DRAWINGS REPLACE WINDOWS CDC
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9124M-16-B-0017_Replace_Windows_CDC_Bldg_403.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR CONSTRUCTION 3/18/2016
DESIGN BY: DATE SHEET OF
DRAWING NUMBER
GEORGIA
DRAWN BY: JMHSCALE:
FORT STEWART, GEORGIA
FT. STEWART
AS SHOWN
OFFICE OF THE ENGINEER
REVISION DATE BYDESCRIPTION
FS-3802
3 5A-2 ALETHIA CANADY 11/18/15
LIBERTY COUNTY
EQUIPMENT
ELECTRICAL
FENCED
X
IJO#SR-86-5J
BY OTHERS
BOLLARDS
XX
X X
3 5
X
X X X
X
X
X
X X
X
XX
X
X
X
X
X
X X X X X
X X
X
UNIT
NEW DUCTLESS MECH
WINDOW REPLACEMENT BLDG 403
NEW WORK
PLATE A-4
SEE DETAIL
A
3 5
IJO#SR-85-5J
3/10/16 ARCATFP WINDOW NOTES UPDATED
W-3 B3
W-3 B3
W-3 B4
W-5 A1
W-5 A1
W-6 D1
W-6 D2
W-6 D3
W-6 D4
W-6 B2
W-6 B2
W-5 B2
W-5 B2
W-5 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 B2
W-7 E3
W-7 A1
W-7 B2
W-7 C1
W-5 B5
W-5 E1
W-4 B6
W-4 B6
W-2 E2
W-1 B1
200FTW-7
100FTW-6
80FTW-5
60FTW-4
25FTW-3
13FTW-2
6FTW-1
BLAST HAZARD DISTANCES
JMH
ALETHIA CANADY 11/15
DRAWING NUMBER
OFFICE OF THE ENGINEER
GEORGIA
DESIGN BY: DATE
SCALE: DRAWN BY:
FORT STEWART, GEORGIA
FT. STEWART
FS-
SHEET OF
LIBERTY COUNTY
REVISION DATE DESCRIPTION BY
REPLACE WINDOWS BLDG 403
1" = 10'-0"
IJO# SR-86-5J
AND SPECIFICATIONS
TECHNICAL PROVISIONS GENERAL
A-3 54
IJO# SR-85-5J
SECTION 238127 DUCTLESS SPLIT-SYSTEM AIR-CONDITIONERS
SPECIFICATIONS:
SECTION 08510 STEEL WINDOWS
TO BEGINNING WORK AT THE WORK SITE.
WORK SCHEDULE TO THE COR FOR APPROVAL PRIOR
C.1.2 CONTRACTOR SHALL SUBMIT A SAFETY PLAN AND A
REQUIRED BY THIS CONTRACT.
SPECIFIC SCHEDULES FOR PERFORMING WORK AS
ADVANCE OF THE ANTICIPATED WORK DAY TO ARRANGE
OFFICER’S REPRESENTATIVE (COR) 10 DAYS IN
C.1 THE CONTRACTOR SHALL NOTIFY THE CONTRACTING
C. SCHEDULING OF WORK:
ARE PRESENT.
WORK SHALL OCCUR IN ROOMS WHERE CHILDREN
COORDINATED WITH FACILITY DIRECTOR AND NO
WORK SCHEDULE TO BE PHASED AND B.1.3
APPROVED SCHEDULES.
BE ACCOMPLISHED IN ACCORDANCE WITH PRIOR
OUTAGES OF UTILITIES OR BUILDING SYSTEMS WILL
B.1.2 WORK REQUIRING OUTAGES WORK REQUIRING
NOON ON THURSDAY.
A SATURDAY SHOULD BE MADE NO LATER THAN
ADVANCE. FOR EXAMPLE, A REQUEST TO WORK ON
BE MADE IN WRITING AT LEAST 36 HOURS IN
DURING OTHER THAN THESE NORMAL HOURS SHALL
THE CONTRACTING OFFICER. REQUESTS TO WORK
UNLESS OTHERWISE INDICATED OR APPROVED BY
AND 4:00 P.M. EXCLUDING OFFICIAL HOLIDAYS,
WORK SHALL BE PERFORMED BETWEEN 7:30 A.M.
ATTICS, CRAWL SPACES, ETC. AND ALL OTHER
ACCESS TO BUILDING INTERIORS EXCLUDING
B.1.1 ACCESS TO BUILDINGS ALL WORK REQUIRING
B.1. TIME OF PERFORMANCE
B. CONSTRUCTION CONSTRAINTS:
IS LOCATED.
DUCTLESS MECH. UNIT WHERE CURRENT WINDOW UNIT
ATFP UFC REQUIREMENTS. INSTALLATION OF
COMPLY WITH CDC UFC SPECIFICATIONS AS WELL AS
REPLACEMENT OF ALL EXTERIOR WINDOWS TO 1.1.1
NECESSARILY RESTRICTED TO, THE FOLLOWING ITEMS.
AND DRAWINGS. THE WORK INCLUDES, BUT IS NOT
COMPLETE IN STRICT ACCORDANCE WITH SPECIFICATIONS
REPLACE WINDOWS CDC 403 IN CONNECTION WITH
MATERIALS AND PERFORMING ALL OPERATIONS REQUIRED
CONTRACT CONSISTS OF FURNISHING ALL PLANT, LABOR,
A.1 WORK TO BE DONE: THE WORK COVERED BY THIS
A. DESCRIPTION OF WORK:
912-767-1581.
POC AND PROJECT MANAGER/COORDINATOR: ALETHIA CANADY.
COR AND THE POC FOR RESOLUTION.
THE SOW WILL BE BROUGHT TO THE ATTENTION OF THE
FOLLOWED. ANY DISCREPANCY BETWEEN THE DRAWING AND
DRAWINGS FOR THIS PROJECT. THE DRAWINGS ARE TO BE
THIS STATEMENT OF WORK IS INTENDED TO ENHANCE THE
OF THE DEVICES SHOWN ON THE CONTRACT DRAWINGS.
INTENDED TO COVER ALL THE NECESSARY ITEMS OR ALL
DRAWINGS. THIS SCOPE IS NARRATIVE IN NATURE AND IS NOT
INSTALLATION OF THE ITEMS AS INDICATED ON THE
MATERIALS, SUPERVISION AND SERVICES FOR THE
THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT,
FORT STEWART.
ACCORDANCE WITH ALL ENFORCEABLE CODES IN EFFECT ON
THAT IS READY FOR CONTINUOUS USE BY THE OWNER IN
CONTRACT IS TO PROVIDE A COMPLETE FINISHED PRODUCT
THIS SCOPE IS NARRATIVE IN NATURE. THE INTENT OF THIS
IJO SR-86-5J
REPLACE WINDOWS CDC 403
TECHNICAL PROVISIONS GENERAL
6.2.-PROTECTION OF EXISTING LANDSCAPING FROM DAMAGE.
6.1.-DISRUPTION OF SITE LANDSCAPING TO ACCESS BUILDING WINDOWS.
THE FOLLOWING TASKS:
6.-SITE WORK: SITE WORK ON THIS PROJECT CONSISTS PRIMARILY OF
NAMA, UL AND IEEE.
SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS OF
5.2.4.-ALL ELECTRICAL FIXTURES, EQUIPMENT, AND MATERIALS
VOLTAGE AND PHASING ON ALL PROJECTS.
5.2.3.-CONTRACTOR IS RESPONSIBLE FOR CHECKING FOR PROPER
AND THE NATIONAL FIRE PROTECTION CODE.(NFPA)
LATEST EDITION OF THE NATIONAL ELECTRICAL CODE (NEC)
5.2.2.-ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE
SPECIFYING THE EQUIPMENT.
CONTROL WIRING SHALL BE DONE UNDER THE SECTION
SHOWN OTHERWISE ON THE DRAWINGS. INTERCONNECT
SHALL BE PROVIDED WITH EQUIPMENT UNLESS SPECIFICALLY
IN OTHER DIVISIONS STARTERS AND RELATED CONTROLS
EQUIPMENT WITH OTHER TRADES. FOR EQUIPMENT FURNISHED
EQUIPMENT AND COORDINATE ALL CONNECTIONS OF
5.2.1.-PROVIDE ELECTRICAL CONNECTIONS COMPLETE TO ALL
5.2.-ELECTRICAL NOTES:
SPLIT SYSTEM AIR-CONDITIONING UNIT.
5.1.1.-PROVIDE AND INSTALL THE POWER SUPPLY FOR DUCTLESS
ROOM FOR THE FOLLOWING NEEDS:
EXISTING POWER SUPPLIED TO WINDOW UNIT IN MULTI-PURPOSE
5.1.-CONTRACTOR SHALL MODIFY AS SHOWN ON DRAWINGS THE
5.-ELECTRICAL
MANUFACTURER'S INSTALLATION INFORMATION.
4.1.-INSTALL DRAIN LINE FOR MECHANICAL UNIT AS REQUIRED BY
4.-PLUMBING
SHOWN ON PLAN.
WALK PATH AND REACH OF CHILDREN, GENERAL LOCATION
3.2.2.-INSTALL EXTERIOR UNIT ON WALL MOUNTED RACK OUT OF
3.2.1.1.-30700 BTU, 14.5 SEER, R410A, 208-230 V/1 PH/60HZ
3.2.1.-BASIS OF DESIGN MITSUBISHI MZ-D30NA
ROOM.
FOR THE COMPUTER RACKS THAT HAVE BEEN ADDED TO THIS
3.2.-INSTALL NEW DUCTLESS UNIT OF REQUIRED SIZE TO COMPENSATE
MULTI-PURPOSE ROOM.
3.1.-REMOVE EXISTING WINDOW MOUNTED HVAC UNIT IN THE
3.-HVAC
2.4.3.9.- ALUMINUM FINISH: BLACK ANODIZED ALUMINUM
2.4.3.8.4.- INTERIOR LAYER CLEAR GLASS
2.4.3.8.3.- OUTER LAYER TINTED GLASS
2.4.3.8.2.- LOW E
2.4.3.8.1.- INSULATED GLASS
2.4.3.8.- GLAZING:
END OF SECTION
FROM DAMAGE.
PROPER OPERATION. CLEAN AND PROTECT WORK
C.-RESTORE DAMAGED FINISHES AND TEST FOR
OTHER SECTIONS.
UNIFORM APPEARANCE. COORDINATE WITH WORK OF
RELATION WITH ADJACENT CONSTRUCTION AND WITH
B.-INSTALL MATERIALS AND SYSTEMS IN PROPER
SUBMITTALS.
WITH MANUFACTURER'S INSTRUCTIONS AND APPROVED
A.-INSTALL MATERIALS AND SYSTEMS IN ACCORDANCE
3.01-INSTALLATION:
PART 3 EXECUTION
2.-INSECT SCREENING.
1.-OPERATING HARDWARE.
C.-AUXILIARY MATERIALS:
B.-WINDOWS: SEE GENERAL INSTRUCTIONS
YKK, OR APPROVED EQUAL
A.-MANUFACTURERS: GRAHAM WINDOWS, KAWNEER &
2.01 MATERIALS:
PART 2 PRODUCTS
INSTRUCTIONS FOR GRADE OF WINDOW REQUIRED.
B.-PERFORMANCE: COMPLY WITH GENERAL
WITH MANUFACTURER'S INSTRUCTIONS.
HANDLE, AND STORE MATERIALS IN ACCORDANCE
YEARS. USE EXPERIENCED INSTALLERS. DELIVER,
SATISFACTORY USE IN SIMILAR SERVICE FOR THREE
MANUFACTURERS WHICH HAVE BEEN IN
REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE
A.-COMPLY WITH GOVERNING CODES AND
1.03 QUALITY ASSURANCE:
INCLUDING MAINTENANCE SCHEDULE.
SUBMIT MANUFACTURER'S MAINTENANCE DATA,
F.-MAINTENANCE DATA:
1.-WARRANTY PERIOD: 5 YEARS.
REPLACE DEFECTIVE MATERIALS.
INCLUDE LABOR AND MATERIALS TO REPAIR OR
SUBMIT MANUFACTURER'S STANDARD WARRANTY.
E.-WARRANTY:
ANTICIPATED.
SAMPLES IF VARIATION OF FINISH IS
CHARACTERISTICS AND FINISH. INCLUDE RANGE
MATERIAL SPECIFIED INDICATING VISUAL
SUBMIT TWO REPRESENTATIVE SAMPLES OF EACH
D.-SAMPLES:
ANCHORING METHODS.
INFORMATION STAMPED FOR BLAST WINDOWS AND
C. -ENGINEERS CALCULATIONS AND DESIGN
CONSTRUCTION.
CONNECTIONS, AND RELATIONSHIP WITH ADJACENT
CHARACTERISTICS, DETAILS OF CONSTRUCTION,
SUBMIT SHOP DRAWINGS INDICATING MATERIAL
B.-SHOP DRAWINGS:
AND PRODUCT USED.
INSTALLATION INSTRUCTIONS FOR EACH MATERIAL
SUBMIT MANUFACTURER'S PRODUCT DATA AND
A.-PRODUCT DATA:
1.02-SUBMITTALS:
A.-PROVIDE WINDOWS.
1.01-SUMMARY:
PART 1 GENERAL
BE HANDS ON TRAINING.
SHIFTS TOTAL, 16 HOURS SHALL BE CLASSROOM TRAINING AND 24 HOURS SHALL
A. TRAINING SHALL INCLUDE MINIMUM OF 10 LAWA PERSONNEL FOR 40 HOURS THREE
3.2 TRAINING:
APPROVED RECEPTOR.
INSTALL CONDENSATE PIPING WITH TRAP AND ROUTE FROM DRAIN PAN TO B.
2”DEFLECTION SPRING VIBRATION ISOLATORS AND SEISMIC RESTRAINTS.
INSTALL PER MANUFACTURER’S RECOMMENDATIONS. WHERE APPROPRIATE, PROVIDE A.
3.1 INSTALLATION FAN COIL UNIT
PART 3 - EXECUTION:
A. CAPABILITY TO INTERFACE WITH BAS (BUILDING AUTOMATION SYSTEM).
2.4 CONTROLS:
PRESSURE RELIEF DEVICE. 11.
HOT GAS MUFFLER. 10.
CRANKCASE HEATER. 9.
OIL LEVEL SIGHT GLASS. 8.
CHARGING VALVE. 7.
LIQUID LINE SOLENOID VALVE. 6.
SHUT-OFF VALVES ON SUCTION AND LIQUID PIPING. 5.
LIQUID LINE SIGHT GLASS AND MOISTURE INDICATOR. 4.
REPLACEABLE CORE TYPE FILTER DRIER. 3.
HOLDING CHARGE OF REFRIGERANT. 2.
CHARGE OF COMPRESSOR OIL. 1.
REFRIGERATION SPECIALTIES: FURNISH THE FOLLOWING FOR EACH CIRCUIT: H.
SUCTION AND DISCHARGE PRESSURE GAUGES. 9.
COATED STEEL WIRE SAFETY GUARDS.
CONDENSER COIL GUARD: CONDENSER FAN OPENINGS FURNISHED WITH PVC 8.
SPRAY TEST OF 1000 HOURS IN ACCORDANCE WITH ASTM B117.
COIL WITH CORROSION RESISTANT COATING CAPABLE OF WITHSTANDING SALT 7.
HOT GAS BYPASS KIT. 6.
VIBRATION ISOLATORS. 5.
DISCONNECT SWITCH. 4.
ANTI-SHORT CYCLE TIMER. 3.
TIME DELAY RELAY. 2.
CONTROLS TO PROVIDE LOW AMBIENT COOLING TO 0 DEGREES F. 1.
CONDENSING UNIT ACCESSORIES: FURNISH THE FOLLOWING ACCESSORIES: G.
PROTECTION. FURNISH HIGH EFFICIENCY FAN MOTORS.
LUBRICATED BALL BEARING TYPE MOTORS WITH BUILT-IN THERMAL OVERLOAD
DYNAMICALLY BALANCED. WIRED TO OPERATE WITH COMPRESSOR. PERMANENTLY
CONDENSER FANS AND DRIVES: DIRECT DRIVE PROPELLER FANS STATICALLY AND F.
FOR COMPRESSOR AND CONDENSER FAN MOTORS.
PRESSURE CUTOUTS. CONTROL TRANSFORMER. FURNISH MAGNETIC CONTACTORS
CONTROLS: FURNISH OPERATING AND SAFETY CONTROLS INCLUDING HIGH AND LOW E.
PER ASTM D5339.
HOURS IN BOTH SALT SPRAY TEST PER ASTM B117 AND ACID SALT SPRAY TEST
BLYGOLD POLUAL XT OR APPROVED EQUAL. COATING SHALL WITHSTAND 4,000
WITH MINIMUM 1.0 MIL. ALUMINUM IMPREGNATED POLYURETHANE COATING BY
COPPER FINS, FACTORY LEAK AND PRESSURE TESTED. COIL SHALL BE COATED
CONDENSER COIL: CONSTRUCTED OF COPPER TUBING MECHANICALLY BONDED TO D.
FIVE (5) YEAR WARRANTY.
LUBRICATION, AND INTERNAL MOTOR OVERLOAD PROTECTION. COMPRESSOR SHALL
RECIPROCATING TYPE COMPRESSORS, RESILIENTLY MOUNTED, WITH POSITIVE
REFRIGERATION CIRCUITS WITH ROTARY OR HERMETIC SEMI-HERMETIC
COMPRESSOR: SINGLE REFRIGERATION CIRCUIT OR TWO INDEPENDENT C.
COMPRESSORS, CONTROLS, CONDENSER FANS, MOTORS, AND DRIVES.
CONTROLS, AND COMPLETE WITH REMOVABLE PANELS FOR REQUIRED ACCESS TO
INSTALLATION AND COMPLETE WITH WEATHER PROTECTION FOR COMPONENTS AND
WITH MANUFACTURER'S STANDARD BAKED ENAMEL FINISH. DESIGNED FOR OUTDOOR
UNIT CASINGS: EXPOSED CASING SURFACES CONSTRUCTED OF GALVANIZED STEEL B.
MOTORS, AND UNIT CONTROLS.
CONSISTING OF CASING, COMPRESSORS, CONDENSERS, COILS, CONDENSER FANS AND
GENERAL: FACTORY ASSEMBLED AND TESTED AIR COOLED CONDENSING UNITS, A.
2.3 - CONDENSING UNIT:
(INTEGRAL WITH GRID).
UNIT SHALL BE WALL MOUNTED, CEILING MOUNTED, OR CEILING CASSETTE TYPE F.
TO 30 PERCENT EFFICIENCY BASED ON ASHRAE 52.1.
AIR FILTERS: 1 INCH THICK GLASS FIBER DISPOSABLE MEDIA IN METAL FRAMES. 25 E.
R407C OR R410A.
BY FACTORY INSTALLED THERMAL EXPANSION VALVE. REFRIGERANT SHALL BE
REFRIGERATION SYSTEM: SINGLE OR DUAL REFRIGERATION CIRCUITS CONTROLLED D.
ACID SALT SPRAY TEST PER ASTM D5339.
SHALL WITHSTAND 4,000 HOURS IN BOTH SALT SPRAY TEST PER ASTM B117 AND
POLYURETHANE COATING BY BLYGOLD POLUAL XT OR APPROVED EQUAL. COATING
SIDES. COIL SHALL BE COATED WITH MINIMUM 1.0 MIL. ALUMINUM IMPREGNATED
DOUBLE-SLOPED STAINLESS STEEL DRAIN PAN WITH PIPING CONNECTIONS ON BOTH
FINS. FACTORY LEAK TESTED UNDER WATER. REMOVABLE, PVC CONSTRUCTION,
EVAPORATOR COIL: CONSTRUCTED OF COPPER TUBES EXPANDED ONTO COPPER C.
LUBRICATED WITH BUILT-IN THERMAL OVERLOAD PROTECTION.
WITH ADJUSTABLE BELT DRIVE AND HIGH EFFICIENCY MOTOR. MOTOR PERMANENTLY
EVAPORATOR FAN: FORWARD CURVED CENTRIFUGAL TYPE, RESILIENTLY MOUNTED B.
FIBER WITH EDGES PROTECTED FROM EROSION.
CABINET. ONE INCH THICK NEOPRENE COATED ALUMINUM FOIL FACED GLASS
INSULATION: FACTORY APPLIED TO EACH SURFACE TO INSULATE ENTIRE 2.
COLLARS ON INLETS AND OUTLETS.
ACCESS PANELS: LOCATED ON BOTH SIDES OF UNIT. FURNISH WITH DUCT
PANELS: CONSTRUCTED OF GALVANIZED STEEL WITH BAKED ENAMEL FINISH. 1.
CABINET: A.
2.2 - FAN COIL UNIT:
REFRIGERANTS R-410A AND R-407C. C.
SANYO. 3.
DAIKIN. 2.
MITSUBISHI. 1.
MANUFACTURERS:B.
SPECIALTIES.
HANDLING UNIT ACCESSORIES, CONDENSING UNIT ACCESSORIES, AND REFRIGERATION
COIL, COMPRESSOR, REFRIGERATION CIRCUIT, CONDENSER, AIR FILTERS, CONTROLS, AIR
CONDENSING UNIT INCLUDING CABINET, EVAPORATOR FAN, REFRIGERANT COOLING
PRODUCT DESCRIPTION: SPLIT SYSTEM CONSISTING OF FAN COIL UNIT AND A.
2.1 SPLIT SYSTEM AIR CONDITIONING UNITS
PART 2 - PRODUCTS:
ACCORDANCE WITH ARI STANDARDS.
IN COMBINATION WITH COMPRESSORS AND EVAPORATOR COILS WHEN TESTED IN
OF PERFORMANCE (COP) NOT LESS THAN PRESCRIBED BY ASHRAE 90.1 WHEN USED
A. PERFORMANCE REQUIREMENTS: ENERGY EFFICIENCY RATING (EER) AND COEFFICIENT
1.4 - QUALITY ASSURANCE:
DETAILS, CONNECTION REQUIREMENTS, AND INCLUDE START-UP INSTRUCTIONS.
MANUFACTURER'S INSTALLATION INSTRUCTIONS: SUBMIT ASSEMBLY, SUPPORT B.
ACCESSORIES. 7.
CONTROLS. 6.
CONNECTION REQUIREMENTS.
ELECTRICAL REQUIREMENTS WITH ELECTRICAL CHARACTERISTICS AND 5.
ROUGH-IN CONNECTIONS AND CONNECTION REQUIREMENTS. 4.
WEIGHTS. 3.
DIMENSIONS. 2.
COOLING AND HEATING CAPACITIES. 1.
PRODUCT DATA: SUBMIT DATA INDICATING: A.
1.2 - SUBMITTALS:
FOR UNITS/SYSTEMS UP TO THREE TONS MAXIMUM. 3.
CONDENSING UNIT. 2.
FAN COIL UNIT. 1.
A.-SECTION INCLUDES:
1.1 SUMMARY:
PART 1 - GENERAL
2.4.3.7.- CONSTRUCTION : THERMAL BREAK TYPE
PROFESSIONAL ENGINEER.
2.4.3.6.2.- PROVIDE ANCHORAGE CALCULATIONS PREPARED BY
2.4.3.6.1.- ALL FASTENERS CONCEALED
MEET DOD ANTI-TERRORISM REQUIREMENTS:
2.4.3.6.- PROVIDE REQUIRED ATTACHMENT TO THE EXISTING STRUCTURE TO
PANE.
EXTERIOR PANE AND 57/64" LAMINATED (.030" PVB) INTERIOR
2.4.3.5.1.- INSULATED GLASS UNIT SHALL BE MINIMUM 57/64"THICK
REQUIREMENT: AT CONVENTIONAL CONSTRUCTION STANDOFF DISTANCE
2.4.3.5.- NOMINAL LAMINATED GLASS THICKNESS W/PVB INTERLAYER
2.4.3.4.- FRAMES TO MEET DEFLECTION LIMITS PER THE UFC AND ASTM
2.4.3.3.- APPLICABLE EXPLOSIVE WEIGHT: TYPE II
2.4.3.2.- APPLICABLE LEVEL OF PROTECTION: VERY LOW
2.4.3.1.2.- UFC 4-740-14 CHILD DEVELOPMENT CENTERS
AVAILABLE)
2.4.3.1.1.- UFC 4-010-01 DOD ANTI-TERRORISM (LATEST EDITION
PER:
2.4.3.1.- ENGINEER OF RECORD TO DETERMINE REQUIREMENTS OF WINDOWS
2013) "DOD MINIMUM ANTITERRORISM STANDARD FOR BUILDINGS"
REQUIREMENTS OF UFC 4-010-01( FEB. 9, 2012 WITH CHANGE 1 DATED OCT 1,
2.4.3.-BLAST MITIGATION: PROVIDE SYSTEM DESIGNED TO MEET OR EXCEED
2.4.2.2.- HEAVY COMMERCIAL GRADE, AAMA 101
CLASSIFICATION OF WINDOW REQUIRED.
AAMA/WDMA/CSA 101/I.S.2/A440-05 AND AAMA 910-93 FOR TYPE AND
2.4.2.1.- COMPLY WITH AIR, WATER AND STRUCTURAL REQUIREMENTS IN
REQUIREMENTS
2.4.2.-PERFORMANCE STANDARDS: ALUMINUM WINDOWS/STOREFRONT/ENTRANCE
2.4.1.6.- DESIGNED PER UFC 4-740-14 AND COMPLIANT WITH UFC 4-010-01
2.4.1.5.- SOLID SURFACE MATERIAL TO BE USED FOR INTERIOR SILLS.
2.4.1.4.- SCREENS FOR ALL OPERABLE WINDOWS
2.4.1.3.- SAFETY LOCK REQUIRED
2.4.1.2.- UPPER SASH IS OPERABLE
2.4.1.1.- BOTTOM SASH IS FIXED
2.4.1.- OPERABLE WINDOWS ARE TO BE ARRANGED AS SHOWN ON DRAWINGS
2.4.- WINDOWS
CONSTRUCTION.
2.3.4.- PROTECT ADJACENT STRUCTURE FROM DAMAGE DURING DEMOLITION AND
MATERIALS WILL REMAIN THE PROPERTY OF THE GOVERNMENT.
2.3.3.- ALL DEBRIS WILL BE REMOVED FROM FORT STEWART, ALL RECYCLABLE
2.3.2.- REMOVAL OF INTERIOR WINDOWS ONLY AS INDICATED ON DRAWINGS.
2.3.1.1.- PHASING NEEDED FOR WORK TO ALLOW FOR SAFETY OF CHILDREN.
2.3.1.- REMOVAL OF EXTERIOR WINDOWS AS SHOWN ON DRAWINGS.
2.3.- DEMO: WINDOWS (SEE PLANS)
AVAILABLE.
2.2.3.- ALL WINDOWS MUST COMPLY WITH UFC 4-010-01 MOST CURRENT REVISION
AHJ(COR) PRIOR TO THE START OF WORK.
2.2.2.- ALL SUBMITTALS MUST BE TURNED IN AND REVIEWED/ACCEPTED BY THE
DURING PRECONSTRUCTION MEETING PRIOR TO THE START OF WORK.
2.2.1. DEMOLITION OF EXISTING WINDOWS WILL BE PER SCHEDULE DETERMINED
DRAWINGS.
2.2.- GENERAL DESCRIPTION OF WORK: REPLACE ALL EXTERIOR WINDOWS AS SHOWN IN
CODES. ALL WORK WILL BE FOR BUILDING #403 AT FORT STEWART, GEORGIA 31314
AND RECOMMENDATIONS AND SHALL COMPLY WITH THE INTERNATIONAL BUILDING
CONSTRUCTED, TO INCLUDE BEING INSTALLED BY MANUFACTURE SPECIFICATIONS
STANDARD AND TECHNICAL TRADE PRACTICE FOR ALL ITEMS BEING INSTALLED AND
SYSTEM/SYSTEMS AS INTENDED FOR THIS PROJECT. ALL WORK WILL BE INDUSTRY
CONTRACTOR WILL PROVIDE COMPLETE FUNCTIONAL AND OPERATIONAL
CONFORM TO THE INTENT, ARE TO BE CONSIDERED PART OF THE PROJECT.
2.1.- ANY ITEM/ITEMS NOT SPECIFICALLY LISTED, BUT NORMALLY REQUIRED TO
2.- STRUCTURAL:
TBD1.7.1.- CONTRACTING OFFICER REPRESENTATIVE IS
EQUIPMENT OR LABOR IS NOT INCLUDED IN THIS CONTRACT
1.7.- UNLESS SPECIFIED IN THE SCOPE OF WORK, GOVERNMENT FURNISHED MATERIAL,
JOB SITE CONDITIONS.
1.6.1.- CONTRACTOR IS ENCOURAGED TO VISIT JOB SITE AND VERIFY ALL SITE
JUST A GUIDE; THE ACTUAL JOB SITE CONDITIONS MAY VARY.
1.6.- ALL DIMENSIONS, LOCATIONS AND SITE CONDITIONS SHOWN ON DRAWINGS ARE
AWAY.
STORAGE OF RECYCLABLE MATERIALS AND WILL HAUL THOSE MATERIALS
OF THE GOVERNMENT. DPW ENVIRONMENTAL WILL PROVIDE A DUMPSTER FOR
1.5.4.- ALL STEEL/METAL RECYCLABLE MATERIALS ARE TO REMAIN THE PROPERTY
1.5.3.- ALL SOLDER JOINTS SHALL BE LEAD FREE.
FEDERAL REGULATIONS.
1.5.2.- DISPOSAL OF OZONE DEPLETING CHEMICALS SHALL BE IAW STATE AND
IS THE RESPONSIBILITY OF THE CONTRACTOR.
STRINGENT. ACCESS TO AND/OR PURCHASE OF THESE OR ANY PUBLICATIONS
STATE ENVIRONMENTAL LAWS AND REGULATION, WHICH EVER MORE
SMACNA, NATIONAL FIRE PROTECTION ASSOCIATION, AND ALL FEDERAL AND
FACILITIES CRITERIA, LIFE SAFETY CODE, INSTALLATION DESIGN GUIDES,
CODE, NATIONAL ELECTRICAL CODE, INTERNATIONAL PLUMBING CODE, UNIFORM
1.5.1.- ALL CONSTRUCTION SHALL COMPLY WITH IAW, THE INTERNATIONAL BUILDING
GOVERNMENT FOR APPROVAL BEFORE NOTICE TO PROCEED IS PROVIDED.
1.5.- CONTRACTOR SHALL SUBMIT A HAZARD ANALYSIS AND SAFETY PLAN TO THE
AND UNUSED, FREE FROM DEFECTS.
1.4.- ALL MATERIALS AND EQUIPMENT FURNISHED BY THE CONTRACTOR SHALL BE NEW
FOR THE BLAST DESIGN OF WINDOWS.
1.3.5.- ALL WINDOW SUBMITTALS MUST BE STAMPED BY ENGINEER OF RECORD
TO START OF WORK OR THE ACQUISITION OF MATERIALS.
PRIOR1.3.4.- ALL SUBMITTALS FOR WINDOWS MUST BE SUBMITTED AND APPROVED
1.3.3.- DAILY CLEAN-UP OF THE SITE IS REQUIRED.
WINDOW TO BE REMOVED AND REPLACED.
1.3.2.-NO WORK WILL OCCUR IF CHILDREN ARE PRESENT IN THE ROOM BEYOND
OF THE WORK WITH FACILITY MANAGER.
1.3.1.- PRECONSTRUCTION MEETING WILL BE REQUIRED TO COORDINATE PHASING
CONFORM TO THE INTENT, ARE TO BE CONSIDERED PART OF THE CONTRACT.
ACCEPTANCE. ANY ITEM NOT SPECIFICALLY SHOWN BUT NORMALLY REQUIRED TO
PROVIDE A COMPLETE WORKABLE SYSTEM READY FOR THE GOVERNMENT'S
1.3. IT IS THE INTENT OF THE DRAWINGS, SPECIFICATIONS AND SCOPE OF WORK TO
SYSTEMS/CONTROLS.
AND GOVERNMENT ACCEPTANCE AND PROVIDE TRAINING FOR NEW
INSURE PROPER OPERATION ACCORDING TO MANUFACTURER'S SPECIFICATIONS
INSTALLED EQUIPMENT ITEMS. PERFORM START-UP ON ALL SYSTEMS TO
1.2.2.- CONTRACTOR SHALL PROVIDE ALL OPERATING MANUALS FOR
THE STATEMENT OF WORK AND/OR CONSTRUCTION DRAWINGS.
PROVIDE A COMPLETE SYSTEM AND COMPONENTS THEREOF, STIPULATED IN
SUPERVISION, SAFETY EQUIPMENT, LABOR AND MATERIALS NECESSARY TO
APPLIANCES, SERVICES, HOISTING, SCAFFOLDING, SUPPORTS, TOOLS,
1.2.1.- CONTRACTOR SHALL PROVIDE ALL INCIDENTALS, EQUIPMENT,
IN THE SCOPE OF WORK FOR GOVERNMENT APPROVAL.
1.2.- CONTRACTOR SHALL PROVIDE EQUIPMENT AND MATERIAL SUBMITTALS AS SPECIFIED
THE MINIMUM REQUIREMENTS OF NAMA, UL AND IEEE.
1.1.- ALL ELECTRICAL FIXTURES, EQUIPMENT, AND MATERIALS SHALL MEET OR EXCEED
1.- GENERAL NOTES:
GENERAL INSTRUCTIONS:
REVISION DATE DESCRIPTION BY
DRAWING NUMBER
OFFICE OF THE ENGINEER
LIBERTY COUNTY GEORGIA
DESIGN BY: DATE
SCALE: DRAWN BY:
FORT STEWART, GEORGIA
FT. STEWART
SHEET OF
JMH
"8
5'-11
4'-0"
13'-11"
"2
4'-
10'-0" "2
9'-11
11'-9"
"4
15'-4
15'-5"
"2
11'-11
WINDOW REPLACEMENT BLDG 403
FS-3802ALETHIA CANADY 11/18/15
1/2" = 1'-0"
WALL MOUNTING BRACKET
NOT TO SCALE
NOTES:
OPENING 'B2' TYPICAL
OPENING 'E1' OPENING 'E2' OPENING 'E3'
OPENING 'D1' OPENING 'D2'
OPENING 'D3' OPENING 'D4'
OPENING 'A1' OPENING 'C1'
55A-4
IJO# SR-86-5J
REPLACE WINDOWS BLDG 403
A
3 5
DETAIL
ARCHITECTURAL NOTES:
MECHANICAL NOTES:
208-230V/ 1 Ph/ 60hz OR EQUAL
BASIS OF DESIGN MITSUBISHI (MZ-D30NA) 30700 BTU, 14.5 SEER, R410A,04.
REACH OF CHILDREN, GENERAL LOCATION SHOWN ON PLAN.
INSTALL EXTERIOR UNIT ON WALL MOUNTED RACK OUT OF WALK PATH AND03.
COMPUTER RACKS THAT HAVE BEEN ADDED TO THIS ROOM.
INSTALL NEW DUCTLESS UNIT OF REQUIRD SIZE TO COMPENSATE FOR THE02.
REMOVE EXISTING WINDOW MOUNTED HVAC UNIT IN THE MULTI-PURPOSE ROOM.01.
DATE UNKNOWN
IN PLACE. INSTALL
WINDOWS CURRENTLY
METAL FRAMED
NOT TO SCALE
3 5
EXISTING SECTION
TO BE USE FOR INFORMATION ONLY
TYPICAL EXTERIOR WALLS AT WINDOWS
FOR CHILDREN.
FINISHED UNDISTURBED GRADE TO ENSURE SAFETY
MAINTAINING A MINIMUM OF 48" ABOVE EXISTING
WALL BRACKET OR EQUAL TO EXISTING WALL
CONTRACTOR SHALL PROVIDE AND ATTACH CWMB1
IJO# SR-85-5J
3/10/16 ATFP WINDOW NOTES REVISED ARC
B1, B3, B4, B5 & B6 SIMILAR
MEET ATFP AND CDC UFC'S SEE PAGE 4 0F 5 FOR DETAILS
ENGINEER OF RECORD SHALL PROVIDE GLAZING AND FRAME REQUIREMENTS TOC.
BLAST MITIGATION TO MEET UFC REQUIREMENTSB.
ANCHORAGE CALCULATIONSA.
ENGINEER OF RECORD MUST PROVIDE THE FOLLOWING:04.
UFC 4-740-14 SECTION 7-1.3.1 GENERAL WINDOW CRITERIAB.
UFC 4-010-01 MOST CURRENT REVISION AVAILABLEA.
ALL WINDOWS MUST COMPLY WITH THE FOLLOWING:03.
ALL EXISTING WINDOWS ARE SET IN STUD/MASONARY OPENINGS 02.
ALL EXISTING VERTICAL WINDOW MULLIONS ARE 1 1/2" UNLESS OTHERWISE NOTED01.
| 3802-01 G-1 Scanned Cover |
| 3802-02 A-1 Existing Arc Site Plan |
| 3802-03 A-2 Existing Floor Plan |
| 3802-04 A-3 Specifications |
| 3802-05 A-4 Details |
File details come from the government source that posted it. Updated .