER'S INSTRUCTIONS.

HANDLE, AND STORE MATERIALS IN ACCORDANCE

YEARS. USE EXPERIENCED INSTALLERS. DELIVER,

SATISFACTORY USE IN SIMILAR SERVICE FOR THREE

MANUFACTURERS WHICH HAVE BEEN IN

REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE

A.-COMPLY WITH GOVERNING CODES AND

1.03 QUALITY ASSURANCE:

INCLUDING MAINTENANCE SCHEDULE.

SUBMIT MANUFACTURER'S MAINTENANCE DATA,

F.-MAINTENANCE DATA:

1.-WARRANTY PERIOD: 5 YEARS.

REPLACE DEFECTIVE MATERIALS.

INCLUDE LABOR AND MATERIALS TO REPAIR OR

SUBMIT MANUFACTURER'S STANDARD WARRANTY.

E.-WARRANTY:

ANTICIPATED.

SAMPLES IF VARIATION OF FINISH IS

CHARACTERISTICS AND FINISH. INCLUDE RANGE

MATERIAL SPECIFIED INDICATING VISUAL

SUBMIT TWO REPRESENTATIVE SAMPLES OF EACH

D.-SAMPLES:

ANCHORING METHODS.

INFORMATION STAMPED FOR BLAST WINDOWS AND

C. -ENGINEERS CALCULATIONS AND DESIGN

CONSTRUCTION.

CONNECTIONS, AND RELATIONSHIP WITH ADJACENT

CHARACTERISTICS, DETAILS OF CONSTRUCTION,

SUBMIT SHOP DRAWINGS INDICATING MATERIAL

B.-SHOP DRAWINGS:

AND PRODUCT USED.

INSTALLATION INSTRUCTIONS FOR EACH MATERIAL

SUBMIT MANUFACTURER'S PRODUCT DATA AND

A.-PRODUCT DATA:

1.02-SUBMITTALS:

A.-PROVIDE WINDOWS.

1.01-SUMMARY:

PART 1 GENERAL

BE HANDS ON TRAINING.

SHIFTS TOTAL, 16 HOURS SHALL BE CLASSROOM TRAINING AND 24 HOURS SHALL

A. TRAINING SHALL INCLUDE MINIMUM OF 10 LAWA PERSONNEL FOR 40 HOURS THREE

3.2 TRAINING:

APPROVED RECEPTOR.

INSTALL CONDENSATE PIPING WITH TRAP AND ROUTE FROM DRAIN PAN TO B.

2”DEFLECTION SPRING VIBRATION ISOLATORS AND SEISMIC RESTRAINTS.

INSTALL PER MANUFACTURER’S RECOMMENDATIONS. WHERE APPROPRIATE, PROVIDE A.

3.1 INSTALLATION FAN COIL UNIT

PART 3 - EXECUTION:

A. CAPABILITY TO INTERFACE WITH BAS (BUILDING AUTOMATION SYSTEM).

2.4 CONTROLS:

PRESSURE RELIEF DEVICE. 11.

HOT GAS MUFFLER. 10.

CRANKCASE HEATER. 9.

OIL LEVEL SIGHT GLASS. 8.

CHARGING VALVE. 7.

LIQUID LINE SOLENOID VALVE. 6.

SHUT-OFF VALVES ON SUCTION AND LIQUID PIPING. 5.

LIQUID LINE SIGHT GLASS AND MOISTURE INDICATOR. 4.

REPLACEABLE CORE TYPE FILTER DRIER. 3.

HOLDING CHARGE OF REFRIGERANT. 2.

CHARGE OF COMPRESSOR OIL. 1.

REFRIGERATION SPECIALTIES: FURNISH THE FOLLOWING FOR EACH CIRCUIT: H.

SUCTION AND DISCHARGE PRESSURE GAUGES. 9.

COATED STEEL WIRE SAFETY GUARDS.

CONDENSER COIL GUARD: CONDENSER FAN OPENINGS FURNISHED WITH PVC 8.

SPRAY TEST OF 1000 HOURS IN ACCORDANCE WITH ASTM B117.

COIL WITH CORROSION RESISTANT COATING CAPABLE OF WITHSTANDING SALT 7.

HOT GAS BYPASS KIT. 6.

VIBRATION ISOLATORS. 5.

DISCONNECT SWITCH. 4.

ANTI-SHORT CYCLE TIMER. 3.

TIME DELAY RELAY. 2.

CONTROLS TO PROVIDE LOW AMBIENT COOLING TO 0 DEGREES F. 1.

CONDENSING UNIT ACCESSORIES: FURNISH THE FOLLOWING ACCESSORIES: G.

PROTECTION. FURNISH HIGH EFFICIENCY FAN MOTORS.

LUBRICATED BALL BEARING TYPE MOTORS WITH BUILT-IN THERMAL OVERLOAD

DYNAMICALLY BALANCED. WIRED TO OPERATE WITH COMPRESSOR. PERMANENTLY

CONDENSER FANS AND DRIVES: DIRECT DRIVE PROPELLER FANS STATICALLY AND F.

FOR COMPRESSOR AND CONDENSER FAN MOTORS.

PRESSURE CUTOUTS. CONTROL TRANSFORMER. FURNISH MAGNETIC CONTACTORS

CONTROLS: FURNISH OPERATING AND SAFETY CONTROLS INCLUDING HIGH AND LOW E.

PER ASTM D5339.

HOURS IN BOTH SALT SPRAY TEST PER ASTM B117 AND ACID SALT SPRAY TEST

BLYGOLD POLUAL XT OR APPROVED EQUAL. COATING SHALL WITHSTAND 4,000

WITH MINIMUM 1.0 MIL. ALUMINUM IMPREGNATED POLYURETHANE COATING BY

COPPER FINS, FACTORY LEAK AND PRESSURE TESTED. COIL SHALL BE COATED

CONDENSER COIL: CONSTRUCTED OF COPPER TUBING MECHANICALLY BONDED TO D.

FIVE (5) YEAR WARRANTY.

LUBRICATION, AND INTERNAL MOTOR OVERLOAD PROTECTION. COMPRESSOR SHALL

RECIPROCATING TYPE COMPRESSORS, RESILIENTLY MOUNTED, WITH POSITIVE

REFRIGERATION CIRCUITS WITH ROTARY OR HERMETIC SEMI-HERMETIC

COMPRESSOR: SINGLE REFRIGERATION CIRCUIT OR TWO INDEPENDENT C.

COMPRESSORS, CONTROLS, CONDENSER FANS, MOTORS, AND DRIVES.

CONTROLS, AND COMPLETE WITH REMOVABLE PANELS FOR REQUIRED ACCESS TO

INSTALLATION AND COMPLETE WITH WEATHER PROTECTION FOR COMPONENTS AND

WITH MANUFACTURER'S STANDARD BAKED ENAMEL FINISH. DESIGNED FOR OUTDOOR

UNIT CASINGS: EXPOSED CASING SURFACES CONSTRUCTED OF GALVANIZED STEEL B.

MOTORS, AND UNIT CONTROLS.

CONSISTING OF CASING, COMPRESSORS, CONDENSERS, COILS, CONDENSER FANS AND

GENERAL: FACTORY ASSEMBLED AND TESTED AIR COOLED CONDENSING UNITS, A.

2.3 - CONDENSING UNIT:

(INTEGRAL WITH GRID).

UNIT SHALL BE WALL MOUNTED, CEILING MOUNTED, OR CEILING CASSETTE TYPE F.

TO 30 PERCENT EFFICIENCY BASED ON ASHRAE 52.1.

AIR FILTERS: 1 INCH THICK GLASS FIBER DISPOSABLE MEDIA IN METAL FRAMES. 25 E.

R407C OR R410A.

BY FACTORY INSTALLED THERMAL EXPANSION VALVE. REFRIGERANT SHALL BE

REFRIGERATION SYSTEM: SINGLE OR DUAL REFRIGERATION CIRCUITS CONTROLLED D.

ACID SALT SPRAY TEST PER ASTM D5339.

SHALL WITHSTAND 4,000 HOURS IN BOTH SALT SPRAY TEST PER ASTM B117 AND

POLYURETHANE COATING BY BLYGOLD POLUAL XT OR APPROVED EQUAL. COATING

SIDES. COIL SHALL BE COATED WITH MINIMUM 1.0 MIL. ALUMINUM IMPREGNATED

DOUBLE-SLOPED STAINLESS STEEL DRAIN PAN WITH PIPING CONNECTIONS ON BOTH

FINS. FACTORY LEAK TESTED UNDER WATER. REMOVABLE, PVC CONSTRUCTION,

EVAPORATOR COIL: CONSTRUCTED OF COPPER TUBES EXPANDED ONTO COPPER C.

LUBRICATED WITH BUILT-IN THERMAL OVERLOAD PROTECTION.

WITH ADJUSTABLE BELT DRIVE AND HIGH EFFICIENCY MOTOR. MOTOR PERMANENTLY

EVAPORATOR FAN: FORWARD CURVED CENTRIFUGAL TYPE, RESILIENTLY MOUNTED B.

FIBER WITH EDGES PROTECTED FROM EROSION.

CABINET. ONE INCH THICK NEOPRENE COATED ALUMINUM FOIL FACED GLASS

INSULATION: FACTORY APPLIED TO EACH SURFACE TO INSULATE ENTIRE 2.

COLLARS ON INLETS AND OUTLETS.

ACCESS PANELS: LOCATED ON BOTH SIDES OF UNIT. FURNISH WITH DUCT

PANELS: CONSTRUCTED OF GALVANIZED STEEL WITH BAKED ENAMEL FINISH. 1.

CABINET: A.

2.2 - FAN COIL UNIT:

REFRIGERANTS R-410A AND R-407C. C.

SANYO. 3.

DAIKIN. 2.

MITSUBISHI. 1.

MANUFACTURERS:B.

SPECIALTIES.

HANDLING UNIT ACCESSORIES, CONDENSING UNIT ACCESSORIES, AND REFRIGERATION

COIL, COMPRESSOR, REFRIGERATION CIRCUIT, CONDENSER, AIR FILTERS, CONTROLS, AIR

CONDENSING UNIT INCLUDING CABINET, EVAPORATOR FAN, REFRIGERANT COOLING

PRODUCT DESCRIPTION: SPLIT SYSTEM CONSISTING OF FAN COIL UNIT AND A.

2.1 SPLIT SYSTEM AIR CONDITIONING UNITS

PART 2 - PRODUCTS:

ACCORDANCE WITH ARI STANDARDS.

IN COMBINATION WITH COMPRESSORS AND EVAPORATOR COILS WHEN TESTED IN

OF PERFORMANCE (COP) NOT LESS THAN PRESCRIBED BY ASHRAE 90.1 WHEN USED

A. PERFORMANCE REQUIREMENTS: ENERGY EFFICIENCY RATING (EER) AND COEFFICIENT

1.4 - QUALITY ASSURANCE:

DETAILS, CONNECTION REQUIREMENTS, AND INCLUDE START-UP INSTRUCTIONS.

MANUFACTURER'S INSTALLATION INSTRUCTIONS: SUBMIT ASSEMBLY, SUPPORT B.

ACCESSORIES. 7.

CONTROLS. 6.

CONNECTION REQUIREMENTS.

ELECTRICAL REQUIREMENTS WITH ELECTRICAL CHARACTERISTICS AND 5.

ROUGH-IN CONNECTIONS AND CONNECTION REQUIREMENTS. 4.

WEIGHTS. 3.

DIMENSIONS. 2.

COOLING AND HEATING CAPACITIES. 1.

PRODUCT DATA: SUBMIT DATA INDICATING: A.

1.2 - SUBMITTALS:

FOR UNITS/SYSTEMS UP TO THREE TONS MAXIMUM. 3.

CONDENSING UNIT. 2.

FAN COIL UNIT. 1.

A.-SECTION INCLUDES:

1.1 SUMMARY:

PART 1 - GENERAL

2.4.3.7.- CONSTRUCTION : THERMAL BREAK TYPE

PROFESSIONAL ENGINEER.

2.4.3.6.2.- PROVIDE ANCHORAGE CALCULATIONS PREPARED BY

2.4.3.6.1.- ALL FASTENERS CONCEALED

MEET DOD ANTI-TERRORISM REQUIREMENTS:

2.4.3.6.- PROVIDE REQUIRED ATTACHMENT TO THE EXISTING STRUCTURE TO

PANE.

EXTERIOR PANE AND 57/64" LAMINATED (.030" PVB) INTERIOR

2.4.3.5.1.- INSULATED GLASS UNIT SHALL BE MINIMUM 57/64"THICK

REQUIREMENT: AT CONVENTIONAL CONSTRUCTION STANDOFF DISTANCE

2.4.3.5.- NOMINAL LAMINATED GLASS THICKNESS W/PVB INTERLAYER

2.4.3.4.- FRAMES TO MEET DEFLECTION LIMITS PER THE UFC AND ASTM

2.4.3.3.- APPLICABLE EXPLOSIVE WEIGHT: TYPE II

2.4.3.2.- APPLICABLE LEVEL OF PROTECTION: VERY LOW

2.4.3.1.2.- UFC 4-740-14 CHILD DEVELOPMENT CENTERS

AVAILABLE)

2.4.3.1.1.- UFC 4-010-01 DOD ANTI-TERRORISM (LATEST EDITION

PER:

2.4.3.1.- ENGINEER OF RECORD TO DETERMINE REQUIREMENTS OF WINDOWS

2013) "DOD MINIMUM ANTITERRORISM STANDARD FOR BUILDINGS"

REQUIREMENTS OF UFC 4-010-01( FEB. 9, 2012 WITH CHANGE 1 DATED OCT 1,

2.4.3.-BLAST MITIGATION: PROVIDE SYSTEM DESIGNED TO MEET OR EXCEED

2.4.2.2.- HEAVY COMMERCIAL GRADE, AAMA 101

CLASSIFICATION OF WINDOW REQUIRED.

AAMA/WDMA/CSA 101/I.S.2/A440-05 AND AAMA 910-93 FOR TYPE AND

2.4.2.1.- COMPLY WITH AIR, WATER AND STRUCTURAL REQUIREMENTS IN

REQUIREMENTS

2.4.2.-PERFORMANCE STANDARDS: ALUMINUM WINDOWS/STOREFRONT/ENTRANCE

2.4.1.6.- DESIGNED PER UFC 4-740-14 AND COMPLIANT WITH UFC 4-010-01

2.4.1.5.- SOLID SURFACE MATERIAL TO BE USED FOR INTERIOR SILLS.

2.4.1.4.- SCREENS FOR ALL OPERABLE WINDOWS

2.4.1.3.- SAFETY LOCK REQUIRED

2.4.1.2.- UPPER SASH IS OPERABLE

2.4.1.1.- BOTTOM SASH IS FIXED

2.4.1.- OPERABLE WINDOWS ARE TO BE ARRANGED AS SHOWN ON DRAWINGS

2.4.- WINDOWS

CONSTRUCTION.

2.3.4.- PROTECT ADJACENT STRUCTURE FROM DAMAGE DURING DEMOLITION AND

MATERIALS WILL REMAIN THE PROPERTY OF THE GOVERNMENT.

2.3.3.- ALL DEBRIS WILL BE REMOVED FROM FORT STEWART, ALL RECYCLABLE

2.3.2.- REMOVAL OF INTERIOR WINDOWS ONLY AS INDICATED ON DRAWINGS.

2.3.1.1.- PHASING NEEDED FOR WORK TO ALLOW FOR SAFETY OF CHILDREN.

2.3.1.- REMOVAL OF EXTERIOR WINDOWS AS SHOWN ON DRAWINGS.

2.3.- DEMO: WINDOWS (SEE PLANS)

AVAILABLE.

2.2.3.- ALL WINDOWS MUST COMPLY WITH UFC 4-010-01 MOST CURRENT REVISION

AHJ(COR) PRIOR TO THE START OF WORK.

2.2.2.- ALL SUBMITTALS MUST BE TURNED IN AND REVIEWED/ACCEPTED BY THE

DURING PRECONSTRUCTION MEETING PRIOR TO THE START OF WORK.

2.2.1. DEMOLITION OF EXISTING WINDOWS WILL BE PER SCHEDULE DETERMINED

DRAWINGS.

2.2.- GENERAL DESCRIPTION OF WORK: REPLACE ALL EXTERIOR WINDOWS AS SHOWN IN

CODES. ALL WORK WILL BE FOR BUILDING #403 AT FORT STEWART, GEORGIA 31314

AND RECOMMENDATIONS AND SHALL COMPLY WITH THE INTERNATIONAL BUILDING

CONSTRUCTED, TO INCLUDE BEING INSTALLED BY MANUFACTURE SPECIFICATIONS

STANDARD AND TECHNICAL TRADE PRACTICE FOR ALL ITEMS BEING INSTALLED AND

SYSTEM/SYSTEMS AS INTENDED FOR THIS PROJECT. ALL WORK WILL BE INDUSTRY

CONTRACTOR WILL PROVIDE COMPLETE FUNCTIONAL AND OPERATIONAL

CONFORM TO THE INTENT, ARE TO BE CONSIDERED PART OF THE PROJECT.

2.1.- ANY ITEM/ITEMS NOT SPECIFICALLY LISTED, BUT NORMALLY REQUIRED TO

2.- STRUCTURAL:

TBD1.7.1.- CONTRACTING OFFICER REPRESENTATIVE IS

EQUIPMENT OR LABOR IS NOT INCLUDED IN THIS CONTRACT

1.7.- UNLESS SPECIFIED IN THE SCOPE OF WORK, GOVERNMENT FURNISHED MATERIAL,

JOB SITE CONDITIONS.

1.6.1.- CONTRACTOR IS ENCOURAGED TO VISIT JOB SITE AND VERIFY ALL SITE

JUST A GUIDE; THE ACTUAL JOB SITE CONDITIONS MAY VARY.

1.6.- ALL DIMENSIONS, LOCATIONS AND SITE CONDITIONS SHOWN ON DRAWINGS ARE

AWAY.

STORAGE OF RECYCLABLE MATERIALS AND WILL HAUL THOSE MATERIALS

OF THE GOVERNMENT. DPW ENVIRONMENTAL WILL PROVIDE A DUMPSTER FOR

1.5.4.- ALL STEEL/METAL RECYCLABLE MATERIALS ARE TO REMAIN THE PROPERTY

1.5.3.- ALL SOLDER JOINTS SHALL BE LEAD FREE.

FEDERAL REGULATIONS.

1.5.2.- DISPOSAL OF OZONE DEPLETING CHEMICALS SHALL BE IAW STATE AND

IS THE RESPONSIBILITY OF THE CONTRACTOR.

STRINGENT. ACCESS TO AND/OR PURCHASE OF THESE OR ANY PUBLICATIONS

STATE ENVIRONMENTAL LAWS AND REGULATION, WHICH EVER MORE

SMACNA, NATIONAL FIRE PROTECTION ASSOCIATION, AND ALL FEDERAL AND

FACILITIES CRITERIA, LIFE SAFETY CODE, INSTALLATION DESIGN GUIDES,

CODE, NATIONAL ELECTRICAL CODE, INTERNATIONAL PLUMBING CODE, UNIFORM

1.5.1.- ALL CONSTRUCTION SHALL COMPLY WITH IAW, THE INTERNATIONAL BUILDING

GOVERNMENT FOR APPROVAL BEFORE NOTICE TO PROCEED IS PROVIDED.

1.5.- CONTRACTOR SHALL SUBMIT A HAZARD ANALYSIS AND SAFETY PLAN TO THE

AND UNUSED, FREE FROM DEFECTS.

1.4.- ALL MATERIALS AND EQUIPMENT FURNISHED BY THE CONTRACTOR SHALL BE NEW

FOR THE BLAST DESIGN OF WINDOWS.

1.3.5.- ALL WINDOW SUBMITTALS MUST BE STAMPED BY ENGINEER OF RECORD

TO START OF WORK OR THE ACQUISITION OF MATERIALS.

PRIOR1.3.4.- ALL SUBMITTALS FOR WINDOWS MUST BE SUBMITTED AND APPROVED

1.3.3.- DAILY CLEAN-UP OF THE SITE IS REQUIRED.

WINDOW TO BE REMOVED AND REPLACED.

1.3.2.-NO WORK WILL OCCUR IF CHILDREN ARE PRESENT IN THE ROOM BEYOND

OF THE WORK WITH FACILITY MANAGER.

1.3.1.- PRECONSTRUCTION MEETING WILL BE REQUIRED TO COORDINATE PHASING

CONFORM TO THE INTENT, ARE TO BE CONSIDERED PART OF THE CONTRACT.

ACCEPTANCE. ANY ITEM NOT SPECIFICALLY SHOWN BUT NORMALLY REQUIRED TO

PROVIDE A COMPLETE WORKABLE SYSTEM READY FOR THE GOVERNMENT'S

1.3. IT IS THE INTENT OF THE DRAWINGS, SPECIFICATIONS AND SCOPE OF WORK TO

SYSTEMS/CONTROLS.

AND GOVERNMENT ACCEPTANCE AND PROVIDE TRAINING FOR NEW

INSURE PROPER OPERATION ACCORDING TO MANUFACTURER'S SPECIFICATIONS

INSTALLED EQUIPMENT ITEMS. PERFORM START-UP ON ALL SYSTEMS TO

1.2.2.- CONTRACTOR SHALL PROVIDE ALL OPERATING MANUALS FOR

THE STATEMENT OF WORK AND/OR CONSTRUCTION DRAWINGS.

PROVIDE A COMPLETE SYSTEM AND COMPONENTS THEREOF, STIPULATED IN

SUPERVISION, SAFETY EQUIPMENT, LABOR AND MATERIALS NECESSARY TO

APPLIANCES, SERVICES, HOISTING, SCAFFOLDING, SUPPORTS, TOOLS,

1.2.1.- CONTRACTOR SHALL PROVIDE ALL INCIDENTALS, EQUIPMENT,

IN THE SCOPE OF WORK FOR GOVERNMENT APPROVAL.

1.2.- CONTRACTOR SHALL PROVIDE EQUIPMENT AND MATERIAL SUBMITTALS AS SPECIFIED

THE MINIMUM REQUIREMENTS OF NAMA, UL AND IEEE.

1.1.- ALL ELECTRICAL FIXTURES, EQUIPMENT, AND MATERIALS SHALL MEET OR EXCEED

1.- GENERAL NOTES:

GENERAL INSTRUCTIONS:

REVISION DATE DESCRIPTION BY

DRAWING NUMBER

OFFICE OF THE ENGINEER

LIBERTY COUNTY GEORGIA

DESIGN BY: DATE

SCALE: DRAWN BY:

FORT STEWART, GEORGIA

FT. STEWART

SHEET OF

JMH

"8

5'-11

4'-0"

13'-11"

"2

4'-

10'-0" "2

9'-11

11'-9"

"4

15'-4

15'-5"

"2

11'-11

WINDOW REPLACEMENT BLDG 403

FS-3802ALETHIA CANADY 11/18/15

1/2" = 1'-0"

WALL MOUNTING BRACKET

NOT TO SCALE

NOTES:

OPENING 'B2' TYPICAL

OPENING 'E1' OPENING 'E2' OPENING 'E3'

OPENING 'D1' OPENING 'D2'

OPENING 'D3' OPENING 'D4'

OPENING 'A1' OPENING 'C1'

55A-4

IJO# SR-86-5J

REPLACE WINDOWS BLDG 403

A

3 5

DETAIL

ARCHITECTURAL NOTES:

MECHANICAL NOTES:

208-230V/ 1 Ph/ 60hz OR EQUAL

BASIS OF DESIGN MITSUBISHI (MZ-D30NA) 30700 BTU, 14.5 SEER, R410A,04.

REACH OF CHILDREN, GENERAL LOCATION SHOWN ON PLAN.

INSTALL EXTERIOR UNIT ON WALL MOUNTED RACK OUT OF WALK PATH AND03.

COMPUTER RACKS THAT HAVE BEEN ADDED TO THIS ROOM.

INSTALL NEW DUCTLESS UNIT OF REQUIRD SIZE TO COMPENSATE FOR THE02.

REMOVE EXISTING WINDOW MOUNTED HVAC UNIT IN THE MULTI-PURPOSE ROOM.01.

DATE UNKNOWN

IN PLACE. INSTALL

WINDOWS CURRENTLY

METAL FRAMED

NOT TO SCALE

3 5

EXISTING SECTION

TO BE USE FOR INFORMATION ONLY

TYPICAL EXTERIOR WALLS AT WINDOWS

FOR CHILDREN.

FINISHED UNDISTURBED GRADE TO ENSURE SAFETY

MAINTAINING A MINIMUM OF 48" ABOVE EXISTING

WALL BRACKET OR EQUAL TO EXISTING WALL

CONTRACTOR SHALL PROVIDE AND ATTACH CWMB1

IJO# SR-85-5J

3/10/16 ATFP WINDOW NOTES REVISED ARC

B1, B3, B4, B5 & B6 SIMILAR

MEET ATFP AND CDC UFC'S SEE PAGE 4 0F 5 FOR DETAILS

ENGINEER OF RECORD SHALL PROVIDE GLAZING AND FRAME REQUIREMENTS TOC.

BLAST MITIGATION TO MEET UFC REQUIREMENTSB.

ANCHORAGE CALCULATIONSA.

ENGINEER OF RECORD MUST PROVIDE THE FOLLOWING:04.

UFC 4-740-14 SECTION 7-1.3.1 GENERAL WINDOW CRITERIAB.

UFC 4-010-01 MOST CURRENT REVISION AVAILABLEA.

ALL WINDOWS MUST COMPLY WITH THE FOLLOWING:03.

ALL EXISTING WINDOWS ARE SET IN STUD/MASONARY OPENINGS 02.

ALL EXISTING VERTICAL WINDOW MULLIONS ARE 1 1/2" UNLESS OTHERWISE NOTED01.

3802-01 G-1 Scanned Cover
3802-02 A-1 Existing Arc Site Plan
3802-03 A-2 Existing Floor Plan
3802-04 A-3 Specifications
3802-05 A-4 Details

File details come from the government source that posted it. Updated .